CN206471739U - Side vertical bridge mounting, supporting and positioning marker post - Google Patents
Side vertical bridge mounting, supporting and positioning marker post Download PDFInfo
- Publication number
- CN206471739U CN206471739U CN201720169807.7U CN201720169807U CN206471739U CN 206471739 U CN206471739 U CN 206471739U CN 201720169807 U CN201720169807 U CN 201720169807U CN 206471739 U CN206471739 U CN 206471739U
- Authority
- CN
- China
- Prior art keywords
- vertical rod
- sleeve
- scale
- crane span
- fastener
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000003550 marker Substances 0.000 title 1
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000003466 welding Methods 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 15
- 238000010276 construction Methods 0.000 abstract description 5
- 238000010616 electrical installation Methods 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a side-standing bridge frame mounting, supporting and positioning mark post, which comprises a scale vertical rod, a vertical rod fastener and a positioning structure; the upright rod fastener is of an n-shaped structure, the middle of the upright rod fastener is welded with a first sleeve, the first sleeve is sleeved on the scale upright rod, first bolts are vertically arranged on two sides of the upright rod fastener, and the front end of the first sleeve horizontally fixes the supporting rod; location structure comprises second sleeve pipe and location chi, and location structure sets up in pole setting fastener top, and the second sleeve pipe overlaps in the scale pole setting, and the location chi level is fixed at the sheathed tube front end of second, and location structure accessible sets up the second bolt on the second sleeve pipe and is fixed mutually with the scale pole setting. Through pole setting fastener and stand fixed mutually, fix a position the mounting height of crane span structure by the positioning rule, place the crane span structure and can install the operation on the positioning rule, do not need constructor to carry out manual support to the crane span structure, saved the manpower to factor of safety is high, the efficiency of construction is high, and the quality of installation obtains improving.
Description
Technical field
The utility model is related to electrical installation project field, especially a kind of that two-sided crane span structure can be installed on same column
Side-stand type crane span structure installs support positioning mark pole.
Background technology
It is usually to be lifted crane span structure two ends by several workmens to put down, it is determined that erection bridge when installing side-stand type crane span structure
Height after crane span structure is raised to the side that installation site abuts in column by workmen, then crane span structure and column are consolidated
It is fixed, need workmen whole in installation process and crane span structure is lifted flat, original traditional mounting means just compares artificial requirement
Height, if run into job site narrow space or under the environmental conditions such as work high above the ground if can not arrange multiple workmens simultaneously
Construction, and now the actual installation intensity of job site is bigger, safety coefficient and efficiency of construction are lower, and the quality of installation is also difficult to
Ensure.
Utility model content
Technical problem to be solved in the utility model is:A kind of side-stand type crane span structure is provided support positioning mark pole is installed, can
The installation of two-sided crane span structure is carried out on same column, construction manpower is reduced, and installation effectiveness can be improved, construction cost is reduced and applies
Work risk.
It is to solve the technical scheme that is used of above-mentioned technical problem the utility model:Side-stand type crane span structure installs support positioning
Mark post, including scale vertical rod, vertical rod fastener and location structure;The vertical rod fastener is welded with first sleeve for centre
" Π " shape structure, first sleeve is enclosed in scale vertical rod, and the both sides of vertical rod fastener are vertically arranged the first bolt, first sleeve
Front end level fixes support bar;The location structure is made up of the second sleeve pipe and positioning rule, and location structure is arranged on vertical rod fastening
Above part, the second casing pipe sleeve is in scale vertical rod, and positioning rule is horizontally fixed on the front end of the second sleeve pipe, and location structure can be by setting
The second bolt put on the second sleeve pipe is mutually fixed with scale vertical rod.
It is further:The scale vertical rod is provided with scale.
It is further:The material for preparing of the scale vertical rod is square steel.
It is further:First sleeve and the second sleeve pipe are all made up of angle steel welding.
The beneficial effects of the utility model are:Mutually fixed with column by vertical rod fastener, by peace of the positioning rule to crane span structure
Dress height is positioned, and crane span structure, which is placed in positioning rule, can carry out installation operation, two-sided bridge can be carried out on column simultaneously
The installation of frame, it is not necessary to which workmen carries out manual support to crane span structure, saves manpower, reduces workmen's working strength;
It is practical, a large amount of installations carried out on the truss of high-altitude in electrical installation project are particularly suitable for use in, safety coefficient is high, apply
Work efficiency high;Also the error because caused by artificial lift is flat is will not relate in installation process, the quality of installation is improved;Assembling,
Convenient disassembly, is easy to reuse, can effectively reduce production cost.
Brief description of the drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is side view of the present utility model;
Fig. 3 is the top view of vertical rod fastener;
Fig. 4 is the top view of location structure;
Marked in figure:The vertical rod of 1- scales, 2- vertical rods fastener, 21- first sleeves, the bolts of 22- first, 23- support bars,
3- location structures, the sleeve pipes of 31- second, 32- positioning rules, the bolts of 33- second.
Embodiment
For the ease of understanding the utility model, the utility model is further detailed below in conjunction with the accompanying drawings.
As shown in Figure 1 and Figure 2, the utility model side-stand type crane span structure installs support positioning mark pole, including scale vertical rod 1, vertical rod
Fastener 2 and location structure 3;The vertical rod fastener 2 is welded with " Π " shape structure of first sleeve 21, first sleeve for centre
21 are enclosed in scale vertical rod 1, and the both sides of vertical rod fastener 2 are vertically arranged the first bolt 22, and the front end level of first sleeve 21 is consolidated
Determine support bar 23, vertical rod fastener 2 is used to be fixed with column, and " Π " shape structure provides left and right two fixed spaces, operation
Person can voluntarily select as needed;The location structure 3 is made up of the second sleeve pipe 31 and positioning rule 32, and location structure 3 is arranged on
The top of vertical rod fastener 2, the second sleeve pipe 31 is enclosed in scale vertical rod 1, and the second sleeve pipe 31 can be freely lifted in scale vertical rod 1,
The positioning of setting height(from bottom) is convenient for, positioning rule 32 is horizontally fixed on the front end of the second sleeve pipe 31, and location structure 3 can be by setting
The second bolt 33 on the second sleeve pipe 31 is mutually fixed with scale vertical rod 1.
Scale vertical rod 1 is provided with scale, is convenient for the positioning of crane span structure setting height(from bottom).
Because the utility model is fastened using bolt, in order to ensure fastening effect, contact of the scale vertical rod 1 with bolt
Face should be plane, therefore prepare scale vertical rod 1 from square steel, at the same the first sleeve 21 that is engaged with scale vertical rod 1 and
Second sleeve pipe 31 is also made from angle steel welding.
When carrying out the installation of side-stand type crane span structure using the utility model, first the first bolt 22 is unscrewed, vertical rod is fastened
Part 2 is stuck on the column of pending installation, and the bottom of scale vertical rod 1 is supported in the horizontal plane, then tightens the first bolt 22 by scale
Vertical rod 1 is mutually fixed with column, is then adjusted the height of the second sleeve pipe 31 to the default setting height(from bottom) of crane span structure, is tightened the second bolt 33
Location structure 3 is fixed, finally crane span structure, which is placed in positioning rule 32, makes crane span structure holding level to proceed by installation;To
When the installation or positioning rule 32 for carrying out two-sided crane span structure individually can not support crane span structure, the support bar 23 on vertical rod fastener 2
Also positioning rule 32 can be coordinated to carry out the support of crane span structure together, vertical rod fastener 2 is turned to, support bar 23 is turned to the back of the body of column
Face, you can in the another side erection bridge of column.After installation, unscrew the first bolt 22 and the second bolt 33, vertical rod is tight
Firmware 2 is unloaded from column, then extracts scale vertical rod 1 from the sleeve pipe 31 of first sleeve 21 and second out, you can complete overall
Dismantlement work.
Claims (4)
1. side-stand type crane span structure installs support positioning mark pole, it is characterised in that:Including scale vertical rod (1), vertical rod fastener (2) and fixed
Bit architecture (3);The vertical rod fastener (2) is " Π " shape structure that centre is welded with first sleeve (21), first sleeve (21)
It is enclosed in scale vertical rod (1), the both sides of vertical rod fastener (2) are vertically arranged the first bolt (22), the front end of first sleeve (21)
Level fixes support bar (23);The location structure (3) is made up of the second sleeve pipe (31) and positioning rule (32), location structure (3)
It is arranged on above vertical rod fastener (2), the second sleeve pipe (31) is enclosed in scale vertical rod (1), positioning rule (32) is horizontally fixed on the
The front end of two sleeve pipes (31), location structure (3) can be stood by the second bolt (33) being arranged on the second sleeve pipe (31) with scale
Bar (1) is mutually fixed.
2. side-stand type crane span structure as claimed in claim 1 installs support positioning mark pole, it is characterised in that:The scale vertical rod (1)
It is provided with scale.
3. side-stand type crane span structure as claimed in claim 1 installs support positioning mark pole, it is characterised in that:The scale vertical rod (1)
Prepare material for square steel.
4. side-stand type crane span structure as claimed in claim 3 installs support positioning mark pole, it is characterised in that:First sleeve (21) and
Two sleeve pipes (31) are all made up of angle steel welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720169807.7U CN206471739U (en) | 2017-02-24 | 2017-02-24 | Side vertical bridge mounting, supporting and positioning marker post |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720169807.7U CN206471739U (en) | 2017-02-24 | 2017-02-24 | Side vertical bridge mounting, supporting and positioning marker post |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206471739U true CN206471739U (en) | 2017-09-05 |
Family
ID=59708764
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720169807.7U Active CN206471739U (en) | 2017-02-24 | 2017-02-24 | Side vertical bridge mounting, supporting and positioning marker post |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206471739U (en) |
-
2017
- 2017-02-24 CN CN201720169807.7U patent/CN206471739U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104925680B (en) | A kind of method of stabilizer tower crane body | |
CN201665992U (en) | Whole lifting platform of large steel net frame | |
CN204753397U (en) | Temporary mounting hanger for steel box bridge | |
CN207714108U (en) | A kind of support system of the more arcading arched aqueducts of large span or bridge | |
CN206471739U (en) | Side vertical bridge mounting, supporting and positioning marker post | |
CN202850515U (en) | Regulating-type temporary supporting rod for inclined steel column installation | |
CN206428986U (en) | A kind of detachable turnover type support jig | |
CN206279783U (en) | Assembled construction safety channel | |
CN216275244U (en) | Prefabricated pier stud installation viewing device that takes one's place | |
CN206468030U (en) | Independent beam combined type limb protective railing | |
CN213563427U (en) | Precast beam removes stretch-draw rack | |
CN201377167Y (en) | High-altitude assembly platform for segmented factory-building pillars | |
CN213061799U (en) | Vehicle restriction device for bridge engineering | |
CN205531410U (en) | A simply can dismantle construction canopy for steel construction job site | |
CN205502730U (en) | A can dismantle railing for marine wind power | |
CN209820971U (en) | Steel construction welding department quality detection device | |
CN211625739U (en) | Base structure of solar water heater | |
CN204552051U (en) | The cradle structure of high-altitude crossbeam soffit monitoring point layout | |
CN206707239U (en) | A kind of elevator Integral hoisting operating platform | |
CN203890893U (en) | Supporting bracket for integral lifting of hollow slab girder | |
CN103397638A (en) | Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support | |
CN209780326U (en) | Support column for assembly type building | |
CN206554249U (en) | A kind of new steel structure column braces | |
CN106532556A (en) | Electric power tool storage scaffold for power supply line maintenance | |
CN208310044U (en) | A kind of keel positioning device of polygon column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |