CN109577484A - A kind of assembly method of the cabin of incorporeity beam frame structure - Google Patents
A kind of assembly method of the cabin of incorporeity beam frame structure Download PDFInfo
- Publication number
- CN109577484A CN109577484A CN201811340424.7A CN201811340424A CN109577484A CN 109577484 A CN109577484 A CN 109577484A CN 201811340424 A CN201811340424 A CN 201811340424A CN 109577484 A CN109577484 A CN 109577484A
- Authority
- CN
- China
- Prior art keywords
- plate
- cabin
- incorporeity
- frame structure
- chassis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/34315—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
- E04B1/34321—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by panels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/44—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
- E04C2/52—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits
- E04C2/521—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits serving for locating conduits; for ventilating, heating or cooling
Abstract
The invention discloses a kind of assembly methods of the cabin of incorporeity beam frame structure, and steps are as follows: 1. first prefabricated panels;2. chassis then is arranged in predetermined position;3. finally splicing the cabin that plate forms incorporeity girder construction on chassis.Using modularized design thinking, just entire external and internal compositions and ornament materials can be assembled in place in the production phase, and water pipe and All other routes pipeline are reserved in specific plate according to design, only all conveying sheets to infield need to be accomplished fluently just direct splicing molding after the fixed structure of ground.Continuous pipeline configuration is just formed after connecting by the pipeline that insertion bolt is fixed, and presets in plate layer into the bolt mounting holes being reserved with according to predetermined installation method between plate and plate, is usable by carrying out certain processing in junction.Installing and dismounting efficiency is not only improved, does not need that inside and outside wall covering is additionally installed, is in process of production just respectively mounted all material in place, and transported in the form of plate.
Description
Technical field
The invention belongs to fabricated structure technical fields, and in particular to a kind of assembly of dismountable incorporeity beam cabin
Method.
Background technique
The eco-tour amusement and recreation mode using ecological farm village as representative was risen in recent years, was to be with green, ecology, environmental protection
Target is support with scientific and technical innovation using utilization of resources as carrier, and using market operation as means, collection agricultural production adds deeply
The ecological entertainment way that work and sightseeing tour are integrated.For eco-tourism model, " Peasants Joy " troop huge at present, China
Occupy leading position, the drawbacks such as " taste low side, product is single, and interaction lacks, and consumptive power is weak " be exposed through obviously, for
The development of fine work people place develops fine work people place and needs to solve the problems, such as: by " fine work people place " as the weight for promoting Rural Tourism Development
Point;Carry out policy execution, the key area of planning of science activities " fine work people place " development;Demoncal ration effect is played, introduces product with all strength
Board;Merge local conditions and customs.
The short rent in people place undergoes long-run development, gradually moves towards city and scenic spot from rural area, farm.It is quick with Internet technology
Development, reduces the sharing cost of lodging information, and online short rent concept is increasingly risen in the whole world.The transaction constructed by internet
The idle source of houses is combined local culture and gardens to be modified to the service of accommodating by platform, landlord, and tenant passes through search sieve
The source of houses is selected, both sides complete the relevant operations such as real-time communication, grace payment online.Because its cultural inclusiveness, credit system are perfect etc.
Feature development is more mature mode.
Existing Peasants Joy perhaps people's Su Duowei permanent type building in bio-farm for some remote districts or
The area that can not carry out big component or heavy construction equipment transport is had certain limitations to communications and transportation, builds this permanent type building
Object difficulty is larger, higher cost.A kind of provisional easy-to-mount cabin structure is needed, now to meet the demand.And show
All provides tent progress lodge in many outdoor campsites, even if being large-scale tent, comfort level and firmness degree also without
Method is compared with fixed buildings.And if assembly efficiency can only be improved using fabricated structure, but its essence or it is one kind
Fixed building can not accomplish the function of fast assembling-disassembling and recycling.
And people's Su Duowei permanent type building in existing Peasants Joy or bio-farm, for some remote districts
Or the area that can not carry out big component or heavy construction equipment transport is had certain limitations to communications and transportation, build this permanent type
Building difficulty is larger, higher cost.A kind of provisional easy-to-mount cabin structure is needed, now to meet the demand.
Summary of the invention
In order to solve to be unable to reach in above-mentioned existing structure of the existing technology, fast assembling-disassembling and stablizing used asks
Topic, it is an object of that present invention to provide one kind can be for progress fast assembling-disassembling and tool in some Peasants Joy or eco-tour campsite
There are the quick production and assembly method of the cabin of preferable comfort.
The technical scheme adopted by the invention is as follows: a kind of assembly method of the cabin of incorporeity beam frame structure, steps are as follows:
G1. first prefabricated panels;
Then chassis is arranged in predetermined position in G2;
G3. finally splice the cabin that plate forms incorporeity girder construction on chassis.
Wherein, a kind of cabin of incorporeity girder construction includes the room body for the incorporeity beam that multiple board material splices are formed
With the chassis of setting on the ground, the room body is placed on chassis.
Incorporeity girder construction refers to the beam frame structure without any entity outside it, but the plate spliced by muti-piece into
Row is connected and fixed, and is designed by the structure of plate so that plate undertakes the effect structure of beam, is belonged to hiding beam frame structure, is led to
It crosses the plate interconnecting piece known to force analysis at the top of its room body and forms actual girder construction.In the design can not only increase as far as possible
Portion's space utilization rate, while production and assembly process can also be reduced, simplify assemble flow, improves efficiency.
Further, wherein the detailed step of prefabricated panels is as follows in step G1:
(1.1) panel body of multilayered structure is first made;
(1.2) it is offered on panel body again convenient for the mounting groove of bolt;
(1.3) then pipeline is set in panel body reserve channel, and is equipped with water pipe and spool in reserved channel.
Wherein, the pipeline includes wireway and water pipe, is equipped with cable messenger in the wireway.Pipe in plate
Road is the pipeline of PVC material, and can generally be pierced by plate and cut adjustment when being reserved with additional length to install.
And cable installation when needing to assemble, but the closed cable pipeline formed after board material splice can not be threaded directly.Then can
Cable messenger is equipped in wireway.It, can be first by the water pipe and wireway between two adjacent sheet metals when splicing plate
Connection, at the same the cable messenger end bolt being reserved in wireway is tight.Finally again by electric wire and optical fiber end bolt in side
The end of cable messenger, and pull cable messenger to enable cable completely through entire wireway from end side.
Further, the detailed step that chassis is wherein arranged in step G2 is as follows:
(2.1) it first crosses in predetermined position according to predetermined scheme, and marks piling point;
(2.2) spud pile is beaten downwards in piling point, and is in the spud pile top surface in same level;
(2.3) the cement fixed structure for being used to reinforce is equipped on the spud pile top set;
(2.4) it is finally equipped with keel strip on spud pile and forms chassis.
General room body bottom is rectangular plate structure, therefore draws rectangular shaped rim with paint marking or magnesium powder in predetermined position,
And piling point is marked in rectangular shaped rim, then spud pile is moved at corresponding piling point and is driven underground.
Further, the spud pile bottom be equipped with external screw thread, and by rotation piling machine by spud pile screw in ground with
Under;Fixed disk is equipped at the top of the spud pile.Wherein the keel strip is arranged in fixed disk, and the general spud pile is to wait row
Column setting, is respectively provided with same root keel strip on single spud pile, and more keel strips constitute latticed keel shoes, then by the plate
It is arranged on keel shoe.
Further, specific step is as follows by the step G3:
(3.1) by plate it is regular be deposited in predetermined position side, and prepare successively to set up from bottom to up on chassis;
(3.2) it when setting up plate, first passes through bolt and is fixedly connected with adjacent sheet metal, and by the seal for pipe joints of junction two sides
Connection;
(3.3) after all board material splices are completed to form room body structure, then door and window and internal furniture are installed;
(3.4) room body energization water flowing is given again, and room body sewage draining exit is connect with external waste removal equipment.
Further, the plate includes roofing board, shingle nail and bottom plate, further includes that at least two will be divided into inside room body
The internal partition of layer.
Further, the substrate of the plate is keel, and lamina rara externa is equipped on the outside of the keel, is equipped with internal layer on the inside of keel
Plate;It is fixedly connected between adjacent sheet metal by the bolt being plugged on keel.
Further, specific step is as follows by the step G3:
(3.1) different type plate is classified and regular to be placed on predetermined position side to be installed;
(3.2) first bottom plate is placed on chassis and is fixed, then shingle nail is mounted on bottom plate again, and pass through bolt
Be fixed, then internal partition be set on the shingle nail and bottom plate set, finally by roofing board and shingle nail and inside every
Plate connects and composes room body;The seal for pipe joints of junction two sides is connected when plate is connected and fixed;
(3.3) after all board material splices are completed to form room body structure, then door and window and internal furniture are installed;
(3.4) room body energization water flowing is given again, and room body sewage draining exit is connect with external waste removal equipment.
It is worth noting that the external waste removal equipment drainage of position and area can be set according to practical cabin and
It is fixed.If the cabin is built in Peasants Joy or scenic spot, and comes with blowdown pipeline, then small blowdown general pipeline within doors and outside are arranged
Dirty pipeline connection, by concentrating blowdown to be handled.If not set blow-off line, individual blowdown is equipped with outside cabin and is received
Collect tank, and the waste water in periodic cleaning blowdown collecting tank, the blowdown mode of similar existing outdoor temporary toilet.And internal dress
Decorations and furniture can be installed according to actual needs, and there are wiring board mounting grooves for the plate of room body, and are equipped with wiring board.Its
Power supply conveys electric energy by External cable, can be small individually spare equipped with diesel power generation equipment within doors.And window equally can be according to reality
Border demand is configured.
Further, the roofing board includes light-transmitting plate and barn door.Light-transmitting plate described here equally uses wooden
Keel are as substrate, and lamina rara externa and inner plating are all made of transparent panel, such as acrylic board, then external light can be through saturating
Isotropic disk enters the room, and increases illuminating area.
The corresponding interior space of light-transmitting plate can be used as entrance hall or parlor and carry out function division.And barn door is similar to tile material
Matter achievees the effect that subregion by the difference of light.And general room body is double-layer structure, wherein in order to guarantee preferable illumination effect
Fruit, the internal partition is positioned only in the corresponding space of barn door, and the corresponding region of light-transmitting plate can then be directed through light
Onto bottom plate, thus more penetrating bright.Simultaneously in order to improve energy utilization rate, be usually additionally provided on the outside of barn door it is multiple too
Positive energy power generation plate can provide the energy to cabin indoor section electric appliance by solar panel.
Further, the shingle nail includes side plate and door-plate, and the door-plate is equipped with hinge window and door.
The invention has the benefit that
The present invention is a kind of two layers of cabin structure being spliced completely by wooden boards, using modularized design thinking,
Just entire external and internal compositions and ornament materials can be assembled in place in the production phase, and be reserved in specific plate according to design
There are water pipe and All other routes pipeline, all conveying sheets to infield need to only be accomplished fluently just direct after the fixed structure of ground
Spicing forming type.
It is fixed between plate and plate by being inserted into bolt into the bolt mounting holes being reserved with, and is preset in plate layer
Good pipeline is according to continuous pipeline configuration is just formed after the connection of predetermined installation method, by being in the certain processing of junction progress
It can be used.Installing and dismounting efficiency is not only improved, does not need that inside and outside wall covering is additionally installed, in process of production just by institute
There is material to be respectively mounted in place, and is transported in the form of plate.
Some areas for having extreme terrain to limit can either be completed without large-scale transporting equipment and installation equipment
The installation process of entire photosynthetic cabin.And all material after mounted cabin disassembly is reusable, and cost is relatively low, more
Add clean and environmental protection.Compared to existing movable plank house, it is ensured that certain life basic function demand is capable of providing comfortable
Living conditions.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is spud pile structural schematic diagram of the invention.
In figure: 1- room body, 2- spud pile, 3- cement fixed structure, 4- platform, 5- fence.
Specific embodiment
With reference to the accompanying drawing and specific embodiment does further explaination to the present invention.
Embodiment 1:
The present embodiment provides the cabins and its assembly method of a kind of incorporeity girder construction, as shown in Figure 1, including incorporeity beam
Room body 1 and setting chassis on the ground, the room body 1 be placed on chassis.Wherein, the room body 1 has multiple identical structures
Plate bolt and constitute, and be arranged on the chassis preset.Incorporeity girder construction refers to the beam without any entity outside it
Frame structure, but fixation is attached by the plate that muti-piece splices, and designed by the structure of plate so that plate undertakes
The effect structure of beam belongs to hiding beam frame structure, forms reality by the plate interconnecting piece at its 1 top of room body known to force analysis
Girder construction.
It is assembled and manufacturing method is as follows: cabin whole design is first carried out, limits size and structure according to actual needs, then
It is split in the enterprising andante material of cabin overall construction design.Plate is made in factory according to the sheet shape of fractionation and size.
Chassis can be carried out in predetermined installation site simultaneously to set up, first ground is flattened and removes peripheral obstacle to be put down
Whole fabricating yard, while it needs to be determined that raw material laydown area.The plate made and raw material are transported into pre- Dingan County again
Holding position.After chassis is set up, plate is ridden upon on chassis and is successively bolted from the bottom to top.Eventually form one
Water flowing, which is powered and clears the field, after 1 structure of complete room body is detected, and is delivered for use if all facilities test passes.
And when needing to remove, only need to by the equipment Removal of outwardly and inwardly non-1 structure of room body, then according to from top to bottom according to
It is secondary remove plate and be packaged install, finally remove all building materials on chassis and disposal field and be packaged arrangement.
The double slope surface roof structure that room body 1 in the present embodiment is two layers, and plate is all made of preserving timber, not only has
Preferable weatherability, while assembly efficiency can be improved as ground in the chassis by being previously provided with, while having preferable stabilization
Property.
Embodiment 2:
As shown in Figure 1, the present embodiment discloses a kind of cabin of entity girder construction, specially a kind of double inclined plane of bilayer is wooden
Cabin structure is constituted including chassis on the ground and the room body 1 being arranged on chassis is arranged.
Roof is the inversion V-structure being obliquely installed, and tilt angle is larger, and ice and snow is avoided to be deposited on roof.
As shown in Fig. 2, wherein the chassis is the three identical spacing of column and spud pile 2 arranged in parallel, the spud pile 2 of same column
Between spacing it is equal.It is disc-shaped structure at the top of all spud piles 2 and is in same level, and the room body 1 is then
It is fixed on the supporting plane being made of all 2 bottoms of spud pile.
Spud pile 2 is driven underground, and reserved part is used as support tie point on the ground.Spud pile 2 similar to screw form,
End is equipped with plane and expands end, and expands in plane and be equipped with multiple fixation holes on end, to fix keel.On the ground in predetermined position
More spud piles 2 have been evenly arranged on face according to plan, and have guaranteed that all 2 tops of spud pile are in same level, so that
The plate for being fixed thereon portion is able to maintain level.
Spud pile 2 bassets part equipped with cement fixed structure 3.After the completion of single spud pile 2 plugs, in order into one
Step is fixed prevent spud pile 2 because soil layer is loose deflect the problem of appearance, first righting makes spud pile 2 keep vertical shape
State, then around spud pile 2 ground joints cement formation the cement for the quadrangular shape that 2 aerial part of spud pile wraps up is consolidated
Structure 3 is determined, to reinforce fixed effect.And in disassembly, impact type cement crusher can be directlyed adopt and directly smash taking-up to pieces admittedly
Determine stake 2.
The room body 1 has muti-piece different type but there is mutually isostructural board material splice to form, and the substrate of the plate is
Keel, the keel outside are equipped with lamina rara externa, are equipped with inner plating on the inside of keel;By being plugged on keel between adjacent sheet metal
Bolt is fixedly connected.
Wherein the keel are the fenestral fabric that is spliced of rough ground, fill wherein heat-preservation cotton and being compacted to be formed compared with
For closely knit insulating layer, to further increase heat preservation and soundproof effect.
Meanwhile the outside is the outside of entire room body 1, is set by the multi-layer bonded structure of lamina rara externa and inner plating
Meter, the effective performance and aesthetic measure for improving monolith plate, compared to coarse keel layer, can suitably increase finishing material with
Improve vision perception.
It is worth noting that wherein keel are main force structure, therefore when board material splice, consolidated using bolt mode
It is fixed, and bolt is connect with the keel of two neighboring plate.It can reach the effect of fast assembling-disassembling by way of bolt, simultaneously
In junction, coating marine glue is sealed, to guarantee the sealing effect of junction.And the uniform cloth between two neighboring plate
More bolts are equipped with, and are preset according to practical structures Mechanics Calculation and to the size of bolt and specific setting position, from
And reach preferable structural stability.
Wherein, plate classify and individually optimize its structure according to setting position.It mainly include roofing board, wall
Panel and bottom plate further include that two layers of internal partition will be divided into inside room body 1.
The roofing board includes light-transmitting plate and barn door.Light-transmitting plate is equally using wooden keel as substrate, and outer layer
Plate and inner plating are all made of acrylic transparent panel, then external light can be entered the room through transparent panel, increase illuminating area.
And the corresponding interior space of light-transmitting plate can be used as entrance hall or parlor and carry out function division.
And barn door achievees the effect that subregion by the difference of light similar to tile material.And general room body 1 is two layers of knot
Structure, wherein the internal partition is positioned only in the corresponding space of barn door, and light-transmitting plate in order to guarantee preferable lighting effect
Corresponding region can be then directed through on light to bottom plate, thus more penetrating bright.Simultaneously in order to improve energy utilization rate, lead to
It is often additionally provided with multiple solar panels on the outside of barn door, can be provided to cabin indoor section electric appliance by solar panel
The energy.
Wherein, it is respectively that the wooden keel of 89mm and 38mm set up the dragon to form fenestral fabric that roofing board, which is all made of length and width,
Skeleton is as main body, and in the high-density flame-proof heat-preservation cotton of the 90mmEpc of keel shoe.And that barn door is arranged on the outside of keel is outer
Laminate is multilayered structure, is followed successively by the OSB plate of colorful watt of pitch, polypropylene fibre waterproof cloth and 12mm thickness from outside to inside;And barn door exists
The inner plating being arranged on the inside of keel is similarly multilayered structure, the true qualities paint free plate of OSB plate and 10mm thickness including 6mm thickness,
Middle true qualities paint free plate is arranged indoors, as indoor panel.
The shingle nail includes side plate and door-plate, and the door-plate is equipped with hinge window and door.Its middle door-plate lower part is square
Shape, and top is the triangle for agreeing with roofing board.The door runs through rectangle and delta-shaped region, identical as hinge window to be all made of
Rotate opening-closing structure.Entire room body 1 includes the door-plate of two pieces of identical sizes, and locking door is equipped on each door-plate.
And it is respectively that the wooden keel of 89mm and 38mm set up the dragon to form fenestral fabric that shingle nail, which equally uses length and width,
Skeleton is as main body, and its lamina rara externa includes outside the PVC Side fascia of 12mm thickness and the OSB plate of 12mm thickness, wherein OSB plate and PVC
Breathing paper is additionally provided between wallboard.The PVC Side fascia is arranged in outermost, passes through bonding connection.And its inner plating includes
The wooden lining of 10mm thickness and the OSB plate of 12mm thickness, wherein wooden lining is in innermost layer.
The bottom plate then uses length and width to set up shape for the wooden keel of 140mm and 38mm size to improve structural strength
At the keel shoe of fenestral fabric as main body, and its lamina rara externa includes the solid wood roof boarding of 10mm thickness and the OSB plate of 6mm thickness,
Middle solid wood roof boarding is in outermost.And its inner plating includes the solid wooden floor board of 20mm thickness and the OSB plate of 12mm thickness, wherein solid wood
Plate is in most inner side.
It is worth noting that plate by early period it is prefabricated after bolt fixation is carried out by bolt again, and in the plate
Inside it is reserved with pipeline.Because of plate needed for needing present prefabrication good, and in order to avoid being opened up on plate again when cabin assembly
Slot improves efficiency simultaneously, can at the beginning of design will the pipeline of entire cabin preset, and not to the design of the plate of different location
With preformed groove size, to guarantee to be directly connected to pipeline according to drawing during installation, shorten installation step to
Assembly efficiency is improved, causes route is unstable to ask to avoid the setting of later period temporary construction simultaneously also by unified route design
Topic occurs.
Pipeline includes wireway and water pipe, is equipped with cable messenger in the wireway.Pipeline in plate is PVC
The pipeline of material, and can generally be pierced by plate and cut adjustment when being reserved with additional length to install.And cable needs to assemble
When install, but the closed cable pipeline formed after board material splice can not be threaded directly.It can then draw in wireway equipped with cable
Rope.When splicing plate, first the water pipe between two adjacent sheet metals can be connected to wireway, while conduit will be reserved in
Cable messenger end bolt in road is tight.Finally again by electric wire and optical fiber end bolt in the end of side cable messenger, and from another
Side end pulls cable messenger to enable cable completely through entire wireway.
Also the socket slot being connected to conduit can be dug on surface according to design drawing on the plate made and hold
Slot is closed, so that directly switch and socket can be arranged in corresponding position when later period assembly.
And the platform 4 connecting with room body 1 is additionally provided on the outside of room body 1, fence 5 and staircase are additionally provided on the platform 4.Cause
It is above the ground level for chassis, so that the bottom plate of entire room body 1 and ground tool are at regular intervals.
And its segment space is divided by two chambers up and down by a horizontal internal partition inside entire room body 1.
The loft of its middle and upper part passes through the ladder being equipped with or more, and upper and lower two chambers can be used as bedroom, to reach function division
Effect.
The assembly method of entire cabin is as follows:
1, cabin whole design is first carried out, limits size and structure according to actual needs, then in cabin overall construction design
Enterprising andante material is split.Plate is made in factory according to the sheet shape of fractionation and size.
2, start the panel body that multilayered structure is made in factory;It is offered on panel body again convenient for the peace of bolt
Tankage;Then pipeline is set in panel body reserve channel, and is equipped with water pipe and spool in reserved channel.
3, chassis can be carried out in predetermined installation site simultaneously to set up, first ground is flattened and removes peripheral obstacle to obtain
Smooth fabricating yard, while it needs to be determined that raw material laydown area.It first crosses in predetermined position according to predetermined scheme, and marks and beat
Stake point;Spud pile 2 is beaten downwards in piling point, and is in 2 top surface of spud pile in same level;In the fixation set
2 tops of stake are equipped with the cement fixed structure 3 for being used to reinforce;It is finally equipped with keel strip on spud pile 2 and forms chassis.
General 1 bottom of room body is rectangular plate structure, therefore draws rectangular shaped rim with paint marking or magnesium powder in predetermined position,
And piling point is marked in rectangular shaped rim, then spud pile 2 is moved at corresponding piling point and is driven underground.The spud pile
2 bottoms are equipped with external screw thread, and spud pile 2 is screwed in below ground by rotation piling machine;It is equipped with and fixes at the top of the spud pile 2
Disk.Wherein the keel strip is arranged in fixed disk, and the general spud pile 2, which is, etc. is arranged, and is all provided on single spud pile 2
Same root keel strip is set, and more keel strips constitute latticed keel shoe, then the plate is arranged on keel shoe.
And the rotation piling machine is a kind of motor driver with multiple support rods, support rod can be rotated simultaneously
Similar tripod structure is placed on the ground, so that motor is directed at corresponding 2 top of spud pile and will be at the top of motor and spud pile 2
Connection.The angle for adjusting support frame before start makes the axis of motor perpendicular to ground, so that opening motor drives spud pile 2
It is vertical to screw in ground.
4, after setting up chassis, plate is ridden upon on chassis and is successively bolted from the bottom to top.By inhomogeneity
Based plate classification and regular to be placed on predetermined position side to be installed;First bottom plate is placed on chassis and is fixed, then again
Shingle nail is mounted on bottom plate, and is fixed by bolt, then on the shingle nail and bottom plate set setting inside every
Roofing board and shingle nail and internal partition are finally connected and composed room body 1 by plate;When plate is connected and fixed by junction two sides
Seal for pipe joints connection;After all board material splices are completed to form 1 structure of room body, then door and window and internal furniture are installed;Room body 1 is given again
Energization water flowing, and 1 sewage draining exit of room body is connect with external waste removal equipment.
It eventually forms to clear the field after 1 structure of complete room body and be detected, handed over if all facilities test passes
It pays and uses.
It is worth noting that the external waste removal equipment drainage of position and area can be set according to practical cabin and
It is fixed.If the cabin is built in Peasants Joy or scenic spot, and comes with blowdown pipeline, then small blowdown general pipeline within doors and outside are arranged
Dirty pipeline connection, by concentrating blowdown to be handled.If not set blow-off line, individual blowdown is equipped with outside cabin and is received
Collect tank, and the waste water in periodic cleaning blowdown collecting tank, the blowdown mode of similar existing outdoor temporary toilet.And internal dress
Decorations and furniture can be installed according to actual needs, and there are wiring board mounting grooves for the plate of room body 1, and are equipped with wiring board.
It, which is powered, conveys electric energy by External cable, can be small individually spare equipped with diesel power generation equipment within doors.And window equally can basis
Actual demand is configured.
And when needing to remove, only need to by the equipment Removal of outwardly and inwardly non-1 structure of room body, then according to from top to bottom according to
It is secondary remove plate and be packaged install, finally remove all building materials on chassis and disposal field and be packaged arrangement.
The present invention is not limited to above-mentioned optional embodiment, anyone can show that other are each under the inspiration of the present invention
The product of kind form.Above-mentioned specific embodiment should not be understood the limitation of pairs of protection scope of the present invention, protection of the invention
Range should be subject to be defined in claims, and specification can be used for interpreting the claims.
Claims (10)
1. a kind of assembly method of the cabin of incorporeity beam frame structure, it is characterised in that: steps are as follows:
G1. first prefabricated panels;
Then chassis is arranged in predetermined position in G2;
G3. finally splice the cabin that plate forms incorporeity girder construction on chassis.
2. a kind of assembly method of the cabin of incorporeity beam frame structure according to claim 1, it is characterised in that: wherein walk
The detailed step of prefabricated panels is as follows in rapid G1:
(1.1) panel body of multilayered structure is first made;
(1.2) it is offered on panel body again convenient for the mounting groove of bolt;
(1.3) then pipeline is set in panel body reserve channel, and is equipped with water pipe and spool in reserved channel.
3. a kind of assembly method of the cabin of incorporeity beam frame structure according to claim 1 or 2, it is characterised in that: its
The detailed step that chassis is arranged in middle step G2 is as follows:
(2.1) it first crosses in predetermined position according to predetermined scheme, and marks piling point;
(2.2) spud pile (2) are beaten downwards in piling point, and is in the spud pile (2) top surface in same level;
(2.3) the cement fixed structure (3) for being used to reinforce is equipped on spud pile (2) top set;
(2.4) it is finally equipped with keel strip on spud pile (2) and forms chassis.
4. a kind of assembly method of the cabin of incorporeity beam frame structure according to claim 3, it is characterised in that: described solid
Stake (2) bottom is determined equipped with external screw thread, and spud pile (2) are screwed in by below ground by rotation piling machine;Spud pile (2) top
Portion is equipped with fixed disk.
5. a kind of assembly method of the cabin of incorporeity beam frame structure according to claim 1 or 2, it is characterised in that: institute
Stating step G3, specific step is as follows:
(3.1) by plate it is regular be deposited in predetermined position side, and prepare successively to set up from bottom to up on chassis;
(3.2) it when setting up plate, first passes through bolt and is fixedly connected with adjacent sheet metal, and the seal for pipe joints of junction two sides is connected
It connects;
(3.3) after all board material splices are completed to form room body (1) structure, then door and window and internal furniture are installed;
(3.4) room body (1) energization water flowing is given again, and room body (1) sewage draining exit is connect with external waste removal equipment.
6. a kind of assembly method of the cabin of incorporeity beam frame structure according to claim 1 or 2, it is characterised in that: institute
Stating plate includes roofing board, shingle nail and bottom plate, further includes that will be divided at least two layers of internal partition inside room body (1).
7. a kind of assembly method of the cabin of incorporeity beam frame structure according to claim 1 or 2, it is characterised in that: institute
The substrate for stating plate is keel, and lamina rara externa is equipped on the outside of the keel, is equipped with inner plating on the inside of keel;Pass through between adjacent sheet metal
The bolt being plugged on keel is fixedly connected.
8. a kind of assembly method of the cabin of incorporeity beam frame structure according to claim 6, it is characterised in that: the step
Specific step is as follows by rapid G3:
(3.1) different type plate is classified and regular to be placed on predetermined position side to be installed;
(3.2) first bottom plate is placed on chassis and is fixed, then shingle nail is mounted on bottom plate again, and passed through bolt and carry out
It is fixed, then internal partition is set on the shingle nail and bottom plate set, finally roofing board and shingle nail and internal partition are connected
It connects and constitutes room body (1);The seal for pipe joints of junction two sides is connected when plate is connected and fixed;
(3.3) after all board material splices are completed to form room body (1) structure, then door and window and internal furniture are installed;
(3.4) room body (1) energization water flowing is given again, and room body (1) sewage draining exit is connect with external waste removal equipment.
9. a kind of assembly method of the cabin of incorporeity beam frame structure according to claim 6, it is characterised in that: the room
Top plate includes light-transmitting plate and barn door.
10. a kind of assembly method of the cabin of incorporeity beam frame structure according to claim 6, it is characterised in that: described
Shingle nail includes side plate and door-plate, and the door-plate is equipped with hinge window and door.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811340424.7A CN109577484A (en) | 2018-11-12 | 2018-11-12 | A kind of assembly method of the cabin of incorporeity beam frame structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811340424.7A CN109577484A (en) | 2018-11-12 | 2018-11-12 | A kind of assembly method of the cabin of incorporeity beam frame structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109577484A true CN109577484A (en) | 2019-04-05 |
Family
ID=65922274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811340424.7A Pending CN109577484A (en) | 2018-11-12 | 2018-11-12 | A kind of assembly method of the cabin of incorporeity beam frame structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109577484A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1115350A (en) * | 1994-01-31 | 1996-01-24 | 株式会社久门工务店 | Assembly of bamboo assembled house |
CN105908840A (en) * | 2016-05-10 | 2016-08-31 | 丁献忠 | Mounting method for pure board structure assembled house |
CN106013460A (en) * | 2016-07-07 | 2016-10-12 | 浙江越宫钢结构有限公司 | Assembling type house capable of being repeatedly disassembled and assembled |
CN106368210A (en) * | 2016-10-17 | 2017-02-01 | 重庆大学 | Large-diameter hollow steel thread pile and construction method thereof |
CN106958293A (en) * | 2017-04-26 | 2017-07-18 | 万华集成房屋(烟台)有限公司 | A kind of big plate prefabricated buildings and its assembly and disassembly methods |
US20170306610A1 (en) * | 2008-02-02 | 2017-10-26 | Charles H. Leahy | Methods and systems for modular buildings |
-
2018
- 2018-11-12 CN CN201811340424.7A patent/CN109577484A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1115350A (en) * | 1994-01-31 | 1996-01-24 | 株式会社久门工务店 | Assembly of bamboo assembled house |
US20170306610A1 (en) * | 2008-02-02 | 2017-10-26 | Charles H. Leahy | Methods and systems for modular buildings |
CN105908840A (en) * | 2016-05-10 | 2016-08-31 | 丁献忠 | Mounting method for pure board structure assembled house |
CN106013460A (en) * | 2016-07-07 | 2016-10-12 | 浙江越宫钢结构有限公司 | Assembling type house capable of being repeatedly disassembled and assembled |
CN106368210A (en) * | 2016-10-17 | 2017-02-01 | 重庆大学 | Large-diameter hollow steel thread pile and construction method thereof |
CN106958293A (en) * | 2017-04-26 | 2017-07-18 | 万华集成房屋(烟台)有限公司 | A kind of big plate prefabricated buildings and its assembly and disassembly methods |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5336514B2 (en) | Prefab building components and assembly apparatus | |
CN103562472B (en) | Building structure | |
CN105507432A (en) | Energy-saving house, energy-saving curtain wall, decorative wall and plastering wall | |
CN105926765B (en) | The regular polygon of falling umbrella steel structure module and its installation method | |
Brookes et al. | The building envelope: applications of new technology cladding | |
CN106285074A (en) | A kind of design specification of Logistics Park | |
CN102444206B (en) | Prefabricated modular building supporting overlapping and combination | |
CN109322399A (en) | A kind of cabin of incorporeity girder construction | |
CN106639364A (en) | Multi-purpose quickly assembled natural ecological penthouse and manufacturing method thereof | |
CN109577484A (en) | A kind of assembly method of the cabin of incorporeity beam frame structure | |
CN206873986U (en) | The aerial villa of multipurpose quick assembled type natural, ecological | |
CN206128370U (en) | Integrated wallboard and equipment room | |
CN210067040U (en) | Cabin without solid beam structure | |
CN202202580U (en) | Precast modular building capable of being subjected to overlapping combination | |
CN211909854U (en) | Energy-conserving sunlight greenhouse of easy dismouting removal | |
CN108412033B (en) | External vertical forest overhanging balcony structure of building and construction method thereof | |
CN111255081A (en) | Fast-assembly steel structure, solar multifunctional building and installation method | |
CN206346540U (en) | Compound underground garage | |
CN110259200A (en) | A kind of umbrella pavilion corridor and integrated module type gluing Wood construction | |
CN114482565B (en) | Adjacent type multilayer gymnasium construction method with indoor ice rink | |
CN212271224U (en) | Fast-assembling steel construction and solar energy multi-functional formula building | |
CN201301499Y (en) | Constructional structure for air terrace | |
Chen et al. | Contemporary Design in Detail: Sustainable Environments | |
NL2012897C2 (en) | MODULAR SKELETON BUILDING SYSTEM FOR HOUSES. | |
CN214301223U (en) | Bridge corridor roofing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190405 |
|
RJ01 | Rejection of invention patent application after publication |