CN106203969A - A kind of prison check system of steel-making boiler tubing based on BIM - Google Patents

A kind of prison check system of steel-making boiler tubing based on BIM Download PDF

Info

Publication number
CN106203969A
CN106203969A CN201610761660.0A CN201610761660A CN106203969A CN 106203969 A CN106203969 A CN 106203969A CN 201610761660 A CN201610761660 A CN 201610761660A CN 106203969 A CN106203969 A CN 106203969A
Authority
CN
China
Prior art keywords
construction
computer
bim
boiler tubing
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610761660.0A
Other languages
Chinese (zh)
Inventor
王磊
时小兵
刘家宽
施光涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201610761660.0A priority Critical patent/CN106203969A/en
Publication of CN106203969A publication Critical patent/CN106203969A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2113/00Details relating to the application field
    • G06F2113/14Pipes

Abstract

The invention discloses the prison check system of a kind of steel-making boiler tubing based on BIM, this system is to include OA system, terminal handler, the Internet, pipeline construction side's computer, Non-Destructive Testing side's computer and government supervision department computer, and described OA system is connected by the Internet with terminal handler;Described terminal handler is available with the information processor that BIM technology is modeled;Described pipeline construction side's computer is connected by the Internet with terminal handler;Described Non-Destructive Testing side's computer is connected by the Internet with terminal handler;Described government supervision department computer is connected by the Internet with terminal handler, and the whole operation of this system is that pipeline construction side, Non-Destructive Testing side, government supervision department link up linking and only need to carry out on a public OA platform based on internetwork operation platform.

Description

A kind of prison check system of steel-making boiler tubing based on BIM
Technical field
The present invention relates to metallurgical system steel-making waste heat boiler Pipe installing prison inspection field, specifically a kind of based on BIM and The ultra-large type steel-making waste heat boiler pipeline prison check system of the Internet and construction method, for ultra-large type steel-making waste heat boiler pipeline peace The prison inspection work carried out in dress engineering.
Background technology
In view of particular hazard and the importance of ultra-large type steel-making waste heat boiler pipeline, State General Administration for Quality Supervision is to ultra-large type Steel-making waste heat boiler Pipe installing requires must to carry out in a pre-installation informing, in installation process various process qualitys exercise supervision, Just can run after being issued prison inspection return on qualification by government's quality testing department after installation.Conventional ultra-large type steel-making waste heat boiler pipe Road is installed and is followed above step, reports nondestructive testing department and government supervision during various operations are carried out and after completing Department, nondestructive testing department arrangement personnel carry out scene and carry out Non-Destructive Testing, need to carry coherent detection data after having detected Government supervision departmental staff is transferred to check.According to conventional construction experience, above-mentioned steps is followed in the construction of everywhere pipeline, to item The mesh duration brings and has a strong impact on.
Summary of the invention
It is an object of the invention to provide the prison check system of a kind of steel-making boiler tubing based on BIM, to solve the above-mentioned back of the body The problem proposed in scape technology.
For achieving the above object, the present invention provides following technical scheme: the prison of a kind of steel-making boiler tubing based on BIM is examined System, this system includes OA system, terminal handler, the Internet, pipeline construction side's computer, Non-Destructive Testing side's computer and political affairs Mansion superintendent office computer, described OA system is connected by the Internet with terminal handler;Described pipeline construction side calculates Machine, Non-Destructive Testing side's computer and government supervision department computer are connected with terminal handler by the Internet respectively.
Preferably, described pipeline construction side computer, Non-Destructive Testing side's computer and government supervision department computer are platforms Formula machine, smart mobile phone or panel computer;Described pipeline construction side computer, Non-Destructive Testing side's computer and government supervision department meter Calculation machine is one or more computers.
Preferably, described terminal handler built-in BIM software, by BIM software data processing.
The invention also discloses the construction method of a kind of steel-making boiler tubing prison check system based on BIM, as follows Construct:
S1, set up OA system, create tripartite's common platform
The entry password of the most newly-built pipeline construction side, Non-Destructive Testing side and government supervision side and log in close in OA system Code;
S2, by OA system, terminal handler, the Internet, pipeline construction side's computer, Non-Destructive Testing side's computer and government Superintendent office's computer is connected by the Internet.Utilize the Internet, each sub-block of whole system is connected, forms an entirety;
S3, utilize on terminal handler BIM technology carry out ultra-large type steel-making waste heat boiler tubing modeling;
Construction party logs in OA system, utilizes computer and BIM technology to carry out ultra-large type steel-making waste heat on terminal handler Boiler tubing system modelling, each item data of input channel and mouth of pipe weld interval, welding personnel in each mouth of pipe welding process With data such as welding manners;
S4, Non-Destructive Testing side utilize computer to understand terminal handler institute input channel weld bond welding situation, carry out in time The Non-Destructive Testing of weld bond
Non-Destructive Testing side logs in OA system, and the weld bond showing terminal handler carries out Non-Destructive Testing, detection is tied simultaneously Fruit is input in terminal handler BIM modeling in time, Data Enter point and nozzle position one_to_one corresponding in BIM modeling;
S5, the prison inspection of government supervision department
Government supervision department logs in OA system, clicks on every data link of terminal handler BIM modeling, understands weld bond weldering Connect situation and integral installation situation, nonconformance is indicated, send rectification instruction;
In step S5, construction speed is observed by government supervision department computer whole process by government supervision department, models BIM The indefinite ground of middle construction data can send instruction, and this instruction can be shown that instruction issuing side information, instruction by OA system Content includes ordering other two sides to provide definite data, and determines according to the data of feedback in job site data and BIM modeling Do over again or stop work;
S6, construction party recovery command, rectify and improve, and whole system forms closed loop
Construction party logs in OA system and receives the instruction of government supervision department, for needing the job site of rectification to carry out in time Rectification, is simultaneously entered information after rectification.Ensure that whole Pipe installing, detection form a perfect closed-loop structure.
Preferably, described S3 includes:
S31, obtain according to equipment and materials dimensional drawing ultra-large type steel-making waste heat boiler tubing basic model;
S32, carry out structure discipline and electromechanical speciality BIM mould according to construction and the demand of user and the basic model obtained Type models, and obtains the threedimensional model of ultra-large type steel-making waste heat boiler tubing;
S33, carry out structure discipline and electromechanical speciality BIM model checking for the first time, and generate audit report for the first time;
S34, according to first time audit report BIM model adjusted repeatedly and revise, finally giving BIM model;
S35, construction drawing according to BIM model generation ultra-large type steel-making waste heat boiler tubing, and to design drawing Carry out three-dimensional drawing school to examine, obtain ultra-large type steel-making waste heat boiler tubing construction drawing:
Preferably, described step S35 includes:
S351, the BIM model that waste heat boiler tubing construction drawing of making steel according to ultra-large type is corresponding carry out construction area Divide, construction speed is simulated and equipment and materials transport simulation these three three-dimensional artificial construction simulation;
S352, result according to these three three-dimensional artificial construction simulation determine ultra-large type steel-making waste heat boiler tubing Construction area.
Preferably, in described step S4, Non-Destructive Testing can determine the reality of next step arrangement and method for construction according to testing result Granting no, by Non-Destructive Testing side's computer by the result typing OA system of detection, it is qualified to detect, and continues construction, and detection does not conforms to Lattice then send command request construction party and do over again and stop next step construction.
Preferably, in described step S5, construction is observed by government supervision department computer whole process by government supervision department Progress, in modeling BIM, the indefinite place of construction data sends instruction.
Preferably, described pipeline construction side computer, Non-Destructive Testing side's computer and government supervision department computer have BIM modeling carries out the computer of information reading, display and referential function.
Compared with prior art, the invention has the beneficial effects as follows:
The whole operating process of this system is based on internetwork operation platform, pipeline construction side, Non-Destructive Testing side, government's prison The department that superintends and directs links up linking and only need to carry out on a public OA platform.Meanwhile, project is to carry out based on the basis of BIM modeling Every operation input, read, process and rectify and improve, form a blood circulation so that project process is very clear.
Accompanying drawing explanation
Fig. 1: the prison check system flow chart of a kind of steel-making boiler tubing based on BIM.
In figure: 1, OA system, 2, terminal handler, 3, the Internet, 4, pipeline construction side's computer, 5, Non-Destructive Testing side's meter Calculation machine, 6, government supervision department computer.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise Embodiment, broadly falls into the scope of protection of the invention.
Referring to Fig. 1, the present invention provides a kind of technical scheme: a kind of ultra-large type based on BIM and the Internet steel-making waste heat Boiler tubing prison check system, including OA system 1, terminal handler 2, the Internet 3, pipeline construction side's computer 4, Non-Destructive Testing side Computer 5 and government supervision department computer 6, OA system 1 is connected by the Internet 3 with terminal handler 2;Pipeline construction side counts Calculation machine 4 is connected by the Internet 3 with terminal handler 2;Non-Destructive Testing side's computer 5 is with terminal handler 2 by the Internet 3 even Connect;Government supervision department computer 6 is connected by the Internet 3 with terminal handler 2;Wherein pipeline construction side's computer 4, lossless Detection side's computer 5 and government supervision department computer 6 carry out information reading, display and referential function on BIM models Computer.
Pipeline construction side's computer 4, Non-Destructive Testing side's computer 5 and government supervision department computer 6 are all desktop computer, intelligence Energy mobile phone or panel computer, it is simple to tripartite inputs and checks information.
