- CN109577151A CN109577151A CN201910104781.1A CN201910104781A CN109577151A CN 109577151 A CN109577151 A CN 109577151A CN 201910104781 A CN201910104781 A CN 201910104781A CN 109577151 A CN109577151 A CN 109577151A
- Authority
- CN
- China
- Prior art keywords
- fixed plate
- kerbstone
- stock
- carried
- axletree
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/52—Apparatus for laying individual preformed surfacing elements, e.g. kerbstones
- E01C19/526—Apparatus for laying individual preformed surfacing elements, e.g. kerbstones hand operated
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/52—Apparatus for laying individual preformed surfacing elements, e.g. kerbstones
- E01C19/526—Apparatus for laying individual preformed surfacing elements, e.g. kerbstones hand operated
- E01C19/528—Apparatus for laying individual preformed surfacing elements, e.g. kerbstones hand operated with wheels
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The present invention relates to highway engineering construction field, especially a kind of Simple small carried, installed for kerbstone, including wheel, axletree, support frame, handrail tube, fixed plate and clamping plate, wheel are mounted on axletree, it is characterised in that: axletree is connect by support frame with handrail tube;Stock is provided on handrail tube, the two sides of stock are connect with fixed plate respectively, are connected between the fixed plate at stock both ends by connecting rod, are provided with clamping plate in fixed plate.The present invention can improve carrying and the installation effectiveness of kerbstone in the case where not consuming any energy, and economic and practical, energy conservation and environmental protection shortens the construction period, reduces labour cost.
Description
Technical field
The present invention relates to highway engineering construction field, especially a kind of Simple small carried, installed for kerbstone.
Background technique
With the fast development of Chinese economy, urbanization process is accelerated, transport development is quickly grown, then directly resulting in road
Face engineering specific gravity is increasing, and affiliated facility construction is essential in pavement engineering, and kerbstone installation is again affiliated facility work
Important component in journey.The node of kerbstone construction most critical is exactly to install, and it is whole that installation progress directly affects road engineering
Body construction progress, because kerbstone installation is not completed to will result directly in next process and can not be constructed.Furthermore kerbstone is due to certainly
Body weight is larger, if installation is improper during installation directly results in the overall beautiful effect of road.
Traditional kerbstone construction drawback is more, such as: (1) kerbstone own wt is overweight, laborious in handling process;(2)
It places and concentrates, apply man-hour requirement dispersion and carry;(3) construction personnel is carrying and is being easy to be injured by a crashing object by kerbstone in installation process;(4)
Labour is significantly increased to increase cost in manual handling installation.
Summary of the invention
In order to solve the above technical problems, the present invention proposes a kind of light structure, easy to operate carries for kerbstone, pacifies
The Simple small of dress.
The present invention adopts the following technical scheme:
It is a kind of carried for kerbstone, the Simple small of installation, including wheel, axletree, support frame, handrail tube, fixed plate and
Clamping plate, wheel are mounted on axletree, and axletree is connect by support frame with handrail tube;Stock, stock are provided on handrail tube
Two sides connect respectively with fixed plate, connected between the fixed plate at stock both ends by connecting rod, be provided with clamping plate in fixed plate.
Compared with prior art, the beneficial effects of the present invention are:
Structure design of the invention is light and handy, easy to operate, and carrying and installation are improved in the case where not consuming any energy
Efficiency, economic and practical, energy conservation and environmental protection shorten the construction period, while while guaranteeing to improve kerbstone installation effectiveness, very well
Ensure that the quality requirements such as kerbstone slit width, adjacent block height difference and straight cis degree, improve the presentation quality of kerbstone entirety,
Improve city image.
Further, the preferred embodiment that the present invention uses is:
Support frame is made of two diagonal braces, and the upper end of diagonal brace is fixed with handrail casing respectively, the lower end of diagonal brace respectively with axletree
It is fixed, and two diagonal braces and axletree constitute triangular structure, are provided with reinforcing rib between two diagonal braces.
Location hole one is equidistantly provided on handrail tube, the front end of handrail tube is provided with stock, and rear end is provided with quarter butt, long
And stock vertical with handrail tube is arranged in parallel with quarter butt respectively for bar and quarter butt.
The side of stock is provided with the first fixed plate and the second fixed plate, and the other side is provided with third fixed plate and the 4th and consolidates
Fixed board, the front end of the second fixed plate and the end face of third fixed plate are respectively arranged with clamping plate, the rear end of the first fixed plate and the 4th
The rear end of fixed plate is respectively arranged with clamping plate.
Stock is connect by chain with connecting rod.
Each fixed plate is provided with wirerope lifting hole(eyelet) far from one end of clamping plate, and stock is connect by wirerope with fixed plate.
It is respectively arranged with rubber on each clamping plate, the overall thickness of rubber and clamping plate is 8-10mm.
Handrail casing is fixed by bolt and handrail tube.
Equidistant location hole two is respectively arranged in each fixed plate.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention:
Fig. 2 is the main view of Fig. 1;
Fig. 3 is the top view of Fig. 1;
In figure: wheel 1;Axletree 2;Diagonal brace 3;Reinforcing rib 4;Handrail tube 5;Location hole 1;Quarter butt 6;Handrail pipe sleeve 7;Chain
8;Stock 9;Connecting rod 10;Wirerope 11;Fixed plate 12;First fixed plate 1201;Second fixed plate 1202;Third fixed plate
1203;4th fixed plate 1204;Location hole 2 1205;Wire rope hole 1206;Clamping plate 13;Kerbstone 14.
Specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is further described.
Referring to attached drawing 1, a kind of Simple small carried, installed for kerbstone, by wheel 1, axletree 2, support frame is helped
Hand pipe 5, fixed plate 12 and clamping plate 13 form, and the both ends of axletree 2 are separately installed with wheel 1, and axletree 2 passes through the two of support frame
Root diagonal brace 3 is connect with the handrail pipe sleeve 7 being sleeved on handrail tube 5, and the upper end of every diagonal brace 3 is solid with 7 outer wall of handrail pipe sleeve respectively
Fixed connection, lower end are separately fixed on axletree 2, and two diagonal braces 3 and axletree 2 constitute triangular structure, small in order to enhance
The stability of vehicle entirety is horizontally arranged with reinforcing rib 4 in two diagonal braces 3;A fixation is provided on the tube wall of handrail pipe sleeve 7
Hole.
Handrail tube 5 is long tube structure, and the front end of handrail tube 5 is provided with stock 9, and stock 9 and the tie point of handrail tube 5 are set
In the center of stock 9, the rear end of handrail tube 5 is provided with quarter butt 6, and stock 9 and quarter butt 6 are vertical with handrail tube 5 respectively and long
Bar 9 is arranged in parallel with quarter butt 6;Location hole 1 is equidistantly provided on handrail tube 5, screw rod passes through the fixation hole of handrail pipe sleeve 7
Handrail pipe sleeve 7 is connect with handrail tube 5 with location hole 1 and by nut.
Referring to attached drawing 1, the both ends of stock 9 pass through chain 8 respectively and connect with the both ends of connecting rod 10, the left end of connecting rod 10
It is provided with the first fixed plate 1201 and the second fixed plate 1202, the right end of connecting rod 10 is provided with third fixed plate 1203 and the 4th
Fixed plate 1204, in the first fixed plate 1201, the second fixed plate 1201, third fixed plate 1203 and the 4th fixed plate 1204 respectively
It is provided with clamping plate 13, and the rear end of the first fixed plate 1201, the rear end of the 4th fixed plate 1204 are respectively welded clamping plate 13, second
The front end of fixed plate 1202 and the front end of third fixed plate 1203 are respectively welded clamping plate 13, each clamping plate 13 and its respective place
Fixed plate 12 constitute L-type structure, each fixed plate 12 is respectively arranged with wire rope hole 1206, stock far from one end of clamping plate 13
Both ends pass through wirerope 11 respectively and connect with each fixed plate 12.
Referring to attached drawing 1, attached drawing 3, the first fixed plate 1201, the second fixed plate 1201, third fixed plate 1203 and the 4th are solid
Spaced set has location hole 2 1205 respectively on fixed board 1204, and connecting rod 10 passes through location hole 2 1205 and fixed by nut
Locking adjusts the spacing between ipsilateral two clamping plate 13 by location hole 2 1205 to meet the kerbstone 14 of different-thickness, positioning
Be respectively arranged with rubber on each clamping plate 13 in hole 2 1205, rubber is placed in 13 inside of clamping plate and contacts with kerbstone 14, rubber with
The overall thickness of clamping plate 13 is 10mm, guarantees that 14 slit width of kerbstone of installation is consistent.
The clamping plate 13 of trolley arranged on left and right sides in use, is buckled in the both ends of kerbstone 14, and trolley is ipsilateral by the present invention
The setting of 13 make-up of two clamping plates, kerbstone 14 are placed between two ipsilateral clamping plates 13 of trolley, are selected according to the thickness of kerbstone 14
It selects the location hole 2 1205 in each fixed plate 14 and location hole 2 1205 is passed through by connecting rod 10 and connect four fixed plates 12
It connects, is locked between fixed plate 12 and connecting rod 10 by the way that nut is fixed;According to the position of the self weight adjustable handrail pipe sleeve 7 of kerbstone 14
It sets and is bolted, push the quarter butt 6 of trolley rear end, tilt the front end of trolley, by curb under the action of clamping plate 13
Stone 14 is sling, and trolley rear end is lifted after trolley is pushed into scheduled installation site by construction personnel, and front end falls, and kerbstone 14 is flat
It is surely placed in installation site, loosens the nut between connecting rod 10 and fixed plate 12, separate clamping plate 13 with kerbstone 14.
8 length of chain at the trolley both ends in the present embodiment can be adjusted according to the height of construction personnel, make construction personnel
Reach optimal Construction State.
The present invention reaches labour-saving effect using lever principle, reduces the labor intensity of construction personnel, clamping plate 13 with
Rubber is arranged in the side that kerbstone 14 contacts, and the frictional force of clamping plate 13 Yu kerbstone 14 is increased, to increase work progress
In safety coefficient, it is ensured that the construction safety of construction personnel.
The above is only a specific embodiment of the invention, but are not limited to this to protection of the invention, all this technology necks
Field technique personnel it is thinkable to the technical program technical characteristic propose equivalence changes or replacement, all cover of the invention
Within protection scope.
Claims (9)
1. a kind of Simple small carried, installed for kerbstone, including wheel, axletree, support frame, handrail tube, fixed plate
And clamping plate, wheel are mounted on axletree, it is characterised in that: axletree is connect by support frame with handrail tube;It is set on handrail tube
It is equipped with stock, the two sides of stock are connect with fixed plate respectively, are connected between the fixed plate at stock both ends by connecting rod, fixed plate
On be provided with clamping plate.
2. the Simple small according to claim 1 carried, installed for kerbstone, it is characterised in that: support frame is by two
Root diagonal brace composition, the upper end of diagonal brace are fixed with handrail casing respectively, and the lower end of diagonal brace is fixed with axletree respectively, and two diagonal braces
Triangular structure is constituted with axletree, is provided with reinforcing rib between two diagonal braces.
3. the Simple small according to claim 1 carried, installed for kerbstone, it is characterised in that: on handrail tube etc.
Spacing is provided with location hole one, and the front end of handrail tube is provided with stock, and rear end is provided with quarter butt, stock and quarter butt respectively with handrail
Pipe is vertical and stock is arranged in parallel with quarter butt.
4. the Simple small according to claim 1 carried, installed for kerbstone, it is characterised in that: the side of stock
It is provided with the first fixed plate and the second fixed plate, the other side is provided with third fixed plate and the 4th fixed plate, the second fixed plate
Front end and the end face of third fixed plate are respectively arranged with clamping plate, and the rear end of the rear end of the first fixed plate and the 4th fixed plate is set respectively
It is equipped with clamping plate.
5. the Simple small according to claim 1 carried, installed for kerbstone, it is characterised in that: stock passes through chain
Item is connect with connecting rod.
6. the Simple small according to claim 1 carried, installed for kerbstone, it is characterised in that: each fixed plate
One end far from clamping plate is provided with wirerope lifting hole(eyelet), and stock is connect by wirerope with fixed plate.
7. the Simple small according to claim 1 carried, installed for kerbstone, it is characterised in that: on each clamping plate
It is respectively arranged with rubber, the overall thickness of rubber and clamping plate is 8-10mm.
8. the Simple small according to claim 1 carried, installed for kerbstone, it is characterised in that: handrail casing is logical
Bolt is crossed to fix with handrail tube.
9. the Simple small according to claim 1 carried, installed for kerbstone, it is characterised in that: each fixed plate
On be respectively arranged with equidistant location hole two.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910104781.1A CN109577151A (en) | 2019-02-01 | 2019-02-01 | It is carried for kerbstone, the Simple small of installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910104781.1A CN109577151A (en) | 2019-02-01 | 2019-02-01 | It is carried for kerbstone, the Simple small of installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109577151A true CN109577151A (en) | 2019-04-05 |
Family
ID=65918692
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910104781.1A Withdrawn CN109577151A (en) | 2019-02-01 | 2019-02-01 | It is carried for kerbstone, the Simple small of installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109577151A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110629645A (en) * | 2019-09-02 | 2019-12-31 | 中冶天工集团有限公司 | Device for carrying and adjusting kerbs and stones and using method thereof |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2547153A1 (en) * | 1975-10-21 | 1977-04-28 | Raimund Binni | Masonry block handling grab - has jaws formed by L-shaped pivoting flat strips on supports from handle |
JPH049407U (en) * | 1990-05-15 | 1992-01-28 | ||
CN203666712U (en) * | 2013-12-12 | 2014-06-25 | 山西四建集团有限公司 | Kerb transporting crane |
CN108116459A (en) * | 2018-01-10 | 2018-06-05 | 金钰琦 | A kind of kerbstone carrying trolley of suitable northern area winter construction |
-
2019
- 2019-02-01 CN CN201910104781.1A patent/CN109577151A/en not_active Withdrawn
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2547153A1 (en) * | 1975-10-21 | 1977-04-28 | Raimund Binni | Masonry block handling grab - has jaws formed by L-shaped pivoting flat strips on supports from handle |
JPH049407U (en) * | 1990-05-15 | 1992-01-28 | ||
CN203666712U (en) * | 2013-12-12 | 2014-06-25 | 山西四建集团有限公司 | Kerb transporting crane |
CN108116459A (en) * | 2018-01-10 | 2018-06-05 | 金钰琦 | A kind of kerbstone carrying trolley of suitable northern area winter construction |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110629645A (en) * | 2019-09-02 | 2019-12-31 | 中冶天工集团有限公司 | Device for carrying and adjusting kerbs and stones and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105442934B (en) | Bi-directional torque cement pole pole centralizing device | |
CN202023404U (en) | Multifunctional pole erecting device | |
CN201581623U (en) | Novel bowl-type steel tube scaffold | |
CN204876547U (en) | Big template system of APC shell structure | |
CN109577151A (en) | It is carried for kerbstone, the Simple small of installation | |
CN209508774U (en) | It is carried for kerbstone, the Simple small of installation | |
CN211285166U (en) | Bidirectional cross slope concrete pavement vibrating device | |
CN206128814U (en) | Iron tower is salvageed chevron shape and is embraced pole | |
CN209022832U (en) | A kind of ultra-wide T plate inclination transport support | |
CN213868835U (en) | Scaffold frame for interior decoration convenient to height-adjusting | |
CN208088101U (en) | A kind of splicing of Zhongting is floatd bridge | |
CN208502205U (en) | The high mobile operation platform of big layer | |
CN214117429U (en) | Multifunctional plate paving machine | |
CN208088954U (en) | A kind of construction protective fence | |
CN206570707U (en) | A kind of bridge stiffening device | |
CN207211808U (en) | A kind of buckle-type Quick Release independent rack | |
CN206707239U (en) | A kind of elevator Integral hoisting operating platform | |
CN205558256U (en) | Two concrete construction die carrier systems that prop separation | |
CN220518286U (en) | Curb handling tool with clearance gap adjusting function | |
CN204551271U (en) | A kind of reinforcement type Hanging Basket | |
CN204714315U (en) | A kind of simple multifunctional template suspension appliance | |
CN214822870U (en) | Outer wall plate transport vehicle | |
CN214786283U (en) | Regularization stair packway footboard connection structure | |
CN213859246U (en) | Movable clamp for mounting kerbstone | |
CN218090529U (en) | Cast-in-place box girder external mold rapid prototyping bearing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |