CN109610323A - A kind of bridge cantilever construction Hanging Basket equipment suspension system - Google Patents

A kind of bridge cantilever construction Hanging Basket equipment suspension system Download PDF

Info

Publication number
CN109610323A
CN109610323A CN201811496494.1A CN201811496494A CN109610323A CN 109610323 A CN109610323 A CN 109610323A CN 201811496494 A CN201811496494 A CN 201811496494A CN 109610323 A CN109610323 A CN 109610323A
Authority
CN
China
Prior art keywords
guardrail
type steel
square type
hanging basket
suspension system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811496494.1A
Other languages
Chinese (zh)
Inventor
欧阳玉平
蒋水龙
曾凡荣
周庆文
邱素珍
任伟铭
江志伟
郑天禹
胡泽闽
黄渝菊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Jiyin Technology Co Ltd
Original Assignee
Jiangxi Jiyin Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Jiyin Technology Co Ltd filed Critical Jiangxi Jiyin Technology Co Ltd
Priority to CN201811496494.1A priority Critical patent/CN109610323A/en
Publication of CN109610323A publication Critical patent/CN109610323A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of bridge cantilever construction Hanging Basket equipment suspension system, applied in the cradle construction equipment of construction, including preceding upper beam, upper guardrail, lower guardrail, carry guardrail, sunpender, hanging box, lower front suspended beam, it is lower after overarm, side form, inner template, end template and bottom girder.The present invention can make load-bearing capacity be substantially improved according to distance between different bridges arbitrarily relatively reasonable each suspension centre of adjustment, and bending resistance square ability is prominent, and structure is simple, quick detachable installation, and conformability is good.