Pipeline construction side's computer 4, Non-Destructive Testing side's computer 5 and government supervision department computer 6 are all one or many Platform computer.
Terminal handler 2 is by the data in built-in BIM software processes work progress.
Ultra-large type based on BIM steel-making waste heat boiler Pipe installing prison check system is constructed as follows:
S1, set up OA system 1, create tripartite's common platform
Newly-built pipeline construction side, Non-Destructive Testing side and the entry password of government supervision side and login respectively in OA system 1 Password;
S2, by OA system 1, terminal handler 2, the Internet 3, pipeline construction side's computer 4, Non-Destructive Testing side's computer 5 Connected by the Internet 3 with government supervision department computer 6.Utilize the Internet 3, each sub-block of whole system is connected, formed One entirety;
S3, utilize on terminal handler 2 BIM technology carry out ultra-large type steel-making waste heat boiler tubing modeling;
Construction party logs in OA system 1, utilizes computer and BIM technology to carry out ultra-large type steel-making on terminal handler 2 remaining Heat boiler tubing models, each item data of input channel and mouth of pipe weld interval, welding people in each mouth of pipe welding process The data such as member and welding manner;
S31, obtain according to equipment and materials dimensional drawing ultra-large type steel-making waste heat boiler tubing basic model;
S32, carry out structure discipline and electromechanical speciality BIM mould according to construction and the demand of user and the basic model obtained Type models, and obtains the threedimensional model of ultra-large type steel-making waste heat boiler tubing;
S33, carry out structure discipline and electromechanical speciality BIM model checking for the first time, and generate audit report for the first time;
S34, according to first time audit report BIM model adjusted repeatedly and revise, finally giving BIM model;
S35, construction drawing according to BIM model generation ultra-large type steel-making waste heat boiler tubing, and to design drawing Carry out three-dimensional drawing school to examine, obtain ultra-large type steel-making waste heat boiler tubing construction drawing;
S351, the BIM model that waste heat boiler tubing construction drawing of making steel according to ultra-large type is corresponding carry out construction area Divide, construction speed is simulated and equipment and materials transport simulation these three three-dimensional artificial construction simulation;
S352, result according to these three three-dimensional artificial construction simulation determine ultra-large type steel-making waste heat boiler tubing Construction area.
S4, Non-Destructive Testing side utilize computer to understand terminal handler institute input channel weld bond welding situation, carry out in time The Non-Destructive Testing of weld bond
Non-Destructive Testing side logs in OA system 1, and the weld bond of terminal handler 2 display is carried out Non-Destructive Testing, simultaneously will detection Result is input in terminal handler BIM modeling in time, Data Enter point and nozzle position one_to_one corresponding in BIM modeling;
In step S4, whether Non-Destructive Testing can determine the enforcement of next step arrangement and method for construction according to testing result, by nothing Damaging the detection side's computer 5 result typing OA system 1 by detection, it is qualified to detect, and can continue construction, detect defective, send out Go out command request construction party do over again and stop next step construction;
S5, the prison inspection of government supervision department
Government supervision department logs in OA system 1, clicks on every data link of terminal handler BIM modeling, understands weld bond Welding situation and integral installation situation, indicate for nonconformance, sends rectification instruction;
In step S5, construction speed is observed by government supervision department computer 6 is omnidistance by government supervision department, builds BIM In mould, the indefinite ground of construction data can send instruction, and this instruction can be shown that instruction issuing side information by OA system 1, refers to Make content include ordering other two sides to provide definite data, and determine according to the data of feedback in job site data and BIM modeling Surely do over again or stop work;
S6, construction party recovery command, rectify and improve, and whole system forms closed loop
Construction party logs in OA system 1 and receives the instruction of government supervision department, for needing the job site of rectification to enter in time Row rectification, is simultaneously entered information after rectification.Ensure that whole Pipe installing, detection form a perfect closed-loop structure.
Wherein, it is to whole ultra-large type steel-making waste heat boiler pipe design once to BIM modelling in step S35 " previewing ", the process of modeling is also once comprehensive " three-dimensional school is examined " process simultaneously, can find in the process to be hidden in a large number Problem in design, promotes global design quality, and input that later stage building site process is greatly decreased.Three-dimensional school is examined process and is mainly wrapped Include:
(1), structure discipline model three-dimensional school is examined
The threedimensional model of structure discipline is mainly carried out matched moulds by collaborative on-link mode (OLM) by this process, by REVIT software The functions such as the 3-D view that carries, wandering map, camera view, carry out three-dimensional school and examine, observe ultra-large type steel-making structural elements Whether the body of waste heat boiler piping facility own, component and space layout have irrational situation, thus find to be hidden in design In problem, it is to avoid the design alteration in later stage.The most no matter in the conceptual level or in the construction drawing stage, designer can be right Ultra-large type steel-making waste heat boiler piping facility details is studied intuitively, strengthens the control dynamics of detailing;
(2), electromechanical speciality model three-dimensional school is examined
This process is mainly by the threedimensional model of link structure specialty, and the filter, the three-dimensional that carry in conjunction with REVIT software regard The functions such as figure, wandering map and camera view, carry out three-dimensional school and examine, get rid of project in time each electromechanical equipment special pipelines model The collision conflict being likely encountered in construction link, substantially reduces consequent modification application list, it is to avoid due to system various and Spatial complex and between the pipeline that usually occurs, clash between pipeline and structural elements, or affect clear height and sky in pipeline Between effect, or cause trouble to construction, cause doing over again or the generation of the situation such as waste.
Construction stage:
Boiler tubing project construction is complicated, and the present invention can utilize BIM system, derives three-dimensional simulation video, guiding construction Person works, thus ensure construction speed, it is to avoid cause delaying work as drawing lacks;
BIM technology contains the full detail of building, is possible not only to the two and three dimensions drawing providing image visual, and The information that bill of quantities, construction management, virtual construction, cost estimate etc. are more abundant can be provided, it is simple to each portion of project Communicating with each other of door, collaborative work.BIM has publishing picture property: as provided integrated pipe line chart, collision detection to detect wrong reports and recommendations The construction drawing that improvement project etc. are practical.BIM also can derive three-dimensional simulation video, preferably guiding construction person works;
The present invention can realize progress simulation, work progress is monitored in real time, planning of science activities place, control construct into Degree, resource and quality, it is ensured that the safety of construction, improve construction quality and reduction of erection time;
By the BIM simulation to construction organization, tripartite can very be visually known the time of whole construction and installation link Node and installation procedure, and clearly the difficult point being held in installation process and main points, construction party can also be further to original peace Dress scheme is optimized and improves, to improve the safety of efficiency of construction and arrangement and method for construction;
The present invention is by being connected BIM with construction schedule, and spatial information and temporal information are incorporated into one can Depending on 4D (3D+Time) model in, can intuitively, accurately reflect the work progress of whole building.4D construction simulation technology can With rational construction plan in project building course, accurate perception construction speed, optimize and use working sources and science Ground carry out Ground arrangement, construction speed, resource and the quality of whole engineering is managed collectively and controls, with the reduction of erection time, Reduce cost and improve quality.
Engineering equipment and material are unfamiliar with by a lot of construction teams and groups, are easily caused and miss dress or damage equipment and material, impact Construction speed.And BIM system comprises all information of building, working procedure simulation can be carried out for construction Difficulties, instruct workman Construction, it is ensured that construction speed.
Construction data:
In January, 2016, in Zhanjiang steel mill steel-making 350t converter producing system, use this kind based on BIM and interconnection The ultra-large type steel-making waste heat boiler Pipe installing prison check system of net, whole converter Pipe installing and detection and prison inspection have only used three Half month, also start the beginning of information-based prison inspection in this field simultaneously.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, permissible Understand and these embodiments can be carried out multiple change without departing from the principles and spirit of the present invention, revise, replace And modification, the scope of the present invention be defined by the appended.

Claims (9)

1. the prison check system of a steel-making boiler tubing based on BIM, it is characterised in that include OA system (1), terminal handler (2), the Internet (3), pipeline construction side's computer (4), Non-Destructive Testing side's computer (5) and government supervision department computer (6), Described OA system (1) is connected by the Internet (3) with terminal handler (2);Described pipeline construction side's computer (4) is with whole End processor (2) is connected by the Internet (3);Described Non-Destructive Testing side's computer (5) and terminal handler (2) are by interconnection Net (3) connects;Described government supervision department computer (6) is connected by the Internet (3) with terminal handler (2).
The prison check system of a kind of steel-making boiler tubing based on BIM, it is characterised in that described pipe Road construction party computer (4), Non-Destructive Testing side's computer (5) and government supervision department computer (6) are desktop computer, smart mobile phone Or panel computer;Described pipeline construction side computer (4), Non-Destructive Testing side's computer (5) and government supervision department computer (6) It is one or more computers.
The prison check system of a kind of steel-making boiler tubing based on BIM, it is characterised in that described end End processor (2) built-in BIM software, by BIM software data processing.
4. the construction party of the prison check system of steel-making boiler tubing based on a kind of BIM according to any one of claims 1 to 3 Method, it is characterised in that carry out as follows:
S1, set up OA system (1), create tripartite's common platform:
The most newly-built pipeline construction side, Non-Destructive Testing side and the logon account of government supervision side and log in close in OA system (1) Code;
S2, by OA system (1), terminal handler (2), the Internet (3), pipeline construction side's computer (4), Non-Destructive Testing side calculate Machine (5) and government supervision department computer (6) are connected by the Internet (3), utilize the Internet (3) by each sub-block of whole system Connect, form an entirety;
S3, utilize on terminal handler (2) BIM technology carry out ultra-large type steel-making waste heat boiler tubing modeling:
Construction party logs in OA system (1), utilizes computer and BIM technology to carry out ultra-large type steel-making on terminal handler (2) remaining Heat boiler tubing models, time in mouth of pipe welding process by OA system (1) input channel initial data, mouth of pipe welding Between, welding personnel name and welding manner;
S4, Non-Destructive Testing side utilize computer to understand the pipe welding port welding situation that terminal handler (2) is inputted, and carry out in time The Non-Destructive Testing of weld bond:
Non-Destructive Testing side logs in OA system (1), and the weld bond of display upper to terminal handler (2) carries out Non-Destructive Testing, simultaneously will inspection Survey in result timely input terminal processor BIM modeling, Data Enter point and nozzle position one_to_one corresponding in BIM modeling;
S5, the prison inspection of government supervision department:
Government supervision department logs in OA system (1), clicks on every data link of terminal handler BIM modeling, understands weld bond weldering Connect situation and integral installation situation, nonconformance is indicated, send rectification instruction;
S6, construction party recovery command, rectify and improve, whole system formation closed loop:
Construction party logs in OA system (1), for needing the job site of rectification to rectify and improve in time, believes after being simultaneously entered rectification Breath.
The construction method of a kind of steel-making boiler tubing prison check system based on BIM, its feature exists In, described S3 includes:
S31, obtain according to equipment and materials dimensional drawing ultra-large type steel-making waste heat boiler tubing basic model;
S32, carry out structure discipline and electromechanical speciality BIM model modeling according to construction and the basic model that obtains of user's request, Threedimensional model to ultra-large type steel-making waste heat boiler tubing;
S33, carry out structure discipline and electromechanical speciality BIM model checking for the first time, and generate audit report for the first time;
S34, according to first time audit report BIM model adjusted repeatedly and revise, finally giving BIM model;
S35, construction drawing according to BIM model generation ultra-large type steel-making waste heat boiler tubing, and carried out design drawing Three-dimensional drawing school is examined, and obtains ultra-large type steel-making waste heat boiler tubing construction drawing.
The construction method of a kind of steel-making boiler tubing prison check system based on BIM, its feature exists In, described step S35 includes:
S351, carry out according to ultra-large type steel-making BIM model corresponding to waste heat boiler tubing construction drawing construction area division, Construction speed simulation and equipment and materials transport simulation these three three-dimensional artificial construction simulation;
S352, result according to these three three-dimensional artificial construction simulation determine the construction of ultra-large type steel-making waste heat boiler tubing Region.
The construction method of a kind of steel-making boiler tubing prison check system based on BIM, its feature exists In, in described step S4, whether Non-Destructive Testing root determines the enforcement of next step arrangement and method for construction according to testing result, by lossless Detection side's computer (5) is by result typing OA system (1) of detection, and it is qualified to detect, and continues construction, detects defective, send Command request construction party is done over again and stops next step construction.
The construction method of a kind of steel-making boiler tubing prison check system based on BIM, its feature exists In, in described step S5, construction speed is observed, to BIM by government supervision department computer (6) is omnidistance by government supervision department In modeling, the indefinite place of construction data sends instruction.
The construction method of a kind of steel-making boiler tubing prison check system based on BIM, its feature exists In, described pipeline construction side computer (4), Non-Destructive Testing side's computer (5) and government supervision department computer (6) they are at BIM The computer of information reading, display and referential function is carried out in modeling.
CN201610761660.0A 2016-08-29 2016-08-29 A kind of prison check system of steel-making boiler tubing based on BIM Pending CN106203969A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610761660.0A CN106203969A (en) 2016-08-29 2016-08-29 A kind of prison check system of steel-making boiler tubing based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610761660.0A CN106203969A (en) 2016-08-29 2016-08-29 A kind of prison check system of steel-making boiler tubing based on BIM

Publications (1)

Publication Number Publication Date
CN106203969A true CN106203969A (en) 2016-12-07

Family

ID=58089524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610761660.0A Pending CN106203969A (en) 2016-08-29 2016-08-29 A kind of prison check system of steel-making boiler tubing based on BIM

Country Status (1)

Country Link
CN (1) CN106203969A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106845832A (en) * 2017-01-20 2017-06-13 四川理工学院 Based on BQIM construction quality information management systems
CN107133338A (en) * 2017-05-16 2017-09-05 廊坊市新思维科技有限公司 Non-destructive Testing Data auditing system
CN109711114A (en) * 2019-03-13 2019-05-03 江苏柯瑞机电工程股份有限公司 Pipeline construction and management system based on BIM
CN112485377A (en) * 2020-11-24 2021-03-12 南京睿控自动化有限公司 Intelligent boiler based on BIM structure combines data model

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104766182A (en) * 2015-04-30 2015-07-08 北京宁晖兴业科技有限公司 Intelligent monitoring system for building design construction based on BIM

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104766182A (en) * 2015-04-30 2015-07-08 北京宁晖兴业科技有限公司 Intelligent monitoring system for building design construction based on BIM

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王丽佳: "基于BIM的智慧建造策略研究", 《中国优秀硕士学位论文全文数据库电子期刊 工程科技II辑》 *
袁晓 等: "基于智慧城市和BIM理念的建设工程政务监管模式探讨", 《土木建筑工程信息技术》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106845832A (en) * 2017-01-20 2017-06-13 四川理工学院 Based on BQIM construction quality information management systems
CN107133338A (en) * 2017-05-16 2017-09-05 廊坊市新思维科技有限公司 Non-destructive Testing Data auditing system
CN109711114A (en) * 2019-03-13 2019-05-03 江苏柯瑞机电工程股份有限公司 Pipeline construction and management system based on BIM
CN112485377A (en) * 2020-11-24 2021-03-12 南京睿控自动化有限公司 Intelligent boiler based on BIM structure combines data model

Similar Documents

Publication Publication Date Title
US20230065286A1 (en) Cloud-enabled generation of construction metrics and documentation
Ding et al. A digital construction framework integrating building information modeling and reverse engineering technologies for renovation projects
Abanda et al. BIM in off-site manufacturing for buildings
CN108875273B (en) BIM-based foundation pit engineering forward design and operation and maintenance management system
CN109064133A (en) A kind of engineering whole process management system based on BIM+AR
CN106595565A (en) BIM-based intelligent monitoring system
CN105844380A (en) BIM-based BIM project element management method and system
CN106203969A (en) A kind of prison check system of steel-making boiler tubing based on BIM
Jiang et al. Automated rule-based constructability checking: Case study of formwork
Nguyen et al. Building code compliance checking using BIM technology
Kim et al. Interactive modeler for construction equipment operation using augmented reality
CN107330970A (en) A kind of threedimensional model processing method, server and computer read/write memory medium
CN107451737A (en) A kind of big data O2O check of drawings cloud platform management systems examined for engineering construction figure
KR102085271B1 (en) Vitual Construction Simulation Method
Ahmed et al. A brief discussion on augmented reality and virtual reality in construction industry
CN110704904B (en) Multi-software collaborative three-dimensional planning method for transformer substation
CN112232683A (en) Comprehensive pipe gallery full-period construction management system based on BIM
CN110990927A (en) BIM-based whole process consultation method
Ogwueleka et al. The future of BIM technologies in Africa: prospects and challenges
CN104951350A (en) Aerospace product general assembly technology simulation analysis method
CN110181519A (en) Subway station door fault detection method and system based on the twin robot of number
CN106383832A (en) Data excavation training model forming method
Baker et al. Benchmarking FEMA P-58 performance predictions against observed earthquake data–a preliminary evaluation for the Canterbury earthquake sequence
US20150317415A1 (en) System and method for engineering and detailing steel joints in a steel structure
CN111126691A (en) Project management method and related product

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207