CN109344560A - Assembled architecture modeling method and model management system based on BIM technology - Google Patents

Assembled architecture modeling method and model management system based on BIM technology Download PDF

Info

Publication number
CN109344560A
CN109344560A CN201811494802.7A CN201811494802A CN109344560A CN 109344560 A CN109344560 A CN 109344560A CN 201811494802 A CN201811494802 A CN 201811494802A CN 109344560 A CN109344560 A CN 109344560A
Authority
CN
China
Prior art keywords
model
bim
data
building
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811494802.7A
Other languages
Chinese (zh)
Inventor
郑忠
高柏迎
郁磊
翟合欢
葛玥
许晓霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Guohua Construction Project Management Co Ltd
Original Assignee
Anhui Guohua Construction Project Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Guohua Construction Project Management Co Ltd filed Critical Anhui Guohua Construction Project Management Co Ltd
Priority to CN201811494802.7A priority Critical patent/CN109344560A/en
Publication of CN109344560A publication Critical patent/CN109344560A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Business, Economics & Management (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Health & Medical Sciences (AREA)
  • Pure & Applied Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Computational Mathematics (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Mathematical Optimization (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses assembled architecture modeling method and model management system based on BIM technology, first, data acquisition: the ground base data, building framework data, surrounding terrain data of building are acquired, and establishes database according to above-mentioned data;The second, environmental model is established: being called the surrounding terrain data in database, is established 3D environmental model;Third, buildings model are established: base area base data and skeleton data divide building unit, and BIM model of element is established based on each building unit, will form whole BIM buildings model after the assembling of multiple BIM model of element;4th, based on requiring by building decoration, real scene reduction true reduction: is carried out to BIM buildings model;5th, scheme comparison: digital simulation is carried out in conjunction with 3D environmental model and BIM buildings model, and refers to the preferred best model scheme of user experience information;6th, model emulation: being rendered by software, analogue simulation is carried out to best model scheme, by best model solution integration to BIM information platform.

Description

Assembled architecture modeling method and model management system based on BIM technology
Technical field
The present invention relates to BIM technology fields, more particularly to assembled architecture modeling method and model based on BIM technology Management system.
Background technique
Building Information Model, that is, BIM(Building Information Modeling) architectural design method, due to each special Industry is combined closely on this platform of hub file, especially electromechanical speciality, it has to is bundled in same file, to model The modification made directly is reacted on model, and the compact of information flow is resulted in.And due to the intuitive of model, reduce explanation Time the effect for enhancing communication, the link for reducing exchange, ensures that the stabilization of information is accurate, while also improving design Quality.The three-dimensional simulation operating mode of BIM will really reflect the case where architecture construction, and record related full and accurate data information, And be fully exposed design problem, by many problem transparences, this solves many construction problems by discovery in advance Certainly, the reasonability and quality of architectural design are fundamentally improved, the change in this and later period is compared, and has huge economic effect Benefit and value.
And the difference due to BIM technology and traditional conceptual design work substantially, the work of designer is affected indirectly Process.BIM design process is that the information synergism behavior of real-time interactive is carried out based on the same platform, and whole process can generate largely Information.How organizational information, what when is organized, whom information is supplied to, and how using the information etc. obtained to be actually The higher management of BIM design work.Different from CAD design, since more information exchanges manage this link, cause on stream Must pay close attention to multi-specialized cooperation, but BIM is a new things, especially in the design production phase, at present also not to its into The maturation method of the operation of row tissue and management causes many design companies that can not effectively organize operation BIM production line.
Summary of the invention
Present invention mainly solves problems of the prior art and defect, and the purpose is to provide the dress based on BIM technology With formula Buildings Modeling method and model management system.
One technical scheme adopted by the invention is that: assembled architecture modeling method and model management based on BIM technology System, method and step include:
The first, data acquire: acquiring the ground base data, building framework data, surrounding terrain data of building, and according to above-mentioned data Establish database;
The second, environmental model is established: being called the surrounding terrain data in database, is established 3D environmental model;
Third, buildings model are established: base area base data and skeleton data divide building unit, using each building unit as base Plinth establishes BIM model of element, will form whole BIM buildings model after the assembling of multiple BIM model of element, and pass through architectural drawing Paper carries out data verification to the BIM buildings model after whole assembly;
4th, true reduction: based on being required by building decoration, real scene reduction is carried out to BIM buildings model, refine to dress Adorn unit;
5th, scheme comparison: digital simulation is carried out in conjunction with 3D environmental model and BIM buildings model, and refers to user experience information It is preferred that best model scheme;
6th, model emulation: being rendered by software, carries out analogue simulation to best model scheme, and by best model scheme collection At arrive BIM information platform.
In a preferred embodiment of the present invention, the surrounding terrain data include itself geographical coordinate, building orientation, Peripheral ground building parameter peripherally descends architectural modulus, soil parameter, the public pipeline parameter of surrounding, surrounding streets parameter.
In a preferred embodiment of the present invention, BIM model of element includes frame modeling, structural modeling in the third portion And equipment modeling.
In a preferred embodiment of the present invention, the foundation restored in the described 4th is on-site land survey data, question and answer investigation Data, taking photo by plane records data.
In a preferred embodiment of the present invention, in the 5th step, the model result simulated every time is kept separately simultaneously Correspondence database generates list.
The present invention also provides the assembled architecture model management systems based on BIM technology comprising database module, mould Type designs module, analogue simulation module, detection module and model generation module;Database module is stored for collected data With the model data store after generation;Modelling module is raw for the design of BIM model of element and the assembly of BIM model of element At;Details of the analogue simulation module for BIM buildings model emulates;Detection module is for BIM buildings model in simulation process The comparison of parameter and database intrinsic parameter;Model generation module is for selecting and generating best model scheme
In a preferred embodiment of the present invention, in the analogue simulation module be equipped with suggest unit, the suggestion unit according to Design parameter is proposed to user using suggestion.
The beneficial effects of the present invention are: the assembled architecture modeling method and model based on BIM technology that the present invention points out Management system blends BIM technology and process of architecture design, and mass data caused by informationization, which not count process, to be tended to Fining, depth.Exchange simultaneously in design process is more convenient, intuitive, and simulates and bring various analysis promotion The precision of verification debugging.The model that BIM design generates has intuitive characteristic, and the engineering for reducing different majors level participates in The access threshold of person reduces because of error caused by understanding difference, also improves the quality and efficiency of communication.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing, in which:
Fig. 1 is the structure principle chart of the assembled architecture model management system based on BIM technology.
Specific embodiment
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation Example is only a part of the embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common Technical staff's all other embodiment obtained without making creative work belongs to the model that the present invention protects It encloses.
Assembled architecture modeling method and model management system, method and step based on BIM technology include:
The first, data acquire: acquiring the ground base data, building framework data, surrounding terrain data of building, and according to above-mentioned data Establish database;Surrounding terrain data include the geographical coordinate of itself, building orientation, peripheral ground building parameter, peripherally Lower architectural modulus, soil parameter, the public pipeline parameter of surrounding, surrounding streets parameter.During preliminary conceptual plan, generally Need to meet urban planning requirement, therefore, it is necessary to the public systems with surrounding to be cooperated, most preferably and rationally public using these System can not only avoid unnecessary trouble, and can provide more convenient condition for user.
The second, environmental model is established: being called the surrounding terrain data in database, is established 3D environmental model;3D environment mould Type is necessary to ensure that higher image and image quality, more convenient in order to provide in the simulation in later period or scene planning It helps.Moreover, the 3D environmental model of high quality can give the better experience sense of user.
Third, buildings model are established: base area base data and skeleton data divide building unit, with each building unit Based on establish BIM model of element, wherein BIM model of element mainly includes frame modeling, structural modeling and equipment modeling.It will Whole BIM buildings model is formed after multiple BIM model of element assemblings, and the BIM after whole assembly is built by architectural drawing It builds model and carries out data verification;Model must enrich design sense, BIM unit mould based on design concept in design basis The actual needs of type comprehensively considers, and the combination sense after especially whole assembly avoids bringing the tomography in appearance and structure from feeling.
4th, based on requiring by building decoration, real scene reduction, refinement true reduction: are carried out to BIM buildings model To decorating unit;The foundation really restored is on-site land survey data, question and answer survey data, taking photo by plane records data.According to these numbers According to can comprehensively be verified to BIM buildings model, it is ensured that each details has higher reduction degree, and model can be improved Total quality.
5th, scheme comparison: digital simulation is carried out in conjunction with 3D environmental model and BIM buildings model, and refers to user experience The preferred best model scheme of information;The model result simulated every time is kept separately and correspondence database generates list.Root The essential of scheme is carried out according to composite factor, screening is compared in the public praise of experience or masses in combination with user, it is ensured that The optimality of institute's model.
6th, model emulation: being rendered by software, carries out analogue simulation to best model scheme, and by best model side Case is integrated into BIM information platform.
The present invention also provides the assembled architecture model management systems based on BIM technology comprising database module, mould Type designs module, analogue simulation module, detection module and model generation module.Database module is stored for collected data With the model data store after generation;Modelling module is raw for the design of BIM model of element and the assembly of BIM model of element At;Details of the analogue simulation module for BIM buildings model emulates;Detection module is for BIM buildings model in simulation process The comparison of parameter and database intrinsic parameter;Model generation module is for selecting and generating best model scheme.Analogue simulation module In be equipped with suggest unit,
It is recommended that unit is proposed to user using suggestion according to design parameter.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright description is applied directly or indirectly in other relevant technology necks Domain is included within the scope of the present invention.