Description

A kind of bridge cantilever construction Hanging Basket equipment suspension system
Technical field
The present invention relates to Hanging Basket fields, and in particular to a kind of bridge cantilever construction Hanging Basket equipment suspension system.
Background technique
Bridge construction is an important ring for road traffic construction, no matter the shape or construction environment of bridge, Hanging Basket are bridges One of key equipment of construction, Hanging Basket are the capital equipments in cantilever construction, by structure type can be divided into truss-like, cable-stayed type, Fashioned iron formula and 4 kinds hybrid.Hanging Basket is from heavy and light, structure is simple, more stable and stronger, moves forward and is convenient to mount and dismount, has stronger weigh Usability is answered, deforms the features such as small after stress, thus obtains large-scale application.
With the development of bridge technology, the span of bridge is big, and Hanging Basket equipment load-carrying requires also to increase accordingly, and Hanging Basket equipment is poured Building position can reach one hundred ton of number of weight, and Hanging Basket is fixed in equipment by suspension system, and suspension system in the prior art is also Heavy load requirement cannot ideally be met.
Summary of the invention
The problem of being proposed according to background technique, the present invention provide a kind of bridge cantilever construction Hanging Basket equipment suspension system to solve Certainly, next the present invention is done and is further illustrated.
A kind of bridge cantilever construction Hanging Basket equipment suspension system, applied in the cradle construction equipment of construction, feature exists In including preceding upper beam, upper guardrail, lower guardrail, carry guardrail, sunpender, hanging box, lower front suspended beam, lower rear overarm, side form, internal model Plate, end template and bottom girder;Preceding upper beam include two pieces mutually simultaneously, and the square type steel being bolted, square type steel two sides are equipped with Stiffening plate, bolt-through stiffening plate, there are gap between two square type steel, both ends are equipped with liner, the side of square type steel in square type steel Cover board is set, and cover board is equipped with two opposite crect ears, and crect ear two sides are equipped with reinforcing rib;Upper guardrail, square type are set on square type steel Gap between steel is equipped with sunpender, and sunpender connects lower front beam by hanging box, lower guardrail is arranged on lower front beam;Lower front beam is logical It crosses bottom girder and connects lower rear cross beam, lower rear cross beam is equipped with carry guardrail, and bottom girder is equipped with end template;Lower front beam and it is lower after Two outsides are equipped with side form between crossbeam, and the side form includes side template and plays the outer positioning beam of fixed function to side template.Into one " recessed " shape is presented in step ground, liner, and the liner recess in two torch fashioned iron is oppositely arranged.
Further, stiffening plate is welded between liner and square type steel.
Further, backing plate is equipped with above sunpender;Increase the contact face with square type steel.
Further, side template is connected with side form frame.
The utility model has the advantages that compared with prior art, the present invention can be according to different bridges arbitrarily relatively reasonable each suspension centre of adjustment Between distance load-bearing capacity is substantially improved, bending resistance square ability is prominent, and structure is simple, quick detachable installation, and conformability is good.
Detailed description of the invention
Fig. 1: the structural schematic diagram of the present apparatus;
Fig. 2: the structural schematic diagram above hung oneself from a beam;
Fig. 3: the partial structure diagram above hung oneself from a beam;
Fig. 4 a: partial structural diagram of the present apparatus;
Fig. 5: another partial structural diagram of the present apparatus;
Fig. 6: the partial structural diagram of side form;
Fig. 7: the present apparatus is applied to the effect diagram of bridge;
In figure: upper overarm before 1-;11- crossbeam;12- bolt;13- stiffening plate;14- liner;15- heelpiece;16- cover board;17- Crect ear;18- reinforcing rib;The upper guardrail of 2-;Guardrail under 21-;22- carry guardrail;3- sunpender;31- hanging box;32- panel;Front overhang under 4- Beam;Overarm after under 5-;6- side form;61- side template;62- external mold grillage;7- inner template;8- end template;9- bottom girder.
Specific embodiment
Next a specific embodiment of the invention is set forth in conjunction with attached drawing.
A kind of bridge cantilever construction Hanging Basket equipment suspension system, applied in the cradle construction equipment of construction, including connection The upper overarm 1 before Hanging Basket equipment diamond shape frame, suspension system are arranged in Hanging Basket equipment by preceding upper overarm 1.
With reference to attached drawing 2,3, preceding upper overarm 1 includes the two opposite crossbeams 11 connected by bolt 12, and 11 two sides of crossbeam are equipped with Stiffening plate 13, bolt 12 complete the connection to crossbeam 11 through stiffening plate 13, and existing stiffening plate 13 makes cross between two crossbeams Gap is formed between beam, crossbeam 11 uses rectangle steel;Both ends in crossbeam 11 are respectively provided with a promotion crossbeam bending resistance square ability " recessed " shape is presented in liner 14, liner, and 14 recess of liner in two crossbeams is oppositely arranged, and is welded with bottom between liner 14 and crossbeam 11 Pad 15, depth of the heelpiece 15 in crossbeam 11 are 10mm, and cover board 16 is arranged in the side of crossbeam 11, and cover board 16 is equipped with opposite Two crect ears 17,17 two sides of crect ear are reinforced fixing by reinforcing rib 18.
Overarm 1 is equipped with upper guardrail 2, is formed between crossbeam and is equipped with sunpender 3 in gap, and sunpender 3 is increased by panel 32 With the contact face of crossbeam 11, as shown in Fig. 4;Lower front suspended beam 4 is connected by hanging box 31 below sunpender 3, lower front suspended beam 4 passes through Four sunpenders are worn, the hanging box 4 of connection completes the fixation to lower front suspended beam 4, and lower front suspended beam 4 is equipped with lower guardrail 21, such as 5 institute of attached drawing Show;Lower front suspended beam 4 connects lower outer crossbeam 5 by bottom girder 9, and lower outer crossbeam 5 is equipped with the carry guardrail walked for construction personnel 22,9 top of bottom girder is equipped with end template 8, and side form 6 is equipped between lower front suspended beam 4 and lower outer crossbeam 5, and side form 6 includes side template 61 With the outside mould bases 62 for playing fixed function to side template 61, as shown in Fig. 6, side form 6 is arranged on bridge floor 10 by girder steel again; The inner template 7 being fixedly connected with bridge pier by girder steel is equipped with above end template 8, side form 6, inner template 7 and end template 8 form bridge The template that mixed mud pours, as shown in Fig. 7.
Working principle: suspension system is fixed on the diamond shape frame of Hanging Basket equipment by upper overarm 1, on lower front suspended beam 4 And inner template 7, end template 8, side form 6 constitute formwork for placing, perfusion mixed mud can be completed bridge construction and pour paragraph by paragraph after installation It builds.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (4)

