CN109436192A - 船舶侧靠状态下的钢桩整体装船工艺 - Google Patents
船舶侧靠状态下的钢桩整体装船工艺 Download PDFInfo
- Publication number
- CN109436192A CN109436192A CN201811364016.5A CN201811364016A CN109436192A CN 109436192 A CN109436192 A CN 109436192A CN 201811364016 A CN201811364016 A CN 201811364016A CN 109436192 A CN109436192 A CN 109436192A
- Authority
- CN
- China
- Prior art keywords
- piling bar
- barge
- shipment
- transportation frame
- self
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B71/00—Designing vessels; Predicting their performance
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/10—Arrangement of ship-based loading or unloading equipment for cargo or passengers of cranes
Abstract
一种船舶侧靠状态下的钢桩整体装船工艺,采用以下步骤:一,摆放支墩,在支墩上安装底层横梁;二,在底层横梁上安装数个底层立柱;三,将钢桩吊放在底层横梁上;四,在底层立柱上安装中层横梁;五,将钢桩吊放在中层横梁上;六,在底层立柱安装上层横梁,将钢桩对接成一个运输整体;七,当驳船侧靠码头后,在驳船的甲板上安装船体垫墩及栈桥;八,将自行式模块化运输车行驶到运输框架的底部抬起上驳船;九,上驳船;十,将运输框架及钢桩放置在船体垫墩上,下驳船;十一,钢桩装船固定,栈桥拆除。本发明在驳船到码头侧靠状态下,利用自行式模块化运输车把运输框架连同钢桩一起运输到驳船上;大大提高了钢桩装船的效率,节约了运输成本。
Description
技术领域
本发明涉及钢桩装船的工艺,尤其涉及一种用于船舶侧靠状态下的钢桩整体装船工艺。属于海洋石油工程领域。
背景技术
目前,由于导管架的钢桩结构吨位较重,因此,导管架的钢桩在装船时,普遍是用浮吊来完成。利用浮吊将钢桩装船的过程如下:在驳船到达码头后,钢桩是一根一根地被浮吊吊装上船;一根钢桩上船后,需要等它被固定完成后,才能开始吊装下一根。因此,导致装船的工期较长,装船效率较低。且由于这种装船工艺需要长时间利用浮吊和驳船,因此,导致装船的费用较高。
发明内容
本发明的主要目的在于克服现有技术存在的上述缺点,而提供一种船舶侧靠状态下的钢桩整体装船工艺,其在驳船到码头侧靠状态下,利用自行式模块化运输车,把运输框架连同钢桩一起运输到驳船上;不仅解决了导管架钢桩装船工期较长、效率较低的问题,大幅度缩短钢桩装船工期,提高了钢桩装船的效率;而且,还节约导管架钢桩的装船运输成本。
本发明的目的是由以下技术方案实现的:
一种船舶侧靠状态下的钢桩整体装船工艺,其特征在于:采用以下步骤:
第一步,在陆地上摆放数个支墩,在支墩上安装底层横梁;
第二步,在底层横梁上间隔一定距离竖立,并安装数个底层立柱和侧撑;
第三步,将钢桩吊装放在底层横梁上,并完成底层的钢桩摆放;
第四步,在数个底层立柱上安装中层横梁;
第五步,将钢桩吊装放在中层横梁上,然后,再进行上层的钢桩的摆放;
第六步,在数个底层立柱安装上层横梁,此时,便完成了整个运输框架的安装,然后,通过数个运输框架对接,将位于运输框架上的钢桩对接,并构成一个运输整体;
第七步,当驳船到达码头,并侧靠后,在驳船的甲板上安装船体垫墩及栈桥;
第八步,将自行式模块化运输车行驶到运输框架的底部,顶升抬起运输框架及钢桩,并缓慢行驶到码头的栈桥前沿,自行式模块化运输车开始通过栈桥行驶上驳船;
第九步,自行式模块化运输车行驶一段后停止,等待驳船调载完成后继续行驶;
第十步,重复第九步的过程,直到自行式模块化运输车完全行驶到驳船上;
第十一步,将运输框架及钢桩放置在船体垫墩上,自行式模块化运输车下驳船;
第十二步,钢桩装船完成后进行装船固定,并将栈桥拆除。
所述运输框架为钢材。
本发明的有益效果:本发明由于采用上述技术方案,其在驳船到码头侧靠状态下,利用自行式模块化运输车把运输框架连同钢桩一起运输到驳船上;不仅解决了导管架钢桩装船工期较长、效率较低的问题,大幅度缩短钢桩装船工期,提高了钢桩装船的效率;而且,还节约导管架钢桩的装船运输成本。
附图说明
图1为本发明装船示意图。
图2为本发明自行式模块化运输车运输侧视示意图。
图3-1为本发明支墩和底层横梁摆放示意图。
图3-2为本发明底层立柱和侧撑型钢摆放示意图。
图3-3为本发明下层的钢桩摆放示意图。
图3-4为本发明中层横梁的安装示意图。
图3-5为本发明上层的钢桩摆放示意图。
图3-6为本发明上层横梁的摆放示意图。
图4为本发明装船完成示意图。
图5为图4中A-A向示意图。
图中主要标号说明:
1.钢桩、2.运输框架、3.自行式模块化运输车、4.支墩;5.底层横梁、6.侧撑、7.底层立柱、8.中层横梁、9.上层横梁、10.栈桥、11.船体垫墩、12.驳船。
具体实施方式
如图1至图5所示,本发明采用以下步骤:
第一步,如图3-1所示,在陆地上摆放数个支墩4,在支墩4上采用螺栓连接方式安装底层横梁5;
第二步,如图3-2所示,在底层横梁5上间隔一定距离竖立,并采用螺栓连接方式安装数个底层立柱7和侧撑6;
第三步,如图3-3所示,采用吊机将钢桩1吊装放在底层横梁5上,并完成底层的钢桩1摆放;
第四步,如图3-4所示,在数个底层立柱7上采用螺栓连接方式安装中层横梁8;
第五步,如图3-5所示,采用吊机将钢桩1吊装放在中层横梁8上,然后,再进行上层的钢桩1的摆放;
第六步,如图3-6所示,在数个底层立柱7采用螺栓连接方式安装上层横梁9,此时,便完成了整个运输框架2的安装,然后,通过数个运输框架2对接,将位于运输框架2上的钢桩1对接,并构成一个运输整体;
第七步,如图1所示,当驳船12到达码头,并侧靠后,在驳船12的甲板上采用螺栓连接方式安装船体垫墩11及栈桥10;
第八步,将自行式模块化运输车3行驶到运输框架2的底部,顶升抬起运输框架2及钢桩1,并缓慢行驶到码头的栈桥10前沿,自行式模块化运输车3开始通过栈桥10行驶上驳船12;
第九步,如图1所示,自行式模块化运输车3行驶一段后停止,等待驳船12调载完成后继续行驶;
第十步,重复第九步的过程,直到自行式模块化运输车3完全行驶到驳船12上;
第十一步,通过自行式模块化运输车3下降,将运输框架2及钢桩1放置在船体垫墩10上,自行式模块化运输车3下驳船12;
第十二步,如图4所示,钢桩1装船完成后,进行装船固定,并将栈桥10拆除。
上述运输框架2为钢材。
上述钢桩、自行式模块化运输车运输为现有技术,未作说明的技术为现有技术,故不再赘述。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。
Claims (2)
1.一种船舶侧靠状态下的钢桩整体装船工艺,其特征在于:采用以下步骤:
第一步,在陆地上摆放数个支墩,在支墩上安装底层横梁;
第二步,在底层横梁上间隔一定距离竖立,并安装数个底层立柱和侧撑;
第三步,将钢桩吊装放在底层横梁上,并完成底层的钢桩摆放;
第四步,在数个底层立柱上安装中层横梁;
第五步,将钢桩吊装放在中层横梁上,然后,再进行上层的钢桩的摆放;
第六步,在数个底层立柱安装上层横梁,此时,便完成了整个运输框架的安装,然后,通过数个运输框架对接,将位于运输框架上的钢桩对接,并构成一个运输整体;
第七步,当驳船到达码头,并侧靠后,在驳船的甲板上安装船体垫墩及栈桥;
第八步,将自行式模块化运输车行驶到运输框架的底部,顶升抬起运输框架及钢桩,并缓慢行驶到码头的栈桥前沿,自行式模块化运输车开始通过栈桥行驶上驳船;
第九步,自行式模块化运输车行驶一段后停止,等待驳船调载完成后继续行驶;
第十步,重复第九步的过程,直到自行式模块化运输车完全行驶到驳船上;
第十一步,将运输框架及钢桩放置在船体垫墩上,自行式模块化运输车下驳船;
第十二步,钢桩装船完成后进行装船固定,并将栈桥拆除。
2.根据权利要求1所述的船舶侧靠状态下的钢桩整体装船工艺,其特征在于:所述运输框架为钢材。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811364016.5A CN109436192A (zh) | 2018-11-16 | 2018-11-16 | 船舶侧靠状态下的钢桩整体装船工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811364016.5A CN109436192A (zh) | 2018-11-16 | 2018-11-16 | 船舶侧靠状态下的钢桩整体装船工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109436192A true CN109436192A (zh) | 2019-03-08 |
Family
ID=65552460
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811364016.5A Pending CN109436192A (zh) | 2018-11-16 | 2018-11-16 | 船舶侧靠状态下的钢桩整体装船工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109436192A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111424652A (zh) * | 2020-03-02 | 2020-07-17 | 海洋石油工程(青岛)有限公司 | Fpso吸力锚桩建造及装船工艺 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101879932A (zh) * | 2009-05-08 | 2010-11-10 | 中国海洋石油总公司 | 大型深水导管架的钢桩接长及装船的方法 |
MX2010010469A (es) * | 2008-03-26 | 2010-12-21 | Technip France | Sistema y metodo para traslado y lanzamiento de pilote. |
CN102888842A (zh) * | 2012-10-29 | 2013-01-23 | 中国海洋石油总公司 | 大型深水导管架钢桩接长及移位工艺 |
CN103129984A (zh) * | 2013-03-05 | 2013-06-05 | 中国海洋石油总公司 | 细长结构模块的叠加固定及运输工艺 |
CN108001630A (zh) * | 2017-11-28 | 2018-05-08 | 海洋石油工程(青岛)有限公司 | 大型模块的装船工艺 |
-
2018
- 2018-11-16 CN CN201811364016.5A patent/CN109436192A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
MX2010010469A (es) * | 2008-03-26 | 2010-12-21 | Technip France | Sistema y metodo para traslado y lanzamiento de pilote. |
CN101879932A (zh) * | 2009-05-08 | 2010-11-10 | 中国海洋石油总公司 | 大型深水导管架的钢桩接长及装船的方法 |
CN102888842A (zh) * | 2012-10-29 | 2013-01-23 | 中国海洋石油总公司 | 大型深水导管架钢桩接长及移位工艺 |
CN103129984A (zh) * | 2013-03-05 | 2013-06-05 | 中国海洋石油总公司 | 细长结构模块的叠加固定及运输工艺 |
CN108001630A (zh) * | 2017-11-28 | 2018-05-08 | 海洋石油工程(青岛)有限公司 | 大型模块的装船工艺 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111424652A (zh) * | 2020-03-02 | 2020-07-17 | 海洋石油工程(青岛)有限公司 | Fpso吸力锚桩建造及装船工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
TWI314536B (en) | Method for building ship on ground and launching ship using skid launching system | |
CN102337736B (zh) | 海洋石油平台上部模块的安装工艺 | |
CN110306435B (zh) | 一种超大分段钢结构桥梁多船联运施工方法 | |
AU704347B1 (en) | Method and apparatus for deck installation on an offshore structure | |
CN102602712A (zh) | 一种钢箱梁节段滚装装船的方法 | |
KR101075160B1 (ko) | 분할 건조 방식을 이용한 선박 진수 방법 | |
CN107628202A (zh) | 滚装装船跳板装置 | |
CN113353202A (zh) | 一种海上换流站的浮托式安装结构及方法 | |
CN212243724U (zh) | 一种海上换流站的浮托式安装结构 | |
JP3237813U (ja) | 浮体式洋上風力発電プラットフォーム用のロールオン・ロールオフ転送システム | |
CN109436190A (zh) | 船舶尾靠状态下的钢桩整体装船工艺 | |
CN110182313B (zh) | 30万吨浮式生产储油轮艏货舱舷侧总段异地总组工艺 | |
OA11467A (en) | Method and apparatus for deck installation on an offshore substructure. | |
CN111188324A (zh) | 一种海上风电安装平台升降系统水上合拢工艺 | |
CN109436192A (zh) | 船舶侧靠状态下的钢桩整体装船工艺 | |
CN213862601U (zh) | 一种用于半潜驳运输大型构件的橡胶支墩系统 | |
CN101941510A (zh) | 一种提高集装箱(或散杂货)船舶装卸效率的方法及设备 | |
CN110306436B (zh) | 一种超大分段钢结构桥梁两船联运跨墩架设施工方法 | |
CN103129984A (zh) | 细长结构模块的叠加固定及运输工艺 | |
CN112081011B (zh) | 一种大型预应力混凝土预制箱梁的装船运输方法 | |
CN212896121U (zh) | 分离式高桩矿石码头结构 | |
CN211642531U (zh) | 桥梁段半潜式安装运输平台 | |
WO1997033788A1 (en) | Transportation system and installation method of an offshore deck or modular assembly | |
CN104420453A (zh) | 一种自升式钻井平台悬臂梁整体合拢方法 | |
CN113602431A (zh) | 一种双层火车栈桥的船体支撑结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190308 |
|
WD01 | Invention patent application deemed withdrawn after publication |