CN208088101U - A kind of splicing of Zhongting is floatd bridge - Google Patents

A kind of splicing of Zhongting is floatd bridge Download PDF

Info

Publication number
CN208088101U
CN208088101U CN201820198555.5U CN201820198555U CN208088101U CN 208088101 U CN208088101 U CN 208088101U CN 201820198555 U CN201820198555 U CN 201820198555U CN 208088101 U CN208088101 U CN 208088101U
Authority
CN
China
Prior art keywords
bridge
piece
zhongting
truss
revolving part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820198555.5U
Other languages
Chinese (zh)
Inventor
文会儒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Extreme Aerial Working Equipment Co Ltd
Original Assignee
Zhuhai Extreme Aerial Working Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Extreme Aerial Working Equipment Co Ltd filed Critical Zhuhai Extreme Aerial Working Equipment Co Ltd
Priority to CN201820198555.5U priority Critical patent/CN208088101U/en
Application granted granted Critical
Publication of CN208088101U publication Critical patent/CN208088101U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of Zhongtings to splice the bridge that floats, the bridge that floats for being connected to each other and being set up on two groups of bridge chairs including two groups of bridge chairs and two groups, two groups of bridge chairs are respectively arranged at two opposed corridors, the bridge that floats includes truss and piece bridge, the truss rear end is fixed at bridge chair, be equipped in the truss can feed bridge stretch the sliding rails of receipts, described bridge rear end part is installed in truss front end, and the front end of two pack bridges is docked by quick-locking device.Two bridge chairs are respectively arranged at two opposed corridors by this splicing bridge that floats, the bridge that floats is built toward the overhanging of Zhongting direction, then extended through the sliding rail bridge length that will float at from corridor, wherein, piece bridge can be stretched in splicing along the sliding rail in truss to be received and finally docks fastening, a complete bridge is formed, to bypass column, meets the needs of Zhongting smallpox operation, improve applicability, it no longer needs to be pushed into working face again after side corridor is built, reduces floor space, and safe and reliable.

Description

A kind of splicing of Zhongting is floatd bridge
Technical field
The utility model is related to Zhongting smallpox construction operation fields more particularly to a kind of Zhongting to splice the bridge that floats.
Background technology
With rapid economic development, place is one after another fitted up to attract customer in the large-scale consumption place such as market, hotel As smart as a new pin and complicated, most typical example is exactly that market Zhongting is designed as hollow form, and this design at present has become The Basic Design pattern of most of megastore is taken in the day of Zhongting and furred ceiling or various decorations is often housed, In later period maintenance work, due to there is no standing surface, cause maintenance work extremely difficult;And much market Zhongting ground are high to smallpox Degree can reach 20 meters or more, and construction cost and time can be greatly increased if directly building scaffold straight up, and Very large space is occupied, market business is influenced.
Most common method is at present:The long bridge of a connection is built on the corridor of two opposites, then long bridge by side Side integrally pushes laterally at Zhongting, and worker station repairs work on long bridge to smallpox, and there are great offices for this way Sex-limited, the surrounding for being only used for Zhongting does not have the case where column that could use, if there are column, can stop the promotion of long bridge into Journey.And visit each metropolitan market at present and find, there is the hollow rim that column is close to Zhongting more than the market of half, leads Cause the long bridge of above-mentioned pattern that can not be pushed at Zhongting completely.
Utility model content
In order to overcome the above-mentioned deficiencies of the prior art, the utility model provides a kind of splicing of Zhongting and floats bridge, applicability Height can be built around column, meet Zhongting smallpox job requirements.
Technical solution is used by the utility model solves its technical problem:
A kind of splicing of Zhongting is floatd bridge, including two groups of bridge chairs and two groups of bridges that float for being connected to each other and being set up on two groups of bridge chairs, and two Group bridge chair is respectively arranged at two opposed corridors, and the bridge that floats includes truss and piece bridge, and the truss rear end is fixed on At bridge chair, be equipped in the truss can feed bridge stretch the sliding rails of receipts, described bridge rear end part is installed in truss front end, two It is docked by quick-locking device the front end of pack bridge.
As an improvement of the above technical solution, the truss and piece pars basilaris pontis are equipped with landing slab, described bridge or so two Side has been removably installed protective fence.
As an improvement of the above technical solution, scaffold has been built in the front end of described bridge, and the bridge chair lower part is equipped with can Flexible support leg up and down.
As an improvement of the above technical solution, if described bridge is extremely before spliced by dry plate bridge unit by rear.
As an improvement of the above technical solution, the truss and piece bridge are Combined aluminum alloy frame, wherein piece bridge Weight ratio truss it is light-weight.
As an improvement of the above technical solution, the quick-locking device includes the rod piece and buckle being mounted on piece bridge, Rod piece on one of which piece bridge can be with the buckle quick locking on another set piece bridge.
As an improvement of the above technical solution, the buckle includes being mounted on the shell of piece bridge front end and being set in shell The first revolving part and the second revolving part, first revolving part offers the holding tank for placing rod piece, described first Revolving part and the second revolving part are respectively equipped with the first stopper section and the second stopper section, first revolving part and the second revolving part it Between be provided with spring, when rod piece be pressed into holding tank and drive the first revolving part rotate in the forward direction when, spring is stretched and drives second Revolving part rotates in the forward direction, until the first stopper section and the second stopper section abut stop, rod piece restrained can be locked;When the second rotation When part reversely rotates, the first stopper section and the second stopper section are separated, and spring is stretched and the first revolving part is driven to reversely rotate, Rod piece can be made to be detached from holding tank.
As an improvement of the above technical solution, be additionally provided on the shell for rod piece enter before holding tank by flaring Slot, as the first revolving part is rotationally-varying, the openings of sizes of the flaring slot and holding tank overlapping region, which has, to be more than outside rod piece Diameter and two kinds of variable conditions less than rod piece outer diameter.
As an improvement of the above technical solution, it is also equipped on the shell for driving the second revolving part to reversely rotate Release lever, the release lever stretch into shell and are equipped with card slot, axis pin, the axis pin are additionally provided on second revolving part It is plugged in card slot, described release lever one end is equipped with the drawstring extended at bridge chair.
As an improvement of the above technical solution, it is fastened by bolts between two pack bridges.
The beneficial effects of the utility model have:
Two bridge chairs are respectively arranged at two opposed corridors by this splicing bridge that floats, from corridor at hanged toward Zhongting direction Choose and build the bridge that floats, then by sliding rail will float bridge length extend, wherein piece bridge splicing when can be stretched along the sliding rail in truss receipts and most Docking fastening eventually forms a complete bridge, to bypass column, meets the needs of Zhongting smallpox operation, improves applicability, It no longer needs to be pushed into working face again after side corridor is built, reduces floor space, and safe and reliable.
Description of the drawings
Below in conjunction with the accompanying drawings and specific embodiment the utility model is described in further detail, wherein:
Fig. 1 is structural schematic diagram of the utility model embodiment before docking;
Fig. 2 is the partial enlarged view at A in Fig. 1;
Fig. 3 is the structural schematic diagram that the utility model embodiment installs protective fence additional;
Fig. 4 is the structural schematic diagram of the utility model embodiment;
Fig. 5 is the partial structural diagram being buckled in the utility model embodiment before locking rod piece;
Fig. 6 is the partial structural diagram being buckled in the utility model embodiment after locking rod piece.
Specific implementation mode
Referring to Fig. 1, a kind of splicing of Zhongting of the utility model is floatd bridge, including two groups of bridge chairs 1 and two groups are connected to each other and set up In the bridge 2 that floats on two groups of bridge chairs 1, two groups of bridge chairs 1 are respectively arranged at two opposed corridors, and the bridge 2 that floats includes truss 3 With piece bridge 4,3 rear end of the truss is fixed at bridge chair 1, be equipped in the truss 3 can feed bridge stretch the sliding rails 31 of receipts, institute It states 4 rear end part of piece bridge to be installed in 3 front end of truss, the front end of two pack bridges 4 is docked by quick-locking device 5, is played pre- Tight effect, then again by the upper bridge of worker, bolt fastens two pack bridges 4, achievees the purpose that reinforce completely, is forming complete bridge Beam simultaneously, also bypasses column, meets the needs of Zhongting smallpox operation, improves applicability, it is no longer necessary to after side corridor is built It is pushed into working face again, reduces floor space.
With further reference to Fig. 3 and Fig. 4, after the completion of docking, truss 3 and 4 bottom of piece bridge are laid with landing slab, facilitate on worker Bridge is walked, and has been removably installed protective fence 6 in 4 left and right sides of piece bridge, plays security protection and reinforcement structure, described 1 lower part of bridge chair is equipped with the support leg 8 that can be stretched up and down, and to adjust the height for the bridge 2 that floats, foot has been built in the front end of described bridge 4 Hand cradle 7, auxiliary increases, and in actual operation, needs to stand in different height standing surfaces on scaffold 7, convenient working And repair.
Specifically, if described bridge 4 is extremely before spliced by dry plate bridge unit 41 by rear, the truss 3 and piece bridge 4 are Combined aluminum alloy frame, wherein the weight ratio truss 3 of piece bridge 4 it is light-weight, truss 3 be high intensity Combined aluminum alloy Frame, piece bridge 4 are light-weight Combined aluminum alloy frame, and the two perfection collocation mitigates the load of bridge chair 1, and can guarantee foot Enough safety.
With further reference to Fig. 2, since the bridge 2 that floats is overhanging in the air, pontic is easy to shake and flexible deformation, and overhangs Beam is long so that and it is difficult alignment to dock this link, and uses the docking meeting of bridge 2 of floaing on artificial dangerous before docking, this Quick-locking device 5 in embodiment can solve the problems, such as this, and quick-locking device 5 includes the rod piece being mounted on piece bridge 4 10 and buckle 9, the rod piece 10 on one of which piece bridge 4 can be with 9 quick locking of buckle on another set piece bridge 4.
With further reference to Fig. 5, the buckle 9 includes being mounted on the shell 91 of 4 front end of piece bridge and being set in shell 91 First revolving part 92 and the second revolving part 93, first revolving part 92 offer the holding tank 921 for placing rod piece, institute State be additionally provided on shell 91 for rod piece 10 enter holding tank 921 before by flaring slot 95, with the first revolving part 92 rotate become Change, the flaring slot 95 and the openings of sizes of 921 overlapping region of holding tank have more than 10 outer diameter of rod piece and less than outside rod piece 10 Two kinds of variable conditions of diameter, to lock/dismantle rod piece 10.
Specifically, first revolving part, 92 and second revolving part 93 is respectively equipped with the first stopper section 922 and the second backstop Portion 931, spring 94 is provided between first revolving part, 92 and second revolving part 93, and first stopper section 922 includes extremely Lack two convex blocks, groove is formd between two neighboring convex block, second stopper section 931 includes at least two convex blocks, adjacent Groove is formd between two convex blocks, the convex block of first stopper section 922 can coordinate with the groove of the second stopper section 931 to be supported It connects, the convex block of second stopper section 931 can coordinate with the groove of the first stopper section 922 to abut.
With further reference to Fig. 6, when rod piece 10 is pressed into holding tank 921 and the first revolving part 92 is driven to rotate in the forward direction, spring 94 are stretched and the second revolving part 93 are driven to rotate in the forward direction, until the first stopper section 922 and the second stopper section 931 abut stop, Rod piece 10 restrained can be locked;When the second revolving part 93 reversely rotates, the first stopper section 922 mutually takes off with the second stopper section 931 From spring 94 is stretched and the first revolving part 92 is driven to reversely rotate, and rod piece 10 can be made to be detached from holding tank 921.
In addition, the stop block 98 that the first revolving part 92 of limitation reversely rotates is additionally provided in the shell 91, the shell 91 On be also equipped with release lever 96 for driving the second revolving part 93 to reversely rotate, the release lever 96 stretches into shell 91 And it is equipped with card slot 97, it is additionally provided with axis pin 932 on second revolving part 93, the axis pin 932 is plugged in card slot 97, described to release 96 one end of handle let go equipped with the drawstring 12 extended at bridge chair 1.
In bridge build process of floaing, bridging machine 11 need to be used, two bridging machines 11 are respectively first placed on walking for both sides On corridor, in the installation to bridging machine of bridge chair 1, a firm frame is formed, it at this time need not be part forward surface of blowing out It is right, continue the Combined aluminum alloy frame for building high intensity at corridor, until truss 3 builds completion, rotates bridging machine 11, Make two 3 forward surfaces pair of truss, reuses light-weight Combined aluminum alloy frame and continue to blow out and build, building piece bridge 4 When be specially:Material is sent to 3 inner cavity of truss by corridor, in 3 inner cavity assembling combination piece bridge unit 41 of truss, is completed assembled every After a piece bridge unit 41, it is pushed along sliding rail 31 toward direction of blowing out, after vacating space, continues to build next bridge unit 41, it repeats the above steps, until the length of blowing out of piece bridge 4 meets docking length, it is assembled to carry out docking by quick-locking device 5 Step is pre-tightened, quick-locking device 5 has self-locking function, is operated without worker upper piece bridge 4, ensures the manual security before docking, After docking, then using worker upper piece bridge 4 and it is fastened by bolts two pack bridges 4, it can selectively mounting platform as needed Plate, protective fence 6 and scaffold 7 complete the docking fastening work of two groups of bridges 2 that float, in order to save corridor space, dismountable bridging Machine 11 restores people's row space in corridor.
After the completion of operation to be onstructed, the bridge that floats need to be removed, needs to be reinstalled bridging machine 11 at this time, worker dismantles bolt, then By the release lever 96 on 12 remote operation of drawstring buckle 9, quick-locking device 5 releases, then pulls piece bridge list backward one by one Member 41 simultaneously removes piece bridge unit 41, has often torn a piece bridge unit 41 open and has been further continued for toward another piece bridge unit 41 of post-tensioning, until complete Portion removes and finishes, and finally removes truss 3 again, entirely builds safe and reliable with demolishing process, and this splicing is floatd the applicability of bridge It is very high.
The above, the only better embodiment of the utility model, but the utility model is not limited to above-mentioned reality Example is applied, as long as it reaches the technique effect of the utility model with any same or similar means, should all belong to the utility model Protection domain.

Claims (10)

  1. The bridge 1. a kind of Zhongting splicing is floatd, it is characterised in that:It is connected to each other and is set up on two groups of bridge chairs including two groups of bridge chairs and two groups The bridge that floats, two groups of bridge chairs are respectively arranged at two opposed corridors, and the bridge that floats includes truss and piece bridge, after the truss End is fixed at bridge chair, be equipped in the truss can feed bridge stretch the sliding rails of receipts, described bridge rear end part is installed on truss In front end, the front end of two pack bridges is docked by quick-locking device.
  2. The bridge 2. a kind of Zhongting splicing according to claim 1 is floatd, it is characterised in that:The truss and piece pars basilaris pontis are equipped with Landing slab, the described bridge left and right sides have been removably installed protective fence.
  3. The bridge 3. a kind of Zhongting splicing according to claim 1 is floatd, it is characterised in that:Foot hand is built in the front end of described bridge Frame, the bridge chair lower part are equipped with the support leg that can be stretched up and down.
  4. The bridge 4. a kind of Zhongting splicing according to claim 1 is floatd, it is characterised in that:If described bridge by dry plate bridge unit by It is extremely before spliced afterwards.
  5. The bridge 5. a kind of Zhongting splicing according to claim 1 is floatd, it is characterised in that:The truss and piece bridge are combined type Aluminum alloy frame, wherein the weight ratio truss of piece bridge it is light-weight.
  6. The bridge 6. a kind of Zhongting splicing according to claim 1 is floatd, it is characterised in that:The quick-locking device includes installation Rod piece on piece bridge and buckle, the rod piece on one of which piece bridge can be with the buckle quick locking on another set piece bridge.
  7. The bridge 7. a kind of Zhongting splicing according to claim 6 is floatd, it is characterised in that:The buckle includes before being mounted on piece bridge The shell at end and the first revolving part and the second revolving part being set in shell, first revolving part are offered for placing The holding tank of rod piece, first revolving part and the second revolving part are respectively equipped with the first stopper section and the second stopper section, and described It is provided with spring between one revolving part and the second revolving part, when rod piece is pressed into holding tank and the first revolving part is driven to rotate in the forward direction When, spring is stretched and the second revolving part is driven to rotate in the forward direction, until the first stopper section and the second stopper section abut stop, rod piece It restrained can lock;When the second revolving part reversely rotates, the first stopper section and the second stopper section are separated, and spring is stretched simultaneously It drives the first revolving part to reversely rotate, rod piece can be made to be detached from holding tank.
  8. The bridge 8. a kind of Zhongting splicing according to claim 7 is floatd, it is characterised in that:Be additionally provided on the shell for rod piece into Enter before holding tank by flaring slot, as the first revolving part is rotationally-varying, the flaring slot is opened with holding tank overlapping region Mouth size, which has, is more than rod piece outer diameter and two kinds of variable conditions less than rod piece outer diameter.
  9. The bridge 9. a kind of Zhongting splicing according to claim 7 is floatd, it is characterised in that:It is also equipped with for band on the shell The release lever that dynamic second revolving part reversely rotates, the release lever stretch into shell and are equipped with card slot, second rotation Axis pin is additionally provided on part, the axis pin is plugged in card slot, and described release lever one end is equipped with the drawstring extended at bridge chair.
  10. The bridge 10. a kind of Zhongting splicing according to claim 1 or 6 is floatd, it is characterised in that:Pass through bolt between two pack bridges Fastening.
CN201820198555.5U 2018-02-02 2018-02-02 A kind of splicing of Zhongting is floatd bridge Active CN208088101U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820198555.5U CN208088101U (en) 2018-02-02 2018-02-02 A kind of splicing of Zhongting is floatd bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820198555.5U CN208088101U (en) 2018-02-02 2018-02-02 A kind of splicing of Zhongting is floatd bridge

Publications (1)

Publication Number Publication Date
CN208088101U true CN208088101U (en) 2018-11-13

Family

ID=64063439

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820198555.5U Active CN208088101U (en) 2018-02-02 2018-02-02 A kind of splicing of Zhongting is floatd bridge

Country Status (1)

Country Link
CN (1) CN208088101U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108239917A (en) * 2018-02-02 2018-07-03 珠海及力高空作业设备有限公司 A kind of Zhongting splices the bridge that floats

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108239917A (en) * 2018-02-02 2018-07-03 珠海及力高空作业设备有限公司 A kind of Zhongting splices the bridge that floats

Similar Documents

Publication Publication Date Title
CN103635643B (en) The construction method of nigh-level synthesis steel bar concrete cylindrical shell
CN110092264B (en) Material lifting system in elevator shaft in building construction stage
CN107419894B (en) Adhesion type lifting type aluminium alloy scaffold
CN104564104B (en) A kind of table system for tunnel-liner
CN109898819A (en) A kind of the overhanging tool type scaffold system and its installation method of foldable telescopic
CN112727074B (en) Building machine and building construction method
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN208088101U (en) A kind of splicing of Zhongting is floatd bridge
CN209293474U (en) A kind of support device that cantilevered structure falsework is shared with external scaffolding
CN109881585A (en) A kind of assembly flow shop platform for high pier construction
CN107100361B (en) Inner support aluminum dipping form device and its installation method are climbed outside a kind of
CN106638300B (en) Great-leap-forward bridge maintenance system
CN208844424U (en) Multifunctional assembled construction trolley
CN206144124U (en) A scaffold for construction of tall and big space
CN110805289A (en) Plug-in type discharging platform and construction method
CN208380589U (en) The rail formwork jumbo system that road is constructed against the wind can be carried out simultaneously in the shield-tunneling construction stage
CN110468743A (en) A kind of traveling cradle and construction method for the transformation of old pier coping
CN108239917A (en) A kind of Zhongting splices the bridge that floats
KR20020047071A (en) Rail railing (scaffolding) clamping device in the construction site.
CN208380058U (en) Removable hanging basket suspension scaffold
CN106271520A (en) Photovoltaic module for flexible photovoltaic power station changes system
CN1020645C (en) Integral elevating system for out-mould scaffold of super-high buildings
CN216194090U (en) Wet seam attached construction platform of precast box girder
CN113235904B (en) Circulating mutual climbing lifting column and using method thereof
CN115075558A (en) Fair-faced concrete formwork and formwork cast-in-place construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant