CN109357355B - 空调开关机控制方法 - Google Patents

空调开关机控制方法 Download PDF

Info

Publication number
CN109357355B
CN109357355B CN201811219703.8A CN201811219703A CN109357355B CN 109357355 B CN109357355 B CN 109357355B CN 201811219703 A CN201811219703 A CN 201811219703A CN 109357355 B CN109357355 B CN 109357355B
Authority
CN
China
Prior art keywords
variable
air conditioner
capacity compressor
cylinder operation
compressor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811219703.8A
Other languages
English (en)
Other versions
CN109357355A (zh
Inventor
余凯
戎耀鹏
许克
刘群波
倪毅
李龙飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201811219703.8A priority Critical patent/CN109357355B/zh
Priority to PCT/CN2018/120622 priority patent/WO2020077779A1/zh
Priority to US17/284,100 priority patent/US11841150B2/en
Priority to EP18937413.5A priority patent/EP3869111A4/en
Publication of CN109357355A publication Critical patent/CN109357355A/zh
Application granted granted Critical
Publication of CN109357355B publication Critical patent/CN109357355B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/65Electronic processing for selecting an operating mode
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/86Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling compressors within refrigeration or heat pump circuits
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B1/00Compression machines, plants or systems with non-reversible cycle
    • F25B1/10Compression machines, plants or systems with non-reversible cycle with multi-stage compression
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/20Disposition of valves, e.g. of on-off valves or flow control valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/005Arrangement or mounting of control or safety devices of safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/023Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units
    • F25B2313/0233Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units in parallel arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/07Details of compressors or related parts
    • F25B2400/074Details of compressors or related parts with multiple cylinders
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/02Increasing the heating capacity of a reversible cycle during cold outdoor conditions
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/26Problems to be solved characterised by the startup of the refrigeration cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/27Problems to be solved characterised by the stop of the refrigeration cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control
    • F25B2600/024Compressor control by controlling the electric parameters, e.g. current or voltage
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control
    • F25B2600/025Compressor control by controlling speed
    • F25B2600/0251Compressor control by controlling speed with on-off operation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control
    • F25B2600/025Compressor control by controlling speed
    • F25B2600/0253Compressor control by controlling speed with variable speed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control
    • F25B2600/027Compressor control by controlling pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/25Control of valves
    • F25B2600/2519On-off valves
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Abstract

本发明公开了一种空调开关机控制方法,涉及空调领域,用于优化现有空调的控制方法,增加机组启动的可靠性。该方法包括以下步骤:启动空调之前,判断空调的可变容压缩机是否处于待单缸运行状态;其中,可变容压缩机被构造为能在单缸运行状态和双缸运行状态之间切换。如果是,启动空调;否则,将可变容压缩机切换至待单缸运行状态,以使得可变容压缩机变容口的压力与可变容压缩机吸气口的压力相等,然后启动空调。上述技术方案,无论空调是机组断电关机还是收到关机信号,最终都能使得下次启动时,以单缸运行状态启动,使得空调开启时缸体的运行状态始终是确定的。