1. a kind of bridge cantilever construction Hanging Basket equipment suspension system, applied in the cradle construction equipment of construction, it is characterised in that Including preceding upper beam, upper guardrail, lower guardrail, carry guardrail, sunpender, hanging box, lower front suspended beam, it is lower after overarm, side form, inner template, End template and bottom girder;Preceding upper beam includes two pieces phase and the square type steel being bolted, and square type steel two sides, which are equipped with, to be reinforced Plate, bolt-through stiffening plate, there are gap between two square type steel, the both ends in square type steel are equipped with liner, and the side of square type steel is set Cover board is set, cover board is equipped with two opposite crect ears, and crect ear two sides are equipped with reinforcing rib;Upper guardrail, square type steel are set on square type steel Between gap be equipped with sunpender, sunpender connects lower front beam, guardrail under being arranged on lower front beam by hanging box;Lower front beam passes through Bottom girder connects lower rear cross beam, and lower rear cross beam is equipped with carry guardrail, and bottom girder is equipped with end template;Lower front beam and lower rear cross Two outsides are equipped with side form between beam, and the side form includes side template and plays the outer positioning beam of fixed function to side template.
2. a kind of bridge cantilever construction Hanging Basket equipment suspension system according to claim 1, it is characterised in that: the liner " recessed " shape is presented.
3. a kind of bridge cantilever construction Hanging Basket equipment suspension system according to claim 2, it is characterised in that: two square Liner recess in fashioned iron is oppositely arranged.
4. a kind of bridge cantilever construction Hanging Basket equipment suspension system according to claim 1, it is characterised in that: the liner Stiffening plate is welded between square type steel.
CN201811496494.1A 2018-12-07 2018-12-07 A kind of bridge cantilever construction Hanging Basket equipment suspension system Pending CN109610323A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811496494.1A CN109610323A (en) 2018-12-07 2018-12-07 A kind of bridge cantilever construction Hanging Basket equipment suspension system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811496494.1A CN109610323A (en) 2018-12-07 2018-12-07 A kind of bridge cantilever construction Hanging Basket equipment suspension system

Publications (1)

Publication Number Publication Date
CN109610323A true CN109610323A (en) 2019-04-12

Family

ID=66008401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811496494.1A Pending CN109610323A (en) 2018-12-07 2018-12-07 A kind of bridge cantilever construction Hanging Basket equipment suspension system

Country Status (1)

Country Link
CN (1) CN109610323A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114541280A (en) * 2022-04-06 2022-05-27 蒙城安路蓝海交通投资有限公司 Hanging basket suspension mechanism for bridge cantilever construction

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06146221A (en) * 1992-10-30 1994-05-27 Shimizu Corp Mobile working vehicle for pc diagonal tensioned bridge
JP2008038463A (en) * 2006-08-07 2008-02-21 Shimizu Corp Bridge girder erection method
CN101250856A (en) * 2007-08-30 2008-08-27 中铁大桥局集团第一工程有限公司 Echelon cradle as well as construction method thereof
CN101586330A (en) * 2008-05-22 2009-11-25 中铁十一局集团第一工程有限公司 Receding construction method of cradle of continuous girder bridge made of prestressing concrete
CN102102342A (en) * 2010-12-30 2011-06-22 广东省航盛建设集团有限公司 Integral-structure type rear upper separator of diamond cradle
CN202039300U (en) * 2011-04-12 2011-11-16 中铁三局集团有限公司 Hanging bracket for bridge cantilever casting construction
CN203866715U (en) * 2014-06-18 2014-10-08 中铁二十四局集团安徽工程有限公司 Multi-roof-truss rhombic truss hanging basket for long-cantilever box beam construction
CN204000634U (en) * 2014-08-15 2014-12-10 曾凡荣 The bridge cradle construction rhombus frame of fast demountable
CN204139075U (en) * 2014-10-30 2015-02-04 中国水利水电第五工程局有限公司 A kind of semi girder cast-in-place construction spreading Hanging Basket
CN104631343A (en) * 2015-02-15 2015-05-20 河海大学 Self-travelling diamond-shaped pin-connected truss-type form traveler structure and form traveler travelling and constructing method
CN204690605U (en) * 2015-03-20 2015-10-07 宇杰集团股份有限公司 The self-propelled triangular truss hanging basket of large span beam bridge
CN205529912U (en) * 2015-10-30 2016-08-31 浙江兴土桥梁临时钢结构工程有限公司 Platform is decoratied in continuous beam construction
ES2624211A1 (en) * 2016-01-13 2017-07-13 Puentes Y Calzadas Grupo De Empresas, S.A. System to extend a cable-stayed bridge structure, extended cable-stayed bridge structure and its constructive process (Machine-translation by Google Translate, not legally binding)
CN207608836U (en) * 2017-12-07 2018-07-13 中交第三航务工程局有限公司 A kind of Successive interference cancellation cantilever pouring construction Diamond-Shape Form Traveler
CN108914776A (en) * 2018-07-02 2018-11-30 浙江中乐建设有限公司 A kind of construction hanging basket built for municipal works and room

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06146221A (en) * 1992-10-30 1994-05-27 Shimizu Corp Mobile working vehicle for pc diagonal tensioned bridge
JP2008038463A (en) * 2006-08-07 2008-02-21 Shimizu Corp Bridge girder erection method
CN101250856A (en) * 2007-08-30 2008-08-27 中铁大桥局集团第一工程有限公司 Echelon cradle as well as construction method thereof
CN101586330A (en) * 2008-05-22 2009-11-25 中铁十一局集团第一工程有限公司 Receding construction method of cradle of continuous girder bridge made of prestressing concrete
CN102102342A (en) * 2010-12-30 2011-06-22 广东省航盛建设集团有限公司 Integral-structure type rear upper separator of diamond cradle
CN202039300U (en) * 2011-04-12 2011-11-16 中铁三局集团有限公司 Hanging bracket for bridge cantilever casting construction
CN203866715U (en) * 2014-06-18 2014-10-08 中铁二十四局集团安徽工程有限公司 Multi-roof-truss rhombic truss hanging basket for long-cantilever box beam construction
CN204000634U (en) * 2014-08-15 2014-12-10 曾凡荣 The bridge cradle construction rhombus frame of fast demountable
CN204139075U (en) * 2014-10-30 2015-02-04 中国水利水电第五工程局有限公司 A kind of semi girder cast-in-place construction spreading Hanging Basket
CN104631343A (en) * 2015-02-15 2015-05-20 河海大学 Self-travelling diamond-shaped pin-connected truss-type form traveler structure and form traveler travelling and constructing method
CN204690605U (en) * 2015-03-20 2015-10-07 宇杰集团股份有限公司 The self-propelled triangular truss hanging basket of large span beam bridge
CN205529912U (en) * 2015-10-30 2016-08-31 浙江兴土桥梁临时钢结构工程有限公司 Platform is decoratied in continuous beam construction
ES2624211A1 (en) * 2016-01-13 2017-07-13 Puentes Y Calzadas Grupo De Empresas, S.A. System to extend a cable-stayed bridge structure, extended cable-stayed bridge structure and its constructive process (Machine-translation by Google Translate, not legally binding)
CN207608836U (en) * 2017-12-07 2018-07-13 中交第三航务工程局有限公司 A kind of Successive interference cancellation cantilever pouring construction Diamond-Shape Form Traveler
CN108914776A (en) * 2018-07-02 2018-11-30 浙江中乐建设有限公司 A kind of construction hanging basket built for municipal works and room

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114541280A (en) * 2022-04-06 2022-05-27 蒙城安路蓝海交通投资有限公司 Hanging basket suspension mechanism for bridge cantilever construction

Similar Documents

Publication Publication Date Title
CN206219997U (en) A kind of box crossbeam of bridge is reinforced and mounting structure
CN110273539A (en) A kind of combination set shaped steel formwork and its modeling method
CN102286932B (en) Construction method for off-site assembling and automatic mounting on bridge of mobile mould bridge abutment
CN109610323A (en) A kind of bridge cantilever construction Hanging Basket equipment suspension system
CN214497202U (en) Strutting arrangement is used in construction of steel-concrete composite beam decking
CN211369646U (en) Reinforced supporting structure for constructional engineering
CN208934422U (en) A kind of pump concrete pump line support device with bumper and absorbing shock function
CN209443849U (en) Prefabricated factory for bridge construction
CN105625177A (en) Steel truss suspending support construction method
CN213198093U (en) Isolated pier mould
CN211034888U (en) Lifting appliance
CN210368578U (en) Emergency bridge for oil field emergency
CN203832566U (en) Vibrated roller vehicle frame structure
CN209602954U (en) A kind of no bracket is without the rapid construction steel concrete combined bridge front panel of template
CN110577146A (en) Lifting appliance and method for removing old bridge body
CN202726429U (en) Bracket for moving and mounting double-slipper mill cylinder body
CN109403674A (en) For the prefabricated factory of bridge construction and its construction method
CN104532744A (en) Orbital transfer portal crane matched with movable formwork
CN208748526U (en) A kind of bracket for bridge construction
CN204282226U (en) Mobile formwork supporting change rail portal crane
CN204551271U (en) A kind of reinforcement type Hanging Basket
CN212428107U (en) Assembled superimposed layer pouring mechanism
CN208005949U (en) High speed railway prefabricating box girder fixes shifting formwork bracket
CN213596808U (en) Suspended maintenance platform at bottom of steel structure beam
CN217499974U (en) Device for bridge closure construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination