CN110032804A - Engineering information system based on BIM, MR in conjunction with 3DP technology - Google Patents

Engineering information system based on BIM, MR in conjunction with 3DP technology Download PDF

Info

Publication number
CN110032804A
CN110032804A CN201910302454.7A CN201910302454A CN110032804A CN 110032804 A CN110032804 A CN 110032804A CN 201910302454 A CN201910302454 A CN 201910302454A CN 110032804 A CN110032804 A CN 110032804A
Authority
CN
China
Prior art keywords
information
model
bim
equipment
technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910302454.7A
Other languages
Chinese (zh)
Other versions
CN110032804B (en
Inventor
薛鑫磊
肖成志
王子寒
尚静媛
张永坡
刘晓铮
文超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei University of Technology
Original Assignee
Hebei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei University of Technology filed Critical Hebei University of Technology
Priority to CN201910302454.7A priority Critical patent/CN110032804B/en
Publication of CN110032804A publication Critical patent/CN110032804A/en
Application granted granted Critical
Publication of CN110032804B publication Critical patent/CN110032804B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C64/00Additive manufacturing, i.e. manufacturing of three-dimensional [3D] objects by additive deposition, additive agglomeration or additive layering, e.g. by 3D printing, stereolithography or selective laser sintering
    • B29C64/30Auxiliary operations or equipment
    • B29C64/386Data acquisition or data processing for additive manufacturing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B33ADDITIVE MANUFACTURING TECHNOLOGY
    • B33YADDITIVE MANUFACTURING, i.e. MANUFACTURING OF THREE-DIMENSIONAL [3-D] OBJECTS BY ADDITIVE DEPOSITION, ADDITIVE AGGLOMERATION OR ADDITIVE LAYERING, e.g. BY 3-D PRINTING, STEREOLITHOGRAPHY OR SELECTIVE LASER SINTERING
    • B33Y50/00Data acquisition or data processing for additive manufacturing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T19/00Manipulating 3D models or images for computer graphics
    • G06T19/006Mixed reality

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Geometry (AREA)
  • Materials Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Manufacturing & Machinery (AREA)
  • Software Systems (AREA)
  • Architecture (AREA)
  • Pure & Applied Mathematics (AREA)
  • Mathematical Optimization (AREA)
  • Computer Graphics (AREA)
  • Mathematical Analysis (AREA)
  • Computational Mathematics (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Optics & Photonics (AREA)
  • Evolutionary Computation (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention is the engineering information system based on BIM, MR in conjunction with 3DP technology, and the build process of the system is: the first step gradually builds the relevant buildings model to be analyzed of engineering using BIM technology in a computer, and obtains the information data of building Life cycle;Second step, recorded using SQL Server database according to different classifications the buildings model building Life cycle information data;MR equipment is worn on user's eye by third step, it is shown using MR technology and intellectual analysis, include BIM modeling mode, line holographic projections molding mode and intellectual analysis the mode option on the screen of MR equipment, selects to enter different operating modes by MR equipment;3D printing equipment is connect by the 4th step with above-mentioned computer, is carried out BIM model using 3DP technology and is taken precautions against natural calamities the printing of model and buildings model.Solves the problems such as information data transmitting of the BIM technology in application for building Life cycle is discontinuous, linking is uncoordinated, analysis is not intelligent and expression is not intuitive.