Description

空调开关机控制方法
技术领域
本发明涉及空调领域,具体涉及一种空调开关机控制方法。
背景技术
基于大小缸容积切换的变频多联机与普通多联机相比,其压缩机采用大小缸设计,且大缸可以卸载。在中高负荷下压缩机双缸都运行,低负荷下压缩机只有单缸运行。
通过高、低压电磁阀改变压缩机变容口压力进行单双缸运行状态的切换。高压电磁阀开启时变容口通入高压气体,压缩机双缸运行;低压电磁阀开启时变容口通入低压气体,压缩机单缸运行。
发明人发现,现有技术中至少存在下述问题:由于变频变容多联机关机时,压缩机有可能处于双缸运行,也有可能处于单缸运行,故下次启动时无法确认压缩机缸体状态,则压缩机振动无法控制,导致管路应力应变等受到影响。
发明内容
本发明提出一种空调开关机控制方法,用以优化现有空调的控制方法,增加机组启动的可靠性。
本发明提出了一种空调开关机控制方法,包括以下步骤:
启动空调之前,判断空调的可变容压缩机是否处于待单缸运行状态;其中,所述可变容压缩机被构造为能在单缸运行状态和双缸运行状态之间切换;
如果是,启动所述空调;否则,将所述空调的可变容压缩机切换至待单缸运行状态,以使得所述可变容压缩机变容口的压力与所述可变容压缩机吸气口的压力相等,然后启动所述空调。
在一些实施例中,采用下述步骤判断所述可变容压缩机是否处于待单缸运行状态:
判断所述空调上一次关机是否因为接收到关机信号,如果是,则所述空调的可变容压缩机处于待单缸运行状态。
在一些实施例中,在启动所述空调之后,还包括以下步骤:
运行所述空调;
在所述空调收到关机命令后,判断所述可变容压缩机当前处于单缸运行状态还是双缸运行状态;
如果所述可变容压缩机处于双缸运行状态,关闭所述空调,然后将所述可变容压缩机切换至待单缸运行状态,以使得所述可变容压缩机变容口的压力与所述可变容压缩机吸气口的压力相等;如果所述可变容压缩机处于单缸运行状态,关闭所述空调。
在一些实施例中,采用下述步骤使得所述可变容压缩机切换至待单缸运行状态:
将所述可变容压缩机的变容口与所述可变容压缩机的排气口之间支路上的第一电磁阀关闭,将所述可变容压缩机的变容口与所述可变容压缩机的吸气口之间支路上的第二电磁阀开启。
在一些实施例中,所述将所述空调的可变容压缩机切换至待单缸运行状态,以使得所述可变容压缩机变容口的压力与所述可变容压缩机吸气口的压力相等,然后启动所述空调包括以下步骤:
将所述可变容压缩机切换至待单缸运行状态;
将所述可变容压缩机保持在待单缸运行状态,并持续第一设定时长;
启动所述空调。
在一些实施例中,所述第一设定时长介于0至3分钟。
在一些实施例中,所述如果所述可变容压缩机处于双缸运行状态,关闭所述空调,然后将所述可变容压缩机切换至待单缸运行状态,以使得所述可变容压缩机变容口的压力与所述可变容压缩机吸气口的压力相等包括以下步骤:
关闭所述空调;
将所述可变容压缩机切换至待单缸运行状态;
将所述可变容压缩机保持在待单缸运行状态,并持续第二设定时长。
在一些实施例中,所述第二设定时长介于0至3分钟。
在一些实施例中,所述空调包括变频多联机。
上述技术方案,空调正常关机时,关机前若空调是在双缸运行模式下运行,则在关机后将空调的管路调节为待单缸运行状态,以使得可变容压缩机的变容口的压力与压缩机吸气口的压力相等,下次启动时,空调不会出现振动异常。若空调是单缸运行模式下关机,则正常关机。若机组不是因为收到停机信号关机,比如是在断电情况下关机,则在下一次启动前,现将机组的可变容压缩机调整为能够单缸运行的模式,以使得可变容压缩机的变容口的压力与压缩机吸气口的压力相等,然后再启动空调。由上述分析可见,无论空调是机组断电关机还是收到关机信号,最终都能使得下次启动前,可变容压缩机的变容口的压力都等于压缩机吸气口的压力,故后续启动时,空调缸体的运行状态始终是确定的,不会出现因为变容口封闭高压气体而导致的振动异响现象。
附图说明
此处所说明的附图用来提供对本发明的进一步理解,构成本申请的一部分,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。在附图中:
图1为本发明实施例提供的空调原理示意图;
图2为本发明实施例提供的空调开关机控制方法的流程示意图。
具体实施方式
下面结合图1~图2对本发明提供的技术方案进行更为详细的阐述。
本发明实施例提供一种空调开关机控制方法,用于实现变频多联机的开机、关机控制。下面介绍该控制方法所基于的一种空调结构。
参见图1,空调包括可变容压缩机1、油分离器2、四通阀3、第一换热器4、一个或以上数量的第二换热器5,以及气液分离器6。在可变容压缩机1的变容口11设置有两路控制支路,用于实现可变容压缩机1的单双缸切换。可变容压缩机1的吸气口和气液分离器6的出口之间的支路上设有第一电磁阀7。油分离器2的出口和可变容压缩机1的变容口11之间的支路上设有第二电磁阀8。此处以第一换热器4作为室外换热器,第二换热器5作为室内换热器为例。
若第一电磁阀7处于导通状态、第二电磁阀8处于断开状态,则可变容压缩机1处于单缸模式。若第二电磁阀8处于导通状态、第一电磁阀7处于断开状态,则可变容压缩机1处于双缸模式。通过第一电磁阀7、第二电磁阀8控制可变容压缩机1变容口11的压力,以切换单双缸。第一电磁阀7开启时变容口11通入低压,可变容压缩机1处于单缸运行状态。第二电磁阀8开启时变容口11通入高压,可变容压缩机1处于双缸运行状态。
本实施例通过改变变容口11的气体压力,实现可变容压缩机1的单双缸切换。此方式采用判断变容口11连接的电磁阀的通断状态,来判断可变容压缩机1下次启动时的单双缸状态。当然,亦可采用其他方式实现可变容压缩机1的单双缸切换,只是采用其他方式时,需要采用相应的参数判断可变容压缩机1的状态。
参见图2,本发明实施例提供一种空调开关机控制方法,包括以下步骤:
步骤S10、启动空调之前,判断空调的可变容压缩机1是否处于待单缸运行状态。其中,可变容压缩机1被构造为能在单缸运行状态和双缸运行状态之间切换。
单缸运行状态、双缸运行状态是以机组处于运行状态下说的。待单缸运行状态则是静态的,是指机组此时尚未启动,但其管路连接、阀位等满足单缸运行的要求。
若可变容压缩机1处于待单缸运行状态,则直接执行步骤S30;若可变容压缩机1没有处于待单缸运行状态,则执行步骤S20。
其中一种判断方式为:通过可变容压缩机1上变容口11所连通的气源为高压或低压,判断可变容压缩机1后续启动时是处于单缸运行或是双缸运行状态。此处的高压是指,变容口11连通可变容压缩机1的排气口或者连通油分离器2出口的压力。此处的低压是指,变容口11连通可变容压缩机1的吸气口。低压约等于可变容压缩机1的吸气压力。
另一种判断方式为:根据空调上一次的关机原因判断可变容压缩机1是否处于能够单缸运行。具体步骤如下:
首先,获取空调上一次的关机原因。其中,关机原因包括接收到关机信号和断电关机。
其次,根据获取到的关机原因,判断可变容压缩机1是否处于待单缸运行状态。若关机原因是接收到关机信号,则空调的可变容压缩机1处于待单缸运行状态。若关机原因是断电关机,则认为空调的可变容压缩机1没有处于待单缸运行状态。
步骤S20、如果可变容压缩机1处于待单缸运行状态,直接启动空调。否则,先将空调的可变容压缩机切换至待单缸运行状态,以使得可变容压缩机变容口的压力与可变容压缩机吸气口的压力相等,然后启动空调。
在上述步骤S20中,具体采用改变变容口11压力的方式调节可变容压缩机1的滑片位置,以使得可变容压缩机1处于待单缸运行状态。即,将变容口11与可变容压缩机1的吸气口连通。
在上述的步骤S20中,若可变容压缩机1没有处于待单缸运行状态,则其执行以下步骤:
首先,将可变容压缩机1切换至待单缸运行状态。
其次,将可变容压缩机1保持在待单缸运行状态,并持续第一设定时长。在一些实施例中,第一设定时长介于0至3分钟。
最后,启动空调。
在一些实施例中,采用下述步骤判断可变容压缩机1是否处于待单缸运行状态:判断空调上一次关机是否因为接收到关机信号,如果是,则空调的可变容压缩机1处于待单缸运行状态。
若空调上一次的关机原因为断电关机,则说明空调的可变容压缩机1的状态是不确定的,有可能处于单缸运行状态下被断电,也有可能在双缸运行状态下被断电。这些情况都统一被认定为可变容压缩机1没有处于待单缸运行状态。所以在此状态下,无须分辨断电前空调处于单缸或是双缸运行状态,开机之前,都统一将变容口11与低压气体连通,以使得可变容压缩机1的变容口11的压力与可变容压缩机1吸气口的压力相等,然后再进行步骤S30。
上述的步骤S20,能够使得空调启动前,可变容压缩机1的变容口11的压力等于吸气口压力,故启动时不会振动异常的现象,保证了启动的可靠性。
在一些实施例中,空调开关机控制方法还包括以下步骤:
步骤S30、运行空调。
步骤S40、在空调收到关机命令后,判断可变容压缩机1当前处于单缸运行状态还是双缸运行状态。
步骤S50、如果可变容压缩机1处于双缸运行状态,关闭空调,然后将可变容压缩机1切换至待单缸运行状态,以使得可变容压缩机1的变容口11的压力与可变容压缩机1吸气口的压力相等。如果可变容压缩机1处于单缸运行状态,关闭空调。
上述步骤S50,正常关机时,空调的状态不变,可以单缸运行下关机,亦可双缸运行下关机。但是在双缸运行下,关机之后,将可变容压缩机1切换至待单缸运行状态,以使得可变容压缩机1的变容口11的压力与可变容压缩机1吸气口的压力相等。
在上述的步骤S50中,如果可变容压缩机1处于双缸运行状态,其具体执行以下步骤:
首先,关闭空调;
其次,将可变容压缩机1切换至待单缸运行状态;
最后,将可变容压缩机1保持在待单缸运行状态,并持续第二设定时长。在一些实施例中,第二设定时长介于0至3分钟。该时长能够使得可变容压缩机1的变容口11的压力与可变容压缩机1吸气口的压力相等。
在本发明的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为便于描述本发明和简化描述,而不是指示或暗指所指的装置或元件必须具有特定的方位、为特定的方位构造和操作,因而不能理解为对本发明保护内容的限制。
最后应说明的是:以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,但这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。

Claims (8)

1.一种空调开关机控制方法,其特征在于,包括以下步骤:
启动空调之前,判断空调的可变容压缩机是否处于待单缸运行状态;其中,所述可变容压缩机被构造为能在单缸运行状态和双缸运行状态之间切换;采用下述步骤判断所述可变容压缩机是否处于待单缸运行状态:判断所述空调上一次关机是否因为接收到关机信号,如果是,则所述空调的可变容压缩机处于待单缸运行状态;
如果是,启动所述空调;否则,将所述可变容压缩机切换至待单缸运行状态,以使得所述可变容压缩机变容口的压力与所述可变容压缩机吸气口的压力相等,然后启动所述空调。
2.根据权利要求1所述的空调开关机控制方法,其特征在于,在启动所述空调之后,还包括以下步骤:
运行所述空调;
在所述空调收到关机命令后,判断所述可变容压缩机当前处于单缸运行状态还是双缸运行状态;
如果所述可变容压缩机处于双缸运行状态,关闭所述空调,然后将所述可变容压缩机切换至待单缸运行状态,以使得所述可变容压缩机变容口的压力与所述可变容压缩机吸气口的压力相等;如果所述可变容压缩机处于单缸运行状态,关闭所述空调。
3.根据权利要求1所述的空调开关机控制方法,采用下述步骤使得所述可变容压缩机切换至待单缸运行状态:
将所述可变容压缩机的变容口与所述可变容压缩机的排气口之间支路上的第一电磁阀关闭,将所述可变容压缩机的变容口与所述可变容压缩机的吸气口之间支路上的第二电磁阀开启。
4.根据权利要求1所述的空调开关机控制方法,所述将所述空调的可变容压缩机切换至待单缸运行状态,以使得所述可变容压缩机变容口的压力与所述可变容压缩机吸气口的压力相等,然后启动所述空调包括以下步骤:
将所述可变容压缩机切换至待单缸运行状态;
将所述可变容压缩机保持在待单缸运行状态,并持续第一设定时长;
启动所述空调。
5.根据权利要求4所述的空调开关机控制方法,所述第一设定时长介于0至3分钟。
6.根据权利要求2所述的空调开关机控制方法,其特征在于,所述如果所述可变容压缩机处于双缸运行状态,关闭所述空调,然后将所述可变容压缩机切换至待单缸运行状态,以使得所述可变容压缩机变容口的压力与所述可变容压缩机吸气口的压力相等包括以下步骤:
关闭所述空调;
将所述可变容压缩机切换至待单缸运行状态;
将所述可变容压缩机保持在待单缸运行状态,并持续第二设定时长。
7.根据权利要求6所述的空调开关机控制方法,其特征在于,所述第二设定时长介于0至3分钟。
8.根据权利要求1所述的空调开关机控制方法,所述空调包括变频多联机。
CN201811219703.8A 2018-10-19 2018-10-19 空调开关机控制方法 Active CN109357355B (zh)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201811219703.8A CN109357355B (zh) 2018-10-19 2018-10-19 空调开关机控制方法
PCT/CN2018/120622 WO2020077779A1 (zh) 2018-10-19 2018-12-12 空调开关机控制方法
US17/284,100 US11841150B2 (en) 2018-10-19 2018-12-12 Method for controlling power-on or power-off of air conditioner
EP18937413.5A EP3869111A4 (en) 2018-10-19 2018-12-12 AIR CONDITIONER ON OR OFF CONTROL METHOD

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811219703.8A CN109357355B (zh) 2018-10-19 2018-10-19 空调开关机控制方法

Publications (2)

Publication Number Publication Date
CN109357355A CN109357355A (zh) 2019-02-19
CN109357355B true CN109357355B (zh) 2020-01-03

Family

ID=65345868

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811219703.8A Active CN109357355B (zh) 2018-10-19 2018-10-19 空调开关机控制方法

Country Status (4)

Country Link
US (1) US11841150B2 (zh)
EP (1) EP3869111A4 (zh)
CN (1) CN109357355B (zh)
WO (1) WO2020077779A1 (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111720979B (zh) * 2020-06-16 2021-11-05 海信(山东)空调有限公司 空调器及其节能控制方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3932921B2 (ja) * 2002-02-08 2007-06-20 株式会社デンソー エンジン駆動式冷凍サイクル装置及び空調装置
CN101995110A (zh) * 2010-10-29 2011-03-30 广东美的电器股份有限公司 一种双缸变容压缩机空调系统及其控制方法
CN203375701U (zh) * 2013-06-26 2014-01-01 广东美的暖通设备有限公司 热泵热水器
CN103940051A (zh) * 2014-05-13 2014-07-23 珠海格力电器股份有限公司 一种空调器模式转换的控制方法及控制系统
CN206281240U (zh) * 2016-11-25 2017-06-27 广东美的制冷设备有限公司 一种双缸变容空调系统

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105180372B (zh) * 2015-09-29 2018-07-31 Tcl空调器(中山)有限公司 空调器控制方法及装置
CN109538457B (zh) * 2018-10-10 2020-05-22 珠海格力电器股份有限公司 一种控制压缩机切缸的方法、装置及机组、空调系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3932921B2 (ja) * 2002-02-08 2007-06-20 株式会社デンソー エンジン駆動式冷凍サイクル装置及び空調装置
CN101995110A (zh) * 2010-10-29 2011-03-30 广东美的电器股份有限公司 一种双缸变容压缩机空调系统及其控制方法
CN203375701U (zh) * 2013-06-26 2014-01-01 广东美的暖通设备有限公司 热泵热水器
CN103940051A (zh) * 2014-05-13 2014-07-23 珠海格力电器股份有限公司 一种空调器模式转换的控制方法及控制系统
CN206281240U (zh) * 2016-11-25 2017-06-27 广东美的制冷设备有限公司 一种双缸变容空调系统

Also Published As

Publication number Publication date
CN109357355A (zh) 2019-02-19
US20210348785A1 (en) 2021-11-11
EP3869111A4 (en) 2022-07-06
WO2020077779A1 (zh) 2020-04-23
EP3869111A1 (en) 2021-08-25
US11841150B2 (en) 2023-12-12

Similar Documents

Publication Publication Date Title
KR101698261B1 (ko) 공기 조화기 및 공기 조화기의 제어 방법
US20180274822A1 (en) Variable-Capacity Compressor, Two-Stage Compression System and Control Method Thereof
CN109812920B (zh) 一种空调器多压缩机启停的控制方法、装置及多联机系统
EP2015004B1 (en) Air conditioner
JPWO2009028450A1 (ja) クライオポンプシステム
CN103075344B (zh) 一种变容量双级增焓压缩机及一种空调系统
JP6291533B2 (ja) 高圧圧縮機及びそれを備えた冷凍サイクル装置
KR100504900B1 (ko) 4대의 압축기를 구비한 공기조화기 및 그의 균유운전 제어방법
CN102889210B (zh) 双缸双模压缩机
CN109357355B (zh) 空调开关机控制方法
CN106871386B (zh) 一种空调器及控制方法
CN105443384A (zh) 压缩机及其控制方法和空调器
CN102588285A (zh) 压缩机及具有该压缩机的空调器
CN102251965B (zh) 可进行单双级切换的压缩机及其控制方法
CN113758035A (zh) 一种制冷系统
CN111076350B (zh) 一种压缩机启动的控制方法、装置及空调器
CN109798628B (zh) 冷媒分流装置压力差的控制方法和装置
CN106440443B (zh) 一种适用高温制冷的空调系统及控制方法
WO2020073488A1 (zh) 一种控制压缩机切缸的方法、装置及机组、空调系统
CN105698456A (zh) 变容压缩机系统控制方法
CN107023964B (zh) 一种空调器及控制方法
CN110966202A (zh) 压缩机组件、压缩机组件的控制方法和制冷设备
CN114087738A (zh) 一种空调的控制方法、装置、存储介质及空调
CN208012161U (zh) 压缩机的空调系统
CN108224827B (zh) 一种涡旋并联制冷机组

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant