CN206707239U - A kind of elevator Integral hoisting operating platform - Google Patents
A kind of elevator Integral hoisting operating platform Download PDFInfo
- Publication number
- CN206707239U CN206707239U CN201720310195.9U CN201720310195U CN206707239U CN 206707239 U CN206707239 U CN 206707239U CN 201720310195 U CN201720310195 U CN 201720310195U CN 206707239 U CN206707239 U CN 206707239U
- Authority
- CN
- China
- Prior art keywords
- support frame
- bracket
- elevator
- operating platform
- integral hoisting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
A kind of elevator Integral hoisting operating platform, belongs to construction equipment technical field.Platform above support frame and support frame including cuboid(4), it is characterised in that:Described support frame two bottom sides, which are provided with, to be used to carry on a shoulder pole the installation unit being placed on elevator hoistways side bar, and the telescopic installation of installation unit is on the support frame.The support frame basal sliding of this elevator Integral hoisting operating platform is provided with installation unit, installation unit load is placed on elevator side bar, so as to be installed to this elevator Integral hoisting operating platform, convenient disassembly, and wall-through hole need not be reserved on shear wall, it is easy to use, and wide adaptation range.
Description
Technical field
A kind of elevator Integral hoisting operating platform, belongs to construction equipment technical field.
Background technology
In major structure of construction work progress, elevator is more tired without support, its formwork erection because of narrow space, bottom
Difficulty, and in form removable, the operating inconvenience of material upper layer.Traditional construction of lift well is taken always using steel pipe from bottom more
Be set to operation layer, bamboo slab rubber laid above, its weak point be tube material expend big, security is poor, low construction efficiency and
The operating inconvenience of material upper layer.Therefore, a kind of easy for construction, simple to operate, reusable edible and good whole of security are designed
Body formula construction operation platform is significant to construction of lift well.
Application No. ZL201320232773.3 Chinese utility model patent discloses constructing operation in a kind of elevator
Platform, its security protection platform and material Turnoverplatform are placed in the hole through walls of shear wall by steel pipe load, and material turnover is flat
Platform is arranged on above security protection platform.But there are the following problems in use for construction operation platform in the elevator:
Material Turnoverplatform and security protection platform are installed in the hole through walls of shear wall, it is therefore desirable to are reserved on shear wall through walls
Hole, it is very inconvenient using installing.
The content of the invention
The technical problems to be solved in the utility model is:Overcome the deficiencies in the prior art, there is provided one kind is convenient to assemble and disassemble, is not required to
The elevator Integral hoisting operating platform of wall-through hole is reserved on shear wall.
Technical scheme is used by the utility model solves its technical problem:Elevator Integral hoisting operation is flat
Platform above platform, including the support frame and support frame of cuboid, it is characterised in that:Described support frame bottom two
Side, which is provided with, to be used to carry on a shoulder pole the installation unit being placed on elevator hoistways side bar, and the telescopic installation of installation unit is on the support frame.
Preferably, described support frame includes bottom bracket, bracket and column, and bracket is being arranged on bottom bracket just
Top, column are arranged between bracket and bottom bracket, and are connected respectively with bracket and bottom bracket, and stage+module is in bracket
Upside.
Preferably, described column is fixedly connected by bolt with bracket and bottom bracket.
Preferably, described installation unit is that load puts pipe, and load is put pipe and is horizontally disposed with, and load is put pipe and is slidably located in support frame
On, load puts the fixture for being provided between pipe and support frame and being used for that pipe fixation to be put to load.
Preferably, described load put it is axially spaced on pipe be provided with multiple adjustment holes, support frame is provided with fixing hole, adjust
Knothole is aligned with fixing hole, and fixture, which stretches into, to be put pipe to load in fixing hole and adjustment hole and fix.
Preferably, described platform is provided with the hoisting ring for lifting by crane.
Preferably, vertical pin is provided with the upside of described platform, pin has the sidepiece around platform spaced more
Root.
Compared with prior art, beneficial effect possessed by the utility model is:
1st, the support frame basal sliding of this elevator Integral hoisting operating platform is provided with installation unit, installation unit
Load is placed on elevator side bar, so as to be installed to this elevator Integral hoisting operating platform, convenient disassembly, and be not required to
Wall-through hole is reserved on shear wall, it is easy to use, and wide adaptation range.
2nd, load puts pipe and is provided with multiple adjustment holes, and support frame is provided with fixing hole, and fixture passes through adjustment hole and fixation
Load is put pipe fixation on the support frame by hole, and fixed and contact fixed operation is simple.
3rd, hoisting ring is convenient lifts by crane to this elevator Integral hoisting operating platform.
4th, convenient shear wall formwork, the steel pipe to being placed on platform of pin.The equipment such as screw mandrel are fixed.
Brief description of the drawings
Fig. 1 is the schematic perspective view of elevator Integral hoisting operating platform.
Fig. 2 is the partial enlarged drawing at A in Fig. 1.
In figure:1st, bottom bracket 101, fixing hole 2, column 3, bracket 4, platform 5, pin 6, hoisting ring
7th, fixture 8, load put pipe 801, adjustment hole 9, installing pipe.
Embodiment
Fig. 1 ~ 2 are most preferred embodiments of the present utility model, and 1 ~ 2 pair of the utility model is done furtherly below in conjunction with the accompanying drawings
It is bright.
A kind of elevator Integral hoisting operating platform, including it is flat above the support frame and support frame of cuboid
Platform 4, support frame two bottom sides, which are provided with, to be used to carry on a shoulder pole the installation unit being placed on elevator hoistways side bar, the telescopic peace of installation unit
Dress is on the support frame.The support frame basal sliding of this elevator Integral hoisting operating platform is provided with installation unit, peace
Dress unit load is placed on elevator side bar, so as to be installed to this elevator Integral hoisting operating platform, convenient disassembly, and
And wall-through hole need not be reserved on shear wall, it is easy to use, and wide adaptation range.
Specifically:As shown in Figure 1:Support frame includes bottom bracket 1, bracket 3 and column 2.Bracket 3 and bottom bracket
1 is rectangular frame, and bracket 3 is arranged on the surface of bottom bracket 1.Column 2 is arranged between bracket 3 and bottom bracket 1,
The both ends of column 2 are fixedly connected by bolt with bracket 3 and bottom bracket 1 respectively.Column 2 has four.
The front and rear sides of bottom bracket 1 are I-steel, and the middle part of two I-steel is fixedly connected by two steel pipes, the two of steel pipe
End is fixedly connected by bolt with two I-steel respectively.Installation unit has four, and four installation units are separately mounted to two works
The end of word steel.
Bracket 3 is the cuboid framework being welded into by channel-section steel, and the middle part of bracket 3 is provided with two parallel support bars, is propped up
The I-steel of strut and bottom bracket 1 is coaxially disposed, and support bar is rectangular steel tube, and support bar is bolted company with bracket
Connect.The upper end of column 2 is fixedly connected with support bar.
Horizontal installing pipe 9 is installed, width of the installing pipe 9 along bracket 3 is set in bracket 3.In installing pipe 9
Adjustable support support is installed, screw rod one end of adjustable support support is stretched into installing pipe 9, and the block of adjustable support support is arranged on outside installing pipe 9
And the end of installing pipe 9 is supported on, when deployed, supportted by adjusting adjustable support, the screw support of adjustable support support can be made in elevator
On inwall, so as to which bracket 3 be held out against, platform 4 is avoided to shake.
The pipe for support platform 4 is provided between platform 4 and bracket 3, pipe there are spaced two.
Platform 4 is provided with hoisting ring 6, and hoisting ring 6 is arranged on the middle part of platform 4.Hoisting ring 6 has two, two hoisting rings 6
The both sides of platform 4 are symmetricly set on along the longitudinal direction.The upside of platform 4 is additionally provided with pin 5, and pin 5 is vertically arranged, and pin 5 has
Four, four pins 5 surround platform 4 uniformly at intervals.The convenient shear wall formwork, steel pipe, screw mandrel to being placed on platform of pin 5
It is fixed Deng equipment.
As shown in Figure 2:Installation unit is that load puts pipe 8, and it be rectangular steel tube that load, which puts pipe 8, carries on a shoulder pole and puts pipe 8 and be slidably located in bottom bracket
On 1 I-steel.Load puts pipe 8 and is provided with vertical adjustment hole 801, and adjustment hole 801 has two row, and two row adjustment holes 801 are symmetrically set
Put and put the both sides of pipe 8 in load, each row adjustment hole 801 it is axially disposed have it is multiple.The I-steel of bottom bracket 1 is provided with fixing hole
101, fixing hole 101 have it is symmetrically arranged two row, each row fixing hole 101 have can have it is multiple, it is possibility to have one.Load puts pipe
8 are fixed on bottom bracket 1 by fixture 7.Fixture 7 is " u "-shaped bar, and regulation load puts the position of pipe 8 and makes regulation vertically
Hole 801 and fixing hole 101, and two vertical portions of fixture 7 are inserted in the adjustment hole 801 aligned with fixing hole 101 respectively,
It is fixed on so as to which load is put into pipe 8 on bottom bracket 1, completes to carry on a shoulder pole the regulation for putting pipe 8 and load is placed on elevator hoistways side bar, and regulation side
Just.
It is described above, only it is preferred embodiment of the present utility model, is not that other forms are made to the utility model
Limitation, any person skilled in the art is changed or is modified as possibly also with the technology contents of the disclosure above equivalent
The equivalent embodiment of change.But it is every without departing from the content of the technical scheme of the utility model, it is real according to technology of the present utility model
Any simple modification, equivalent variations and the remodeling that confrontation above example is made, still fall within the guarantor of technical solutions of the utility model
Protect scope.
Claims (7)
1. a kind of elevator Integral hoisting operating platform, including the platform above the support frame and support frame of cuboid
(4), it is characterised in that:Described support frame two bottom sides, which are provided with, to be used to carry on a shoulder pole the installation unit being placed on elevator hoistways side bar,
The telescopic installation of installation unit is on the support frame.
2. elevator Integral hoisting operating platform according to claim 1, it is characterised in that:Described support frame bag
Include bottom bracket(1), bracket(3)And column(2), bracket(3)It is arranged on bottom bracket(1)Surface, column(2)Set
In bracket(3)And bottom bracket(1)Between, and respectively with bracket(3)And bottom bracket(1)Connection, platform(4)Installed in pop-up
Frame(3)Upside.
3. elevator Integral hoisting operating platform according to claim 2, it is characterised in that:Described column(2)It is logical
Cross bolt and bracket(3)And bottom bracket(1)It is fixedly connected.
4. elevator Integral hoisting operating platform according to claim 1, it is characterised in that:Described installation unit is
Load puts pipe(8), carry on a shoulder pole and put pipe(8)Horizontally disposed, load puts pipe(8)It is slidably located in support frame, load puts pipe(8)And support frame
Between be provided be used for load put pipe(8)Fixed fixture(7).
5. elevator Integral hoisting operating platform according to claim 4, it is characterised in that:Described load puts pipe(8)
It is above axially spaced to be provided with multiple adjustment holes(801), support frame is provided with fixing hole(101), adjustment hole(801)With fixing hole
(101)Align, fixture(7)Stretch into fixing hole(101)And adjustment hole(801)It is interior that pipe is put to load(8)It is fixed.
6. elevator Integral hoisting operating platform according to claim 1, it is characterised in that:Described platform(4)On
Provided with the hoisting ring for lifting(6).
7. elevator Integral hoisting operating platform according to claim 1, it is characterised in that:Described platform(4)On
Side is provided with vertical pin(5), pin has circular platform(4)Spaced more of sidepiece.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720310195.9U CN206707239U (en) | 2017-03-28 | 2017-03-28 | A kind of elevator Integral hoisting operating platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720310195.9U CN206707239U (en) | 2017-03-28 | 2017-03-28 | A kind of elevator Integral hoisting operating platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206707239U true CN206707239U (en) | 2017-12-05 |
Family
ID=60468163
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720310195.9U Expired - Fee Related CN206707239U (en) | 2017-03-28 | 2017-03-28 | A kind of elevator Integral hoisting operating platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206707239U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111851976A (en) * | 2020-06-29 | 2020-10-30 | 中天华南建设投资集团有限公司 | Sizing operation platform used around internal climbing type movable arm tower crane and installation method thereof |
-
2017
- 2017-03-28 CN CN201720310195.9U patent/CN206707239U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111851976A (en) * | 2020-06-29 | 2020-10-30 | 中天华南建设投资集团有限公司 | Sizing operation platform used around internal climbing type movable arm tower crane and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206513004U (en) | A kind of movable hanger for being easy to roof inner slab to install | |
CN206707239U (en) | A kind of elevator Integral hoisting operating platform | |
CN203255914U (en) | Unit-typed curtain wall lifting device | |
CN208396714U (en) | Supporting construction is adjusted in a kind of hollow concrete well unilateral side inner wall form | |
CN206359109U (en) | Tower hanging apparatus and tower hoisting structure | |
CN108590151A (en) | A kind of scalable elevator hanging basket in four sides | |
CN103953187B (en) | A kind of sliding-mode platform system of band center vertical tube structure | |
CN211173007U (en) | Novel tripod of encorbelmenting | |
CN204920178U (en) | Attaching scaffold main part | |
CN105926917A (en) | Suspension platform for construction of steel structure cornice exterior facing, and construction method and detaching method of suspension platform | |
CN206428986U (en) | A kind of detachable turnover type support jig | |
CN204552051U (en) | The cradle structure of high-altitude crossbeam soffit monitoring point layout | |
CN213563427U (en) | Precast beam removes stretch-draw rack | |
CN207903700U (en) | A kind of lift car telescope support | |
CN210798251U (en) | But scaffold of automatically regulated height | |
CN208844896U (en) | A kind of scalable elevator hanging basket in four sides | |
CN208310404U (en) | Unit type suspended moso bamboo ecological enclosing wall | |
CN206667784U (en) | The erecting device of glass curtain wall outer visor | |
CN205894662U (en) | Modular triangle steel truss template | |
CN205976431U (en) | Tube -shape structures hydraulic pressure slipform promotes construction platform | |
CN203308069U (en) | Translational attached lifting scaffold | |
CN209686839U (en) | Spandrel girder on attachment type raise scaffold combined type | |
CN211548702U (en) | Upper and lower lifting point truss device for attached lifting scaffold | |
CN209429589U (en) | A kind of packaged type reinforcing steel processing shed | |
CN206471739U (en) | Side vertical bridge mounting, supporting and positioning marker post |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171205 Termination date: 20180328 |