CN206418747U - A kind of construction coherent-wall scaffolding cantilever arrangement - Google Patents
A kind of construction coherent-wall scaffolding cantilever arrangement Download PDFInfo
- Publication number
- CN206418747U CN206418747U CN201620718259.4U CN201620718259U CN206418747U CN 206418747 U CN206418747 U CN 206418747U CN 201620718259 U CN201620718259 U CN 201620718259U CN 206418747 U CN206418747 U CN 206418747U
- Authority
- CN
- China
- Prior art keywords
- telescopic joint
- cantilever
- holder
- telescope motor
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of construction coherent-wall scaffolding cantilever arrangement, including holder, the both sides of holder are provided with fixed pin, fixed pin is provided with bolt hole, and bolt is fixed with bolt hole, holder is provided with groove, and groove and is fixed with head tree, head tree is provided with the first telescopic joint, and the first telescopic joint includes telescope motor.The utility model, holder both sides are provided with the stability that fixed pin improves coherent-wall scaffolding, include telescope motor in first telescopic joint, can be freely lifted discrete post, connecting rod is connected with second telescopic joint to be connected with external fixture, the lateral separation that 3rd telescopic joint can adjust cantilever with building facilitates workman to construct, cantilever adds the security of cantilever arrangement provided with guardrail and protection network, cantilever is provided with the 4th telescopic joint and long-handled hook, long-handled hook can be made closely to be connected with building, cantilever is set not rocked in work progress, work task efficiency can be improved.
Description
Technical field
The utility model is related to scaffold cantilever arrangement technical field, more particularly to a kind of construction coherent-wall scaffolding hangs
Arm assembly.
Background technology
Scaffold is job site for operative and solves vertically and horizontally to transport the various supports set up, architecture field
Generic term, refer on construction site be used in exterior wall, inside fitting or the higher place that can not directly construct of floor height, mainly for
Operation or perimeter security net are gone along with sb. to guard him and high-altitude installation component etc. above and below workmen, are a kind of common instruments in construction,
At present, in the construction in many places, scaffold is mostly root in the pole type scaffold on ground, although this pin hand
Frame is widely used, but the problem of have a lot, first, the scaffold volume of this structure is larger, and consumable quantity is big, especially right
For skyscraper, this consumption is especially huge, in addition, the scaffold of this mode, time-consuming to take during building
Power, during building, slightly neglects, and very big potential safety hazard is will result in when in use.
Utility model content
The purpose of this utility model is that, in order to solve shortcoming present in prior art, and a kind of construction proposed is attached
Foundation hand cradle cantilever arrangement.
To achieve these goals, the utility model employs following technical scheme:
A kind of construction coherent-wall scaffolding cantilever arrangement, including holder, the both sides of the holder are provided with fixed pin, described
Fixed pin is main vertical provided with being fixed with groove, and groove provided with bolt, the holder is fixed with bolt hole, and bolt hole
Post, the head tree is provided with the first telescopic joint, and the first telescopic joint includes telescope motor, and the telescope motor is electrically connected with
Controller, first telescopic joint is provided with discrete post, and the output shaft of telescope motor is connected with discrete post, the discrete post
Side is provided with the second telescopic joint, and the second telescopic joint is connected with connecting rod, and the opposite side of the discrete post is provided with the 3rd telescopic joint,
And the 3rd telescopic joint be connected with cantilever, the cantilever, which is provided with guardrail, and guardrail, is provided with protection network, and the side of the cantilever is set
There is the 4th telescopic joint, and the 4th telescopic joint is connected with long-handled hook.
It is preferred that, telescope motor is included in second telescopic joint, the 3rd telescopic joint and the 4th telescopic joint.
It is preferred that, the telescope motor included in second telescopic joint, the 3rd telescopic joint and the 4th telescopic joint with control
Device is electrically connected with.
It is preferred that, the holder is provided with two to four fixed pin.
In the utility model, holder both sides are provided with the stability that fixed pin improves coherent-wall scaffolding, the first telescopic joint
It can be freely lifted discrete post including telescope motor, connecting rod is connected with the second telescopic joint to be connected with external fixture
Connect, the lateral separation that the 3rd telescopic joint can adjust cantilever with building facilitates workman to construct, cantilever is provided with guardrail and protection network
The security of cantilever arrangement is added, cantilever is provided with the 4th telescopic joint and long-handled hook, long-handled hook can be made closely to be connected with building,
Cantilever is not rocked in work progress, work task efficiency can be improved.
Brief description of the drawings
Fig. 1 be the utility model proposes a kind of construction coherent-wall scaffolding cantilever arrangement structural representation.
In figure:Pin, 3 bolts, 4 head trees, 5 first telescopic joints, 6 discrete posts, 7 second telescopic joints, 8 companies are fixed in 1 holder, 2
Extension bar, 9 the 3rd telescopic joints, 10 cantilevers, 11 guardrails, 12 protection networks, 13 the 4th telescopic joints, 14 long-handled hooks, 15 controllers.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.
Reference picture 1, a kind of construction coherent-wall scaffolding cantilever arrangement, including holder 1, the both sides of holder 1 are provided with fixation
Pin 2, fixed pin 2 is provided with groove, and groove and is fixed with provided with bolt 3, holder 1 is fixed with bolt hole, and bolt hole
Head tree 4, head tree 4 is provided with the first telescopic joint 5, and the first telescopic joint 5 includes telescope motor, and telescope motor is electrically connected with
Controller 15, the first telescopic joint 5 is provided with discrete post 6, and the output shaft of telescope motor is connected with discrete post 6, and the one of discrete post 6
Side is provided with the second telescopic joint 7, and the second telescopic joint 7 is connected with connecting rod 8, and the opposite side of discrete post 6 is provided with the 3rd telescopic joint 9,
And the 3rd telescopic joint be connected with cantilever 10, cantilever 10, which is provided with guardrail 11, and guardrail 11, is provided with protection network 12, the one of cantilever 10
Side is provided with the 4th telescopic joint 13, and the 4th telescopic joint 13 is connected with long-handled hook 14, and the both sides of holder 1 are provided with fixed pin 2 and improve attached wall
It can be freely lifted discrete post 6 comprising telescope motor in the stability of scaffold, the first telescopic joint 5, connect on the second telescopic joint 7
Being connected to connecting rod 8 can be connected with external fixture, and the 3rd telescopic joint 9 can adjust cantilever 10 and the lateral separation of building is convenient
Workman constructs, and cantilever 10 adds the security of cantilever arrangement provided with guardrail 11 and protection network 12, and cantilever 10 is provided with the 4th
Telescopic joint 13 and long-handled hook 14, can be such that long-handled hook 14 is closely connected with building, cantilever 10 is not rocked in work progress, can
To improve work task efficiency.
In the utility model, telescope motor is included in the second telescopic joint 7, the 3rd telescopic joint 9 and the 4th telescopic joint 13, the
The telescope motor included in two telescopic joints 7, the 3rd telescopic joint 9 and the 4th telescopic joint 13 is electrically connected with controller 15, holder 1
Provided with two to four fixed pin 2, the both sides of holder 1 are provided with the stability that fixed pin 2 improves coherent-wall scaffolding, the first telescopic joint
It can be freely lifted discrete post 6 comprising telescope motor in 5, connecting rod 8 is connected with the second telescopic joint 7 can be with external stability
Thing is connected, and the lateral separation that the 3rd telescopic joint 9 can adjust cantilever 10 with building facilitates workman to construct, and cantilever 10 is provided with guardrail
11 and protection network 12 add the security of cantilever arrangement, cantilever 10 is provided with the 4th telescopic joint 13 and long-handled hook 14, can make to scratch
Hook 14 is closely connected with building, cantilever 10 is not rocked in work progress, can improve work task efficiency.
Operation principle:Holder 1 is fixed on wall, and fixed pin 2 is fixed on ground by bolt 3, is passed through
Controller 15 controls the telescope motor in the first telescopic joint 5, the second telescopic joint 7, the 3rd telescopic joint 9 and the 4th telescopic joint 13, enters
Row is transversely or longitudinally moved, so as to facilitate workman to be constructed.
It is described above, only the utility model preferably embodiment, but protection domain of the present utility model is not
This is confined to, any one skilled in the art is in the technical scope that the utility model is disclosed, according to this practicality
New technical scheme and its utility model design are subject to equivalent substitution or change, should all cover in protection model of the present utility model
Within enclosing.
Claims (4)
1. a kind of construction coherent-wall scaffolding cantilever arrangement, including holder(1), it is characterised in that the holder(1)Both sides
Provided with fixed pin(2), the fixed pin(2)It is provided with bolt hole, and bolt hole and is fixed with bolt(3), the holder(1)On
Provided with being fixed with head tree in groove, and groove(4), the head tree(4)It is provided with the first telescopic joint(5), and first is flexible
Section(5)Including telescope motor, the telescope motor is electrically connected with controller(15), first telescopic joint(5)It is provided with and divides
Column(6), and the output shaft of telescope motor and discrete post(6)Connection, the discrete post(6)Side be provided with the second telescopic joint
(7), and the second telescopic joint(7)It is connected with connecting rod(8), the discrete post(6)Opposite side be provided with the 3rd telescopic joint(9), and
3rd telescopic joint is connected with cantilever(10), the cantilever(10)It is provided with guardrail(11), and guardrail(11)It is interior to be provided with protection network
(12), the cantilever(10)Side be provided with the 4th telescopic joint(13), and the 4th telescopic joint(13)It is connected with long-handled hook(14).
2. a kind of construction coherent-wall scaffolding cantilever arrangement according to claim 1, it is characterised in that described second stretches
Casing coupling(7), the 3rd telescopic joint(9)With the 4th telescopic joint(13)Inside include telescope motor.
3. a kind of construction coherent-wall scaffolding cantilever arrangement according to claim 2, it is characterised in that described second stretches
Casing coupling(7), the 3rd telescopic joint(9)With the 4th telescopic joint(13)The telescope motor inside included is and controller(15)It is electrically connected with.
4. a kind of construction coherent-wall scaffolding cantilever arrangement according to claim 1, it is characterised in that the holder
(1)Provided with two to four fixed pin(2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620718259.4U CN206418747U (en) | 2016-07-10 | 2016-07-10 | A kind of construction coherent-wall scaffolding cantilever arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620718259.4U CN206418747U (en) | 2016-07-10 | 2016-07-10 | A kind of construction coherent-wall scaffolding cantilever arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206418747U true CN206418747U (en) | 2017-08-18 |
Family
ID=59578972
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620718259.4U Expired - Fee Related CN206418747U (en) | 2016-07-10 | 2016-07-10 | A kind of construction coherent-wall scaffolding cantilever arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206418747U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112814351A (en) * | 2021-01-04 | 2021-05-18 | 邓维记 | Lifting construction equipment hanging point device |
-
2016
- 2016-07-10 CN CN201620718259.4U patent/CN206418747U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112814351A (en) * | 2021-01-04 | 2021-05-18 | 邓维记 | Lifting construction equipment hanging point device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204024005U (en) | Assembly type suspension platform | |
CN201649678U (en) | Semi-automatic safety protective shed for high-rise building construction | |
CN205063308U (en) | Outer hanging protection frame and outer hanging protective structure | |
CN206418747U (en) | A kind of construction coherent-wall scaffolding cantilever arrangement | |
CN207079899U (en) | A kind of construction coherent-wall scaffolding suspending apparatus | |
CN107840255A (en) | A kind of both arms safe tower crane machine | |
CN203066844U (en) | Folding protective-type climbing ladder | |
CN219528334U (en) | Scaffold for building construction | |
CN211200109U (en) | Hanging bracket for bridge construction | |
CN203430009U (en) | Construction hanging basket | |
CN204877244U (en) | Long ladder of suspension type | |
CN213952912U (en) | Overhanging type scaffold | |
CN204059909U (en) | With the horizontal truss of avoiding structure | |
CN210459915U (en) | Combined operation platform | |
RU150737U1 (en) | CONSTRUCTION HAND AND FLOORING WITH HATCH | |
CN205172411U (en) | Portable novel tub of tower cat ladder | |
CN206705575U (en) | A kind of building tower crane with safety hanging cradle | |
CN105098653A (en) | Foldable manned bracket used for repair and maintenance of power line | |
CN213742162U (en) | Scaffold for house building construction | |
CN202659158U (en) | Vertical height adjustable drilling device | |
CN214462317U (en) | Building construction platform with protective structure | |
CN208220158U (en) | A kind of scaffold of architectural engineering | |
CN205259554U (en) | A mount for installation of light steel joist gypsum -lath furred ceiling | |
CN210828267U (en) | Externally-hung drilling construction platform | |
CN211286570U (en) | Protective net easy to assemble with scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170818 Termination date: 20200710 |