CN113642073A - Design and construction method of lightweight support of cable tower beam - Google Patents

Design and construction method of lightweight support of cable tower beam Download PDF

Info

Publication number
CN113642073A
CN113642073A CN202110899218.5A CN202110899218A CN113642073A CN 113642073 A CN113642073 A CN 113642073A CN 202110899218 A CN202110899218 A CN 202110899218A CN 113642073 A CN113642073 A CN 113642073A
Authority
CN
China
Prior art keywords
support
bracket
pouring
load
design
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110899218.5A
Other languages
Chinese (zh)
Other versions
CN113642073B (en
Inventor
谢朋林
高璞
王殿永
赵文磊
黎人亮
杨毅辉
耿文宾
陈诗祥
李明
刘传东
周俊龙
强伟亮
赵云雷
张敏月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China State Construction Bridge Corp Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China State Construction Bridge Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China State Construction Bridge Corp Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN202110899218.5A priority Critical patent/CN113642073B/en
Publication of CN113642073A publication Critical patent/CN113642073A/en
Application granted granted Critical
Publication of CN113642073B publication Critical patent/CN113642073B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/23Design optimisation, verification or simulation using finite element methods [FEM] or finite difference methods [FDM]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/14Force analysis or force optimisation, e.g. static or dynamic forces

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • General Physics & Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Bridges Or Land Bridges (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention provides a design and construction method of a lightweight bracket of a cable tower beam, which comprises the following specific steps: dividing all pouring layers of the cable tower beam and determining the height of each pouring layer; preliminarily drawing up the structural form of the beam support and the type and parameters of the section of the support; determining the design load of the support structure; re-determining the type and parameters of the section of the bracket, and comparing the type and parameters with the preliminarily formulated result; repeating the first two steps until the deviation of the load values borne by the bracket compared before and after does not exceed the limit value N%; installing a support structure on site, and making support observation preparation; carrying out a support prepressing experiment; and (4) alternately carrying out beam layered pouring and bracket observation to finish beam pouring. Compared with the traditional method, the method can reduce the material consumption of the beam bracket and realize cost reduction and efficiency improvement; a design mode of multiple simulation and optimization is adopted, so that the design precision is ensured and the safety is improved; the method is applicable to various layered pouring constructions, and has a very wide application range.

Description

Design and construction method of lightweight support of cable tower beam
Technical Field
The invention relates to the technical field of bridge construction, in particular to a design and construction method of a lightweight support of a cable tower beam.
Background
The large-span bridge cable tower beam generally adopts a layered pouring method. For the design and construction of the beam support, the traditional method takes the dead weight of the whole beam and the live loads of personnel machines and tools and the like as design loads. In the traditional method, a portal rigid frame is not fully utilized, namely, the self bearing capacity of the portal frame structure is formed by a beam structure which is cast and formed firstly and two tower columns, so that the structural design of a beam support is unreasonable, the design load of the support is far greater than the actual load, and the waste of resources is caused.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides a design and construction method of a lightweight bracket of a cable tower beam.
In order to achieve the purpose, the invention adopts the following technical scheme:
a design method of a lightweight support of a cable tower beam comprises the following specific steps:
dividing all pouring layers of a cable tower beam and determining the height of each pouring layer;
preliminarily drawing up the structural form of the beam support and the type and parameters of the cross section of the support according to the division result of the step one;
thirdly, simulating and analyzing the rigidity ratio of the portal rigid frame and the preliminarily formulated result of the second step by using simulation software, calculating load values of the upper-layer beam load distributed on the portal rigid frame and the support, and determining the structural design load of the support;
step four, simulating the design of the optimized support of the load born by the support according to the step three, re-determining the section type and parameters of the support, re-simulating and analyzing the load value of the upper-layer beam distributed on the optimized support, and comparing the value with the value of the load born by the support in the preliminary set result;
and step five, repeating the step three and the step four until the deviation of the load values borne by the bracket compared before and after does not exceed the limit value N%, and finishing the final design of the bracket.
Furthermore, in the second step, a tentative value Q ═ Q1+ (Q2+ Q3+. + Qj) × a% of the design load of the preliminary design of the beam support, where Qi is the weight of the concrete of the i-th layer of the layer, and a% is a proportional value, and through multiple engineering statistics, the number of times of repeated design can be effectively reduced when the value is 60%; and (3) primarily designing parameters such as a support structure form, a support section type and the like by taking the Q as a temporary design load and combining the spatial position and the type of the cross beam.
Furthermore, the 'portal rigid frame' in the third step is composed of two tower columns and the cable tower beam which is cast and formed for the first time, the 'portal rigid frame' is simulated by adopting beam units, the tower column finite element model needs to simulate variable cross section details, the cable tower beam which is cast and formed for the first time is simulated by adopting the beam units, and the cable tower beam finite element model which is cast and formed for the first time is directly connected with the tower column finite element model.
Further, the structure of the support in the third step is a preliminary design form in the second step, the support is simulated by adopting a beam unit, the support is built in a column base embedded part, and the root part of the support is provided with hinging constraint; and elastic connection is established between the support finite element model and the beam finite element model.
Further, the simulation analysis in the third step specifically includes: comparing and analyzing the rigidity of the portal rigid frame and the support by adopting a finite element method, applying loads of a beam structure to be poured on the portal rigid frame and the support finite element model, and applying the beam to be poured on the cable tower beam structure which is poured and formed for the first time in a uniformly distributed load mode; the load is distributed on the portal rigid frame and the support in a proportional relation with the rigidity of the support, and is expressed in the form of the counter force of the support; extracting the vertical counter force of the support of the tower column, namely part of load borne by the portal rigid frame; the counterforce of the column base of the bracket is part of the load borne by the bracket; and then the load sharing value of the layered beam to be poured on the support is obtained.
A construction method of a lightweight bracket of a cable tower beam comprises the following specific steps:
step A, adopting the final design prefabricated support obtained by the design method, installing a support structure on site, and making support observation preparation;
step B, carrying out a support prepressing experiment; the inelastic deformation and the uneven settlement of the bracket are eliminated, and the safety and the stability of the bracket structure are tested;
and step C, alternately carrying out beam layered pouring and bracket observation to finish beam pouring.
Further, the stent observation in the step C specifically includes: arranging an observation mark at a place which does not influence the construction and has a good visual field at the upper part of the bracket, and preparing settlement observation; according to Hooke's law, the size of the vertical load borne by the bracket can be deduced according to the compression settlement of the bracket.
Further, the step C specifically comprises: after the pre-pressing experiment is finished, cleaning the bracket; observing the initial reading of the support, pouring a first layer of cross beam, and observing the second reading of the support at the same temperature time period after pouring; and pouring the second layer of beam after the first layer of beam reaches the design strength, observing the support for reading again in the same temperature time period after pouring, and repeating the steps until the cable tower beam is poured alternately by layered pouring of the beam and settlement observation of the support.
The invention has the beneficial effects that:
(1) compared with the traditional method, the method can reduce the design load of the bracket by 20-25 percent, reduce the material consumption of the beam bracket by 20-25 percent, realize cost reduction and efficiency improvement and simultaneously realize certain breakthrough on the traditional cable tower beam construction technology;
(2) the invention adopts a design mode of multiple simulation and optimization, thereby ensuring the design precision and improving the safety;
(3) the method is applicable to layered pouring construction of bridge bent caps, layered pouring construction of thick-layer floor slabs of house buildings, layered pouring construction of deep beams and the like, and has a very wide application range.
Drawings
FIG. 1 is a flow chart of the present invention;
FIG. 2 is a schematic diagram of a first embodiment;
FIG. 3 is a schematic view of the second embodiment;
the following detailed description will be made in conjunction with embodiments of the present invention with reference to the accompanying drawings.
Detailed Description
The invention is further illustrated by the following examples:
example one
The design method of the embodiment comprises the following specific steps:
dividing all pouring layers of a cable tower beam and determining the height of each pouring layer, wherein a horizontal beam is divided into two layers with equal height;
preliminarily drawing up the structural form of the beam support and the type and parameters of the cross section of the support according to the division result of the step one; the tentative value Q of the design load preliminarily designed by the beam support is Q1+ Q2A%, wherein Qi is the weight of the concrete of the ith layered layer, and the proportion value A% is 60%; taking Q as a temporary design load, and combining the spatial position and the type of the cross beam to carry out preliminary design on parameters such as the structural form of the bracket, the type of the section of the bracket and the like, wherein the preliminary design is a floor type steel pipe bracket;
thirdly, simulation software is used for carrying out simulation analysis on the rigidity ratio of the 'portal rigid frame' to the preliminarily drawn result in the second step, the simulation software can adopt Midas, SAP, Ansys, bridge doctor and other simulation software commonly used in the field, Midas is adopted in the embodiment, the load value of the upper-layer beam load distributed on the 'portal rigid frame' and the support is calculated, and the structural design load of the support is determined; the portal rigid frame is formed by two tower columns and a concave cable tower beam which is poured and formed for the first time, the portal rigid frame is simulated by a beam unit, a tower column finite element model needs to simulate variable section details, the cable tower beam which is poured and formed for the first time is simulated by the beam unit, and the cable tower beam finite element model which is poured and formed for the first time is directly connected with the tower column finite element model; the support is simulated by adopting a beam unit, the support is built on a column base embedded part, and the root part of the support is provided with hinged constraint; elastic connection is established between the bracket finite element model and the beam finite element model; comparing and analyzing the rigidity of the portal rigid frame and the support by adopting a finite element method, applying loads of a beam structure to be poured on the portal rigid frame and the support finite element model, and applying the beam to be poured on the cable tower beam structure which is poured and formed for the first time in a uniformly distributed load mode; the load is distributed on the portal rigid frame and the support in a proportional relation with the rigidity of the support, and is expressed in the form of the counter force of the support; extracting the vertical counter force of the support of the tower column, namely part of load borne by the portal rigid frame; the counterforce of the column base of the bracket is part of the load borne by the bracket; the load sharing value of the layered beam to be poured on the support is obtained;
step four, simulating the design of the optimized support of the load born by the support according to the step three, re-determining the section type and parameters of the support, re-simulating and analyzing the load value of the upper-layer beam distributed on the optimized support, and comparing the value with the value of the load born by the support in the preliminary set result;
and step five, repeating the step three and the step four until the deviation of the load values borne by the bracket compared before and after does not exceed the limit value of 5 percent, and finishing the final design of the bracket.
The construction method of the embodiment comprises the following specific steps:
step A, adopting the final design prefabricated support obtained by the design method, installing a support structure on site, and making support observation preparation;
step B, carrying out a support prepressing experiment; the inelastic deformation and the uneven settlement of the bracket are eliminated, and the safety and the stability of the bracket structure are tested;
step C, alternately performing beam layered pouring and bracket observation, finishing beam pouring, and cleaning the bracket after the pre-compaction is finished; observing the initial reading of the support, pouring a first layer of cross beam, and observing the second reading of the support at the same temperature time period after pouring; pouring the second layer of beams after the first layer of beams reach the designed strength, observing the support at the same temperature time period after pouring, reading again, and repeating the steps until the cable tower beam pouring is finished;
wherein, the support is observed specifically to be: arranging an observation mark at a place which does not influence the construction and has a good visual field at the upper part of the bracket, and preparing settlement observation; according to Hooke's law, the size of the vertical load borne by the bracket can be deduced according to the compression settlement of the bracket.
Example two
The design method of the embodiment comprises the following specific steps:
dividing all pouring layers of a cable tower beam and determining the height of each pouring layer, wherein the arc-shaped beam is divided into four layers in the embodiment, and closure is realized after the front three layers of beams are poured, so that Q1 in the original equation is the sum of the quality of the front three layers of concrete in the embodiment;
preliminarily drawing up the structural form of the beam support and the type and parameters of the cross section of the support according to the division result of the step one; the tentatively determined value Q of the design load preliminarily designed by the beam support is (Q1+ Q2+ Q3) + Q4A%, and the proportion value A% is 60%; taking Q as a temporary design load, and combining the spatial position and the type of the cross beam to carry out preliminary design on parameters such as the structural form of the bracket, the type of the section of the bracket and the like, wherein the preliminary design is a pre-buried bracket type bracket;
thirdly, simulation software is used for carrying out simulation analysis on the rigidity ratio of the 'portal rigid frame' to the preliminarily drawn result in the second step, the simulation software can adopt Midas, SAP, Ansys, bridge doctor and other simulation software commonly used in the field, Midas is adopted in the embodiment, the load value of the upper-layer beam load distributed on the 'portal rigid frame' and the support is calculated, and the structural design load of the support is determined; the portal rigid frame is formed by two tower columns and an arc cable tower beam poured and formed for the first three times, the portal rigid frame is simulated by a beam unit, a tower column finite element model needs to simulate variable section details, the arc cable tower beam poured and formed for the first three times is simulated by the beam unit, and the arc cable tower beam finite element model poured and formed for the first three times is directly connected with the tower column finite element model; the support is simulated by adopting a beam unit, the support is built on a column base embedded part, and the root part of the support is provided with hinged constraint; elastic connection is established between the bracket finite element model and the beam finite element model; comparing and analyzing the rigidity of the portal rigid frame and the support by adopting a finite element method, applying loads of a beam structure to be poured on the portal rigid frame and the support finite element model, and applying the beam to be poured on the arc cable tower beam structure which is poured and formed in the previous three times in a uniformly distributed load manner; the load is distributed on the portal rigid frame and the support in a proportional relation with the rigidity of the support, and is expressed in the form of the counter force of the support; extracting the vertical counter force of the support of the tower column, namely part of load borne by the portal rigid frame; the counterforce of the column base of the bracket is part of the load borne by the bracket; the load sharing value of the layered beam to be poured on the support is obtained;
step four, simulating the design of the optimized support of the load born by the support according to the step three, re-determining the section type and parameters of the support, re-simulating and analyzing the load value of the upper-layer beam distributed on the optimized support, and comparing the value with the value of the load born by the support in the preliminary set result;
and step five, repeating the step three and the step four until the deviation of the load values borne by the bracket compared before and after does not exceed the limit value of 5 percent, and finishing the final design of the bracket.
The construction method of the embodiment comprises the following specific steps:
step A, adopting the final design prefabricated support obtained by the design method, installing a support structure on site, and making support observation preparation;
step B, carrying out a support prepressing experiment; the inelastic deformation and the uneven settlement of the bracket are eliminated, and the safety and the stability of the bracket structure are tested;
step C, alternately performing beam layered pouring and bracket observation, finishing beam pouring, and cleaning the bracket after the pre-compaction is finished; observing the initial reading of the support, pouring a first layer of cross beam, and observing the second reading of the support at the same temperature time period after pouring; pouring the second layer of beams after the first layer of beams reach the designed strength, observing the support at the same temperature time period after pouring, reading again, and repeating the steps until the cable tower beam pouring is finished;
wherein, the support is observed specifically to be: arranging an observation mark at a place which does not influence the construction and has a good visual field at the upper part of the bracket, and preparing settlement observation; according to Hooke's law, the size of the vertical load borne by the bracket can be deduced according to the compression settlement of the bracket.
The present invention has been described in connection with the specific embodiments, and it is obvious that the specific implementation of the present invention is not limited by the above-mentioned manner, and it is within the protection scope of the present invention as long as various modifications are made by using the method concept and technical solution of the present invention, or the present invention is directly applied to other occasions without modification.

Claims (8)

1. A design method of a lightweight support of a cable tower beam is characterized by comprising the following specific steps:
dividing all pouring layers of a cable tower beam and determining the height of each pouring layer;
preliminarily drawing up the structural form of the beam support and the type and parameters of the cross section of the support according to the division result of the step one;
thirdly, simulating and analyzing the rigidity ratio of the portal rigid frame and the preliminarily formulated result of the second step by using simulation software, calculating load values of the upper-layer beam load distributed on the portal rigid frame and the support, and determining the structural design load of the support;
step four, simulating the design of the optimized support of the load born by the support according to the step three, re-determining the section type and parameters of the support, re-simulating and analyzing the load value of the upper-layer beam distributed on the optimized support, and comparing the value with the value of the load born by the support in the preliminary set result;
and step five, repeating the step three and the step four until the deviation of the load values borne by the bracket compared before and after does not exceed the limit value N%, and finishing the final design of the bracket.
2. The method for designing the lightweight bracket of the cable tower beam as claimed in claim 1, wherein in the second step, the tentative value of the design load of the preliminary design of the beam bracket is Q1+ (Q2+ Q3+. + Qj) a%, where Qi is the weight of the concrete in the i-th layer and a% is a proportional value; and (3) primarily designing parameters such as a support structure form, a support section type and the like by taking the Q as a temporary design load and combining the spatial position and the type of the cross beam.
3. The design method of a cable tower beam lightweight support according to claim 1, characterized in that in step three, a "portal rigid frame" is composed of two tower columns and a cable tower beam formed by first pouring, the "portal rigid frame" is simulated by using beam units, a tower column finite element model needs to simulate variable section details, the cable tower beam formed by first pouring is simulated by using beam units, and the cable tower beam finite element model formed by first pouring is directly connected with the tower column finite element model.
4. The design method of the cable tower beam lightweight bracket according to claim 3, characterized in that the structure of the bracket in the third step is a preliminary design form in the second step, the bracket is simulated by a beam unit, the bracket is built up in a column foot embedded part, and the root of the bracket is provided with a hinged constraint; and elastic connection is established between the support finite element model and the beam finite element model.
5. The method for designing the lightweight bracket of the cable tower beam according to claim 4, wherein the simulation analysis in the third step is specifically as follows: comparing and analyzing the rigidity of the portal rigid frame and the support by adopting a finite element method, applying loads of a beam structure to be poured on the portal rigid frame and the support finite element model, and applying the beam to be poured on the cable tower beam structure which is poured and formed for the first time in a uniformly distributed load mode; the load is distributed on the portal rigid frame and the support in a proportional relation with the rigidity of the support, and is expressed in the form of the counter force of the support; extracting the vertical counter force of the support of the tower column, namely part of load borne by the portal rigid frame; the counterforce of the column base of the bracket is part of the load borne by the bracket; and then the load sharing value of the layered beam to be poured on the support is obtained.
6. A construction method of a lightweight support of a cable tower beam is characterized by comprising the following specific steps:
step A, adopting a prefabricated support with final design completed by any one of claims 1-5, installing a support structure on site, and preparing for support observation;
step B, carrying out a support prepressing experiment; the inelastic deformation and the uneven settlement of the bracket are eliminated, and the safety and the stability of the bracket structure are tested;
and step C, alternately carrying out beam layered pouring and bracket observation to finish beam pouring.
7. The construction method of the cable tower beam lightweight bracket according to claim 6, further characterized in that the bracket observation in the step C is specifically: arranging an observation mark at a place which does not influence the construction and has a good visual field at the upper part of the bracket, and preparing settlement observation; according to Hooke's law, the size of the vertical load borne by the bracket can be deduced according to the compression settlement of the bracket.
8. The construction method of the cable tower beam lightweight bracket according to claim 6, wherein the step C is specifically: after the pre-pressing experiment is finished, cleaning the bracket; observing the initial reading of the support, pouring a first layer of cross beam, and observing the second reading of the support at the same temperature time period after pouring; and pouring the second layer of beam after the first layer of beam reaches the design strength, observing the support for reading again in the same temperature time period after pouring, and repeating the steps until the cable tower beam is poured alternately by layered pouring of the beam and settlement observation of the support.
CN202110899218.5A 2021-08-06 2021-08-06 Design and construction method of lightweight bracket of cable tower beam Active CN113642073B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110899218.5A CN113642073B (en) 2021-08-06 2021-08-06 Design and construction method of lightweight bracket of cable tower beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110899218.5A CN113642073B (en) 2021-08-06 2021-08-06 Design and construction method of lightweight bracket of cable tower beam

Publications (2)

Publication Number Publication Date
CN113642073A true CN113642073A (en) 2021-11-12
CN113642073B CN113642073B (en) 2024-03-22

Family

ID=78419867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110899218.5A Active CN113642073B (en) 2021-08-06 2021-08-06 Design and construction method of lightweight bracket of cable tower beam

Country Status (1)

Country Link
CN (1) CN113642073B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855667A (en) * 2022-06-21 2022-08-05 中交公路规划设计院有限公司 Modularized multifunctional integrated traffic portal frame and design method and installation method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106650130A (en) * 2016-12-28 2017-05-10 湖南宝信云建筑综合服务平台股份有限公司 Design method for large-span steel frame structure
CN107905109A (en) * 2017-11-21 2018-04-13 重庆建工市政交通工程有限责任公司 The loads such as the cast-in-place platform simulation of great-leap-forward bridge are segmented precompressed construction method
CN109740280A (en) * 2019-01-14 2019-05-10 江西集银科技有限公司 A kind of bridge hanging basket parameter calculates and emulation mode
CN111576231A (en) * 2020-05-28 2020-08-25 广西交科集团有限公司 Optimization design method for layered pouring concrete beam of upper bracket of soft foundation
CN112195797A (en) * 2020-08-21 2021-01-08 中铁五局集团第四工程有限责任公司 Closure construction method for continuous beam bridge
CN112784333A (en) * 2020-12-22 2021-05-11 中冶南方城市建设工程技术有限公司 Design method of cast-in-place concrete box girder beam

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106650130A (en) * 2016-12-28 2017-05-10 湖南宝信云建筑综合服务平台股份有限公司 Design method for large-span steel frame structure
CN107905109A (en) * 2017-11-21 2018-04-13 重庆建工市政交通工程有限责任公司 The loads such as the cast-in-place platform simulation of great-leap-forward bridge are segmented precompressed construction method
CN109740280A (en) * 2019-01-14 2019-05-10 江西集银科技有限公司 A kind of bridge hanging basket parameter calculates and emulation mode
CN111576231A (en) * 2020-05-28 2020-08-25 广西交科集团有限公司 Optimization design method for layered pouring concrete beam of upper bracket of soft foundation
CN112195797A (en) * 2020-08-21 2021-01-08 中铁五局集团第四工程有限责任公司 Closure construction method for continuous beam bridge
CN112784333A (en) * 2020-12-22 2021-05-11 中冶南方城市建设工程技术有限公司 Design method of cast-in-place concrete box girder beam

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855667A (en) * 2022-06-21 2022-08-05 中交公路规划设计院有限公司 Modularized multifunctional integrated traffic portal frame and design method and installation method thereof
WO2023246476A1 (en) * 2022-06-21 2023-12-28 中交公路规划设计院有限公司 Modular multifunctional integrated traffic gantry, and design method and mounting method therefor

Also Published As

Publication number Publication date
CN113642073B (en) 2024-03-22

Similar Documents

Publication Publication Date Title
CN108319755B (en) Whole-process optimization method for construction of super high-rise hydraulic climbing formwork scaffold
CN109811931A (en) A kind of fabricated shear wall building structure and its construction method based on BIM
CN101200916B (en) Construction method of prestressed suspension type building structure
CN115048695B (en) Intelligent arrangement system and method for formwork support frames of house building engineering
CN101566013A (en) Main factory building structure system for large-scale thermal power plant
CN101736909A (en) Method for restoring building construction with bottom frame posts damaged by vibration
CN111395532A (en) Installation and construction method for large-span half-opening elliptical spherical reticulated shell
CN112195797B (en) Closure construction method for continuous beam bridge
CN113642073A (en) Design and construction method of lightweight support of cable tower beam
CN105302938B (en) A kind of assembly type Internal Force of Truss computational methods
CN114781047A (en) Dynamo-based concrete beam and slab template system internal force calculation method
CN110206153B (en) Reverse construction method for steel reinforced concrete structure
CN108416076A (en) A kind of assembled architecture design method based on BIM technology
Fan et al. Investigation of construction vertical deformation and pre-deformation control for three super high-rise buildings
CN111797449B (en) Method for judging reasonable height of layered pouring concrete beam
Ma et al. Vertical deformation analysis of a high‐rise building with high‐position connections
CN103161322A (en) Reinforcing method and reinforcing structure of improvement of original construction floor structure
Wang et al. Seismic collapse resistance performance on out-jacketing frames with concrete-encased CFST columns for adding storeys
CN207436487U (en) A kind of cylindrical concrete construction form and shoring system
CN111783189A (en) Method for judging reasonable bracket height of layered pouring concrete
CN112883621A (en) Method for acquiring positions of steel bar joints in irregular plate column shear wall under finite element analysis
Pei et al. Design and key construction technology of steel-concrete-steel sandwich composite pylon for a large span cable-stayed bridge
CN104318014A (en) Computing method of binary simulation steel and concrete combined members
CN111709067B (en) Assembly type framework structure automatic splitting optimization method based on LINGO software
Lv et al. Seismic Performance of precast concrete frame with innovative assembly pattern

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant