CN109635339A - PCF system simulation link method and system based on BIM - Google Patents
PCF system simulation link method and system based on BIM Download PDFInfo
- Publication number
- CN109635339A CN109635339A CN201811346092.3A CN201811346092A CN109635339A CN 109635339 A CN109635339 A CN 109635339A CN 201811346092 A CN201811346092 A CN 201811346092A CN 109635339 A CN109635339 A CN 109635339A
- Authority
- CN
- China
- Prior art keywords
- bim
- pcf
- bim technology
- construction
- dimension model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 23
- 238000004088 simulation Methods 0.000 title abstract description 15
- 238000010276 construction Methods 0.000 claims abstract description 63
- 238000005516 engineering process Methods 0.000 claims abstract description 60
- 238000005457 optimization Methods 0.000 claims description 11
- 238000000354 decomposition reaction Methods 0.000 claims description 4
- 230000000694 effects Effects 0.000 abstract description 7
- 238000012800 visualization Methods 0.000 abstract description 7
- 238000009434 installation Methods 0.000 abstract description 5
- 238000011900 installation process Methods 0.000 abstract description 5
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 239000004927 clay Substances 0.000 description 2
- 238000005265 energy consumption Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Abstract
The PCF system simulation link method and system based on BIM that the present invention provides a kind of, the present invention gives the effect after the completion of project by the visualization function of BIM technology, unit in charge of construction modifies and multivariant selection on this basis, it is able to solve the problem of PCF system on-site hoisting, installation inconvenience, construction quality is improved, is accelerated construction progress.The present invention can optimize prefabricated components construction and installation process, component error rate when reducing construction, reduce component heap field time at the construction field (site).The present invention can be improved the construction site level of informatization, reduce it is artificial, shorten the construction period.
Description
Technical field
The PCF system simulation link method and system based on BIM that the present invention relates to a kind of.
Background technique
Overlapped shear wall (PCF) system is precast facade mould (containing exterior finish, exterior wall overlapping)+cast-in-place shear wall.It is existing
PCF system on-site hoisting, installation are inconvenient.
Summary of the invention
The PCF system simulation link method and system based on BIM that the purpose of the present invention is to provide a kind of, are able to solve existing
The inconvenient problem of some PCF system on-site hoistings, installation.
To solve the above problems, the present invention provides a kind of PCF system simulation link method based on BIM, comprising:
Step 1 carries out the assembling scheme selection of PCF system by BIM technology when approving and initiate a project;
Step 2 carries out Deepen Design to selected assembling scheme by BIM technology, with selected PCF and concrete knot
The assembly of structure is combined;
The assembly combination of selected PCF and concrete structure is carried out STRUCTURE DECOMPOSITION by BIM technology, with right by step 3
Each prefabricated member carries out setting-out in the assembly combination, obtains dimension model;
Step 4 carries out pre-simulated to work progress according to the dimension model, and by BIM technology, judges described pre-
Whether simulation has collision problem, if nothing,
Step 5 tell somebody what one's real intentions are and guiding according to the dimension model, and by BIM technology to the assembly construction at scene.
Further, in the above-mentioned methods, the assembly construction at scene tell somebody what one's real intentions are and guiding by BIM technology, comprising:
By BIM technology and mobile terminal, the assembly construction at scene tell somebody what one's real intentions are and guiding.
Further, in the above-mentioned methods, step 4, according to the dimension model, and by BIM technology to work progress
Pre-simulated is carried out, after judging whether the pre-simulated has collision problem, further includes:
If so, step 6, optimizes the dimension model according to the collision problem found out, and according to the ruler after optimization
Very little model, and the assembly construction at scene tell somebody what one's real intentions are and guiding by BIM technology.
Further, in the above-mentioned methods, the dimension model is optimized according to the collision problem found out, comprising:
Again the step 1 is sequentially carried out to step 4.
Further, in the above-mentioned methods, according to the dimension model after the dimension model or optimization, and pass through BIM skill
After art tell somebody what one's real intentions are and and guides to the assembly construction at scene, further includes:
It tells somebody what one's real intentions are and instructs according to described, carry out the on-site hoisting of the PCF system.
Another side according to the present invention provides a kind of PCF system simulation link system based on BIM, comprising:
First device, for carrying out the assembling scheme selection of PCF system when approving and initiate a project by BIM technology;
Second device with selected PCF and is mixed for carrying out Deepen Design to selected assembling scheme by BIM technology
The assembly of Xtah Crude Clay structure is combined;
3rd device, for the assembly combination of selected PCF and concrete structure to be carried out structure point by BIM technology
Solution obtains dimension model to carry out setting-out to each prefabricated member in assembly combination;
4th device, for carrying out pre-simulated, judgement to work progress according to the dimension model, and by BIM technology
Whether the pre-simulated has collision problem;
5th device according to the dimension model, and passes through BIM technology pair if being used for the pre-simulated Lothrus apterus problem
The assembly construction at scene tell somebody what one's real intentions are and guiding.
Further, in above system, the 5th device, for passing through BIM technology and mobile terminal, to scene
Assembly construction tell somebody what one's real intentions are and guiding.
It further, further include the 6th device in above system, if having collision problem for the pre-simulated, according to
The collision problem found out optimizes the dimension model, and according to the dimension model after optimization, and by BIM technology to existing
The assembly construction of field tell somebody what one's real intentions are and guiding.
Further, in above system, the 6th device, for first device described in sequential start again to the 4th
Device.
It further, further include the 7th device in above system, for telling somebody what one's real intentions are and instructing according to, described in progress
The on-site hoisting of PCF system.
Compared with prior art, the present invention gives the effect after the completion of project by the visualization function of BIM technology, applies
Work order position is modified and multivariant selection on this basis, is able to solve PCF system on-site hoisting, is installed inconvenient ask
Topic improves construction quality, accelerates construction progress.The present invention can optimize prefabricated components construction and installation process, structure when reducing construction
Part error rate reduces component heap field time at the construction field (site).The present invention can be improved the construction site level of informatization, reduce people
Work shortens the construction period.
Detailed description of the invention
Fig. 1 is the flow chart of the PCF system simulation link method based on BIM of one embodiment of the invention.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real
Applying mode, the present invention is described in further detail.
As shown in Figure 1, the present invention provides a kind of PCF system simulation link method based on BIM, comprising:
Step 1 is carried out the assembling scheme selection of PCF system when approving and initiate a project by BIM technology, provided directly for owner
The reference frame of sight;
Step 2 carries out Deepen Design to selected assembling scheme by BIM technology, with selected PCF and concrete knot
The assembly of structure is combined;
The assembly combination of selected PCF and concrete structure is carried out STRUCTURE DECOMPOSITION by BIM technology, with right by step 3
Each prefabricated member carries out setting-out in the assembly combination, obtains dimension model;
Step 4 carries out pre-simulated to work progress according to the dimension model, and by BIM technology, judges described pre-
Whether simulation has collision problem,
Here, the dimension model can be fining dimension model;
If nothing, step 5 tells somebody what one's real intentions are simultaneously to the assembly construction at scene according to the dimension model, and by BIM technology
Guidance.
Here, BIM is the abbreviation of Building Infortion Modeling, which is pushed away from 2002 in North America
After wide, the fashionable whole world;Its main line has shaken the traditional two-dintension CAD drawing epoch, will build to the technology subversiveness
All relevant informations of project are built all to be integrated among three-dimensional visualization model, and each participant of project exists in each stage of project
Formula management and perfect is interacted to the model on particular platform, realizes the seamless handover of each link and the real time information of each side
It is shared;Efficiency can be improved using BIM technology, reduce repetition and ineffective labor, promotion fining degree, reduce energy consumption.
The present invention gives the effect after the completion of project by the visualization function of BIM technology, and unit in charge of construction is basic herein
On modify and multivariant selection, be able to solve the inconvenient problem of PCF system on-site hoisting, installation, improve construction quality,
It accelerates construction progress.The present invention can optimize prefabricated components construction and installation process, and component error rate when reducing construction reduces component
Heap field time at the construction field (site).The present invention can be improved the construction site level of informatization, reduce it is artificial, shorten the construction period.
In PCF system simulation one embodiment of link method based on BIM of the invention, by BIM technology to the dress at scene
Tell somebody what one's real intentions are and guiding with construction, comprising:
By BIM technology and mobile terminal, the assembly construction at scene tell somebody what one's real intentions are and guiding, with the assembly at the scene of improving
Construction tell somebody what one's real intentions are the convenience and guided.
In PCF system simulation one embodiment of link method based on BIM of the invention, step 4, according to the size mould
Type, and pre-simulated is carried out to work progress by BIM technology, after judging whether the pre-simulated has collision problem, further includes:
If so, step 6, optimizes the dimension model according to the collision problem found out, and according to the ruler after optimization
Very little model, and the assembly construction at scene tell somebody what one's real intentions are and guiding by BIM technology, to improve the accuracy of dimension model.
In PCF system simulation one embodiment of link method based on BIM of the invention, according to the collision problem found out to institute
Dimension model is stated to optimize, comprising:
Again the step 1 is sequentially carried out to step 4, to improve setting-out and the dimension model of each prefabricated member
Effect of optimization.
In PCF system simulation one embodiment of link method based on BIM of the invention, according to the dimension model or optimization
Dimension model afterwards, and after the assembly construction at scene tell somebody what one's real intentions are and and guided by BIM technology, further includes:
It tells somebody what one's real intentions are and instructs according to described, carry out the on-site hoisting of the PCF system, to improve the convenience of on-site hoisting.
The present invention also provides another kinds to simulate link system based on the PCF system of BIM, comprising:
First device is owner for carrying out the assembling scheme selection of PCF system when approving and initiate a project by BIM technology
Intuitive reference frame is provided;
Second device with selected PCF and is mixed for carrying out Deepen Design to selected assembling scheme by BIM technology
The assembly of Xtah Crude Clay structure is combined;
3rd device, for the assembly combination of selected PCF and concrete structure to be carried out structure point by BIM technology
Solution obtains dimension model to carry out setting-out to each prefabricated member in assembly combination;
4th device, for carrying out pre-simulated, judgement to work progress according to the dimension model, and by BIM technology
Whether the pre-simulated has collision problem;
5th device according to the dimension model, and passes through BIM technology pair if being used for the pre-simulated Lothrus apterus problem
The assembly construction at scene tell somebody what one's real intentions are and guiding.
Here, BIM is the abbreviation of Building Infortion Modeling, which is pushed away from 2002 in North America
After wide, the fashionable whole world;Its main line has shaken the traditional two-dintension CAD drawing epoch, will build to the technology subversiveness
All relevant informations of project are built all to be integrated among three-dimensional visualization model, and each participant of project exists in each stage of project
Formula management and perfect is interacted to the model on particular platform, realizes the seamless handover of each link and the real time information of each side
It is shared;Efficiency can be improved using BIM technology, reduce repetition and ineffective labor, promotion fining degree, reduce energy consumption.
The present invention gives the effect after the completion of project by the visualization function of BIM technology, and unit in charge of construction is basic herein
On modify and multivariant selection, be able to solve the inconvenient problem of PCF system on-site hoisting, installation, improve construction quality,
It accelerates construction progress.The present invention can optimize prefabricated components construction and installation process, and component error rate when reducing construction reduces component
Heap field time at the construction field (site).The present invention can be improved the construction site level of informatization, reduce it is artificial, shorten the construction period.
Further, in above system, the 5th device, for passing through BIM technology and mobile terminal, to scene
Assembly construction tell somebody what one's real intentions are and guiding, and is constructed and tell somebody what one's real intentions are the convenience and guided with the assembly at the scene of improving.
It further, further include the 6th device in above system, if having collision problem for the pre-simulated, according to
The collision problem found out optimizes the dimension model, and according to the dimension model after optimization, and by BIM technology to existing
The assembly construction of field tell somebody what one's real intentions are and guiding, to improve the accuracy of dimension model.
Further, in above system, the 6th device, for first device described in sequential start again to the 4th
Device, to improve the setting-out of each prefabricated member and the effect of optimization of dimension model.
It further, further include the 7th device in above system, for telling somebody what one's real intentions are and instructing according to, described in progress
The on-site hoisting of PCF system, to improve the convenience of on-site hoisting.
Compared with prior art, the present invention gives the effect after the completion of project by the visualization function of BIM technology, applies
Work order position is modified and multivariant selection on this basis, is able to solve PCF system on-site hoisting, is installed inconvenient ask
Topic improves construction quality, accelerates construction progress.The present invention can optimize prefabricated components construction and installation process, structure when reducing construction
Part error rate reduces component heap field time at the construction field (site).The present invention can be improved the construction site level of informatization, reduce people
Work shortens the construction period.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other
The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Professional further appreciates that, unit described in conjunction with the examples disclosed in the embodiments of the present disclosure
And algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and
The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These
Function is implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Profession
Technical staff can use different methods to achieve the described function each specific application, but this realization is not answered
Think beyond the scope of this invention.
Obviously, those skilled in the art can carry out various modification and variations without departing from spirit of the invention to invention
And range.If in this way, these modifications and changes of the present invention belong to the claims in the present invention and its equivalent technologies range it
Interior, then the invention is also intended to include including these modification and variations.
Claims (10)
1. a kind of PCF system based on BIM simulates link method characterized by comprising
Step 1 carries out the assembling scheme selection of PCF system by BIM technology when approving and initiate a project;
Step 2 carries out Deepen Design to selected assembling scheme by BIM technology, to select PCF and concrete structure
Assembly combination;
The assembly combination of selected PCF and concrete structure is carried out STRUCTURE DECOMPOSITION by BIM technology, to described by step 3
Each prefabricated member carries out setting-out in assembly combination, obtains dimension model;
Step 4 carries out pre-simulated to work progress according to the dimension model, and by BIM technology, judges the pre-simulated
Whether collision problem is had, if nothing,
Step 5 tell somebody what one's real intentions are and guiding according to the dimension model, and by BIM technology to the assembly construction at scene.
2. the PCF system based on BIM simulates link method as described in claim 1, which is characterized in that pass through BIM technology pair
The assembly construction at scene tell somebody what one's real intentions are and guiding, comprising:
By BIM technology and mobile terminal, the assembly construction at scene tell somebody what one's real intentions are and guiding.
3. the PCF system based on BIM simulates link method as described in claim 1, which is characterized in that step 4, according to institute
State dimension model, and pre-simulated carried out to work progress by BIM technology, judge the pre-simulated whether have collision problem it
Afterwards, further includes:
If so, step 6, optimizes the dimension model according to the collision problem found out, and according to the size mould after optimization
Type, and the assembly construction at scene tell somebody what one's real intentions are and guiding by BIM technology.
4. the PCF system based on BIM simulates link method as claimed in claim 3, which is characterized in that according to the conflict found out
Problem optimizes the dimension model, comprising:
Again the step 1 is sequentially carried out to step 4.
5. the PCF system based on BIM simulates link method as claimed in claim 3, which is characterized in that according to the size mould
Dimension model after type or optimization, and after the assembly construction at scene tell somebody what one's real intentions are and and guided by BIM technology, further includes:
It tells somebody what one's real intentions are and instructs according to described, carry out the on-site hoisting of the PCF system.
6. a kind of PCF system based on BIM simulates link system characterized by comprising
First device, for carrying out the assembling scheme selection of PCF system when approving and initiate a project by BIM technology;
Second device, for carrying out Deepen Design to selected assembling scheme by BIM technology, with selected PCF and concrete
The assembly of structure is combined;
3rd device, for the assembly combination of selected PCF and concrete structure to be carried out STRUCTURE DECOMPOSITION by BIM technology, with
Setting-out is carried out to each prefabricated member in assembly combination, obtains dimension model;
4th device carries out pre-simulated to work progress for according to the dimension model, and by BIM technology, described in judgement
Whether pre-simulated has collision problem;
5th device, if being used for the pre-simulated Lothrus apterus problem, according to the dimension model, and by BIM technology to scene
Assembly construction tell somebody what one's real intentions are and guiding.
7. the PCF system based on BIM simulates link system as claimed in claim 6, which is characterized in that the 5th device,
For tell somebody what one's real intentions are and guiding to the assembly construction at scene by BIM technology and mobile terminal.
8. the PCF system based on BIM simulates link system as claimed in claim 6, which is characterized in that further include the 6th dress
It sets, if having collision problem for the pre-simulated, the dimension model is optimized according to the collision problem found out, and according to
Dimension model after optimization, and the assembly construction at scene tell somebody what one's real intentions are and guiding by BIM technology.
9. the PCF system based on BIM simulates link system as claimed in claim 8, which is characterized in that the 6th device,
For first device described in sequential start again to the 4th device.
10. the PCF system based on BIM simulates link system as claimed in claim 8, which is characterized in that further include the 7th dress
It sets, for telling somebody what one's real intentions are and instructing according to, carries out the on-site hoisting of the PCF system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811346092.3A CN109635339A (en) | 2018-11-13 | 2018-11-13 | PCF system simulation link method and system based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811346092.3A CN109635339A (en) | 2018-11-13 | 2018-11-13 | PCF system simulation link method and system based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109635339A true CN109635339A (en) | 2019-04-16 |
Family
ID=66067823
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811346092.3A Pending CN109635339A (en) | 2018-11-13 | 2018-11-13 | PCF system simulation link method and system based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109635339A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107958101A (en) * | 2017-11-07 | 2018-04-24 | 山东住工装配建筑有限公司 | A kind of assembled architecture Information Management System and method based on BIM |
CN107967399A (en) * | 2017-12-19 | 2018-04-27 | 广东建远建筑装配工业有限公司 | A kind of assembled architecture Deepen Design method based on BIM softwares |
CN107977487A (en) * | 2017-11-07 | 2018-05-01 | 山东住工装配建筑有限公司 | A kind of assembly concrete architectural design method based on BIM technology |
CN108108510A (en) * | 2017-10-27 | 2018-06-01 | 广东星层建筑科技股份有限公司 | A kind of assembled architecture design method and equipment based on BIM |
CN108133107A (en) * | 2017-12-23 | 2018-06-08 | 中冶建筑研究总院有限公司 | A kind of FRP- concrete assembly methods based on BIM models |
CN108453884A (en) * | 2017-12-15 | 2018-08-28 | 上海建工五建集团有限公司 | Prefabricated components information updating method and system |
-
2018
- 2018-11-13 CN CN201811346092.3A patent/CN109635339A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108108510A (en) * | 2017-10-27 | 2018-06-01 | 广东星层建筑科技股份有限公司 | A kind of assembled architecture design method and equipment based on BIM |
CN107958101A (en) * | 2017-11-07 | 2018-04-24 | 山东住工装配建筑有限公司 | A kind of assembled architecture Information Management System and method based on BIM |
CN107977487A (en) * | 2017-11-07 | 2018-05-01 | 山东住工装配建筑有限公司 | A kind of assembly concrete architectural design method based on BIM technology |
CN108453884A (en) * | 2017-12-15 | 2018-08-28 | 上海建工五建集团有限公司 | Prefabricated components information updating method and system |
CN107967399A (en) * | 2017-12-19 | 2018-04-27 | 广东建远建筑装配工业有限公司 | A kind of assembled architecture Deepen Design method based on BIM softwares |
CN108133107A (en) * | 2017-12-23 | 2018-06-08 | 中冶建筑研究总院有限公司 | A kind of FRP- concrete assembly methods based on BIM models |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Tan et al. | Construction-oriented design for manufacture and assembly guidelines | |
Kim et al. | Applicability of 4D CAD in civil engineering construction: Case study of a cable-stayed bridge project | |
CN104631826A (en) | Construction general layout method based on BIM | |
CN111125814A (en) | BIM-based project supervision and supervision method and system | |
CN107516161A (en) | A kind of project progress management-control method based on BIM | |
CN112257150B (en) | BIM modeling-based raft foundation slab band reinforcing rib refined calculation method | |
CN110991882A (en) | Project construction fine management method based on BIM5D | |
CN106844840A (en) | A kind of method that subway station rapid modeling is realized based on BIM | |
CN115048699A (en) | Construction management method based on BIM | |
CN109635339A (en) | PCF system simulation link method and system based on BIM | |
Rybakova et al. | Opportunities to improve the efficiency of design and construction | |
Chau et al. | 4D dynamic construction management and visualization software: 2. Site trial | |
CN109034551B (en) | Resource balancing method for construction planning | |
CN111535588A (en) | System for selecting optimal pouring scheme based on BIM technology | |
CN116150872A (en) | Modeling method, system, equipment and storage medium of complex system digital function prototype | |
CN114077765B (en) | Dynamo project data management method and device based on Dynamo project data management method and device, and computer equipment | |
CN108846220A (en) | A kind of visualization building illumination design method and its system | |
Huang et al. | System development for non-unit based repetitive project scheduling | |
CN109472084A (en) | Assembled architecture design method and system, computer equipment and storage medium | |
CN114037817A (en) | Three-dimensional simulation drilling system and construction method thereof | |
CN1997191A (en) | A method for animation display in the mobile communication terminal | |
Thabet | Design/construction integration thru virtual construction for improved constructability | |
Yusof et al. | Industrialised building system (IBS)/Off-Site project management life cycle | |
Al-Assaf et al. | Representing the Aesthetics of Richard Meier’s Houses Using Building Information Modeling | |
Fernando et al. | A review of simulation applications for varying demands in tunneling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190416 |