CN109709266A - Vertical well multilayer oil reservoir flow simulation experiment device and method - Google Patents

Vertical well multilayer oil reservoir flow simulation experiment device and method Download PDF

Info

Publication number
CN109709266A
CN109709266A CN201811464961.2A CN201811464961A CN109709266A CN 109709266 A CN109709266 A CN 109709266A CN 201811464961 A CN201811464961 A CN 201811464961A CN 109709266 A CN109709266 A CN 109709266A
Authority
CN
China
Prior art keywords
core
simulation
layer
reservoir
injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811464961.2A
Other languages
Chinese (zh)
Inventor
许洪星
王祖文
张冕
刘国良
兰建平
池晓明
温亚魁
杨敏
姬随波
马新东
田军
陶长州
尹俊禄
王科萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Chuanqing Drilling Engineering Co Ltd filed Critical CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201811464961.2A priority Critical patent/CN109709266A/en
Publication of CN109709266A publication Critical patent/CN109709266A/en
Pending legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention belongs to the technical field of oil and gas field development, and provides a vertical well multilayer reservoir flow simulation experiment device and a method, which are used for experimental research on the high-temperature high-pressure longitudinal heterogeneous multilayer reservoir water-drive oil flow simulation law in a fracturing well chamber in the petroleum industry. The experimental device and the method provided by the invention can truly simulate the flow rule of the heterogeneous multi-layer oil reservoir, and have the advantages of safe and simple operation, high automation degree and high result reliability. The fluid flow rule of the heterogeneous multi-layer oil reservoir is disclosed, a theoretical basis is provided for solving the contradiction between the reservoir stratum and the interlayer, reasonable production measures are formulated, and the oil reservoir development effect is improved.

Description

A kind of straight well stratified reservoir flowing simulated experiment device and method
Technical field
The invention belongs to oil-gas field development technical fields, and in particular to a kind of straight well stratified reservoir flowing simulated experiment device And method.
Background technique
With deepening continuously for China's onshore petroleum industry exploration and development, in incremental reserves dense thin sand and mud interstratification accounting by Year increases.Such oil reservoir sand, mud layer interaction development, layer is more, thin, and the physical differences such as reservoir porosity, permeability are big, development difficulty Greatly.In order to realize that water drive measure is usually taken in the effective exploitation of alternate thin beds reservoir, but developed by long-term injecting water, in reservoir layer, Interlayer contradiction is more prominent, and injection water is advanced by leaps and bounds along hypertonic band or macropore, water drive involve less than region remaining oil be largely enriched with, Non-available water circulation is serious, influences oil field and normally develops.In order to improve such effect of reservoir development, need to disclose non-homogeneous multi-layer oil Fluid flowing law is hidden, to solve in reservoir layer, interlayer contradiction, reasonable production measure is formulated and theoretical foundation is provided.
Experiment simulation is the main means for studying reservoir fluid flowing law.Currently, can be divided according to rock core type are as follows: day The displacements such as right rock core (API rock core, full-hole core), artificial core (specification is customizable), sandpack column and flat plate model Experiment.It can parallel connection by the above different rock cores, string for strong heterogeneous reservoir plane and longitudinal fluid flow displacement test Connection etc. is realized, but not can be carried out the heterogeneous displacement test with different injection production well arrangements of high temperature and pressure lower plane and studied.Patent of invention " heterogeneous multi-layer core holding unit ", " a kind of longitudinal direction and plane heterogeneous plate models oil-water displacement efficiency experimental method " " are used for Heterogeneous multi-layer core holding unit of CT scan " etc. provides non-homogeneous multi-layer reservoir simulator and method, but the rock core It is multi-layer planar, the height fluctuations of the reservoir of true oil reservoir cannot be embodied, meanwhile, pit shaft simulator, crossflow The parts such as monitoring, the rock core crack production of remaining oil distribution prison, confining pressure loading device do not clearly state.
Summary of the invention
The purpose of the present invention is to provide a kind of straight well stratified reservoir flowing simulated experiment devices, disclose non-homogeneous multi-layer oil Fluid flowing law is hidden, to solve in reservoir layer, interlayer contradiction, reasonable production measure is formulated and theoretical foundation is provided.
It is another object of the present invention to provide a kind of straight well stratified reservoir flowing simulated experiment methods, improve heterogeneous Stratified reservoir development effectiveness.
Technical solution provided by the invention is as follows:
A kind of straight well stratified reservoir flowing simulated experiment device, including the injection pump, intermediate receptacle, rock being sequentially communicated by pipeline Heart clamp holder and extraction fluid flow metering system, the core holding unit are connected with confining pressure loading system and potential monitoring system, institute It states core holding unit and is externally provided with insulating box.
The core holding unit is cube, and the core holding unit includes simulated injection pit shaft, gum cover, confining pressure load sky Chamber and simulation extraction pit shaft, the gum cover are set to outside gum cover for wrapping up simulation core, the confining pressure load cavity, the rock core Each side of clamper is folded from inside to outside by multiple confining pressures load cavity, each confining pressure load cavity respectively with confining pressure Loading system is connected;
The simulated injection pit shaft and simulation extraction pit shaft are vertically arranged along the diagonal line of cube and communicate with simulation core, The simulated injection pit shaft and simulation extraction pit shaft include simulation wellbore hole internal layer and simulation wellbore hole outer layer, in the simulation wellbore hole Layer is set in simulation wellbore hole outer layer and the two circumferentially opposed can move, and is all provided on the simulation wellbore hole internal layer and simulation wellbore hole outer layer There are multiple boreholes, the out of phase of the simulation wellbore hole internal layer is equipped with the borehole of different number.
The potential monitoring system includes the measuring electrode being sequentially connected electrically, transmission cable, A/D change-over panel and computer, The measuring electrode be it is multiple, equidistantly distribute each layer in simulation core.
The confining pressure loading system includes confining pressure pump and control cabinet, and the control cabinet is electrically connected with confining pressure pump, the extraction The exit of fluid flow metering system is equipped with backpressure pump.
A kind of straight well stratified reservoir flowing simulated experiment method uses straight well stratified reservoir flowing simulated experiment device, packet Include following steps:
Step 1) makes simulation core;
Simulation core is fitted into core holding unit by step 2, is wrapped up with gum cover;
Step 3) opens the confining pressure pump in confining pressure loading system, to experiment setting pressure and keeps permanent to simulation core plus confining pressure It is fixed;
Simulation core is vacuumized injection saturation water flooding by step 4);
Step 5) opens insulating box and core holding unit is heated to experiment set temperature and is kept constant;
Step 6) opens injection pump and adds displacement pressure, by the simulated formation oil injection core holding unit in intermediate receptacle, makes oil With constant speed, water in displacement vertical heterogeneity simulation core measures each layer of displacement with extraction fluid flow metering system respectively Water and oil mass out, the layer is closed when a certain layer establishes the irreducible water saturation of setting, until all layers all establish The experiment of oil expelling water terminates when irreducible water saturation;
Step 7) adjusts constant pressure, the speed of constant speed injection pump according to the injection rate of experimental design;
Step 8) adds displacement pressure by injection pump, by the simulated formation water in intermediate receptacle, to test the constant-velocity of setting Flood pot test is carried out in injection core holding unit, then according to a series of injection pore volume multiple values of experimental design, is used Extraction fluid flow metering system measures the accumulative displacement oil pump capacity and water of each layer of each pore volume injected Imitating rock core respectively Amount, and outlet pressure is recorded with pressure measurement device record inlet pressure, pressure measurement device, when the moisture content of a certain layer reaches The layer is closed when 100%, until experiment terminates when all layers of moisture content all reaches 100%;
Injection pore volume, the as simulation core pair corresponding to the uniformity coefficient height of all layers of step 9) of displacement oil pump capacity Injection pore volume when the non-homogeneous multi-layer oil reservoir construction answered.
The simulation core is by natural core or Artificial Core Making, first according to reality when the simulation core makes Oil reservoir spread, height fluctuating situation make model base, later according to the reservoir longitudinal direction number of plies, successively process, simulation core Bottom agree with model base.
Process using Artificial Core Making simulation core is as follows: using epoxy resin and difference according to actual reservoir physical property The mixing manufacture of partial size quartz sand, mixing are completed to be placed on model base, are press-formed, successively process;
After epoxy resin and the mixing of different-grain diameter quartz sand it is not yet cementing before, by the measuring electrode and biography of potential monitoring system 10 Transmission cable is embedded in each layer, while crack being arranged in layers, and each layer is separately added into different lanthanide series tracers.
Process using natural core production simulation core is as follows: being cut, is polished to natural core, makes rock core and mould Type pedestal agrees with, and according to the reservoir longitudinal direction number of plies, successively processes rock core.
During flood pot test, each position resistivity is obtained by potential monitoring system, analyzes each layer remaining oil Cloth situation, while by interlayer electrode data, simulation obtains crossflow situation.
The beneficial effects of the present invention are:
This experimental provision provided by the invention and method can real simulation non-homogeneous multi-layer oil reservoir flowing law, safe operation, Simply, the degree of automation and result credibility are high.Non-homogeneous multi-layer reservoir fluid flowing law is disclosed, to solve in reservoir layer, Interlayer contradiction formulates reasonable production measure and provides theoretical foundation, improves such effect of reservoir development.
It is described in further details below in conjunction with attached drawing.
Detailed description of the invention
Fig. 1 is a kind of implementation structural schematic diagram of experimental provision of the present invention;
Fig. 2 is the structural schematic diagram of simulation core;
Fig. 3 is the structural schematic diagram of core holding unit.
In figure: 1, simulation core;2, simulation wellbore hole outer layer;3, simulation wellbore hole internal layer;4, gum cover;5, confining pressure loads cavity; 6, injection pump;7, intermediate receptacle;8, confining pressure loading system;9, core holding unit;10, potential monitoring system;11, insulating box;12, Produce fluid flow metering system;13, simulated injection pit shaft;14, simulation extraction pit shaft.
Specific embodiment
Embodiment 1:
A kind of straight well stratified reservoir flowing simulated experiment device is present embodiments provided, including the injection being sequentially communicated by pipeline Pump 6, intermediate receptacle 7, core holding unit 9 and extraction fluid flow metering system 12, the core holding unit 9 are connected with confining pressure load system System 8 and potential monitoring system 10, the core holding unit 9 are externally provided with insulating box 11.
As shown in Figure 1, injection pump 6 provides displacement power, the preset working solution of intermediate receptacle 7, working solution is entered by pipeline Confining pressure is loaded into simulation core 1 by simulation core 1, confining pressure loading system 8, potential monitoring system 10 in displacement process everybody Resistivity measurement is set, to analyze oil saturation, insulating box 11 is used for simulated formation temperature, fluid flow metering system 12 is produced, For metering layered produced quantity.
The experimental provision is for high temperature and pressure vertical heterogeneity multilayer reservoir water drive oil flowing in petroleum industry fractured well room Simulate Rule research, can real simulation non-homogeneous multi-layer oil reservoir flowing law, safe operation, simple, the degree of automation and Result credibility is high.
Embodiment 2:
On the basis of embodiment 1, a kind of straight well stratified reservoir flowing simulated experiment device, the rock core are present embodiments provided Clamper 9 is cube, and the core holding unit 9 includes that simulated injection pit shaft 13, gum cover 4, confining pressure load cavity 5 and simulation are adopted Pit shaft 14 out, the gum cover 4 are set to outside gum cover 4 for wrapping up simulation core 1, the confining pressure load cavity 5, the rock core clamping Each side of device 9 is folded from inside to outside by multiple confining pressures load cavity 5, each confining pressure load cavity 5 respectively with confining pressure Loading system 8 is connected;
The simulated injection pit shaft 13 and simulation extraction pit shaft 14 be vertically arranged along the diagonal line of cube and with simulation core 1 It communicates, the simulated injection pit shaft 13 and simulation extraction pit shaft 14 include simulation wellbore hole internal layer 3 and simulation wellbore hole outer layer 2, institute Simulation wellbore hole internal layer 3 is stated in simulation wellbore hole outer layer 2 and the two circumferentially opposed can move, the simulation wellbore hole internal layer 3 and mould Multiple boreholes are equipped on quasi- pit shaft outer layer 2, the out of phase of the simulation wellbore hole internal layer 3 is equipped with the borehole of different number. As shown in Figure 3.
The each end face of cube core holding unit 9 is that the multilayer confining pressure load cavity 5 being arranged from inside to outside folds, respectively A confining pressure load cavity 5 is connected with confining pressure pump respectively, and when loaded ring being needed to press, confining pressure is pumped to be injected to each confining pressure load cavity 5 Fluid, each layer form resultant force and are applied on simulation core 1 by gum cover 4;This method ratio is loaded using conventional load machine, is had and is carried The advantages such as lotus is uniform, takes up little area, is easy to operate.
Water filling simulation wellbore hole is made of two layers of pit shaft of simulation wellbore hole internal layer 3 and simulation wellbore hole outer layer 2, can be formed between two layers Sealing, different simulation boreholes are arranged in 3 out of phase of simulation wellbore hole internal layer, and can be rotated, thus can be with by rotation internal layer pit shaft The blasthole number being connected with each layer of reservoir is set, the water drive situation of different opening degrees is simulated.
Embodiment 3:
On the basis of embodiment 1, a kind of straight well stratified reservoir flowing simulated experiment device, the current potential are present embodiments provided Monitoring system 10 includes measuring electrode, transmission cable, A/D change-over panel and the computer being sequentially connected electrically, and the measuring electrode is It is multiple, equidistantly distribute each layer in simulation core 1.
Measuring electrode is made of two copper enameled wires of diameter 1mm, and measuring electrode is inserted before suppressing simulation core 1 Enter into simulation core 1, is equidistantly distributed in plane;After measuring electrode cloth is good, by measuring electrode and transmission cable (flat electricity Cable) welding, and be connected with A/D change-over panel and computer;Each reservoir electrode arrangement is completed, will when simulation core 1 is not yet cementing Measuring electrode, transmission cable are embedded in simulation core 1.
The confining pressure loading system 8 includes confining pressure pump and control cabinet, and the control cabinet is electrically connected with confining pressure pump, the extraction The exit of fluid flow metering system 12 is equipped with backpressure pump.When outlet pressure is greater than the setting pressure of backpressure pump, Produced Liquid discharge. Extraction fluid flow metering system 12 is the prior art, is not just described in detail here.
Embodiment 4:
On the basis of embodiment 2, a kind of straight well stratified reservoir flowing simulated experiment method is present embodiments provided, straight well is used Stratified reservoir flowing simulated experiment device, comprising the following steps:
Step 1) makes simulation core 1;
Simulation core 1 is fitted into core holding unit 9 by step 2, is wrapped up with gum cover 4;
Step 3) opens the confining pressure pump in confining pressure loading system 8, to experiment setting pressure and keeps permanent to simulation core 1 plus confining pressure It is fixed;
Simulation core 1 is vacuumized injection saturation water flooding by step 4);
Step 5) opens insulating box 11 and core holding unit 9 is heated to experiment set temperature and is kept constant;
Step 6) opens injection pump 6 plus displacement pressure, by the simulated formation oil injection core holding unit 9 in intermediate receptacle 7, makes Oil is with constant speed, and water in displacement vertical heterogeneity simulation core 1 measures each layer with extraction fluid flow metering system 12 respectively The water and oil mass that displacement goes out, the layer is closed when a certain layer establishes the irreducible water saturation of setting, until all layers are all built The experiment of oil expelling water terminates when having found irreducible water saturation;
Step 7) adjusts constant pressure, the speed of constant speed injection pump 6 according to the injection rate of experimental design;
Step 8) is permanent with the speed for testing setting by the simulated formation water in intermediate receptacle 7 by injection pump 6 plus displacement pressure Flood pot test is carried out in speed injection core holding unit 9, then according to a series of injection pore volume multiple values of experimental design, Measure each 1 each layer of pore volume injected Imitating rock core of accumulative displacement oil pump capacity respectively with extraction fluid flow metering system 12 And water, and outlet pressure is recorded with pressure measurement device record inlet pressure, pressure measurement device, when the moisture content of a certain layer The layer is closed when reaching 100%, until experiment terminates when all layers of moisture content all reaches 100%;
Injection pore volume, the as simulation core pair corresponding to the uniformity coefficient height of all layers of step 9) of displacement oil pump capacity Injection pore volume when the non-homogeneous multi-layer oil reservoir construction answered.
For non-homogeneous multi-layer oil reservoir, experimental method through this embodiment uses each reservoir output during the experiment The uniformity coefficient evaluation different process and technological parameter of liquid, so that recovering the oil to scene provides theoretical direction.
Embodiment 5:
On the basis of embodiment 4, a kind of straight well stratified reservoir flowing simulated experiment method, the simulation are present embodiments provided Rock core 1 by natural core or Artificial Core Making, when the simulation core 1 makes first according to practical oil reservoir spread, Height fluctuating situation makes model base, later according to the reservoir longitudinal direction number of plies, successively processes, the bottom and model of simulation core 1 Pedestal agrees with.Simulation core 1 is as shown in Figure 2.
Process using Artificial Core Making simulation core 1 is as follows: according to actual reservoir physical property using epoxy resin and not It mixes and manufactures with partial size quartz sand, mixing is completed to be placed on model base, is press-formed, and successively processes;
After epoxy resin and the mixing of different-grain diameter quartz sand it is not yet cementing before, by the measuring electrode and biography of potential monitoring system 10 Transmission cable is embedded in each layer, while crack being arranged in layers, and each layer is separately added into different lanthanide series tracers.
Tracer is gradually dissolved in water during water drive, by being collected in outlet end, detecting each lanthanide content, Each layer can be obtained and produce liquid situation, convenient for disclosing grease flowing law.According to longitudinal each practical pressure break situation of layer, can be made in each reservoir Crack is set in the process, and it is artificial that the still uncemented stratiform of crack ribbon insertion is made in water-soluble high-molecular material (polylactic acid) In rock core, water-soluble material dissolves to form crack after temperature increases during water drive, can real simulation non-homogeneous multi-layer fractured well Situation.
Using natural core production simulation core 1 process it is as follows: natural core is cut, is polished, make rock core with Model base is agreed with, and according to the reservoir longitudinal direction number of plies, successively processes rock core, interlayer can be as needed using permeable or impermeable Material bonding.When needing to simulate crossflow situation, then permeable material is used.
During flood pot test, each position resistivity is obtained by potential monitoring system 10, analyzes each layer remaining oil Distribution situation, while by interlayer electrode data, simulation obtains crossflow situation.
The foregoing examples are only illustrative of the present invention;The limitation to protection scope of the present invention is not constituted;It is all It is within being all belonged to the scope of protection of the present invention with the same or similar design of the present invention.The component that embodiment does not describe in detail With the well-known components and common structure or conventional means of the structure category industry;Here it does not describe one by one.

Claims (9)

1. a kind of straight well stratified reservoir flowing simulated experiment device, it is characterised in that: including the injection being sequentially communicated by pipeline (6), intermediate receptacle (7), core holding unit (9) and extraction fluid flow metering system (12), the core holding unit (9) is pumped to be connected with Confining pressure loading system (8) and potential monitoring system (10), the core holding unit (9) are externally provided with insulating box (11).
2. a kind of straight well stratified reservoir flowing simulated experiment device according to claim 1, it is characterised in that: the rock core Clamper (9) is cube, and the core holding unit (9) includes simulated injection pit shaft (13), gum cover (4), confining pressure load cavity (5) and simulation extraction pit shaft (14), the gum cover (4) are used to wrap up simulation core (1), and confining pressure load cavity (5) is set to Outside, each side of the core holding unit (9) is folded gum cover (4) from inside to outside by multiple confining pressures load cavity (5), often A confining pressure load cavity (5) is connected with confining pressure loading system (8) respectively;
The simulated injection pit shaft (13) and simulation extraction pit shaft (14) be vertically arranged along the diagonal line of cube and with simulation Rock core (1) communicates, and the simulated injection pit shaft (13) and simulation extraction pit shaft (14) include simulation wellbore hole internal layer (3) and simulate Pit shaft outer layer (2), the simulation wellbore hole internal layer (3) is set in simulation wellbore hole outer layer (2) and the two circumferentially opposed can move, described Multiple boreholes, the different phases of the simulation wellbore hole internal layer (3) are equipped on simulation wellbore hole internal layer (3) and simulation wellbore hole outer layer (2) Position is equipped with the borehole of different number.
3. a kind of straight well stratified reservoir flowing simulated experiment device according to claim 1, it is characterised in that: the current potential Monitoring system (10) includes the measuring electrode being sequentially connected electrically, transmission cable, A/D change-over panel and computer, the measuring electrode Be it is multiple, equidistantly distribute each layer in simulation core (1).
4. a kind of straight well stratified reservoir flowing simulated experiment device according to claim 1, it is characterised in that: the confining pressure Loading system (8) includes confining pressure pump and control cabinet, and the control cabinet is electrically connected with confining pressure pump, the extraction fluid flow metering system (12) exit is equipped with backpressure pump.
5. a kind of straight well stratified reservoir flowing simulated experiment method flows mould using straight well stratified reservoir described in claim 1 Draft experiment device, which comprises the following steps:
Step 1) makes simulation core (1);
Simulation core (1) is fitted into core holding unit (9) by step 2, is wrapped up with gum cover (4);
Step 3) opens the confining pressure pump in confining pressure loading system (8), to experiment setting pressure and protects to simulation core (1) plus confining pressure It holds constant;
Simulation core (1) is vacuumized injection saturation water flooding by step 4);
Step 5) opens insulating box (11) and core holding unit (9) is heated to experiment set temperature and is kept constant;
Step 6) opens injection pump (6) plus displacement pressure, and the simulated formation oil in intermediate receptacle (7) is injected core holding unit (9) in, make oil with constant speed, the water in displacement vertical heterogeneity simulation core (1), with extraction fluid flow metering system (12) point Water and oil mass that each layer of displacement goes out are not measured, the layer are closed when a certain layer establishes the irreducible water saturation of setting, directly The experiment of oil expelling water terminates when all establishing irreducible water saturation to all layers;
Step 7) adjusts constant pressure, the speed of constant speed injection pump (6) according to the injection rate of experimental design;
Step 8) is by injection pump (6) plus displacement pressure, by the simulated formation water in intermediate receptacle (7), to test the speed of setting It spends and carries out flood pot test in constant speed injection core holding unit (9), then according to a series of injection pore volumes of experimental design Multiple value measures the tired of each each layer of pore volume injected Imitating rock core (1) with extraction fluid flow metering system (12) respectively Displacement oil pump capacity and water are counted, and records outlet pressure with pressure measurement device record inlet pressure, pressure measurement device, when certain One layer of moisture content closes the layer when reaching 100%, until experiment terminates when all layers of moisture content all reaches 100%;
Injection pore volume, the as simulation core pair corresponding to the uniformity coefficient height of all layers of step 9) of displacement oil pump capacity Injection pore volume when the non-homogeneous multi-layer oil reservoir construction answered.
6. a kind of straight well stratified reservoir flowing simulated experiment method according to claim 5, it is characterised in that: the simulation Rock core (1) is by natural core or Artificial Core Making, first according to practical oil reservoir exhibition when the simulation core (1) makes Cloth, height fluctuating situation make model base, later according to the reservoir longitudinal direction number of plies, successively process, the bottom of simulation core (1) with Model base is agreed with.
7. a kind of straight well stratified reservoir flowing simulated experiment method according to claim 6, which is characterized in that using artificial The process that rock core makes simulation core (1) is as follows: mixed using epoxy resin and different-grain diameter quartz sand according to actual reservoir physical property Manufacture is closed, mixing is completed to be placed on model base, is press-formed, successively processes;
After epoxy resin and the mixing of different-grain diameter quartz sand it is not yet cementing before, by the measuring electrode of potential monitoring system (10) and Transmission cable is embedded in each layer, while crack being arranged in layers, and each layer is separately added into different lanthanide series tracers Agent.
8. a kind of straight well stratified reservoir flowing simulated experiment method according to claim 6, which is characterized in that using natural The process of rock core production simulation core (1) is as follows: natural core cut, is polished, agrees with rock core with model base, root According to the reservoir longitudinal direction number of plies, rock core is successively processed.
9. a kind of straight well stratified reservoir flowing simulated experiment method according to claim 5, it is characterised in that: water drive oil is real During testing, each position resistivity is obtained by potential monitoring system (10), analyzes each layer remaining oil distribution situation, led to simultaneously Interlayer electrode data is crossed, simulation obtains crossflow situation.
CN201811464961.2A 2018-12-03 2018-12-03 Vertical well multilayer oil reservoir flow simulation experiment device and method Pending CN109709266A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811464961.2A CN109709266A (en) 2018-12-03 2018-12-03 Vertical well multilayer oil reservoir flow simulation experiment device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811464961.2A CN109709266A (en) 2018-12-03 2018-12-03 Vertical well multilayer oil reservoir flow simulation experiment device and method

Publications (1)

Publication Number Publication Date
CN109709266A true CN109709266A (en) 2019-05-03

Family

ID=66255407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811464961.2A Pending CN109709266A (en) 2018-12-03 2018-12-03 Vertical well multilayer oil reservoir flow simulation experiment device and method

Country Status (1)

Country Link
CN (1) CN109709266A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110763732A (en) * 2019-11-05 2020-02-07 中国石油大学(华东) Method for measuring resistivity of shale sample under different temperature, pressure and fluid conditions
CN110887766A (en) * 2019-11-01 2020-03-17 中国石油化工股份有限公司石油勘探开发研究院 Compact gas-seal-layer mining fluid-solid coupling gas-water nonlinear seepage experimental device and method
CN111595550A (en) * 2020-05-06 2020-08-28 三峡大学 Device and method for obtaining position of liquid displacement surface in rock fracture
CN113075108A (en) * 2021-03-26 2021-07-06 西南石油大学 Rock core multiple stress sensitivity test method considering irreducible water saturation
CN113431563A (en) * 2021-07-28 2021-09-24 燕山大学 Complex fault block oil reservoir gravity differentiation simulation experiment device and method
CN113567315A (en) * 2020-04-28 2021-10-29 中国石油化工股份有限公司 Reservoir rock compression coefficient determination experimental system and method for multiple injection and production processes of gas storage
CN114016997A (en) * 2020-07-15 2022-02-08 中国石油化工股份有限公司 Heterogeneous reservoir development and adjustment simulation experiment device and method
CN114059998A (en) * 2021-09-28 2022-02-18 中国海洋石油集团有限公司 Chemical flooding injection well and production well blockage simulation device and method
CN114166999A (en) * 2021-12-01 2022-03-11 中国石油大学(北京) Oil reservoir type gas storage simulation experiment device and method
CN114658401A (en) * 2022-04-05 2022-06-24 西南石油大学 Experimental device and method for simulating gas injection of heterogeneous oil reservoir to improve recovery ratio
CN114839130A (en) * 2022-05-12 2022-08-02 西南石油大学 Method for establishing high-temperature high-pressure large-scale section model bound water experimental conditions
CN115012922A (en) * 2022-07-01 2022-09-06 陕西延长石油(集团)有限责任公司 Experiment method for providing true triaxial confining pressure for large-scale real core flat plate model
CN115263257A (en) * 2022-08-19 2022-11-01 陕西延长石油(集团)有限责任公司 Fold structure oil reservoir oil displacement simulation experiment device and simulation method thereof
CN115773094A (en) * 2021-09-08 2023-03-10 中国石油天然气股份有限公司 Indoor experimental device for simulating periodic water injection and experimental simulation method
CN117250140A (en) * 2023-11-15 2023-12-19 中国石油集团川庆钻探工程有限公司 Horizontal well section cluster non-uniform liquid inlet quantitative evaluation experimental device and method

Citations (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4916946A (en) * 1989-03-23 1990-04-17 Amoco Corporation Method of flowing a high viscosity substance through a conduit at a low apparent viscosity
CN1389742A (en) * 2001-06-06 2003-01-08 大庆油田有限责任公司勘探开发研究院 Seismic blasthole cementing method
CN1699998A (en) * 2005-06-06 2005-11-23 里群 Constant quantity substance tracer agent for oilfield monitoring and application in oil deposit dynamic monitoring
CN101187305A (en) * 2007-01-18 2008-05-28 中国海洋石油总公司 Single pipe co-well oil-pumping and water-injecting technological system
CN201555791U (en) * 2009-11-30 2010-08-18 西南石油大学 Multilayer flat plate module rock core clamper
CN101828003A (en) * 2007-10-16 2010-09-08 埃克森美孚上游研究公司 Fluid control device and the method that is used for producing well and injection well
CN201687470U (en) * 2010-06-04 2010-12-29 海安县石油科研仪器有限公司 Dynamic filtration instrument of fracture acidizing working solution
CN101985875A (en) * 2010-09-27 2011-03-16 中国石油大学(华东) Hydraulic pulse-assisted reservoir chemical remedial treatment experiment device and method
CN102042013A (en) * 2010-12-14 2011-05-04 中国海洋石油总公司 Near wellbore area cutting simulation device for combined cylinder body with three layers of compacted sand bodies
CN102094642A (en) * 2010-12-17 2011-06-15 中国石油天然气股份有限公司 In-layer heterogeneous model oil-water displacement efficiency evaluation system
CN102410954A (en) * 2011-08-05 2012-04-11 中国石油天然气股份有限公司 Artificial rock core, and manufacturing method and instrument of artificial rock core
CN202195837U (en) * 2011-09-20 2012-04-18 东北石油大学 High temperature and high pressure sand-pack model for steam driving simulation experiment
CN103588801A (en) * 2013-12-02 2014-02-19 天津大港油田圣达科技有限公司 Trace element well-to-well tracer agent use method
CN103616494A (en) * 2013-11-28 2014-03-05 中国石油天然气集团公司 Method and system for simulating pore space fluid distribution of core
CN103726815A (en) * 2012-10-11 2014-04-16 中国石油化工股份有限公司 CO2 flooding extraction well shaft flow state determining and parameter optimizing method
CN104675394A (en) * 2015-01-22 2015-06-03 西南石油大学 Three-dimensional physical simulation experimental apparatus of heterogeneous bottom-water reservoir and saturation determining method thereof
CN104675370A (en) * 2014-12-23 2015-06-03 东北石油大学 Combinational flooding testing method capable of implementing gel injection and polymer solution injection alternately after water flooding
CN104727814A (en) * 2015-02-14 2015-06-24 东北石油大学 Heterogeneous artificial core
CN104833618A (en) * 2015-02-14 2015-08-12 东北石油大学 Method and device for performing simulating profile control to heterogeneous reservoir in laboratory
CN104863556A (en) * 2015-06-17 2015-08-26 北京科技大学 Easily replaced and disassembled intuitive flat rock core modeling device and manufacturing method thereof
CN105114048A (en) * 2015-08-17 2015-12-02 中国石油大学(华东) Horizontal well staged fracturing oil production method through injection and production in same well
CN103343684B (en) * 2013-06-18 2016-03-09 中国石油天然气股份有限公司 Complex tracer for monitoring among wells of high-temperature and hypersalinity block of oil field and application of complex tracer
CN105952424A (en) * 2016-05-31 2016-09-21 西安交通大学 Supercritical water-oil displacement simulator and method
CN106226503A (en) * 2016-10-13 2016-12-14 中国石油大学(华东) A kind of adjustable ring presses the Oil in Super-low Permeability core holding unit of continuous non-uniform Distribution
CN205826624U (en) * 2016-06-13 2016-12-21 西南石油大学 A kind of long cores hydrocarbon gas drives experimental provision
CN206132573U (en) * 2016-10-31 2017-04-26 大庆亿莱检验检测技术服务有限公司 Rock core holder
CN106644877A (en) * 2016-10-18 2017-05-10 中国石油大学(华东) Experimental device for time domain dynamic CT scanning permeability of low-permeability core and experimental method
CN206177773U (en) * 2016-10-28 2017-05-17 陕西延长石油(集团)有限责任公司研究院 Experimental device for imbibition of special hypotonic oil reservoir developments of simulation crack nature
CN206267827U (en) * 2016-11-24 2017-06-20 辽河石油勘探局 A kind of workover treatment wellbore treatments instrument
US9719009B2 (en) * 2015-03-30 2017-08-01 King Fahd University Of Petroleum And Minerals Oil recovery processes at high salinity carbonate reservoirs
CN206431009U (en) * 2017-02-16 2017-08-22 梅浩林 Low-permeability oil deposit reservoir crude oil fluidity experimental provision
CN107120112A (en) * 2017-05-05 2017-09-01 中国石油大学(北京) A kind of multiple seam coal bed gas is closed and adopts experimental provision
CN107420096A (en) * 2017-08-15 2017-12-01 中国石油大学(北京) The physical simulation experiment device and its method of horizontal well multi-stage water power successively pressure break
CN107559001A (en) * 2017-09-13 2018-01-09 中国石油化工股份有限公司 A kind of artificial ground formation damage evaluating system
CN107576562A (en) * 2017-10-19 2018-01-12 南京泰克奥科技有限公司 A kind of multi- scenarios method true triaxial test system and its test method
US20180037809A1 (en) * 2015-04-30 2018-02-08 Dow Global Technologies Llc Co-surfactant foam-forming composition for enhanced oil recovery
CN107727465A (en) * 2017-09-14 2018-02-23 中国石油大学(华东) A kind of method and device that the artificial sand rock with reservoir architecture is made using calcarinate
CN108318398A (en) * 2018-01-08 2018-07-24 中国石油天然气股份有限公司 Experimental device and experimental method for high-temperature high-pressure oil displacement efficiency of heavy oil reservoir
CN207714768U (en) * 2017-12-14 2018-08-10 中铁五局集团第一工程有限责任公司 A kind of vehicular wet-spraying machine with double acting power drive

Patent Citations (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4916946A (en) * 1989-03-23 1990-04-17 Amoco Corporation Method of flowing a high viscosity substance through a conduit at a low apparent viscosity
CN1389742A (en) * 2001-06-06 2003-01-08 大庆油田有限责任公司勘探开发研究院 Seismic blasthole cementing method
CN1699998A (en) * 2005-06-06 2005-11-23 里群 Constant quantity substance tracer agent for oilfield monitoring and application in oil deposit dynamic monitoring
CN101187305A (en) * 2007-01-18 2008-05-28 中国海洋石油总公司 Single pipe co-well oil-pumping and water-injecting technological system
CN101828003A (en) * 2007-10-16 2010-09-08 埃克森美孚上游研究公司 Fluid control device and the method that is used for producing well and injection well
CN201555791U (en) * 2009-11-30 2010-08-18 西南石油大学 Multilayer flat plate module rock core clamper
CN201687470U (en) * 2010-06-04 2010-12-29 海安县石油科研仪器有限公司 Dynamic filtration instrument of fracture acidizing working solution
CN101985875A (en) * 2010-09-27 2011-03-16 中国石油大学(华东) Hydraulic pulse-assisted reservoir chemical remedial treatment experiment device and method
CN102042013A (en) * 2010-12-14 2011-05-04 中国海洋石油总公司 Near wellbore area cutting simulation device for combined cylinder body with three layers of compacted sand bodies
CN102094642A (en) * 2010-12-17 2011-06-15 中国石油天然气股份有限公司 In-layer heterogeneous model oil-water displacement efficiency evaluation system
CN102410954A (en) * 2011-08-05 2012-04-11 中国石油天然气股份有限公司 Artificial rock core, and manufacturing method and instrument of artificial rock core
CN202195837U (en) * 2011-09-20 2012-04-18 东北石油大学 High temperature and high pressure sand-pack model for steam driving simulation experiment
CN103726815A (en) * 2012-10-11 2014-04-16 中国石油化工股份有限公司 CO2 flooding extraction well shaft flow state determining and parameter optimizing method
CN103343684B (en) * 2013-06-18 2016-03-09 中国石油天然气股份有限公司 Complex tracer for monitoring among wells of high-temperature and hypersalinity block of oil field and application of complex tracer
CN103616494A (en) * 2013-11-28 2014-03-05 中国石油天然气集团公司 Method and system for simulating pore space fluid distribution of core
CN103588801A (en) * 2013-12-02 2014-02-19 天津大港油田圣达科技有限公司 Trace element well-to-well tracer agent use method
CN104675370A (en) * 2014-12-23 2015-06-03 东北石油大学 Combinational flooding testing method capable of implementing gel injection and polymer solution injection alternately after water flooding
CN104675370B (en) * 2014-12-23 2017-05-03 东北石油大学 Combinational flooding testing method capable of implementing gel injection and polymer solution injection alternately after water flooding
CN104675394A (en) * 2015-01-22 2015-06-03 西南石油大学 Three-dimensional physical simulation experimental apparatus of heterogeneous bottom-water reservoir and saturation determining method thereof
CN104727814A (en) * 2015-02-14 2015-06-24 东北石油大学 Heterogeneous artificial core
CN104833618A (en) * 2015-02-14 2015-08-12 东北石油大学 Method and device for performing simulating profile control to heterogeneous reservoir in laboratory
US9719009B2 (en) * 2015-03-30 2017-08-01 King Fahd University Of Petroleum And Minerals Oil recovery processes at high salinity carbonate reservoirs
US20180037809A1 (en) * 2015-04-30 2018-02-08 Dow Global Technologies Llc Co-surfactant foam-forming composition for enhanced oil recovery
CN104863556A (en) * 2015-06-17 2015-08-26 北京科技大学 Easily replaced and disassembled intuitive flat rock core modeling device and manufacturing method thereof
CN105114048A (en) * 2015-08-17 2015-12-02 中国石油大学(华东) Horizontal well staged fracturing oil production method through injection and production in same well
CN105952424A (en) * 2016-05-31 2016-09-21 西安交通大学 Supercritical water-oil displacement simulator and method
CN205826624U (en) * 2016-06-13 2016-12-21 西南石油大学 A kind of long cores hydrocarbon gas drives experimental provision
CN106226503A (en) * 2016-10-13 2016-12-14 中国石油大学(华东) A kind of adjustable ring presses the Oil in Super-low Permeability core holding unit of continuous non-uniform Distribution
CN106644877A (en) * 2016-10-18 2017-05-10 中国石油大学(华东) Experimental device for time domain dynamic CT scanning permeability of low-permeability core and experimental method
CN206177773U (en) * 2016-10-28 2017-05-17 陕西延长石油(集团)有限责任公司研究院 Experimental device for imbibition of special hypotonic oil reservoir developments of simulation crack nature
CN206132573U (en) * 2016-10-31 2017-04-26 大庆亿莱检验检测技术服务有限公司 Rock core holder
CN206267827U (en) * 2016-11-24 2017-06-20 辽河石油勘探局 A kind of workover treatment wellbore treatments instrument
CN206431009U (en) * 2017-02-16 2017-08-22 梅浩林 Low-permeability oil deposit reservoir crude oil fluidity experimental provision
CN107120112A (en) * 2017-05-05 2017-09-01 中国石油大学(北京) A kind of multiple seam coal bed gas is closed and adopts experimental provision
CN107420096A (en) * 2017-08-15 2017-12-01 中国石油大学(北京) The physical simulation experiment device and its method of horizontal well multi-stage water power successively pressure break
CN107559001A (en) * 2017-09-13 2018-01-09 中国石油化工股份有限公司 A kind of artificial ground formation damage evaluating system
CN107727465A (en) * 2017-09-14 2018-02-23 中国石油大学(华东) A kind of method and device that the artificial sand rock with reservoir architecture is made using calcarinate
CN107576562A (en) * 2017-10-19 2018-01-12 南京泰克奥科技有限公司 A kind of multi- scenarios method true triaxial test system and its test method
CN207714768U (en) * 2017-12-14 2018-08-10 中铁五局集团第一工程有限责任公司 A kind of vehicular wet-spraying machine with double acting power drive
CN108318398A (en) * 2018-01-08 2018-07-24 中国石油天然气股份有限公司 Experimental device and experimental method for high-temperature high-pressure oil displacement efficiency of heavy oil reservoir

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
DENNIS NIELSON 等: "Slim hole drilling and testing strategies", 《IOP CONFERENCE SERIES: EARTH AND ENVIRONMENTAL SCIENCE》 *
NORIAKI WATANABE 等: "Geologic Core Holder with a CFR PEEK Body for the X-ray CT-Based Numerical Analysis of Fracture Flow Under Confining Pressure", 《ROCK MECHANICS AND ROCK ENGINEERING》 *
余维初 等: "泥页岩测试专用三轴岩芯夹持器的研制与应用", 《石油天然气学报》 *
李邦超 等: "疏松砂岩油层防砂机理物理模拟", 《油气地质与采收率》 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110887766A (en) * 2019-11-01 2020-03-17 中国石油化工股份有限公司石油勘探开发研究院 Compact gas-seal-layer mining fluid-solid coupling gas-water nonlinear seepage experimental device and method
CN110887766B (en) * 2019-11-01 2022-05-06 中国石油化工股份有限公司石油勘探开发研究院 Compact gas-seal-layer mining fluid-solid coupling gas-water nonlinear seepage experimental device and method
CN110763732A (en) * 2019-11-05 2020-02-07 中国石油大学(华东) Method for measuring resistivity of shale sample under different temperature, pressure and fluid conditions
CN113567315A (en) * 2020-04-28 2021-10-29 中国石油化工股份有限公司 Reservoir rock compression coefficient determination experimental system and method for multiple injection and production processes of gas storage
CN113567315B (en) * 2020-04-28 2024-05-31 中国石油化工股份有限公司 Reservoir rock compression coefficient measurement experiment system and experiment method for multi-round injection and production process of gas storage
CN111595550B (en) * 2020-05-06 2022-07-15 三峡大学 Device and method for obtaining position of liquid displacement surface in rock fracture
CN111595550A (en) * 2020-05-06 2020-08-28 三峡大学 Device and method for obtaining position of liquid displacement surface in rock fracture
CN114016997A (en) * 2020-07-15 2022-02-08 中国石油化工股份有限公司 Heterogeneous reservoir development and adjustment simulation experiment device and method
CN114016997B (en) * 2020-07-15 2024-05-31 中国石油化工股份有限公司 Heterogeneous oil reservoir development and adjustment simulation experiment device and method
CN113075108A (en) * 2021-03-26 2021-07-06 西南石油大学 Rock core multiple stress sensitivity test method considering irreducible water saturation
CN113431563A (en) * 2021-07-28 2021-09-24 燕山大学 Complex fault block oil reservoir gravity differentiation simulation experiment device and method
CN115773094A (en) * 2021-09-08 2023-03-10 中国石油天然气股份有限公司 Indoor experimental device for simulating periodic water injection and experimental simulation method
CN114059998B (en) * 2021-09-28 2023-07-28 中国海洋石油集团有限公司 Device and method for simulating blockage of chemical flooding injection well and production well
CN114059998A (en) * 2021-09-28 2022-02-18 中国海洋石油集团有限公司 Chemical flooding injection well and production well blockage simulation device and method
CN114166999A (en) * 2021-12-01 2022-03-11 中国石油大学(北京) Oil reservoir type gas storage simulation experiment device and method
CN114658401A (en) * 2022-04-05 2022-06-24 西南石油大学 Experimental device and method for simulating gas injection of heterogeneous oil reservoir to improve recovery ratio
CN114839130A (en) * 2022-05-12 2022-08-02 西南石油大学 Method for establishing high-temperature high-pressure large-scale section model bound water experimental conditions
CN115012922A (en) * 2022-07-01 2022-09-06 陕西延长石油(集团)有限责任公司 Experiment method for providing true triaxial confining pressure for large-scale real core flat plate model
CN115263257A (en) * 2022-08-19 2022-11-01 陕西延长石油(集团)有限责任公司 Fold structure oil reservoir oil displacement simulation experiment device and simulation method thereof
CN115263257B (en) * 2022-08-19 2023-10-31 陕西延长石油(集团)有限责任公司 Oil reservoir displacement simulation experiment device with fold structure and simulation method thereof
CN117250140A (en) * 2023-11-15 2023-12-19 中国石油集团川庆钻探工程有限公司 Horizontal well section cluster non-uniform liquid inlet quantitative evaluation experimental device and method
CN117250140B (en) * 2023-11-15 2024-02-02 中国石油集团川庆钻探工程有限公司 Horizontal well section cluster non-uniform liquid inlet quantitative evaluation experimental device and method

Similar Documents

Publication Publication Date Title
CN109709266A (en) Vertical well multilayer oil reservoir flow simulation experiment device and method
Hou et al. Fracture initiation and propagation in a deep shale gas reservoir subject to an alternating-fluid-injection hydraulic-fracturing treatment
CN103556993B (en) Low permeability oil field plane Five-point method pattern carbon dioxide flooding emulation experiment analogy method
CN103527185B (en) Horizontal well physical simulation experiment device and its experimental technique
CN103148888B (en) A kind of coalbed methane reservoir bilayer closes adopts High Temperature High Pressure mining dynamic estimation system
CN109001438A (en) A kind of joint seal gas shutoff experimental simulation device and test method
CN105239986B (en) The infusion device and method of work of displacement fluid among a kind of pulse sand fracturing
CN103048431B (en) Hydrofracture propping agent settlement and permeability testing device
CN104833618B (en) To heterogeneous reservoir simulate the method and apparatus of profile control in laboratory
CN105092446A (en) Two-dimensional visual percolation experiment method capable of simulating in-layer heterogeneity
CN107656036A (en) A kind of HTHP dynamic joint seal gas-stopping effect evaluation experimental device and its evaluation method
CN108166968B (en) Experimental system and method for measuring influence of soaking on permeability of compact rock core
CN110130871B (en) Physical model of heart beach type oil reservoir and manufacturing method and experimental method thereof
CN107402286B (en) Delay swollen performance test experimental method in a kind of polymer microballoon rock core
CN112267873B (en) Single-crack profile control and flooding visualization experiment device and method for simulating formation conditions
CN103674593B (en) A kind of device and method for simulating the flood pot test of low permeability reservoir pressure break straight well
CN105298488A (en) Method for testing flow conductivity in discontinuous filling mode
CN104564043A (en) Flow diversion chamber capable of testing flow diversion capacity of fracture network of tight reservoir by gas and working method thereof
CN108508151A (en) A kind of pressure break diverting agent sealing characteristics evaluation experimental device and its working method and application
CN204327083U (en) A kind of diversion chamber of gas test compact reservoir seam net flow conductivity
CN108179999A (en) Compare the method and apparatus in carbon dioxide-foam flooding displacement stage
CN106469333A (en) A kind of hypotonic horizontal wells in heavy oil reservoir thermal recovery pressure distribution Forecasting Methodology
CN108106969A (en) Experimental system and method for measuring diffusion of pressure wave in core
CN214660085U (en) Carbon dioxide displacement of reservoir oil experimental apparatus
CN208153000U (en) A kind of fracture-pore reservoir water injection well is acidified simulator online

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201030

Address after: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Applicant after: CHINA NATIONAL PETROLEUM Corp.

Applicant after: CNPC Chuanqing Drilling Engineering Co.,Ltd.

Address before: 610056 6 Chenghua District chase street, Chengdu, Sichuan

Applicant before: CNPC Chuanqing Drilling Engineering Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20190503

RJ01 Rejection of invention patent application after publication