Segmentation factory building columns installation at high altitude platform
Technical field
The utility model relates to the factory building columns construction, relates in particular to the used safe supporting facility of segmentation factory building columns assembly unit.
Background technology
The absolute altitude of Standard Factory Room is all more than 3 meters, but part large scale industry factory building absolute altitude is more than 40 meters, therefore, pillar all is that segmentation is installed, and dock assembly unit in the high-altitude, but consolidation service there is no unified job platform, most of traditional method is binding stand on steel column just, utilize and set up springboard on the support, do not establish railing, utilize support directly to tie up safety net all around.The drawback of this way and hidden danger are to set up inconvenience; In case springboard is removed in the demolishing process, platform causes security incident with loss of stability.
Summary of the invention
The utility model is intended to solve the problems referred to above of prior art, and a kind of segmentation factory building columns installation at high altitude platform is provided.The utility model reduces construction risk, reaches safe construction.
The utility model is achieved in that a kind of segmentation factory building columns installation at high altitude platform, and it comprises some supports, and described factory building columns is a double component concrete column, and described support is a trivet, and it also comprises:
Buckle, each factory building columns list limb upper edge circumference are provided with 3-4, and each buckle hangs over a support on the factory building columns;
Vertical rod, it is arranged on the outer end of each support;
Cross bar, it centers on and is arranged on around the factory building columns, and is attached at described vertical rod side, and support is connected into a rectangle integral platform;
Some wooden springboards, they are arranged on the support, and around the factory building columns setting.
Safety net, it is arranged on the bottom surface of the rectangle integral platform that cross bar connects into and all around.
Described segmentation factory building columns installation at high altitude platform, described cross bar and vertical rod all are that angle steel is made.
Described segmentation factory building columns installation at high altitude platform, the junction of described vertical rod and support, cross bar and vertical rod all is to be connected with bolt.
The utility model is made simple, sets up, dismantles all very convenient, with low cost.And stability is strong, safer, suitable.
Description of drawings
Below, the utility model is done further specifying in conjunction with the accompanying drawings:
Fig. 1 is a schematic diagram of the present utility model.
Fig. 2 is the vertical view of Fig. 1.
Fig. 3 is that described support hangs schematic diagram.
The specific embodiment
As Fig. 1, Fig. 2 and shown in Figure 3, the utility model is achieved in that a kind of segmentation factory building columns installation at high altitude platform, and it comprises some supports 1, and described factory building columns 2 is twin columns, and described support 1 is a trivet, and it also comprises:
Buckle 3, each factory building columns 2 upper edge circumference are provided with 3-4, and each buckle 3 hangs over a support 1 on the factory building columns;
Vertical rod 4, it is arranged on the outer end of each support;
Cross bar 5, it centers on and is arranged on around the factory building columns 2, and is attached at described vertical rod 4 sides, and support 1 is connected into a rectangle integral platform; Described cross bar 5 and vertical rod 4 all are that angle steel is made;
The junction of described vertical rod 4 and support 1, cross bar 5 and vertical rod 4 all is to be connected with for convenience detach with bolt.
Some wooden springboards 6, they are arranged on the support 1, and are provided with around factory building columns 2.
Safety net 7, it is arranged on the bottom surface of the rectangle integral platform that cross bar 5 connects into and all around.