Claims (7)

1. assembled architecture modeling method and model management system based on BIM technology, it is characterised in that: method and step includes:
The first, data acquire: acquiring the ground base data, building framework data, surrounding terrain data of building, and according to above-mentioned data Establish database;
The second, environmental model is established: being called the surrounding terrain data in database, is established 3D environmental model;
Third, buildings model are established: base area base data and skeleton data divide building unit, using each building unit as base Plinth establishes BIM model of element, will form whole BIM buildings model after the assembling of multiple BIM model of element, and pass through architectural drawing Paper carries out data verification to the BIM buildings model after whole assembly;
4th, true reduction: based on being required by building decoration, real scene reduction is carried out to BIM buildings model, refine to dress Adorn unit;
5th, scheme comparison: digital simulation is carried out in conjunction with 3D environmental model and BIM buildings model, and refers to user experience information It is preferred that best model scheme;
6th, model emulation: being rendered by software, carries out analogue simulation to best model scheme, and by best model scheme collection At arrive BIM information platform.
2. the assembled architecture modeling method and model management system according to claim 1 based on BIM technology, feature Be: the surrounding terrain data include itself geographical coordinate, building orientation, peripheral ground building parameter, peripherally under Architectural modulus, soil parameter, the public pipeline parameter of surrounding, surrounding streets parameter.
3. the assembled architecture modeling method and model management system according to claim 1 based on BIM technology, feature Be: BIM model of element includes frame modeling, structural modeling and equipment modeling in the third portion.
4. the assembled architecture modeling method and model management system according to claim 6 based on BIM technology, feature Be: the foundation restored in the described 4th is on-site land survey data, question and answer survey data, taking photo by plane records data.
5. the assembled architecture modeling method and model management system according to claim 6 based on BIM technology, feature Be: in the 5th step, the model result simulated every time is kept separately and correspondence database generates list.
6. model management system corresponding to a kind of assembled architecture modeling method according to above-mentioned based on BIM technology, feature Be: it includes database module, modelling module, analogue simulation module, detection module and model generation module;Database Model data store of the module for the storage of collected data and after generating;Modelling module is for BIM model of element Design and the assembly of BIM model of element generate;Details of the analogue simulation module for BIM buildings model emulates;Detection module is used The comparison of the parameter of BIM buildings model and database intrinsic parameter in simulation process;Model generation module is for selecting and generating Best model scheme.
7. model management system according to claim 6, and be characterized in that: it is equipped in the analogue simulation module and suggests list Member, the suggestion unit are proposed to user using suggestion according to design parameter.
CN201811494802.7A 2018-12-07 2018-12-07 Assembled architecture modeling method and model management system based on BIM technology Pending CN109344560A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811494802.7A CN109344560A (en) 2018-12-07 2018-12-07 Assembled architecture modeling method and model management system based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811494802.7A CN109344560A (en) 2018-12-07 2018-12-07 Assembled architecture modeling method and model management system based on BIM technology

Publications (1)

Publication Number Publication Date
CN109344560A true CN109344560A (en) 2019-02-15

Family

ID=65303165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811494802.7A Pending CN109344560A (en) 2018-12-07 2018-12-07 Assembled architecture modeling method and model management system based on BIM technology

Country Status (1)

Country Link
CN (1) CN109344560A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110955926A (en) * 2019-11-19 2020-04-03 中国二十冶集团有限公司 BIM modeling system for medical building and use method thereof
CN111179424A (en) * 2020-01-13 2020-05-19 河南嘉瑞电力工程有限公司 Intelligent operation and maintenance management system and method thereof
CN113051637A (en) * 2021-01-11 2021-06-29 深圳新美装饰建设集团有限公司 BIM modeling method for public medical building
CN116468575A (en) * 2023-06-19 2023-07-21 佛山市银锠精密五金有限公司 House assembly scheme recommendation method, device, equipment and storage medium

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110955926A (en) * 2019-11-19 2020-04-03 中国二十冶集团有限公司 BIM modeling system for medical building and use method thereof
CN111179424A (en) * 2020-01-13 2020-05-19 河南嘉瑞电力工程有限公司 Intelligent operation and maintenance management system and method thereof
CN113051637A (en) * 2021-01-11 2021-06-29 深圳新美装饰建设集团有限公司 BIM modeling method for public medical building
CN116468575A (en) * 2023-06-19 2023-07-21 佛山市银锠精密五金有限公司 House assembly scheme recommendation method, device, equipment and storage medium
CN116468575B (en) * 2023-06-19 2023-09-15 佛山市银锠精密五金有限公司 House assembly scheme recommendation method, device, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN109344560A (en) Assembled architecture modeling method and model management system based on BIM technology
Vanegas et al. Modelling the appearance and behaviour of urban spaces
CN109635426A (en) The modeling and model verification method of BIM project
CN104680320A (en) BIM-based project management system and method
CN110111410A (en) A kind of two three-dimensional pipe network data organizations and display methods based on spatial database
CN104978411B (en) A kind of automobile development method and apparatus of bullet train
CN104573231A (en) BIM based smart building system and method
CN107229794B (en) Model construction system based on CAE and VR and management method thereof
CN111310333B (en) Building decoration simulation construction method
CN110008622A (en) A method of CityGML LOD 1-LOD4 model is automatically extracted from IFC model
CN109948292A (en) Architectural design method based on BIM technology
CN107329984A (en) Agricultural Cultural Heritage analogy method and system based on virtual reality technology
WO2023155113A1 (en) Computer-implemented building modeling method and system
KR100783567B1 (en) Lay-out method of housing development reflected regulations and environment
CN110197035A (en) A kind of navigation channel change of Underwater Topography analysis system and method
CN103914524B (en) A kind of topological method for auto constructing of land use data tense
CN110032804A (en) Engineering information system based on BIM, MR in conjunction with 3DP technology
CN108242074A (en) A kind of three-dimensional exaggeration human face generating method based on individual satire portrait painting
CN116090065A (en) Digital twinning-based smart city greening design method and device
CN113987659A (en) Building design method based on BIM technology
CN116127551A (en) Bridge construction progress refined control method based on digital twin multidimensional model
Dammers Making territorial scenarios for Europe
CN103995886A (en) Multidimensional product design knowledge pushing frame and construction method
CN106202768B (en) Attribute input method in house property area Calculation Plane figure
CN110717252B (en) Virtual atmospheric environment data generation method and system based on WRF and SEDRIS

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190215