Description

Engineering information system based on BIM, MR in conjunction with 3DP technology
Technical field
The present invention relates to a kind of engineering information systems based on BIM, MR in conjunction with 3DP technology.
Background technique
BIM, that is, Building Information Modeling, means Building Information Model, contains architectural engineering item Mesh from planning, prospecting, conceptual design, detailed design, analysis, go out figure, it is prefabricated, construction, construction logistics, operation maintenance and dismounting or All information of the Life cycle of person's renovation, these information include geographical location, engineering background, design information, construction letter The information such as breath, material source, operation maintenance data and dismounting renovation.
MR, that is, Mixed Reality, means mixed reality, is an emerging technology, it be by hologram, will be real Environment is mutually mixed with virtual environment.The new visible environment for merging reality and virtual world and generating, in new visualization Physics and information data coexist in environment, and real-time interactive.
3DP, that is, 3D Printing, means 3D printing, is a kind of technology of Quick-forming, it using digital model file as Printing basis, the material that can be bonded using powdery metal or plastic etc., using the method successively accumulated come the construction bodily form Shape, he is identical as common printing technique principle.
SQL Server database is a kind of system R that U.S.'s Microsoft Corporation is released, and is one It is expansible, high performance, designed data base management system is calculated for distributed client/server, realize with The combination of WindowsNT provides the enterprise-level information management system scheme based on affairs.
Currently, many enterprises of civil engineering industry be try to all information that will in Building Information Model, include into Row unified acquisition, processing, expression and analysis, and many systems are had developed thus, such as Shaanxi Ge Landai that network section WebGL lightweight BIM engine, lightweight BIM collaborative platform and the coordinated management of construction stage BIM that skill Co., Ltd is developed are flat Platform, modeling great master, race library great master and the collaboration great master that Shanghai Hong Wa Information technology Co., Ltd is developed.It is by using these System is it can be found that these systems only play a role in some stage of the whole life cycle of building, between each stage Link and coordination on, do not set up a complete system also, come carry building Life cycle entire data flow.
In addition, the expression for information data, also rests on traditional computer screen and shows, the three-dimensional of three-dimensional environment Displaying is applied to construction project not yet, and need to be carried out using traditional numerical analysis software when numerical analysis a large amount of Modeling and analysis work, workload are heavy.For the expression of each stage of building Life cycle, figure mode mostly uses greatly biography out Two-dimentional drawing or computer screen roaming of system etc., expression is not intuitive, extracts inconvenient for operation when information data on drawing.
In view of this, needing a kind of engineering information system based on BIM, MR in conjunction with 3DP technology, record building is given birth to entirely All information datas in period are ordered, the entire inter-area traffic interarea of BIM technology is efficiently transmitted, by reality and void in construction project It is quasi- to be combined together, environmental perspective intellectual analysis is then carried out by MR technology, and multi-party users can be showed, while going out The solid proportional model of incidental information data can be gone out when figure with 3D printing.
Summary of the invention
In view of the deficiencies of the prior art, the technical problem to be solved by the present invention is to provide a kind of based on BIM, MR and 3DP skill The engineering information system that art combines, should be based on the engineering information system of BIM, MR in conjunction with 3DP technology by utilizing SQL Server database, all data of record building Life cycle are simultaneously transmitted in the different phase of construction, solve BIM For building, the information data transmitting of Life cycle is discontinuous, linking is uncoordinated, analyzes not intelligence and table when applying for technology Up to it is not intuitive the problems such as.
In order to solve the above-mentioned technical problem, the technical scheme is that
A kind of engineering information system based on BIM, MR in conjunction with 3DP technology, the build process of the system is:
The first step is gradually built the relevant buildings model to be analyzed of engineering in a computer using BIM technology, and obtains and build Build the information data of Life cycle;
Second step, the building Life cycle for recording the buildings model according to different classifications using SQL Server database Information data, Life cycle information data divided according to construction front and back different phase, that is, every work before constructing Journey information is construction information, the building element material in construction is plant maintenance after buildings model self attributes information, construction Information is facilities environment status information;
The construction information includes engineering information and project information,
The buildings model self attributes information includes model information, material information, component information and schedule information,
The facilities environment status information includes geographical environment, ambient enviroment and job facilities information;
MR equipment is worn on user's eye by third step, MR equipment and is stored with above-mentioned buildings model and relevant information Computer connection, be shown using MR technology and intellectual analysis, include BIM modeling mould on the screen of MR equipment Formula, line holographic projections molding mode and intellectual analysis the mode option, select to enter different operating modes by MR equipment;
(1) if being carried out in the architectural environment that BIM technology is simulated into BIM modeling mode with third party visual angle Roaming, passes through the movement of the MR equipment simulating third party;MR equipment passes through the data for reading SQL Server database in computer, Can be synchronous by relevant information all in database when being roamed, the information needed is shown in MR equipment according to selection Screen on, for checking and verifying;
(2) if when into Practical Project, when seeing actual components, MR equipment reads mould in SQL Server database The every terms of information of type project is selected by MR equipment, shows the component information currently needed on MR device screen;It opens holographic Shaping mould formula is projected, the next step needs that increasing there has been no in SQL Server database but in the project of reality are built The component made, for judging whether existing member position and size are suitable;
(3) set MR technology scene in a computer in advance, under BIM modeling mode by operation MR equipment into Enter intellectual analysis mode, Disaster prevention analysis is carried out to current BIM model, the BIM model data that variation is generated after simulation of taking precautions against natural calamities is existed Table is established in SQL Server database and is stored and updated legacy data library, is obtained BIM model and is taken precautions against natural calamities model;In reality In the engineering of border, by operating MR equipment, intellectual analysis mode is selected, environmental analysis, Practical Project are carried out to currently practical engineering The result of environmental analysis real-time display in MR equipment, while the analysis result being stored in SQL Server database;
3D printing equipment is connect by the 4th step with above-mentioned computer, is carried out BIM model using 3DP technology and is taken precautions against natural calamities model With the printing of buildings model:
(1) it selects construction different phase BIM model to carry out 3D printing according to project demand, interim meeting is held in project It when view, is shown, the construction plan of next step is formulated for engineering participating parties;
(2) it selects the BIM model for generating variation after the simulation of taking precautions against natural calamities of database intellectual analysis to take precautions against natural calamities model, carries out 3D and beat Print, is analyzed, it is ensured that the safe construction of engineering when holding specialists meeting;
(3) it selects the analysis result of the Practical Project environment in database to carry out 3D printing, is looked into for the monitoring personnel of engineering See analysis.
MR technology scene includes different kinds of building geological process scene, wind load scene, fire scenario, different daylightings field Scape, indoor acoustical environment scene and indoor air quality scene.
Compared with existing system, the beneficial effects of the present invention are: passing through the combination of BIM, MR and 3DP technology, it is based on SQL The engineering of a set of information data that can transmit, coordinate, analyze and express building Life cycle of Server Database Information system.Firstly, carrying out the foundation of model using BIM technology, the every terms of information about building is passed through into SQL Server Database is recorded, this is beneficial to building every terms of information and is stored, read, modified and deleted at any time.Then, using MR The three-dimensional display that technology carries out BIM model can be by the component information stored in SQL Server database and model component one To a corresponding displaying, the displaying of environmental perspective can be carried out using the line holographic projections molding of MR technology in Practical Project, and same When data in SQL Server database can be read carry out the corresponding of information with the actual components of engineering etc. and showing.Use MR skill Art can carry out intellectual analysis to building, and earthquake, wind load and fire etc. can be carried out in BIM model and is taken precautions against natural calamities sunykatuib analysis, The environmental simulation analysis of daylighting, indoor acoustical environment and indoor environmental quality can be carried out in practical projects.Finally, passing through 3DP Technology carries out BIM model, Disaster prevention analysis model and intellectual analysis knot using the information data recorded in SQL Server database The printing of fruit.Three state-of-the-art technology connected applications at present, are a main breakthroughs for building industry, so that work The design and construction of journey are more intelligent, greatly improve the scientific and technological level of industry.
Specific embodiment
The following describes the present invention in detail with reference to examples.Following embodiment will be helpful to those skilled in the art The present invention is further understood, but the invention is not limited in any way.It should be appreciated that those skilled in the art For, without departing from the inventive concept of the premise, several changes and improvements can also be made.These belong to guarantor of the invention Protect range.
The present invention is based on the engineering information system of BIM, MR in conjunction with 3DP technology, and the build process of the system is:
The first step is gradually built the relevant buildings model to be analyzed of engineering in a computer using BIM technology, and obtains and build Build the information data of Life cycle;
Second step, the building Life cycle for recording the buildings model according to different classifications using SQL Server database Information data, Life cycle information data divided according to construction front and back different phase, that is, every work before constructing Journey information is construction information, the building element material in construction is plant maintenance after buildings model self attributes information, construction Information is facilities environment status information;
The construction information includes engineering information and project information,
Engineering information: planning information, investigation information, geological information, ambient condition information, geographical location information and related political affairs Plan information etc.;
Project information: Construction Party's information, building side's information, management side's information, bidding information, assembly package informatin, project Responsible person's information and subpackage information etc.;
The buildings model self attributes information includes model information, material information, component information and schedule information,
Model information: building classification, security level and fire-protection rating etc.;
Material information: budget information, source-information, class information, total dosage information and real-time usage information etc.;
Component information: classification information, quantity information and dimension information etc.;
Schedule information: overall planning and progresses in real time etc.;
The facilities environment status information includes geographical environment, ambient enviroment and job facilities information,
Geographical environment: sunshine information, season information, rainfall data, fugitive dust information and PM2.5 information etc.;
Ambient enviroment: sedimentation information and crack information etc.;
Job facilities: level of ground water, component stress and component displacement etc..
MR equipment is worn on user's eye by third step, MR equipment and is stored with above-mentioned buildings model and relevant information Computer connection, be shown using MR technology and intellectual analysis, include BIM modeling mould on the screen of MR equipment Formula, line holographic projections molding mode and intellectual analysis the mode option, select to enter different operating modes by MR equipment;
(1) if being carried out in the architectural environment that BIM technology is simulated into BIM modeling mode with third party visual angle Roaming, passes through the movement of the MR equipment simulating third party;MR equipment passes through the data for reading SQL Server database in computer, Can be synchronous by relevant information all in database when being roamed, the information needed is shown in MR equipment according to selection Screen on, for checking and verifying;
