CN207079899U - A kind of construction coherent-wall scaffolding suspending apparatus - Google Patents
A kind of construction coherent-wall scaffolding suspending apparatus Download PDFInfo
- Publication number
- CN207079899U CN207079899U CN201721047808.0U CN201721047808U CN207079899U CN 207079899 U CN207079899 U CN 207079899U CN 201721047808 U CN201721047808 U CN 201721047808U CN 207079899 U CN207079899 U CN 207079899U
- Authority
- CN
- China
- Prior art keywords
- swing arm
- wall
- sleeve pipe
- suspending apparatus
- coherent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Movable Scaffolding (AREA)
Abstract
It the utility model is related to technical field of buildings, and disclose a kind of construction coherent-wall scaffolding suspending apparatus, including wall, two circular ports are offered on the wall, the inside of the circular port is interspersed to be provided with sleeve pipe, the inside of described sleeve pipe is interspersed to be provided with sliding bar, and the left end of the sliding bar is installed with square limited block, and hoist engine is installed with the supporting plate and positioned at the left side of safe fence front and back.The construction coherent-wall scaffolding suspending apparatus, by setting sleeve pipe, sliding bar and pulley, makes coherent-wall scaffolding have hanging ability, this suspending apparatus connected mode is simple, it is easy to disassemble, while structure seems compact, small volume, consumptive material is few, the setting of safe fence more ensure that the safety of workmen, wall-attached frame hand cradle is had hanging ability, for skyscraper is built, it is time saving and energy saving, reduce space-consuming.
Description
Technical field
Technical field of buildings is the utility model is related to, specially a kind of construction coherent-wall scaffolding suspending apparatus.
Background technology
Coherent-wall scaffolding refers to job site as operation and solves vertically and horizontally to transport the various supports set up, and builds
The generic term on boundary is built, refers to and exterior wall, inside fitting or the higher place that can not directly construct of floor height is used on construction site, mainly
It is exactly plainly to build a framework in order to which operation above and below workmen or perimeter security net are gone along with sb. to guard him and high-altitude installation component etc., scaffold
Making material generally has:Bamboo and wood, steel pipe or synthetic material etc., coherent-wall scaffolding are to build by laying bricks or stones to use needed for inner-outer wall in building
Build a wall scaffold, external rendering scaffold.
But existing coherent-wall scaffolding be mostly root in the pole type scaffold on ground, although this scaffold application
Extensively, but the problem of many be present, first, the scaffold volume of this structure is larger, and consumable quantity is big, especially for high level
For building, this consumption is especially huge, in addition, the scaffold of this mode, in the process built for skyscraper and
Speech, wastes time and energy, during building, slightly neglects, will result in very big potential safety hazard when in use, so propose one
Construction coherent-wall scaffolding suspending apparatus is planted to solve the problems, such as above-mentioned be previously mentioned.
Utility model content
(1) technical problem solved
In view of the shortcomings of the prior art, the utility model provides a kind of construction coherent-wall scaffolding suspending apparatus, tool
Standby can be hanging the advantages of, solves existing coherent-wall scaffolding for skyscraper, bothersome expense during building
The problem of power.
(2) technical scheme
To realize that above-mentioned coherent-wall scaffolding has hanging purpose, the utility model provides following technical scheme:One kind is built
Construction coherent-wall scaffolding suspending apparatus, including wall are built, two circular ports, the inside of the circular port are offered on the wall
Interspersed to be provided with sleeve pipe, the inside of described sleeve pipe is interspersed to be provided with sliding bar, and the left end of the sliding bar is installed with square
Limited block, the top of the square limited block, bottom, front and back are installed with locating piece, worn on the locating piece
Plug and be equipped with rotating shaft, the first swing arm is connected with the locating piece, the right-hand member of first swing arm is connected with
Second swing arm, second swing arm are flexibly connected with sleeve pipe, and first swing arm and second swing arm one end are fixed
Positioning seat is installed, first swing arm and the second swing arm other end are installed with locating piece, and described sleeve pipe is close
One end of square limited block offers the locating notch corresponding with the second swing arm, and the inside of the locating notch is fixedly mounted
There is a connecting rod, be threaded with described sleeve pipe and on the right side of wall and tighten bolt, on the sliding bar and be located at
Sleeve pipe right-hand member is threaded with locked bolt, the bottom of described sleeve pipe and positioned at tightening fixed peace between bolt and locked bolt
Equipped with two pulleys, the steel wire rope extended downwardly is arranged with two pulleys, the right-hand member of the steel wire rope is fixedly connected with
Supporting plate, is installed with safe fence at the top of the supporting plate, on the supporting plate and positioned at safe fence front and back
Left side is installed with hoist engine, and the left end of the steel wire rope is laid around being located on the output shaft of hoist engine on the supporting plate
There is slipmat.
Preferably, the length of second swing arm is more than locating notch, and the second swing arm width is less than positioning and lacked
Mouthful.
Preferably, the diameter of the circular port on the wall is more than the length between two locating pieces on square limited block.
Preferably, the left side tightened bolt-through circular port and extend to wall, the pulling force of the steel wire rope be not small
In five tons.
Preferably, the square limited block and the first swing arm run through positioning seat and locating piece and first by rotating shaft respectively
Swing arm and the second swing arm are flexibly connected, and second swing arm is flexibly connected by connecting rod with sleeve pipe.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of construction coherent-wall scaffolding suspending apparatus, possess with
Lower beneficial effect:
1st, the construction coherent-wall scaffolding suspending apparatus, by setting sleeve pipe, sliding bar and pulley, makes coherent-wall scaffolding
With hanging ability, this suspending apparatus connected mode is simple, easy to disassemble, while structure seems compact, small volume, consumptive material
Few, the setting of safe fence more ensure that the safety of workmen.
2nd, the construction coherent-wall scaffolding suspending apparatus, by setting sleeve pipe, sliding bar and pulley, makes wall-attached frame hand cradle
With hanging ability, the present apparatus is time saving and energy saving for skyscraper is built, and space-consuming is reduced, so as to solve attached wall
Scaffold is bothersome laborious during skyscraper is built the problem of.
Brief description of the drawings
Fig. 1 is the utility model structural side view;
Fig. 2 is the utility model structural front view;
Fig. 3 is the attachment structure schematic diagram of the square limited block of the utility model and the second swing arm;
Fig. 4 is the structural side view of the utility model sleeve pipe;
Fig. 5 is the structure sectional view of the utility model sleeve pipe.
In figure:1 wall, 2 circular ports, 3 sleeve pipes, 4 sliding bars, 5 square limited blocks, 6 locating pieces, 7 rotating shafts, 8 first are swung
Bolt, 14 locked bolts, 15 pulleys, 16 steel are tightened in arm, 9 second swing arms, 10 positioning seats, 11 locating notches, 12 connecting rods, 13
Cord, 17 supporting plates, 18 safe fences, 19 hoist engines, 20 slipmat.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-5, a kind of construction coherent-wall scaffolding suspending apparatus, including wall 1 are referred to, two are offered on wall 1
Individual circular port 2, the inside of circular port 2 is interspersed to be provided with sleeve pipe 3, and the inside of sleeve pipe 3 is interspersed to be provided with sliding bar 4, sliding bar 4
Left end is installed with square limited block 5, and the top of square limited block 5, bottom, front and back are installed with locating piece
6, the diameter of the circular port 2 on wall 1 is more than the length on square limited block 5 between two locating pieces 6, interts on locating piece 6
Rotating shaft 7 is provided with, the first swing arm 8 is connected with locating piece 6, the right-hand member of the first swing arm 8 is connected with the second pendulum
Swing arm 9, the second swing arm 9 are flexibly connected by connecting rod 12 with sleeve pipe 3, and the first swing arm 8 and the one end of the second swing arm 9 are solid
Dingan County is equipped with positioning seat 10, and the first swing arm 8 and the other end of the second swing arm 9 are installed with locating piece 6, and sleeve pipe 3 is close
One end of square limited block 5 offers the locating notch 11 corresponding with the second swing arm 9, and the length of the second swing arm 9 is more than
Locating notch 11, the width of the second swing arm 9 are less than locating notch 11, and the inside of locating notch 11 is installed with connecting rod 12,
It is threaded with sleeve pipe 3 and positioned at the right side of wall 1 and tightens bolt 13, tightens bolt 13 through circular port 2 and extend to
The left side of wall 1, locked bolt 14, the bottom and position of sleeve pipe 3 are threaded with sliding bar 4 and positioned at the right-hand member of sleeve pipe 3
Two pulleys 15 are installed between bolt 13 and locked bolt 14 in tightening, are arranged with what is extended downwardly on two pulleys 15
Steel wire rope 16, the pulling force of steel wire rope 16 are not less than five tons, and the right-hand member of steel wire rope 16 is fixedly connected with supporting plate 17, the top of supporting plate 17
It is installed with safe fence 18, volume is installed with supporting plate 17 and positioned at the left side of the front and back of safe fence 18
Machine 19 is raised, the left end of steel wire rope 16 is equipped with slipmat 20 around being located on the output shaft of hoist engine 19 on supporting plate 17, square spacing
The swing arm 8 of block 5 and first runs through positioning seat 10 and the swing arm 8 of locating piece 6 and first and the second swing arm 9 by rotating shaft 7 respectively
It is flexibly connected.
When in use, sleeve pipe 3 is run through into wall 1, when the second swing arm 9 is vertical, tightens bolt 13, block it
Wall 1, locked bolt 14 is being tightened, is preventing sliding bar 4 from sliding.
In summary, the construction coherent-wall scaffolding suspending apparatus, by setting sleeve pipe 3, sliding bar 4 and pulley 15,
Make coherent-wall scaffolding that there is hanging ability, this suspending apparatus connected mode is simple, easy to disassemble, while structure seems compact,
Small volume, consumptive material are few.
Also, the construction coherent-wall scaffolding suspending apparatus, by setting sleeve pipe 3, sliding bar 4 and pulley 15, makes attached
Wall stand hand cradle has hanging ability, and the present apparatus is time saving and energy saving for skyscraper is built, and space-consuming is reduced, so as to solve
Coherent-wall scaffolding determined bothersome laborious during skyscraper is built the problem of.
It should be noted that term " comprising ", "comprising" or its any other variant are intended to the bag of nonexcludability
Contain, so that process, method, article or equipment including a series of elements not only include those key elements, but also including
The other element being not expressly set out, or also include for this process, method, article or the intrinsic key element of equipment.
In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that including the key element
Process, method, other identical element also be present in article or equipment.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of construction coherent-wall scaffolding suspending apparatus, including wall (1), it is characterised in that:Opened up on the wall (1)
There are two circular ports (2), the inside of the circular port (2) is interspersed to be provided with sleeve pipe (3), and the inside of described sleeve pipe (3) is interspersed to be set
Sliding bar (4) is equipped with, the left end of the sliding bar (4) is installed with square limited block (5), the square limited block (5)
Top, bottom, front and back are installed with locating piece (6), intert on the locating piece (6) and are provided with rotating shaft (7), institute
State and the first swing arm (8) is connected with locating piece (6), the right-hand member of first swing arm (8) is connected with the second pendulum
Swing arm (9), second swing arm (9) are flexibly connected with sleeve pipe (3), first swing arm (8) and the second swing arm (9) one
End is installed with positioning seat (10), and first swing arm (8) and the second swing arm (9) other end are installed with fixed
Position block (6), described sleeve pipe (3) offer the positioning corresponding with the second swing arm (9) close to one end of square limited block (5) and lacked
Mouthful (11), the inside of the locating notch (11) are installed with connecting rod (12), in described sleeve pipe (3) and are located at wall
(1) it is threaded with the right side of and tightens bolt (13), is threaded with the sliding bar (4) and positioned at sleeve pipe (3) right-hand member
Locked bolt (14), the bottom of described sleeve pipe (3) and is fixedly mounted positioned at tightening between bolt (13) and locked bolt (14)
There are two pulleys (15), the steel wire rope (16) extended downwardly is arranged with two pulleys (15), the steel wire rope (16)
Right-hand member is fixedly connected with supporting plate (17), and safe fence (18), the supporting plate (17) are installed with the top of the supporting plate (17)
Upper and positioned at safe fence (18) front and back left side is installed with hoist engine (19), the steel wire rope (16)
Left end is equipped with slipmat (20) around being located on the output shaft of hoist engine (19) on the supporting plate (17).
A kind of 2. construction coherent-wall scaffolding suspending apparatus according to claim 1, it is characterised in that:Second pendulum
The length of swing arm (9) is more than locating notch (11), and the second swing arm (9) width is less than locating notch (11).
A kind of 3. construction coherent-wall scaffolding suspending apparatus according to claim 1, it is characterised in that:The wall
(1) diameter of the circular port (2) on is more than the length between upper two locating pieces (6) of square limited block (5).
A kind of 4. construction coherent-wall scaffolding suspending apparatus according to claim 1, it is characterised in that:It is described to tighten spiral shell
Bolt (13) is through circular port (2) and extends to the left side of wall (1), and the pulling force of the steel wire rope (16) is not less than five tons.
A kind of 5. construction coherent-wall scaffolding suspending apparatus according to claim 1, it is characterised in that:The square limit
Position block (5) and the first swing arm (8) are respectively by rotating shaft (7) through positioning seat (10) and locating piece (6) and the first swing arm (8)
It is flexibly connected with the second swing arm (9), second swing arm (9) is flexibly connected by connecting rod (12) with sleeve pipe (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721047808.0U CN207079899U (en) | 2017-08-21 | 2017-08-21 | A kind of construction coherent-wall scaffolding suspending apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721047808.0U CN207079899U (en) | 2017-08-21 | 2017-08-21 | A kind of construction coherent-wall scaffolding suspending apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207079899U true CN207079899U (en) | 2018-03-09 |
Family
ID=61420352
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721047808.0U Expired - Fee Related CN207079899U (en) | 2017-08-21 | 2017-08-21 | A kind of construction coherent-wall scaffolding suspending apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207079899U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112832503A (en) * | 2021-01-05 | 2021-05-25 | 常州工学院 | Climbing type building construction operation platform outside building and installation method |
CN113120774A (en) * | 2021-04-23 | 2021-07-16 | 浙大宁波理工学院 | A safe suspended structure for high altitude construction is built in room |
CN113309331A (en) * | 2021-05-31 | 2021-08-27 | 中建七局第一建筑有限公司 | Cantilever frame and supporting method of outer side wall surface of building |
-
2017
- 2017-08-21 CN CN201721047808.0U patent/CN207079899U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112832503A (en) * | 2021-01-05 | 2021-05-25 | 常州工学院 | Climbing type building construction operation platform outside building and installation method |
CN113120774A (en) * | 2021-04-23 | 2021-07-16 | 浙大宁波理工学院 | A safe suspended structure for high altitude construction is built in room |
CN113120774B (en) * | 2021-04-23 | 2022-11-11 | 浙大宁波理工学院 | A safe suspended structure for high altitude construction is built in room |
CN113309331A (en) * | 2021-05-31 | 2021-08-27 | 中建七局第一建筑有限公司 | Cantilever frame and supporting method of outer side wall surface of building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207079899U (en) | A kind of construction coherent-wall scaffolding suspending apparatus | |
CN202023404U (en) | Multifunctional pole erecting device | |
CN210032558U (en) | Scaffold for building convenient to dismouting | |
CN204752026U (en) | Tower crane escape way | |
CN204001791U (en) | A kind of built with ribbed bricks wall prefabricated construction lifting binding apparatus | |
CN210459215U (en) | Bored concrete pile safety work platform | |
CN201162337Y (en) | Adjustable cliff security operation compartment | |
CN216428959U (en) | Assembled building construction platform of conveniently buildding | |
CN207228591U (en) | A kind of architectural engineering scaffold | |
CN210828251U (en) | Scaffold for building construction | |
CN203654789U (en) | Combined type shaping safety net on periphery of building | |
CN207375669U (en) | The electronic lifting bracket of cable tunnel inner column formula cable | |
CN206928748U (en) | A kind of construction site isolation guardrail of installation easy to disassemble | |
CN206971143U (en) | A kind of easy-to-mount municipal administration decoration guardrail | |
CN206418747U (en) | A kind of construction coherent-wall scaffolding cantilever arrangement | |
CN207986495U (en) | A kind of Bridge High-pier main reinforcement hanging apparatus | |
CN206769340U (en) | A kind of easy-to-dismount construction platform | |
CN206693066U (en) | One kind, which builds a bridge, safeguards scaffold | |
CN203977834U (en) | A kind of construction of lift well protective platform | |
CN213742162U (en) | Scaffold for house building construction | |
CN217998841U (en) | Concrete pouring workbench for house construction | |
CN206706816U (en) | A kind of high crane support base of relevance grade | |
CN204282839U (en) | The frame that cast-in-situ concrete beam steadily enters mould founds device | |
CN216379165U (en) | Assembled adjustable support base stone construction protector | |
CN213926086U (en) | Slope protection device for hydraulic and hydroelectric engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180309 Termination date: 20200821 |
|
CF01 | Termination of patent right due to non-payment of annual fee |