CN109551157B - 中空球体的安装方法及安装辅助系统 - Google Patents
中空球体的安装方法及安装辅助系统 Download PDFInfo
- Publication number
- CN109551157B CN109551157B CN201811629440.8A CN201811629440A CN109551157B CN 109551157 B CN109551157 B CN 109551157B CN 201811629440 A CN201811629440 A CN 201811629440A CN 109551157 B CN109551157 B CN 109551157B
- Authority
- CN
- China
- Prior art keywords
- hollow
- stiffening ribs
- hemispheres
- longitudinal
- hemisphere
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/0426—Fixtures for other work
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (7)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210016515.5A CN114378517A (zh) | 2018-12-28 | 2018-12-28 | 中空球体 |
CN201811629440.8A CN109551157B (zh) | 2018-12-28 | 2018-12-28 | 中空球体的安装方法及安装辅助系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811629440.8A CN109551157B (zh) | 2018-12-28 | 2018-12-28 | 中空球体的安装方法及安装辅助系统 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210016515.5A Division CN114378517A (zh) | 2018-12-28 | 2018-12-28 | 中空球体 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109551157A CN109551157A (zh) | 2019-04-02 |
CN109551157B true CN109551157B (zh) | 2023-10-20 |
Family
ID=65871767
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811629440.8A Active CN109551157B (zh) | 2018-12-28 | 2018-12-28 | 中空球体的安装方法及安装辅助系统 |
CN202210016515.5A Pending CN114378517A (zh) | 2018-12-28 | 2018-12-28 | 中空球体 |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210016515.5A Pending CN114378517A (zh) | 2018-12-28 | 2018-12-28 | 中空球体 |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN109551157B (zh) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE932945C (de) * | 1953-04-28 | 1955-09-12 | Aug Kloenne Fa | Vorrichtung zum Drehen von aus einzelnen Blechen zusammenzuschweissenden Kugelbehaeltern |
US4068419A (en) * | 1975-02-14 | 1978-01-17 | General Dynamics Corporation | Inside scaffolding for large metallic structures and method of using same |
JPS59110499A (ja) * | 1982-12-17 | 1984-06-26 | Nissan Motor Co Ltd | 中空球体溶接治具 |
US4538798A (en) * | 1981-05-11 | 1985-09-03 | Hahn & Clay | Frame for constructing a hemispherical multi-layered shell |
CN104785995A (zh) * | 2015-03-31 | 2015-07-22 | 苏州海陆重工股份有限公司 | 安注箱中球壳纵缝自动焊接工装 |
CN204504543U (zh) * | 2015-01-05 | 2015-07-29 | 无锡市恒安特种设备工程有限公司 | 一种球壳内圆撑圆工装 |
CN209647960U (zh) * | 2018-12-28 | 2019-11-19 | 中交路桥华南工程有限公司 | 中空球体的安装辅助系统 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102605960B (zh) * | 2012-03-13 | 2014-06-11 | 中国十七冶集团有限公司 | 中空库屋顶平台微调定位吊装方法 |
CN104018659B (zh) * | 2014-06-16 | 2016-05-11 | 大连理工大学 | 一种球罐内部定检辅助载人器具 |
CN204381626U (zh) * | 2014-12-02 | 2015-06-10 | 武汉钢铁(集团)公司 | 一种空心球焊接设备 |
CN207829578U (zh) * | 2017-12-29 | 2018-09-07 | 温州泰昌铁塔制造有限公司 | 一种多构件汇交大直径空心钢球 |
-
2018
- 2018-12-28 CN CN201811629440.8A patent/CN109551157B/zh active Active
- 2018-12-28 CN CN202210016515.5A patent/CN114378517A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE932945C (de) * | 1953-04-28 | 1955-09-12 | Aug Kloenne Fa | Vorrichtung zum Drehen von aus einzelnen Blechen zusammenzuschweissenden Kugelbehaeltern |
US4068419A (en) * | 1975-02-14 | 1978-01-17 | General Dynamics Corporation | Inside scaffolding for large metallic structures and method of using same |
US4538798A (en) * | 1981-05-11 | 1985-09-03 | Hahn & Clay | Frame for constructing a hemispherical multi-layered shell |
JPS59110499A (ja) * | 1982-12-17 | 1984-06-26 | Nissan Motor Co Ltd | 中空球体溶接治具 |
CN204504543U (zh) * | 2015-01-05 | 2015-07-29 | 无锡市恒安特种设备工程有限公司 | 一种球壳内圆撑圆工装 |
CN104785995A (zh) * | 2015-03-31 | 2015-07-22 | 苏州海陆重工股份有限公司 | 安注箱中球壳纵缝自动焊接工装 |
CN209647960U (zh) * | 2018-12-28 | 2019-11-19 | 中交路桥华南工程有限公司 | 中空球体的安装辅助系统 |
Also Published As
Publication number | Publication date |
---|---|
CN114378517A (zh) | 2022-04-22 |
CN109551157A (zh) | 2019-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107298371A (zh) | 一种钢结构模块化房屋通用吊架及现场吊装就位方法 | |
CN208899886U (zh) | 悬挑桁架平台 | |
CN207362882U (zh) | 管廊底板矮墙模悬挂式支架 | |
CN211057625U (zh) | 一种装配式预制墩柱安装对位装置 | |
CN207243234U (zh) | 一种钢结构模块化房屋通用吊架 | |
CN109551157B (zh) | 中空球体的安装方法及安装辅助系统 | |
CN207682650U (zh) | 一种模具以及筒状构件制造设备 | |
CN107419665B (zh) | 一种大跨度钢梁吊装吊具及其吊装钢梁的方法 | |
CN108532963A (zh) | 大跨度高空钢框架连廊结构的液压提升安装方法 | |
CN102795553A (zh) | 机车预布线吊装系统 | |
CN209958161U (zh) | 轨道梁线形调节设备 | |
CN208981167U (zh) | 吊挂式系梁施工装置 | |
CN209647960U (zh) | 中空球体的安装辅助系统 | |
CN204326570U (zh) | 桁架临时支撑结构 | |
CN113401782B (zh) | 一种大开口平直空腔结构总段的吊装变形控制方法 | |
CN206678143U (zh) | 端模结构及混凝土塔架模具 | |
CN212200032U (zh) | 一种桥梁墩柱钢筋定位胎盘 | |
CN205296583U (zh) | 一种新型箱型柱 | |
CN111704058B (zh) | 一种吊装提升装置 | |
CN209308417U (zh) | 一种快速生产及全自动对接的建筑用半预制体系 | |
CN208685464U (zh) | 一种桥梁墩柱用模板 | |
CN208135765U (zh) | 一种空调水立管固定架吊装装置 | |
CN110359548A (zh) | 一种钢桁架悬挂混合系统及施工方法 | |
CN205873760U (zh) | 一种抱梁起重装置 | |
CN221742006U (zh) | 一种箱梁模板精准对位装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Haiwei Inventor after: Zhao Shenghui Inventor after: Chen Zhenyu Inventor after: Wu Man Inventor after: Ge Jiping Inventor after: Gao Shiqiang Inventor after: Diao Xianjue Inventor after: Liu Huaigang Inventor after: Xiao Xiangrong Inventor after: Xia Jiangnan Inventor after: Tan Xinghua Inventor after: Chen Yang Inventor after: Tao Po Inventor before: Liu Huaigang Inventor before: Zhao Shenghui Inventor before: Chen Zhenyu Inventor before: Wu Man Inventor before: Ge Jiping Inventor before: Wang Haiwei Inventor before: Gao Shiqiang Inventor before: Diao Xianjue Inventor before: Xiao Xiangrong Inventor before: Xia Jiangnan Inventor before: Tan Xinghua Inventor before: Chen Yang Inventor before: Tao Po |
|
GR01 | Patent grant | ||