CN202023404U - Multifunctional pole erecting device - Google Patents

Multifunctional pole erecting device Download PDF

Info

Publication number
CN202023404U
CN202023404U CN2011200958900U CN201120095890U CN202023404U CN 202023404 U CN202023404 U CN 202023404U CN 2011200958900 U CN2011200958900 U CN 2011200958900U CN 201120095890 U CN201120095890 U CN 201120095890U CN 202023404 U CN202023404 U CN 202023404U
Authority
CN
China
Prior art keywords
portal frame
erecting device
people
electric pole
pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200958900U
Other languages
Chinese (zh)
Inventor
刘云峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011200958900U priority Critical patent/CN202023404U/en
Application granted granted Critical
Publication of CN202023404U publication Critical patent/CN202023404U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a multifunctional pole erecting device, which comprises a flat cart. The flat cart is provided with adjustable legs and a portal frame, wherein the portal frame comprises two supporting poles and a cross arm; the cross arm is provided with a chain block. The multifunctional pole erecting device also comprises a hoop, a pulley block and a steel chisel. In the multifunctional pole erecting device, the flat cart is provided with the adjustable legs and the portal frame, the portal frame is provided with the chain block, and the pulley block is arranged, thus, a telegraph pole can be easily erected by at most four people. The multifunctional pole erecting device disclosed by the utility model has purely manual operation, safety and reliability, convenience in carrying and low manufacturing cost, and is capable of improving the working efficiency.

Description

Multi-functional standing device
Technical field
The utility model belongs to instrument, relates in particular to a kind of multi-functional standing device that is used to erect electric pole.
Background technology
Under normal circumstances, need 7-8 people with manually erecting 7-8 rice electric pole, the then general manpower of upright 10 meters electric poles can not be finished, must be by equipment such as cranes, otherwise the not assurance of people's safety.The headcount of existing power industry maintenance department is 4 to 5 people at present, can it seems that thus utilizing assigned personnel to finish artificial vertical rod work is impracticable from the view of safety.But,, also influence the progress of repairing work if employ the people, employ crane to cause very big financial burden to enterprise for safety.Therefore, develop a kind of pure manually-operated, can easy manipulation below the four-player, security performance is secure again, is easy to carry again, and is cheap, and the pike pole that can increase work efficiency is imperative.
Summary of the invention
The purpose of this utility model provide a kind of can be by the multi-functional standing device of the following safety operation of four-player.
For achieving the above object, the utility model adopts following technical scheme: a kind of multi-functional standing device comprises plate pusher, adjustable support leg and portal frame are housed on plate pusher, portal frame is made up of two poles and a cross-arm, and jack is housed on the cross-arm, also comprises anchor ear, assembly pulley and drill rod.
Described pole is an extension type pole.
Described assembly pulley is made up of head pulley group and auxiliary pulley group, and the head pulley group is made up of main stay cord and two sister blocks, and the auxiliary pulley group is made up of secondary stay cord and a single-sheaved block, and single-sheaved block links to each other with an end of main stay cord; Described drill rod has two.
Described adjustable support leg has four.
Adopt the multi-functional standing device of technique scheme, adjustable support leg and portal frame have been installed on plate pusher, jack is housed on the portal frame, and be equipped with assembly pulley, can be by easily erecting electric pole, pure manually-operated below the four-player, safe and reliable, be easy to carry again, cheap, can increase work efficiency.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 looks schematic diagram for the right side of Fig. 1.
Fig. 3 is the user mode schematic diagram of assembly pulley.
The specific embodiment
Multi-functional standing device as shown in Figure 1 and Figure 2, comprise plate pusher 2, four adjustable support legs 1 and portal frame are housed on plate pusher, portal frame is made up of two poles and a cross-arm 6, and jack 5 is housed on the cross-arm 6, and pole is an extension type pole, wherein standing part 3 is to make of channel-section steel, telescopic section 4 usefulness are made than the square steel of the little model of channel-section steel, make the reason that can stretch and mainly lower the center of gravity, and are convenient to the transportation of electric pole.
Also comprise assembly pulley, an anchor ear 7 and two drill rods.As shown in Figure 3, assembly pulley is made up of head pulley group and auxiliary pulley group, and the head pulley group is made up of main stay cord 12 and two sister blocks 14, and the auxiliary pulley group is made up of secondary stay cord 9 and a single-sheaved block 11, and single-sheaved block links to each other with an end of main stay cord.
Use of the present utility model is as follows: will treat earlier that pole erecting is placed on is transported to assigned address on the plate pusher, will make pole-footing aim at the packway position of opening; One people's depression bar is slightly to the electric pole horizontal level, and a people regulates leg as required, guarantees that four adjustable support legs all are in stress; One people places deployed condition with the pole of portal frame, and cross-arm is placed on portal frame topmost, and two tons of jacks are hung on the cross-arm, and the jack other end hangs on the electric pole, slowly spurs jack, and another people is responsible for regulating stressed leg according to actual conditions.Like this, two people just can be easily within 3 minutes safety finish electric pole from (i.e. 0 ° of angle) parallel to the ground such uphill process during to electric pole and angle angle at 45, ground.The electric pole that rises is fixed on above the anchor ear 7, and a people takes jack 5 and cross-arm 6, for erecting the electric pole slot milling smoothly.
As shown in Figure 3, when digging the bar hole at 8 meters of distance pole-footing with first drill rod 10 back to the bar hole to be driven underground with sledgehammer for 45 ° with the ground angle, stay about 10cm and can hang pulley; In like manner squeezing into second drill rod 8 apart from first drill rod 8--10 rice and bar hole, first drill rod sight alignment; The head pulley group is launched, and a sister block is fixed to earlier on first drill rod; Treat that the bar hole accomplishes fluently electric pole and go into behind the position a end with another sister block and main stay cord and be fixed to that electric pole 13 bars are gone up slightly and the rope tension is in stress a little, the auxiliary pulley group is put on, one end of secondary stay cord is fixed on second drill rod, and the other end that spurs secondary stay cord makes it be in stress a little;
Remove back 2 people at last end of assembly pulley pull-up electric pole of making a concerted effort at jack and cross-arm, other two people keep the electric pole balance simultaneously, and four-player cooperates can be with 7 meters or 8 meters light pull-ups of electric pole; Whole vertical rod process is gone into the position to erecting 8 fens clock times of general needs from electric pole.
Last electric pole unloads assembly pulley after standing well, extracts drill rod, all instrument entruckings.
The beneficial effect that the utility model produces:
One, at first, the vertical rod work for a long time that is through with safeguards that with a line employee frees as the history of heavy physical labor in the line upkeep work from heavy manual labor; The utility model 4 people get final product easy manipulation, and still 2 people operate separately for one group, if situation is special, 2 people are easily vertical rod also, and only Hua Fei time is longer a little;
Two, secondly, solved the difficult problem that long-term puzzlement safeguards that enterprise personnel is less, according to existing establishment (per tour 5 people) the easily vertical rod of the unit of maintenance, and security performance traditional vertical rod has than before had large increase;
Three, created good economic benefit, since the utility model comes into operation, for enterprise has saved a large amount of hired laborers and employed fare to use; Need 8 people to calculate with vertical rod, existing 4 people of unit need hired laborer 4 people, calculate by 50 yuan/day/people, employ four-player to need 200 yuan, if a upright separately electric pole cost is just too expensive.Equally, if employ crane, upright electric pole is wanted about 100 yuan when generally nearer apart from cities and towns, if upright separately 1 electric pole far away probably needs about 200 yuan from cities and towns.According to comprehensive statistics, if over a year entirely by employing the people, employing the car vertical rod, an electric pole probably needs about 100 yuan.Like this, only an Xiangcheng branch office just needs about 15000 yuan of costs, calculates and press average, and maintenance centre, whole Zhoukou City just needs about 120,000 yuan of costs.If count the expense of transporting electric pole in, this numeral probably also can strengthen.Certainly, also do not comprise time and efforts of employing the people, employ car to spend before the vertical rod in the middle of this, also do not comprise the short-term hired laborer, employ the risk of the secure context that car exists.
Four, safety factor improves greatly, and the utility model has overcome the potential safety hazard that exists in the electric pole uphill process in traditional poling method.The electric pole uphill process can be grasped fully, can freely control the rate of climb as required, can stop at any time, can put down electric pole at any time.It is a kind of very safe that vertical rod work differentiation is become, very gravy jobs.

Claims (4)

1. a multi-functional standing device comprises plate pusher, it is characterized in that: adjustable support leg and portal frame are housed on plate pusher, and portal frame is made up of two poles and a cross-arm, and jack is housed on the cross-arm, also comprises anchor ear, assembly pulley and drill rod.
2. multi-functional standing device as claimed in claim 1 is characterized in that: described pole is an extension type pole.
3. multi-functional standing device as claimed in claim 1, it is characterized in that: described assembly pulley is made up of head pulley group and auxiliary pulley group, the head pulley group is made up of main stay cord and two sister blocks, and the auxiliary pulley group is made up of secondary stay cord and a single-sheaved block, and single-sheaved block links to each other with an end of main stay cord; Described drill rod has two.
4. multi-functional standing device as claimed in claim 1 is characterized in that: described adjustable support leg has four.
CN2011200958900U 2011-04-02 2011-04-02 Multifunctional pole erecting device Expired - Fee Related CN202023404U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200958900U CN202023404U (en) 2011-04-02 2011-04-02 Multifunctional pole erecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200958900U CN202023404U (en) 2011-04-02 2011-04-02 Multifunctional pole erecting device

Publications (1)

Publication Number Publication Date
CN202023404U true CN202023404U (en) 2011-11-02

Family

ID=44848357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200958900U Expired - Fee Related CN202023404U (en) 2011-04-02 2011-04-02 Multifunctional pole erecting device

Country Status (1)

Country Link
CN (1) CN202023404U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720387A (en) * 2012-05-23 2012-10-10 河南省电力公司信阳供电公司 Pole erecting device
CN105421861A (en) * 2015-11-13 2016-03-23 高世龙 Electricity grid telegraph pole erecting device and construction method
CN105421860A (en) * 2015-11-13 2016-03-23 熊达煜 Electricity grid telegraph pole erecting device and construction method
CN105421859A (en) * 2015-11-13 2016-03-23 高世龙 Electricity grid telegraph pole erecting device and construction method
CN105442932A (en) * 2015-11-13 2016-03-30 高世龙 Power grid pole burying device and construction method
CN106368498A (en) * 2016-09-28 2017-02-01 国网山东省电力公司章丘市供电公司 Intelligent field electric-pole erecting device
CN107905618A (en) * 2017-11-30 2018-04-13 国网辽宁省电力有限公司锦州供电公司 Electric pole sets up car
CN110359371A (en) * 2019-06-21 2019-10-22 中国十七冶集团有限公司 A kind of bridge expanssion joint construction hoisting tool

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720387A (en) * 2012-05-23 2012-10-10 河南省电力公司信阳供电公司 Pole erecting device
CN105421861A (en) * 2015-11-13 2016-03-23 高世龙 Electricity grid telegraph pole erecting device and construction method
CN105421860A (en) * 2015-11-13 2016-03-23 熊达煜 Electricity grid telegraph pole erecting device and construction method
CN105421859A (en) * 2015-11-13 2016-03-23 高世龙 Electricity grid telegraph pole erecting device and construction method
CN105442932A (en) * 2015-11-13 2016-03-30 高世龙 Power grid pole burying device and construction method
CN105421860B (en) * 2015-11-13 2017-08-25 中铁十二局集团有限公司 A kind of power network electric pole stringer and construction method
CN106368498A (en) * 2016-09-28 2017-02-01 国网山东省电力公司章丘市供电公司 Intelligent field electric-pole erecting device
CN106368498B (en) * 2016-09-28 2018-08-07 国网山东省电力公司章丘市供电公司 Field electric pole intelligence stringer
CN107905618A (en) * 2017-11-30 2018-04-13 国网辽宁省电力有限公司锦州供电公司 Electric pole sets up car
CN110359371A (en) * 2019-06-21 2019-10-22 中国十七冶集团有限公司 A kind of bridge expanssion joint construction hoisting tool
CN110359371B (en) * 2019-06-21 2021-05-11 中国十七冶集团有限公司 Bridge expansion joint construction lifting device

Similar Documents

Publication Publication Date Title
CN202023404U (en) Multifunctional pole erecting device
CN204370830U (en) A kind of electric pole centralizer
CN105442934B (en) Bi-directional torque cement pole pole centralizing device
CN202054588U (en) Hydraulic lift-type platform for overhaul and maintenance of GW-6 disconnecting links
CN106121343B (en) Compound polyurethane material electric pole and its installation method
CN207079899U (en) A kind of construction coherent-wall scaffolding suspending apparatus
CN203865934U (en) Temporary suspension device of pulley lifting mechanism for electric pole
CN205132955U (en) Hoist and mount operation of electric power industry low latitude is with hoist and mount frame
CN201162337Y (en) Adjustable cliff security operation compartment
CN206359210U (en) A kind of processing of steel construction is with stablizing lowering or hoisting gear
CN203867198U (en) Slip equipment for high-rise steel structure transfer layer truss
CN203301060U (en) Adjustable lift platform on strain insulator string of UHV power transmission line
CN203022409U (en) Iron tower support assembly
CN105525755A (en) Steel bar planting hole drilling mechanical hand
CN106351503B (en) The mechanical pole type installation method of compound polyurethane material electric pole
CN105305300B (en) It is a kind of for replacing the device of pipe bus support column porcelain bottle
CN204980945U (en) Supplementary tower crane dismounting device
CN203428852U (en) Portable ammeter container hoisting machine
CN106437047A (en) Plant roof panel transporting and mounting equipment
CN210013554U (en) Pole setting traction frame
CN202423898U (en) Maintenance workbench
CN106121353B (en) Hydraulic vertical lever apparatus
CN206225848U (en) Bridge-type high-voltage board installs suspension and support
CN205151577U (en) Fix small -size hoisting machine on steel support of groove
CN204529150U (en) Layer-stepping arranges Capacitor banks installation special tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111102

Termination date: 20120402