(2) if when into Practical Project, when seeing actual components, MR equipment reads mould in SQL Server database The every terms of information of type project is selected by MR equipment, shows the component information currently needed on MR device screen;It opens holographic Shaping mould formula is projected, the next step needs that there has been no in SQL Server database but in the project of reality can be increased The component of construction, for judging whether existing member position and size are suitable;
(3) set MR technology scene in a computer in advance, under BIM modeling mode by operation MR equipment into Enter intellectual analysis mode, Disaster prevention analysis is carried out to current BIM model, the BIM model data that variation is generated after simulation of taking precautions against natural calamities is existed Table is established in SQL Server database and is stored and updated legacy data library, is obtained BIM model and is taken precautions against natural calamities model;In reality In the engineering of border, by operating MR equipment, intellectual analysis mode is selected, environmental analysis, Practical Project are carried out to currently practical engineering The result of environmental analysis can be shown in real time in MR equipment, while the analysis result is stored in SQL Server database In;
BIM model Disaster prevention analysis:
1. geological process
For first class building and category II structure, respectively according to geological process and local once lower than local fortification intensity The identical geological process of fortification intensity, geological process once higher than local fortification intensity carry out earthquake simulation one by one;
For Class C building and class D building, respectively according to geological process and local once lower than local fortification intensity The identical geological process of fortification intensity carries out earthquake simulation one by one;
2. wind load
By the information data in SQL Server database, computer chooses suitable SQL Server database automatically Middle relevant parameter (ambient condition information before constructing i.e. in database, the numerical value of design parameter are chosen according to construction standards), presses According to wkgzμsμzw0Characteristi cvalue o fwindload is calculated, and respectively according to 0.9wk、wkAnd 1.1wkCarry out Simulation of wind;
gzFor gustness factor, provide to use by GB-50009-2001;μsFor structural shape factor of wind load, general metope area is taken 1.2, corner area takes 2.0;μzFor height variation coefficient of wind pressure, provide to use by GB-50009-2001;w0For fundamental wind pressure (KN/ ), m2 it provides to use by GB-50009-2001)
3. fire
It is the building element of level-one for fire resistance rating, uses fire endurance -0.2h, fire endurance -0.1h and fire resisting pole Limit carries out fire disaster simulation;
It is the building element of second level for fire endurance, uses fire endurance -0.25h, fire endurance -0.1h and fire resisting pole Limit carries out fire disaster simulation;
It is the building element of three-level for fire endurance, uses fire endurance -0.3h, fire endurance -0.1h and fire resisting pole Limit carries out fire disaster simulation;
It is the building element of level Four for fire endurance, carries out fire disaster simulation using fire endurance;
Practical Project environmental analysis:
1. daylighting is thrown according to the glazing floor area ratio of GB-50033-2013 defined and the effective depth of daylighting using holography Shadow molding carrys out simulant building daylighting, and whether analysis building meets daylighting requirement;
2. indoor acoustical environment takes the level of noise of 25dB, 30dB, 40dB, 50dB and 75dB in the different location of building Noise simulation is carried out, the noise control ability of building is analyzed;
3. indoor air quality is formed using line holographic projections under construction particle in air carrying out color identifier, according to The density case of certain color analyzes indoor air quality.
3D printing equipment is connect by the 4th step with above-mentioned computer, is carried out BIM model using 3DP technology and is taken precautions against natural calamities model With the printing of buildings model:
(1) it selects construction different phase BIM model to carry out 3D printing according to project demand, interim meeting is held in project It when view, can be shown, the construction plan of next step is formulated for engineering participating parties;
(2) it selects the BIM model for generating variation after the simulation of taking precautions against natural calamities of database intellectual analysis to take precautions against natural calamities model, carries out 3D and beat Print, can be analyzed, it is ensured that the safe construction of engineering when holding specialists meeting;
(3) it selects the analysis result of the Practical Project environment in database to carry out 3D printing, is looked into for the monitoring personnel of engineering See analysis.
Intellectual analysis in the present invention refers to, buildings model (BIM model) ring that can be good with initial design in roaming Border is interacted, and dynamic change and the critical value etc. for changing the observing and nursings such as stress locating for buildings model are passed through;Pass through Originally buildings model build schedule rule watch the overall dynamics of model demonstration, can also environmental perspectiveization displaying in Custom rule changes to watch the dynamic demonstration of construction simulation.
The BIM technology is needed by BIM technology software, can be using some main softwares, such as Ou Teke in industry The Revit software of company;
The frastructure state needs to be acquired using acquisition instrument, such as manually uses total station, inclinometer and stress Meter etc., or be acquired using wireless monitor in industry, as crack sensors, the type vibration wire of Beijing Hao Kun company are embedded to and answer Become meter and laser displacement sensor etc..
When the MR technology carries out environment roaming displaying, mould of the user about sense organs such as vision, the sense of hearing, tactiles is provided It is quasi-, it allows user as being personally on the scene, the things in three-dimensional space can be observed in time, without limitation.
When the described 3DP printer model, the printing of threedimensional model is carried out using 3D printer, and is carried out by computer whole Incidental information is managed, then incidental information is printed by normal printer.At the key node of construction or the key node of structure The model 3D printing at place, incidentally prints key point information;The model 3D printing of interim completion construction task, and it is attached to printing Summary information, after the completion of main structure, 3D printing goes out main structure model.
Equipment includes computer, frastructure state acquisition instrument (such as total station, inclinometer, stress meter, crack in the present invention Sensor, type vibration wire be embedded to strain gauge and laser displacement sensor etc.), MR technical equipment (such as Magic Leap), 3D printer With normal printer etc..The mounting means of above-mentioned frastructure state acquisition instrument is respectively set compared with the code requirement in construction Standby connection usage mode is the prior art.
The present invention updates in building overall process life cycle by SQL Server database real-time perfoming record and energy Immediately it calls, realizes the continuity of whole process data transmission, the consistency of linking.
The present invention does not address place and is suitable for the prior art.

Claims (2)

1. a kind of engineering information system based on BIM, MR in conjunction with 3DP technology, the build process of the system is:
The first step gradually builds the relevant buildings model to be analyzed of engineering using BIM technology in a computer, and it is complete to obtain building The information data of life cycle;
Second step, recorded using SQL Server database according to different classifications the buildings model building Life cycle letter Data are ceased, are divided Life cycle information data according to construction front and back different phase, that is, every engineering letter before constructing Breath is construction information, the building element material in construction is plant maintenance information after buildings model self attributes information, construction For facilities environment status information;
The construction information includes engineering information and project information,
The buildings model self attributes information includes model information, material information, component information and schedule information,
The facilities environment status information includes geographical environment, ambient enviroment and job facilities information;
MR equipment is worn on user's eye, MR equipment and the meter for being stored with above-mentioned buildings model and relevant information by third step The connection of calculation machine, is shown and intellectual analysis using MR technology, includes BIM modeling mode on the screen of MR equipment, complete Breath projection shaping mould formula and intellectual analysis the mode option select to enter different operating modes by MR equipment;
(1) if being roamed in the architectural environment that BIM technology is simulated into BIM modeling mode with third party visual angle, Pass through the movement of the MR equipment simulating third party;MR equipment by read computer in SQL Server database data, into Relevant information all in database can be synchronized when row roaming, the screen in MR equipment is shown according to the information that selection will need On curtain, for checking and verifying;
(2) if when into Practical Project, when seeing actual components, MR equipment reads model terms in SQL Server database Purpose every terms of information is selected by MR equipment, shows the component information currently needed on MR device screen;Open line holographic projections Molding mode, what the next step that increasing there has been no in SQL Server database but in the project of reality needed to build Component, for judging whether existing member position and size are suitable;
(3) MR technology scene is set in a computer in advance, enter intelligence by operating MR equipment under BIM modeling mode Energy analytical model carries out Disaster prevention analysis to current BIM model, generates the BIM model data of variation in SQL after the simulation that will take precautions against natural calamities Table is established in Server database and is stored and updated legacy data library, is obtained BIM model and is taken precautions against natural calamities model;In practical work Cheng Zhong selects intellectual analysis mode, carries out environmental analysis, Practical Project environment to currently practical engineering by operating MR equipment The result of analysis real-time display in MR equipment, while the analysis result being stored in SQL Server database;
3D printing equipment is connect by the 4th step with above-mentioned computer, carries out BIM model using 3DP technology and take precautions against natural calamities model and to build Build the printing of model:
(1) it selects construction different phase BIM model to carry out 3D printing according to project demand, interim meeting is held in project When, it is shown, the construction plan of next step is formulated for engineering participating parties;
(2) it selects the BIM model for generating variation after the simulation of taking precautions against natural calamities of database intellectual analysis to take precautions against natural calamities model, carries out 3D printing, It is analyzed when holding specialists meeting, it is ensured that the safe construction of engineering;
(3) it selects the analysis result of the Practical Project environment in database to carry out 3D printing, is checked point for the monitoring personnel of engineering Analysis.
2. the engineering information system according to claim 1 based on BIM, MR in conjunction with 3DP technology, which is characterized in that MR Technology scene includes different kinds of building geological process scene, wind load scene, fire scenario, different daylighting scenes, indoor sound Environment scene and indoor air quality scene.
CN201910302454.7A 2019-04-16 2019-04-16 Engineering information system based on combination of BIM, MR and 3DP technologies Active CN110032804B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910302454.7A CN110032804B (en) 2019-04-16 2019-04-16 Engineering information system based on combination of BIM, MR and 3DP technologies

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910302454.7A CN110032804B (en) 2019-04-16 2019-04-16 Engineering information system based on combination of BIM, MR and 3DP technologies

Publications (2)

Publication Number Publication Date
CN110032804A true CN110032804A (en) 2019-07-19
CN110032804B CN110032804B (en) 2021-04-13

Family

ID=67238502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910302454.7A Active CN110032804B (en) 2019-04-16 2019-04-16 Engineering information system based on combination of BIM, MR and 3DP technologies

Country Status (1)

Country Link
CN (1) CN110032804B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110969907A (en) * 2019-12-31 2020-04-07 珠海欣邦科技有限公司 Engineering project overall process management teaching system suitable for virtual-actual combination
CN111119480A (en) * 2019-12-06 2020-05-08 中国十七冶集团有限公司 Assembly type building panoramic construction management method based on BIM + MR technology
CN111753353A (en) * 2020-05-19 2020-10-09 中国一冶集团有限公司 Assembly type residence PC component hoisting simulation system and method based on BIM technology
CN113158300A (en) * 2021-03-30 2021-07-23 南京林业大学 BIM-based building fire easy ignition point determination method
CN116301354A (en) * 2023-02-27 2023-06-23 中国人民解放军战略支援部队航天工程大学士官学校 Rocket propellant filling simulation system based on AR technology

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105023201B (en) * 2015-07-24 2017-04-05 中建三局第一建设工程有限责任公司 Assembled architecture Deepen Design and construction method based on BIM and big data
CN107229777A (en) * 2017-05-12 2017-10-03 中国建筑局(集团)有限公司 A kind of acceptance of concealed work method based on mixed reality technology
CN108038917B (en) * 2017-12-27 2021-09-17 上海市地下空间设计研究总院有限公司 Target observation method and inspection system based on MR or AR technology
CN108427830A (en) * 2018-02-09 2018-08-21 中建五局第三建设有限公司 A kind of method and device for constructing object space setting-out using mixed reality technological guidance
CN108683848A (en) * 2018-05-15 2018-10-19 中国十七冶集团有限公司 A kind of 720 ° of panorama construction methods based on BIM+MR
CN108734443A (en) * 2018-05-17 2018-11-02 上海宝冶集团有限公司 A kind of project installation and assembly method, device, system and technological process method
CN108673900A (en) * 2018-05-22 2018-10-19 中国建筑局(集团)有限公司 A kind of forming method of physical model 3D printing
CN108920750A (en) * 2018-05-24 2018-11-30 武汉八维时空信息技术股份有限公司 The fusion of engineering-built Dynamic and Multi dimensional information and cooperation interaction system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119480A (en) * 2019-12-06 2020-05-08 中国十七冶集团有限公司 Assembly type building panoramic construction management method based on BIM + MR technology
CN110969907A (en) * 2019-12-31 2020-04-07 珠海欣邦科技有限公司 Engineering project overall process management teaching system suitable for virtual-actual combination
CN111753353A (en) * 2020-05-19 2020-10-09 中国一冶集团有限公司 Assembly type residence PC component hoisting simulation system and method based on BIM technology
CN111753353B (en) * 2020-05-19 2024-05-17 中国一冶集团有限公司 BIM technology-based assembled house PC component hoisting simulation system and method
CN113158300A (en) * 2021-03-30 2021-07-23 南京林业大学 BIM-based building fire easy ignition point determination method
CN116301354A (en) * 2023-02-27 2023-06-23 中国人民解放军战略支援部队航天工程大学士官学校 Rocket propellant filling simulation system based on AR technology

Also Published As

Publication number Publication date
CN110032804B (en) 2021-04-13

Similar Documents

Publication Publication Date Title
CN110032804A (en) Engineering information system based on BIM, MR in conjunction with 3DP technology
CN106971028B (en) Method for applying virtual reality technology to assembly type building industry
CN111815787B (en) Petrochemical enterprise three-dimensional digital plan making system and method
CN103970920A (en) Earthquake emergency exercise virtual simulation system
Wang et al. Integrating BIM and augmented reality for interactive architectural visualisation
CN102930374B (en) A kind of system using three-dimensional model simulating reality to carry out project management
Sampaio Enhancing BIM methodology with VR technology
CN103927410A (en) System and method for dynamically deducing and simulating emergency plans for chemical accidents
CN108268128A (en) A kind of safety in production emergency preplan 3DVR virtual reality drilling systems
CN109460834A (en) Build operation management system and its management method
CN107170320A (en) Environmental emergency simulative training system based on VR technologies
Fernandes Advantages and disadvantages of BIM platforms on construction site
CN115774488A (en) Cloud service fault simulation diagnosis method based on virtual reality
Wang et al. Virtual reality-based digital restoration methods and applications for ancient buildings
Lee et al. Augmented virtual reality and 360 spatial visualization for supporting user-engaged design
CN106203969A (en) A kind of prison check system of steel-making boiler tubing based on BIM
CN111429578B (en) Three-dimensional model generation method and three-dimensional virtual overhaul system for thermal power plant unit
Abdelhai Integration BIM and emerging technologies in architectural academic programs
Zhang et al. Digital twin technology and wisdom museum from the perspective of artificial intelligence
Brucker et al. Building Information Modeling (BIM): a road map for implementation to support MILCON transformation and civil works projects within the US Army Corps of Engineers
CN114141082A (en) Fire-fighting disaster relief three-dimensional simulation drilling system based on space-time big data
Li Construction of university fire safety facilities management information system based on WebGis
Kuwata et al. Design of Robocup-Rescue Viewers—Towards a Real World Emergency System—
Goldstein Is virtual reality for real?
Counsell et al. Participatory sensing for community engagement with HBIM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant