CN206471739U CN201720169807.7U CN201720169807U CN206471739U CN 206471739 U CN206471739 U CN 206471739U CN 201720169807 U CN201720169807 U CN 201720169807U CN 206471739 U CN206471739 U CN 206471739U
Authority
CN
China
Prior art keywords
vertical rod
sleeve
crane span
span structure
scale
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720169807.7U
Other languages
Chinese (zh)
Inventor
胡尚伟
罗崇勇
汪玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN201720169807.7U priority Critical patent/CN206471739U/en
Application granted granted Critical
Publication of CN206471739U publication Critical patent/CN206471739U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Support positioning mark pole, including scale vertical rod, vertical rod fastener and location structure are installed the utility model discloses side-stand type crane span structure;Vertical rod fastener is welded with " Π " shape structure of first sleeve for centre, and first sleeve is enclosed in scale vertical rod, and the both sides of vertical rod fastener are vertically arranged the first bolt, and the front end level of first sleeve fixes support bar;Location structure is made up of the second sleeve pipe and positioning rule, location structure is arranged on above vertical rod fastener, second casing pipe sleeve is in scale vertical rod, and positioning rule is horizontally fixed on the front end of the second sleeve pipe, and location structure can mutually be fixed by the second bolt being arranged on the second sleeve pipe with scale vertical rod.Mutually fixed with column by vertical rod fastener, the setting height(from bottom) of crane span structure is positioned by positioning rule, crane span structure, which is placed in positioning rule, can carry out installation operation, workmen is not needed to carry out manual support to crane span structure, save manpower, and safety coefficient is high, efficiency of construction is high, and the quality of installation is improved.

Description

Side-stand type crane span structure installs support positioning mark pole
Technical field
The utility model is related to electrical installation project field, especially a kind of that two-sided crane span structure can be installed on same column Side-stand type crane span structure installs support positioning mark pole.
Background technology
It is usually to be lifted crane span structure two ends by several workmens to put down, it is determined that erection bridge when installing side-stand type crane span structure Height after crane span structure is raised to the side that installation site abuts in column by workmen, then crane span structure and column are consolidated It is fixed, need workmen whole in installation process and crane span structure is lifted flat, original traditional mounting means just compares artificial requirement Height, if run into job site narrow space or under the environmental conditions such as work high above the ground if can not arrange multiple workmens simultaneously Construction, and now the actual installation intensity of job site is bigger, safety coefficient and efficiency of construction are lower, and the quality of installation is also difficult to Ensure.
Utility model content
Technical problem to be solved in the utility model is:A kind of side-stand type crane span structure is provided support positioning mark pole is installed, can The installation of two-sided crane span structure is carried out on same column, construction manpower is reduced, and installation effectiveness can be improved, construction cost is reduced and applies Work risk.
It is to solve the technical scheme that is used of above-mentioned technical problem the utility model:Side-stand type crane span structure installs support positioning Mark post, including scale vertical rod, vertical rod fastener and location structure;The vertical rod fastener is welded with first sleeve for centre " Π " shape structure, first sleeve is enclosed in scale vertical rod, and the both sides of vertical rod fastener are vertically arranged the first bolt, first sleeve Front end level fixes support bar;The location structure is made up of the second sleeve pipe and positioning rule, and location structure is arranged on vertical rod fastening Above part, the second casing pipe sleeve is in scale vertical rod, and positioning rule is horizontally fixed on the front end of the second sleeve pipe, and location structure can be by setting The second bolt put on the second sleeve pipe is mutually fixed with scale vertical rod.
It is further:The scale vertical rod is provided with scale.
It is further:The material for preparing of the scale vertical rod is square steel.
It is further:First sleeve and the second sleeve pipe are all made up of angle steel welding.
The beneficial effects of the utility model are:Mutually fixed with column by vertical rod fastener, by peace of the positioning rule to crane span structure Dress height is positioned, and crane span structure, which is placed in positioning rule, can carry out installation operation, two-sided bridge can be carried out on column simultaneously The installation of frame, it is not necessary to which workmen carries out manual support to crane span structure, saves manpower, reduces workmen's working strength; It is practical, a large amount of installations carried out on the truss of high-altitude in electrical installation project are particularly suitable for use in, safety coefficient is high, apply Work efficiency high;Also the error because caused by artificial lift is flat is will not relate in installation process, the quality of installation is improved;Assembling, Convenient disassembly, is easy to reuse, can effectively reduce production cost.
Brief description of the drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is side view of the present utility model;
Fig. 3 is the top view of vertical rod fastener;
Fig. 4 is the top view of location structure;
Marked in figure:The vertical rod of 1- scales, 2- vertical rods fastener, 21- first sleeves, the bolts of 22- first, 23- support bars, 3- location structures, the sleeve pipes of 31- second, 32- positioning rules, the bolts of 33- second.
Embodiment
For the ease of understanding the utility model, the utility model is further detailed below in conjunction with the accompanying drawings.
As shown in Figure 1 and Figure 2, the utility model side-stand type crane span structure installs support positioning mark pole, including scale vertical rod 1, vertical rod Fastener 2 and location structure 3;The vertical rod fastener 2 is welded with " Π " shape structure of first sleeve 21, first sleeve for centre 21 are enclosed in scale vertical rod 1, and the both sides of vertical rod fastener 2 are vertically arranged the first bolt 22, and the front end level of first sleeve 21 is consolidated Determine support bar 23, vertical rod fastener 2 is used to be fixed with column, and " Π " shape structure provides left and right two fixed spaces, operation Person can voluntarily select as needed;The location structure 3 is made up of the second sleeve pipe 31 and positioning rule 32, and location structure 3 is arranged on The top of vertical rod fastener 2, the second sleeve pipe 31 is enclosed in scale vertical rod 1, and the second sleeve pipe 31 can be freely lifted in scale vertical rod 1, The positioning of setting height(from bottom) is convenient for, positioning rule 32 is horizontally fixed on the front end of the second sleeve pipe 31, and location structure 3 can be by setting The second bolt 33 on the second sleeve pipe 31 is mutually fixed with scale vertical rod 1.
Scale vertical rod 1 is provided with scale, is convenient for the positioning of crane span structure setting height(from bottom).
Because the utility model is fastened using bolt, in order to ensure fastening effect, contact of the scale vertical rod 1 with bolt Face should be plane, therefore prepare scale vertical rod 1 from square steel, at the same the first sleeve 21 that is engaged with scale vertical rod 1 and Second sleeve pipe 31 is also made from angle steel welding.
When carrying out the installation of side-stand type crane span structure using the utility model, first the first bolt 22 is unscrewed, vertical rod is fastened Part 2 is stuck on the column of pending installation, and the bottom of scale vertical rod 1 is supported in the horizontal plane, then tightens the first bolt 22 by scale Vertical rod 1 is mutually fixed with column, is then adjusted the height of the second sleeve pipe 31 to the default setting height(from bottom) of crane span structure, is tightened the second bolt 33 Location structure 3 is fixed, finally crane span structure, which is placed in positioning rule 32, makes crane span structure holding level to proceed by installation;To When the installation or positioning rule 32 for carrying out two-sided crane span structure individually can not support crane span structure, the support bar 23 on vertical rod fastener 2 Also positioning rule 32 can be coordinated to carry out the support of crane span structure together, vertical rod fastener 2 is turned to, support bar 23 is turned to the back of the body of column Face, you can in the another side erection bridge of column.After installation, unscrew the first bolt 22 and the second bolt 33, vertical rod is tight Firmware 2 is unloaded from column, then extracts scale vertical rod 1 from the sleeve pipe 31 of first sleeve 21 and second out, you can complete overall Dismantlement work.

Claims (4)

1. side-stand type crane span structure installs support positioning mark pole, it is characterised in that:Including scale vertical rod (1), vertical rod fastener (2) and fixed Bit architecture (3);The vertical rod fastener (2) is " Π " shape structure that centre is welded with first sleeve (21), first sleeve (21) It is enclosed in scale vertical rod (1), the both sides of vertical rod fastener (2) are vertically arranged the first bolt (22), the front end of first sleeve (21) Level fixes support bar (23);The location structure (3) is made up of the second sleeve pipe (31) and positioning rule (32), location structure (3) It is arranged on above vertical rod fastener (2), the second sleeve pipe (31) is enclosed in scale vertical rod (1), positioning rule (32) is horizontally fixed on the The front end of two sleeve pipes (31), location structure (3) can be stood by the second bolt (33) being arranged on the second sleeve pipe (31) with scale Bar (1) is mutually fixed.
2. side-stand type crane span structure as claimed in claim 1 installs support positioning mark pole, it is characterised in that:The scale vertical rod (1) It is provided with scale.
3. side-stand type crane span structure as claimed in claim 1 installs support positioning mark pole, it is characterised in that:The scale vertical rod (1) Prepare material for square steel.
4. side-stand type crane span structure as claimed in claim 3 installs support positioning mark pole, it is characterised in that:First sleeve (21) and Two sleeve pipes (31) are all made up of angle steel welding.
CN201720169807.7U 2017-02-24 2017-02-24 Side-stand type crane span structure installs support positioning mark pole Active CN206471739U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720169807.7U CN206471739U (en) 2017-02-24 2017-02-24 Side-stand type crane span structure installs support positioning mark pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720169807.7U CN206471739U (en) 2017-02-24 2017-02-24 Side-stand type crane span structure installs support positioning mark pole

Publications (1)

Publication Number Publication Date
CN206471739U true CN206471739U (en) 2017-09-05

Family

ID=59708764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720169807.7U Active CN206471739U (en) 2017-02-24 2017-02-24 Side-stand type crane span structure installs support positioning mark pole

Country Status (1)

Country Link
CN (1) CN206471739U (en)

Similar Documents

Publication Publication Date Title
CN202017346U (en) Late poured band hanging formwork structure
CN204753397U (en) Gallows is installed to steel case bridge temporarily
CN207714108U (en) A kind of support system of the more arcading arched aqueducts of large span or bridge
CN206471739U (en) Side-stand type crane span structure installs support positioning mark pole
CN206707128U (en) Reuse adjustable frame trestle reinforcing bar spacer ferrule
CN206887793U (en) A kind of removable protection network removed for bridge static(al)
CN206385568U (en) A kind of city integrated piping lane hoisting ring device
CN204139631U (en) The guard rail of building site fast demountable
CN206428986U (en) A kind of detachable turnover type support jig
CN207878284U (en) Bailey beam cable saddle hoisting bracket
CN206971693U (en) Adjustable type welds hanging basket
CN202925871U (en) Movable operating platform for aloft work
CN206279783U (en) Assembled construction safety channel
CN205531410U (en) A simply can dismantle construction canopy for steel construction job site
CN201377167Y (en) High-altitude assembly platform for segmented factory-building pillars
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN213061799U (en) Vehicle restriction device for bridge engineering
CN204552051U (en) The cradle structure of high-altitude crossbeam soffit monitoring point layout
CN205502730U (en) A can dismantle railing for marine wind power
CN211846865U (en) Device for hoisting corrugated pipe
CN206928748U (en) A kind of construction site isolation guardrail of installation easy to disassemble
CN203699828U (en) Simple tool-type lifting frame for mounting of steel reinforcement cages
CN206554249U (en) A kind of new steel structure column braces
CN206707239U (en) A kind of elevator Integral hoisting operating platform
CN206225848U (en) Bridge-type high-voltage board installs suspension and support