CN207079899U - A kind of construction coherent-wall scaffolding suspending apparatus - Google Patents

A kind of construction coherent-wall scaffolding suspending apparatus Download PDF

Info

Publication number
CN207079899U
CN207079899U CN201721047808.0U CN201721047808U CN207079899U CN 207079899 U CN207079899 U CN 207079899U CN 201721047808 U CN201721047808 U CN 201721047808U CN 207079899 U CN207079899 U CN 207079899U
Authority
CN
China
Prior art keywords
swing arm
wall
sleeve pipe
suspending apparatus
coherent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721047808.0U
Other languages
Chinese (zh)
Inventor
高江平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721047808.0U priority Critical patent/CN207079899U/en
Application granted granted Critical
Publication of CN207079899U publication Critical patent/CN207079899U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Movable Scaffolding (AREA)

Abstract

It the utility model is related to technical field of buildings, and disclose a kind of construction coherent-wall scaffolding suspending apparatus, including wall, two circular ports are offered on the wall, the inside of the circular port is interspersed to be provided with sleeve pipe, the inside of described sleeve pipe is interspersed to be provided with sliding bar, and the left end of the sliding bar is installed with square limited block, and hoist engine is installed with the supporting plate and positioned at the left side of safe fence front and back.The construction coherent-wall scaffolding suspending apparatus, by setting sleeve pipe, sliding bar and pulley, makes coherent-wall scaffolding have hanging ability, this suspending apparatus connected mode is simple, it is easy to disassemble, while structure seems compact, small volume, consumptive material is few, the setting of safe fence more ensure that the safety of workmen, wall-attached frame hand cradle is had hanging ability, for skyscraper is built, it is time saving and energy saving, reduce space-consuming.

Description

A kind of construction coherent-wall scaffolding suspending apparatus
Technical field
Technical field of buildings is the utility model is related to, specially a kind of construction coherent-wall scaffolding suspending apparatus.
Background technology
Coherent-wall scaffolding refers to job site as operation and solves vertically and horizontally to transport the various supports set up, and builds The generic term on boundary is built, refers to and exterior wall, inside fitting or the higher place that can not directly construct of floor height is used on construction site, mainly It is exactly plainly to build a framework in order to which operation above and below workmen or perimeter security net are gone along with sb. to guard him and high-altitude installation component etc., scaffold Making material generally has:Bamboo and wood, steel pipe or synthetic material etc., coherent-wall scaffolding are to build by laying bricks or stones to use needed for inner-outer wall in building Build a wall scaffold, external rendering scaffold.
But existing coherent-wall scaffolding be mostly root in the pole type scaffold on ground, although this scaffold application Extensively, but the problem of many be present, first, the scaffold volume of this structure is larger, and consumable quantity is big, especially for high level For building, this consumption is especially huge, in addition, the scaffold of this mode, in the process built for skyscraper and Speech, wastes time and energy, during building, slightly neglects, will result in very big potential safety hazard when in use, so propose one Construction coherent-wall scaffolding suspending apparatus is planted to solve the problems, such as above-mentioned be previously mentioned.
Utility model content
(1) technical problem solved
In view of the shortcomings of the prior art, the utility model provides a kind of construction coherent-wall scaffolding suspending apparatus, tool Standby can be hanging the advantages of, solves existing coherent-wall scaffolding for skyscraper, bothersome expense during building The problem of power.
(2) technical scheme
To realize that above-mentioned coherent-wall scaffolding has hanging purpose, the utility model provides following technical scheme:One kind is built Construction coherent-wall scaffolding suspending apparatus, including wall are built, two circular ports, the inside of the circular port are offered on the wall Interspersed to be provided with sleeve pipe, the inside of described sleeve pipe is interspersed to be provided with sliding bar, and the left end of the sliding bar is installed with square Limited block, the top of the square limited block, bottom, front and back are installed with locating piece, worn on the locating piece Plug and be equipped with rotating shaft, the first swing arm is connected with the locating piece, the right-hand member of first swing arm is connected with Second swing arm, second swing arm are flexibly connected with sleeve pipe, and first swing arm and second swing arm one end are fixed Positioning seat is installed, first swing arm and the second swing arm other end are installed with locating piece, and described sleeve pipe is close One end of square limited block offers the locating notch corresponding with the second swing arm, and the inside of the locating notch is fixedly mounted There is a connecting rod, be threaded with described sleeve pipe and on the right side of wall and tighten bolt, on the sliding bar and be located at Sleeve pipe right-hand member is threaded with locked bolt, the bottom of described sleeve pipe and positioned at tightening fixed peace between bolt and locked bolt Equipped with two pulleys, the steel wire rope extended downwardly is arranged with two pulleys, the right-hand member of the steel wire rope is fixedly connected with Supporting plate, is installed with safe fence at the top of the supporting plate, on the supporting plate and positioned at safe fence front and back Left side is installed with hoist engine, and the left end of the steel wire rope is laid around being located on the output shaft of hoist engine on the supporting plate There is slipmat.
Preferably, the length of second swing arm is more than locating notch, and the second swing arm width is less than positioning and lacked Mouthful.
Preferably, the diameter of the circular port on the wall is more than the length between two locating pieces on square limited block.
Preferably, the left side tightened bolt-through circular port and extend to wall, the pulling force of the steel wire rope be not small In five tons.
Preferably, the square limited block and the first swing arm run through positioning seat and locating piece and first by rotating shaft respectively Swing arm and the second swing arm are flexibly connected, and second swing arm is flexibly connected by connecting rod with sleeve pipe.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of construction coherent-wall scaffolding suspending apparatus, possess with Lower beneficial effect:
1st, the construction coherent-wall scaffolding suspending apparatus, by setting sleeve pipe, sliding bar and pulley, makes coherent-wall scaffolding With hanging ability, this suspending apparatus connected mode is simple, easy to disassemble, while structure seems compact, small volume, consumptive material Few, the setting of safe fence more ensure that the safety of workmen.
2nd, the construction coherent-wall scaffolding suspending apparatus, by setting sleeve pipe, sliding bar and pulley, makes wall-attached frame hand cradle With hanging ability, the present apparatus is time saving and energy saving for skyscraper is built, and space-consuming is reduced, so as to solve attached wall Scaffold is bothersome laborious during skyscraper is built the problem of.
Brief description of the drawings
Fig. 1 is the utility model structural side view;
Fig. 2 is the utility model structural front view;
Fig. 3 is the attachment structure schematic diagram of the square limited block of the utility model and the second swing arm;
Fig. 4 is the structural side view of the utility model sleeve pipe;
Fig. 5 is the structure sectional view of the utility model sleeve pipe.
In figure:1 wall, 2 circular ports, 3 sleeve pipes, 4 sliding bars, 5 square limited blocks, 6 locating pieces, 7 rotating shafts, 8 first are swung Bolt, 14 locked bolts, 15 pulleys, 16 steel are tightened in arm, 9 second swing arms, 10 positioning seats, 11 locating notches, 12 connecting rods, 13 Cord, 17 supporting plates, 18 safe fences, 19 hoist engines, 20 slipmat.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-5, a kind of construction coherent-wall scaffolding suspending apparatus, including wall 1 are referred to, two are offered on wall 1 Individual circular port 2, the inside of circular port 2 is interspersed to be provided with sleeve pipe 3, and the inside of sleeve pipe 3 is interspersed to be provided with sliding bar 4, sliding bar 4 Left end is installed with square limited block 5, and the top of square limited block 5, bottom, front and back are installed with locating piece 6, the diameter of the circular port 2 on wall 1 is more than the length on square limited block 5 between two locating pieces 6, interts on locating piece 6 Rotating shaft 7 is provided with, the first swing arm 8 is connected with locating piece 6, the right-hand member of the first swing arm 8 is connected with the second pendulum Swing arm 9, the second swing arm 9 are flexibly connected by connecting rod 12 with sleeve pipe 3, and the first swing arm 8 and the one end of the second swing arm 9 are solid Dingan County is equipped with positioning seat 10, and the first swing arm 8 and the other end of the second swing arm 9 are installed with locating piece 6, and sleeve pipe 3 is close One end of square limited block 5 offers the locating notch 11 corresponding with the second swing arm 9, and the length of the second swing arm 9 is more than Locating notch 11, the width of the second swing arm 9 are less than locating notch 11, and the inside of locating notch 11 is installed with connecting rod 12, It is threaded with sleeve pipe 3 and positioned at the right side of wall 1 and tightens bolt 13, tightens bolt 13 through circular port 2 and extend to The left side of wall 1, locked bolt 14, the bottom and position of sleeve pipe 3 are threaded with sliding bar 4 and positioned at the right-hand member of sleeve pipe 3 Two pulleys 15 are installed between bolt 13 and locked bolt 14 in tightening, are arranged with what is extended downwardly on two pulleys 15 Steel wire rope 16, the pulling force of steel wire rope 16 are not less than five tons, and the right-hand member of steel wire rope 16 is fixedly connected with supporting plate 17, the top of supporting plate 17 It is installed with safe fence 18, volume is installed with supporting plate 17 and positioned at the left side of the front and back of safe fence 18 Machine 19 is raised, the left end of steel wire rope 16 is equipped with slipmat 20 around being located on the output shaft of hoist engine 19 on supporting plate 17, square spacing The swing arm 8 of block 5 and first runs through positioning seat 10 and the swing arm 8 of locating piece 6 and first and the second swing arm 9 by rotating shaft 7 respectively It is flexibly connected.
When in use, sleeve pipe 3 is run through into wall 1, when the second swing arm 9 is vertical, tightens bolt 13, block it Wall 1, locked bolt 14 is being tightened, is preventing sliding bar 4 from sliding.
In summary, the construction coherent-wall scaffolding suspending apparatus, by setting sleeve pipe 3, sliding bar 4 and pulley 15, Make coherent-wall scaffolding that there is hanging ability, this suspending apparatus connected mode is simple, easy to disassemble, while structure seems compact, Small volume, consumptive material are few.
Also, the construction coherent-wall scaffolding suspending apparatus, by setting sleeve pipe 3, sliding bar 4 and pulley 15, makes attached Wall stand hand cradle has hanging ability, and the present apparatus is time saving and energy saving for skyscraper is built, and space-consuming is reduced, so as to solve Coherent-wall scaffolding determined bothersome laborious during skyscraper is built the problem of.
It should be noted that term " comprising ", "comprising" or its any other variant are intended to the bag of nonexcludability Contain, so that process, method, article or equipment including a series of elements not only include those key elements, but also including The other element being not expressly set out, or also include for this process, method, article or the intrinsic key element of equipment. In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that including the key element Process, method, other identical element also be present in article or equipment.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of construction coherent-wall scaffolding suspending apparatus, including wall (1), it is characterised in that:Opened up on the wall (1) There are two circular ports (2), the inside of the circular port (2) is interspersed to be provided with sleeve pipe (3), and the inside of described sleeve pipe (3) is interspersed to be set Sliding bar (4) is equipped with, the left end of the sliding bar (4) is installed with square limited block (5), the square limited block (5) Top, bottom, front and back are installed with locating piece (6), intert on the locating piece (6) and are provided with rotating shaft (7), institute State and the first swing arm (8) is connected with locating piece (6), the right-hand member of first swing arm (8) is connected with the second pendulum Swing arm (9), second swing arm (9) are flexibly connected with sleeve pipe (3), first swing arm (8) and the second swing arm (9) one End is installed with positioning seat (10), and first swing arm (8) and the second swing arm (9) other end are installed with fixed Position block (6), described sleeve pipe (3) offer the positioning corresponding with the second swing arm (9) close to one end of square limited block (5) and lacked Mouthful (11), the inside of the locating notch (11) are installed with connecting rod (12), in described sleeve pipe (3) and are located at wall (1) it is threaded with the right side of and tightens bolt (13), is threaded with the sliding bar (4) and positioned at sleeve pipe (3) right-hand member Locked bolt (14), the bottom of described sleeve pipe (3) and is fixedly mounted positioned at tightening between bolt (13) and locked bolt (14) There are two pulleys (15), the steel wire rope (16) extended downwardly is arranged with two pulleys (15), the steel wire rope (16) Right-hand member is fixedly connected with supporting plate (17), and safe fence (18), the supporting plate (17) are installed with the top of the supporting plate (17) Upper and positioned at safe fence (18) front and back left side is installed with hoist engine (19), the steel wire rope (16) Left end is equipped with slipmat (20) around being located on the output shaft of hoist engine (19) on the supporting plate (17).
A kind of 2. construction coherent-wall scaffolding suspending apparatus according to claim 1, it is characterised in that:Second pendulum The length of swing arm (9) is more than locating notch (11), and the second swing arm (9) width is less than locating notch (11).
A kind of 3. construction coherent-wall scaffolding suspending apparatus according to claim 1, it is characterised in that:The wall (1) diameter of the circular port (2) on is more than the length between upper two locating pieces (6) of square limited block (5).
A kind of 4. construction coherent-wall scaffolding suspending apparatus according to claim 1, it is characterised in that:It is described to tighten spiral shell Bolt (13) is through circular port (2) and extends to the left side of wall (1), and the pulling force of the steel wire rope (16) is not less than five tons.
A kind of 5. construction coherent-wall scaffolding suspending apparatus according to claim 1, it is characterised in that:The square limit Position block (5) and the first swing arm (8) are respectively by rotating shaft (7) through positioning seat (10) and locating piece (6) and the first swing arm (8) It is flexibly connected with the second swing arm (9), second swing arm (9) is flexibly connected by connecting rod (12) with sleeve pipe (3).
CN201721047808.0U 2017-08-21 2017-08-21 A kind of construction coherent-wall scaffolding suspending apparatus Expired - Fee Related CN207079899U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721047808.0U CN207079899U (en) 2017-08-21 2017-08-21 A kind of construction coherent-wall scaffolding suspending apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721047808.0U CN207079899U (en) 2017-08-21 2017-08-21 A kind of construction coherent-wall scaffolding suspending apparatus

Publications (1)

Publication Number Publication Date
CN207079899U true CN207079899U (en) 2018-03-09

Family

ID=61420352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721047808.0U Expired - Fee Related CN207079899U (en) 2017-08-21 2017-08-21 A kind of construction coherent-wall scaffolding suspending apparatus

Country Status (1)

Country Link
CN (1) CN207079899U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112832503A (en) * 2021-01-05 2021-05-25 常州工学院 Climbing type building construction operation platform outside building and installation method
CN113120774A (en) * 2021-04-23 2021-07-16 浙大宁波理工学院 A safe suspended structure for high altitude construction is built in room
CN113309331A (en) * 2021-05-31 2021-08-27 中建七局第一建筑有限公司 Cantilever frame and supporting method of outer side wall surface of building

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112832503A (en) * 2021-01-05 2021-05-25 常州工学院 Climbing type building construction operation platform outside building and installation method
CN113120774A (en) * 2021-04-23 2021-07-16 浙大宁波理工学院 A safe suspended structure for high altitude construction is built in room
CN113120774B (en) * 2021-04-23 2022-11-11 浙大宁波理工学院 A safe suspended structure for high altitude construction is built in room
CN113309331A (en) * 2021-05-31 2021-08-27 中建七局第一建筑有限公司 Cantilever frame and supporting method of outer side wall surface of building

Similar Documents

Publication Publication Date Title
CN207079899U (en) A kind of construction coherent-wall scaffolding suspending apparatus
CN202023404U (en) Multifunctional pole erecting device
CN210032558U (en) Scaffold for building convenient to dismouting
CN204752026U (en) Tower crane escape way
CN204001791U (en) A kind of built with ribbed bricks wall prefabricated construction lifting binding apparatus
CN210459215U (en) Bored concrete pile safety work platform
CN201162337Y (en) Adjustable cliff security operation compartment
CN216428959U (en) Assembled building construction platform of conveniently buildding
CN207228591U (en) A kind of architectural engineering scaffold
CN210828251U (en) Scaffold for building construction
CN203654789U (en) Combined type shaping safety net on periphery of building
CN207375669U (en) The electronic lifting bracket of cable tunnel inner column formula cable
CN206928748U (en) A kind of construction site isolation guardrail of installation easy to disassemble
CN206971143U (en) A kind of easy-to-mount municipal administration decoration guardrail
CN206418747U (en) A kind of construction coherent-wall scaffolding cantilever arrangement
CN207986495U (en) A kind of Bridge High-pier main reinforcement hanging apparatus
CN206769340U (en) A kind of easy-to-dismount construction platform
CN206693066U (en) One kind, which builds a bridge, safeguards scaffold
CN203977834U (en) A kind of construction of lift well protective platform
CN213742162U (en) Scaffold for house building construction
CN217998841U (en) Concrete pouring workbench for house construction
CN206706816U (en) A kind of high crane support base of relevance grade
CN204282839U (en) The frame that cast-in-situ concrete beam steadily enters mould founds device
CN216379165U (en) Assembled adjustable support base stone construction protector
CN213926086U (en) Slope protection device for hydraulic and hydroelectric engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180309

Termination date: 20200821

CF01 Termination of patent right due to non-payment of annual fee