CN109598906A - Method is sentenced in a kind of foundation pit Tunnel Engineering security risk early warning survey - Google Patents

Method is sentenced in a kind of foundation pit Tunnel Engineering security risk early warning survey Download PDF

Info

Publication number
CN109598906A
CN109598906A CN201811541091.4A CN201811541091A CN109598906A CN 109598906 A CN109598906 A CN 109598906A CN 201811541091 A CN201811541091 A CN 201811541091A CN 109598906 A CN109598906 A CN 109598906A
Authority
CN
China
Prior art keywords
module
data
wireless telecommunications
water pressure
early warning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811541091.4A
Other languages
Chinese (zh)
Inventor
孙华圣
董云
陈沈威
陈亚东
张继华
尹得余
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaiyin Institute of Technology
Original Assignee
Huaiyin Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaiyin Institute of Technology filed Critical Huaiyin Institute of Technology
Priority to CN201811541091.4A priority Critical patent/CN109598906A/en
Publication of CN109598906A publication Critical patent/CN109598906A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • G08B21/24Reminder alarms, e.g. anti-loss alarms
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B25/00Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems
    • G08B25/01Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems characterised by the transmission medium
    • G08B25/10Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems characterised by the transmission medium using wireless transmission systems
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B7/00Signalling systems according to more than one of groups G08B3/00 - G08B6/00; Personal calling systems according to more than one of groups G08B3/00 - G08B6/00
    • G08B7/06Signalling systems according to more than one of groups G08B3/00 - G08B6/00; Personal calling systems according to more than one of groups G08B3/00 - G08B6/00 using electric transmission, e.g. involving audible and visible signalling through the use of sound and light sources

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Emergency Alarm Devices (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a kind of foundation pit Tunnel Engineering security risk early warning surveys to sentence method, sentence system including early warning survey and survey and sentences method, it includes control system and signal acquiring system that system is sentenced in early warning survey, the present invention can detect the stability in tunnel constantly, tunnel concrete wall vibrations data are detected by acceleration sensing module, vertical displacement detection module receives the manual measurement displacement data of data input module input, pore water pressure changing value module detects tunnel concrete wall interiors water pressure data, when measurement displacement data, Wave data and water pressure data send enabling signal when reaching dangerous numerical value and give wireless telecommunications transmitting module, the signal of combined aural and visual alarm reception wireless telecommunications transmitting module, and issue sound-light alarm, personnel around prompt take care, the present invention can stabilization data to tunnel carry out magnanimity monitoring, system to tunnel The various situations in road are detected, and guarantee the safety of vehicle crew in tunnel.

Description

Method is sentenced in a kind of foundation pit Tunnel Engineering security risk early warning survey
Technical field
The present invention relates to Tunnel testing technical fields, more specifically, in particular to a kind of foundation pit Tunnel Engineering safety wind Method is sentenced in dangerous early warning survey.
Background technique
Urban rail transit in China planning construction enters period of flourishing.Urban track traffic is located in complicated city ring Under border condition, geology Rock Conditions, engineering construction risk is prominent, because design, construction wrong or information system management deficiency cause Newly-built railway traffic engineering enclose supporting construction crack, tilt, sliding, unstability of collapsing and surrounding formations deformation and ground settlement (protuberance) etc., can jeopardize engineering itself and safety of surrounding environment, easily bring serious economic loss, undesirable social influence even Casualties.
It is current to lack the method that magnanimity monitoring is carried out to the stabilization data in tunnel, lack system to the various situations in tunnel into Row detection, not can guarantee the safety of vehicle crew in tunnel.
Summary of the invention
The purpose of the present invention is to provide it is a kind of can the stabilization data to tunnel carry out magnanimity monitoring, be capable of pair of system Method is sentenced in the foundation pit Tunnel Engineering security risk early warning survey that the various situations in tunnel are detected.
In order to achieve the above object, The technical solution adopted by the invention is as follows: a kind of foundation pit Tunnel Engineering security risk is pre- It is alert to survey method of sentencing, including system is sentenced in early warning survey and method is sentenced in survey, it includes control system and signal acquisition that system is sentenced in the early warning survey System;
The master control system includes total control module, combined aural and visual alarm, wireless telecommunications receiving module, main power source module;Institute Total control module is stated to connect with the combined aural and visual alarm, wireless telecommunications receiving module, main power source module;
The combined aural and visual alarm is used to receive the signal of wireless telecommunications transmitting module, and issues sound-light alarm, prompts surrounding Personnel take care;
The wireless telecommunications receiving module with wireless telecommunications transmitting module for sending and receiving signals;
Main power source module is used to power to control system and signal acquiring system;
The signal acquiring system includes sub- control module, wireless telecommunications transmitting module, acceleration sensing module, vibration wave Graphic data library, vibrational waveform analysis module, vertical displacement detection module, pore water pressure changing value module, data input module;
The wireless telecommunications transmitting module is used to emit signal and receives the signal that wireless telecommunications receiving module is sent;
The acceleration sensing module sends data to vibration wave for detecting tunnel concrete wall vibrations data Conformal analysis module;
The vertical displacement detection module manual measurement displacement data that input module inputs for receiving data;
The pore water pressure changing value module is for detecting tunnel concrete wall interiors water pressure data;
The data input module is for being manually entered measurement displacement data;
The sub- control module and wireless telecommunications transmitting module, acceleration sensing module, vertical displacement detection module, hole Water pressure detection module, the connection of vibration plane waveform judgment module.
Preferably, solar battery or lithium battery can be used in the main power source module.
Preferably, the vibrational waveform analysis module is stored with each Wave data, and Wave data includes safe waveform number According to dangerous Wave data.
Preferably, the signal acquiring system further includes data processing module, and data processing module is used to be displaced measurement Data, Wave data and water pressure data are analyzed, when measurement displacement data, Wave data and water pressure data reach dangerous numerical value When send enabling signal give wireless telecommunications transmitting module.
Method is sentenced in a kind of foundation pit Tunnel Engineering security risk early warning survey, which comprises the following steps:
S1, acceleration sensing module are for detecting tunnel concrete wall vibrations data;
S2, vertical displacement detection module the manual measurement displacement data that input module inputs for receiving data;
S3, pore water pressure changing value module are for detecting tunnel concrete wall interiors water pressure data;
S4, enabling signal is sent to wireless when measuring displacement data, Wave data and water pressure data and reaching dangerous numerical value Communicate transmitting module;
S5, wireless telecommunications receiving module receive wireless telecommunications transmitting module enabling signal;
S6, combined aural and visual alarm receive the signal of wireless telecommunications transmitting module, and issue sound-light alarm, prompt the personnel of surrounding It takes care.
Compared with the prior art, the advantages of the present invention are as follows:
The present invention can detect the stability in tunnel constantly, detect the vibration of tunnel concrete wall by acceleration sensing module Dynamic data, vertical displacement detection module receive the manual measurement displacement data of data input module input, pore water pressure variation It is worth module and detects tunnel concrete wall interiors water pressure data, when measurement displacement data, Wave data and water pressure data reach danger Enabling signal is sent when dangerous numerical value and gives wireless telecommunications transmitting module, and wireless telecommunications receiving module receives wireless telecommunications transmitting module and opens Dynamic signal, combined aural and visual alarm receive the signal of wireless telecommunications transmitting module, and issue sound-light alarm, and the personnel of surrounding is prompted to pay attention to Safety, the present invention can stabilization data to tunnel carry out magnanimity monitoring, system detects the various situations in tunnel, guarantees The safety of vehicle crew in tunnel.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is that system framework figure is sentenced in a kind of foundation pit Tunnel Engineering security risk early warning survey of the present invention.
Fig. 2 is the flow chart that method of sentencing is surveyed in a kind of foundation pit Tunnel Engineering security risk early warning of the present invention.
In figure: total control module 1, combined aural and visual alarm 2, wireless telecommunications receiving module 3, sub- control module 4, wireless telecommunications hair Penetrate module 5, acceleration sensing module 6, vibrational waveform database 7, vibrational waveform analysis module 8, vertical displacement detection module 9, Pore water pressure changing value module 10, data input module 11.
Specific embodiment
The preferred embodiment of the present invention is described in detail with reference to the accompanying drawing, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, so as to make a clearer definition of the protection scope of the present invention.
As shown in fig.1, the present invention, which provides a kind of foundation pit Tunnel Engineering security risk early warning survey, sentences method, a kind of foundation pit tunnel Method is sentenced in engineering safety Risk-warning survey in road, including early warning survey sentences system and surveys method of sentencing, and it includes control system that system is sentenced in early warning survey System and signal acquiring system;
Master control system includes total control module 1, combined aural and visual alarm 2, wireless telecommunications receiving module 3, main power source module;Master control Molding block 1 is connect with combined aural and visual alarm 2, wireless telecommunications receiving module 3, main power source module;
Combined aural and visual alarm 2 is used to receive the signal of wireless telecommunications transmitting module 5, and issues sound-light alarm, prompts surrounding Personnel take care;
Wireless telecommunications receiving module 3 with wireless telecommunications transmitting module 5 for sending and receiving signals;
Main power source module is used to power to control system and signal acquiring system;
Signal acquiring system includes sub- control module 4, wireless telecommunications transmitting module 5, acceleration sensing module 6, vibration wave Graphic data library 7, vibrational waveform analysis module 8, vertical displacement detection module 9, pore water pressure changing value module 10, data input Module 11;
Wireless telecommunications transmitting module 5 is used to emit signal and receives the signal that wireless telecommunications receiving module 3 is sent;
Acceleration sensing module 6 sends data to vibrational waveform for detecting tunnel concrete wall vibrations data Analysis module 8;
The manual measurement displacement data that input module 11 inputs for receiving data of vertical displacement detection module 9, it is artificial to survey Amount displacement data can be measured by total station, level meter and various measuring instruments;
Pore water pressure changing value module 10 is for detecting tunnel concrete wall interiors water pressure data, by mixed in tunnel Pressure sensor is buried in solidifying cob wall wall, pressure data is sent to pore water pressure changing value module 10 by pressure sensor;
Data input module 11 is for being manually entered measurement displacement data;
Sub- control module 4 and wireless telecommunications transmitting module 5, acceleration sensing module 6, vertical displacement detection module 9, hole Water pressure detection module, the connection of vibration plane waveform judgment module.
In the present embodiment, solar battery or lithium battery is can be used in main power source module.
In the present embodiment, vibrational waveform analysis module 8 is stored with each Wave data, and Wave data includes safe waveform number According to dangerous Wave data.
In the present embodiment, signal acquiring system further includes data processing module, and data processing module is used to be displaced measurement Data, Wave data and water pressure data are analyzed, when measurement displacement data, Wave data and water pressure data reach dangerous numerical value When send enabling signal to wireless telecommunications transmitting module 5.
As shown in Fig. 2, method is sentenced in a kind of foundation pit Tunnel Engineering security risk early warning survey, following steps are included:
S1, acceleration sensing module 6 are for detecting tunnel concrete wall vibrations data;
S2, vertical displacement detection module 9 the manual measurement displacement data that input module 11 inputs for receiving data;
S3, pore water pressure changing value module 10 are for detecting tunnel concrete wall interiors water pressure data;
S4, enabling signal is sent to wireless when measuring displacement data, Wave data and water pressure data and reaching dangerous numerical value Communicate transmitting module 5;
S5, wireless telecommunications receiving module 3 receive 5 enabling signal of wireless telecommunications transmitting module;
S6, combined aural and visual alarm 2 receive the signal of wireless telecommunications transmitting module 5, and issue sound-light alarm, prompt the people of surrounding Member takes care.
Working principle: tunnel concrete wall vibrations data are detected by acceleration sensing module 6, vertical displacement detects mould Block 9 receives the manual measurement displacement data that data input module 11 inputs, and it is mixed that pore water pressure changing value module 10 detects tunnel Solidifying cob wall pars intramuralis water pressure data sends starting when measuring displacement data, Wave data and water pressure data and reaching dangerous numerical value Signal receives 5 enabling signal of wireless telecommunications transmitting module, acousto-optic report to wireless telecommunications transmitting module 5, wireless telecommunications receiving module 3 Alert device 2 receives the signal of wireless telecommunications transmitting module 5, and issues sound-light alarm, and the personnel of surrounding is prompted to take care.
Although the embodiments of the invention are described in conjunction with the attached drawings, but patent owner can be in appended claims Within the scope of make various deformations or amendments, as long as it does not exceed the scope of protection described in the claims to the invention, all should Within protection scope of the present invention.

Claims (5)

1. method is sentenced in a kind of foundation pit Tunnel Engineering security risk early warning survey, including system is sentenced in early warning survey and method, feature are sentenced in survey Be: it includes control system and signal acquiring system that system is sentenced in the early warning survey;
The master control system includes total control module (1), combined aural and visual alarm (2), wireless telecommunications receiving module (3), main power source mould Block;The total control module (1) connect with the combined aural and visual alarm (2), wireless telecommunications receiving module (3), main power source module;
The combined aural and visual alarm (2) is used to receive the signal of wireless telecommunications transmitting module (5), and issues sound-light alarm, prompts week The personnel enclosed take care;
The wireless telecommunications receiving module (3) with wireless telecommunications transmitting module (5) for sending and receiving signals;
Main power source module is used to power to control system and signal acquiring system;
The signal acquiring system include sub- control module (4), wireless telecommunications transmitting module (5), acceleration sensing module (6), Vibrational waveform database (7), vibrational waveform analysis module (8), vertical displacement detection module (9), pore water pressure changing value mould Block (10), data input module (11);
The wireless telecommunications transmitting module (5) is used to emit signal and receives the signal that wireless telecommunications receiving module (3) are sent;
The acceleration sensing module (6) sends data to vibration wave for detecting tunnel concrete wall vibrations data Conformal analysis module (8);
The vertical displacement detection module (9) the manual measurement displacement data that input module (11) inputs for receiving data;
The pore water pressure changing value module (10) is for detecting tunnel concrete wall interiors water pressure data;
The data input module (11) is for being manually entered measurement displacement data;
The sub- control module (4) and wireless telecommunications transmitting module (5), acceleration sensing module (6), vertical displacement detection module (9), pore water pressure detection module, the connection of vibration plane waveform judgment module.
2. method is sentenced in a kind of foundation pit Tunnel Engineering security risk early warning survey according to claim 1, it is characterised in that: described Solar battery or lithium battery can be used in main power source module.
3. method is sentenced in a kind of foundation pit Tunnel Engineering security risk early warning survey according to claim 1, it is characterised in that: described Vibrational waveform analysis module (8) is stored with each Wave data, and Wave data includes safe Wave data and dangerous Wave data.
4. method is sentenced in a kind of foundation pit Tunnel Engineering security risk early warning survey according to claim 1, it is characterised in that: described Signal acquiring system further includes data processing module, and data processing module is used for measurement displacement data, Wave data and hydraulic pressure Data are analyzed, and enabling signal is sent when measuring displacement data, Wave data and water pressure data and reaching dangerous numerical value to nothing Line communicates transmitting module (5).
5. method is sentenced in a kind of foundation pit Tunnel Engineering security risk early warning survey according to claim 1, which is characterized in that including Following steps:
S1, acceleration sensing module (6) are for detecting tunnel concrete wall vibrations data;
S2, vertical displacement detection module (9) the manual measurement displacement data that input module (11) inputs for receiving data;
S3, pore water pressure changing value module (10) are for detecting tunnel concrete wall interiors water pressure data;
S4, enabling signal is sent to wireless telecommunications when measuring displacement data, Wave data and water pressure data and reaching dangerous numerical value Transmitting module (5);
S5, wireless telecommunications receiving module (3) receive wireless telecommunications transmitting module (5) enabling signal;
S6, combined aural and visual alarm (2) receive the signal of wireless telecommunications transmitting module (5), and issue sound-light alarm, prompt the people of surrounding Member takes care.
CN201811541091.4A 2018-12-17 2018-12-17 Method is sentenced in a kind of foundation pit Tunnel Engineering security risk early warning survey Pending CN109598906A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811541091.4A CN109598906A (en) 2018-12-17 2018-12-17 Method is sentenced in a kind of foundation pit Tunnel Engineering security risk early warning survey

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811541091.4A CN109598906A (en) 2018-12-17 2018-12-17 Method is sentenced in a kind of foundation pit Tunnel Engineering security risk early warning survey

Publications (1)

Publication Number Publication Date
CN109598906A true CN109598906A (en) 2019-04-09

Family

ID=65962633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811541091.4A Pending CN109598906A (en) 2018-12-17 2018-12-17 Method is sentenced in a kind of foundation pit Tunnel Engineering security risk early warning survey

Country Status (1)

Country Link
CN (1) CN109598906A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103942923A (en) * 2014-04-27 2014-07-23 张臣 Road slope retaining engineering safety early-warning system
CN104167084A (en) * 2014-08-18 2014-11-26 同济大学 Engineering-risk wireless-sensing early-warning visualization system and method
CN104879169A (en) * 2015-05-18 2015-09-02 广州市建设工程质量安全检测中心 Underground engineering and deep foundation pit unattended real-time monitoring early warning system and working method thereof
CN105095679A (en) * 2015-09-10 2015-11-25 北京安捷工程咨询有限公司 Security risk early warning measurement and judgment method of foundation pit tunnel engineering
CN106224007A (en) * 2016-08-26 2016-12-14 招商局重庆交通科研设计院有限公司 Safety for tunnel engineering monitoring and warning management system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103942923A (en) * 2014-04-27 2014-07-23 张臣 Road slope retaining engineering safety early-warning system
CN104167084A (en) * 2014-08-18 2014-11-26 同济大学 Engineering-risk wireless-sensing early-warning visualization system and method
CN104879169A (en) * 2015-05-18 2015-09-02 广州市建设工程质量安全检测中心 Underground engineering and deep foundation pit unattended real-time monitoring early warning system and working method thereof
CN105095679A (en) * 2015-09-10 2015-11-25 北京安捷工程咨询有限公司 Security risk early warning measurement and judgment method of foundation pit tunnel engineering
CN106224007A (en) * 2016-08-26 2016-12-14 招商局重庆交通科研设计院有限公司 Safety for tunnel engineering monitoring and warning management system

Similar Documents

Publication Publication Date Title
KR102042616B1 (en) IoT Based Safety Management System of Urban Construction Site
CN205445677U (en) Tunnel safety precaution and automatic control system of measurationing
CN103743441B (en) The polynary of a kind of side slope safety is coupling in line monitoring system and method
CN203204791U (en) Multiparameter landslide and mud-rock flow monitoring early warning system
CN106224007A (en) Safety for tunnel engineering monitoring and warning management system
CN102943459B (en) Remote smart monitoring and three-dimensional early warning method and system for deformation stability of deep foundation pit
CN105116440B (en) A kind of slope rock mass monitoring system and monitoring method
CN109374049A (en) A kind of tunnel wall rock deformation monitoring alarm
CN103134473B (en) Wireless barometric leveling device and survey high method
CN103996269B (en) Wireless data collecting control system
CN105006108B (en) A kind of natural calamity automatic early-warning system and its implementation
CN108571932A (en) A kind of side slope comprehensive monitor system and monitoring method
CN107067690A (en) A kind of Tunnel automation monitoring system and its monitoring method based on ZigBee
CN104715575A (en) Landslide monitoring and alarming method and device base on laser ranging
CN205121825U (en) Tailing storehouse safety monitoring system
CN111678489A (en) Runway settlement monitoring system and method for airport flight area
CN103046525A (en) Facility and method for mechanical stability remote intelligent monitoring and three-dimensional early warning of deep foundation pit
CN205665418U (en) Vehicular removes traffic meteorological monitoring system
CN102797504A (en) Remote three-dimensional digital alarm method and facility of deformation stability of primary tunnel supporting body
CN202693117U (en) Bridge amplitude real-time monitoring device based on laser modulation
CN205138471U (en) Railway roadbed subsides real -time monitoring system based on big dipper dual -frenquency is measured
CN205015487U (en) Side slope rock mass monitoring system
CN109598906A (en) Method is sentenced in a kind of foundation pit Tunnel Engineering security risk early warning survey
CN107747966A (en) A kind of high slope builds monitoring early-warning system
CN203849835U (en) Wireless data acquisition control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190409

RJ01 Rejection of invention patent application after publication