CN109322669A - The alternate filling of the hard and soft band in inclined seam goaf is without coal column continuous mining method - Google Patents

The alternate filling of the hard and soft band in inclined seam goaf is without coal column continuous mining method Download PDF

Info

Publication number
CN109322669A
CN109322669A CN201811471156.2A CN201811471156A CN109322669A CN 109322669 A CN109322669 A CN 109322669A CN 201811471156 A CN201811471156 A CN 201811471156A CN 109322669 A CN109322669 A CN 109322669A
Authority
CN
China
Prior art keywords
band
filling
sand
drift
goaf
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811471156.2A
Other languages
Chinese (zh)
Other versions
CN109322669B (en
Inventor
张志义
吕金星
陈辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang University
Original Assignee
Xinjiang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang University filed Critical Xinjiang University
Priority to CN201811471156.2A priority Critical patent/CN109322669B/en
Publication of CN109322669A publication Critical patent/CN109322669A/en
Application granted granted Critical
Publication of CN109322669B publication Critical patent/CN109322669B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D19/00Provisional protective covers for working space
    • E21D19/02Provisional protective covers for working space for use in longwall working
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to a kind of alternate fillings of hard and soft band in inclined seam goaf without coal column continuous mining method, this method carries out rigid strip filling to inclined seam goaf first, band multiple operation face arrangement, material are sand base lotion, spacing less than the breaking down for the first time step pitch directly pushed up, and the back production side of band upper end to track gallery terminates;Then drift-sand is transported to goaf using the track gallery of reservation, poured into and full of the gap between rigid strip, flexible support band of the formation to goaf top plate;The closing of lotion wall finally is carried out to drift-sand band in track gallery back production side.The alternate filling of the hard and soft band in inclined seam goaf is without coal column continuous mining method, it ensure that drift-sand dry stowing connects top effect using the slipping property certainly of drift-sand, improve filling band overall stability, it is ensured that obturation to inclined seam goaf top plate it is long when control effect;The track gallery of reservation can be the back production service of subsequent work face, continuously exploit between realization working face without coal column.

Description

The alternate filling of the hard and soft band in inclined seam goaf is without coal column continuous mining method
Technical field
The present invention relates to a kind of underground mine recovery method, especially a kind of hard and soft band in inclined seam goaf is alternate to be filled Fill out no coal column continuous mining method.
Background technique
Northwest China area especially Xinjiang region coal resources reserves are abundant, and seam inclination is big, and be distributed in more arid, Semiarid desert or Gobi Region, water resources shortage, ecological environment are extremely fragile.Traditional caving method processing goaf generates Mining induced fissure and ground settlement can cause serious destruction to groundwater resources and surface vegetation.Filling mining is to reduce to adopt The effective ways in crack and ground settlement, and filler and filling method are the weights for influencing filling mining overall technology economy Want factor.Goaf filling material mainly has gangue, ointment material, high-water material and concrete material, filling method at present There are part (band) filling and whole filling.Strip filling is higher to filler performance requirement, uses ointment material, Gao Shui more Material and concrete material.Although material utilization amount is less compared to whole filling, filler unit price is higher, and needs to consume big The water resource of amount is not suitable for western water shortage mining area.Moreover, filling band is poor in inclined seam goaf internal stability, add The top plate of filling interband exposure be easy to take out and emit and be caving, filling band to top plate it is long when control effect be difficult to ensure.It is mined out Area integrally fills the overall stability that can effectively improve obturation, it is ensured that obturation to goaf top plate it is long when control imitate Fruit, but the restriction by filling cost, practical application are restricted.Either strip filling or the whole method of collecting coal by the means of filling, A degree of influence and destruction inevitably are caused on local environment, in addition northwest coal resources as China most The coal reserve of not yet large-scale development afterwards, also should be as much as possible while reducing mining activity to ecological environment destruction Improve the rate of extraction of coal resources.And segment protection coal column stays to set and causes underground mine Coal Loss between working face at present Main cause.
Summary of the invention
In order to reduce when northwest China especially Xinjiang region inclined seam is exploited to groundwater resources and surface vegetation Destroy, improve obturation to inclined seam overburden of the goaf it is long when control effect, meanwhile, reduce filling cost, increase coal Resource recovery ratio, the present invention specific condition sandy for above-mentioned regional water shortage, proposes the hard and soft band in inclined seam goaf Alternate filling is without coal column continuous mining method.
The technical scheme adopted by the invention to solve the technical problem are as follows:
1. the working face about 30-60m that exceeds the time limit carries out anchor cable reinforcement to track gallery after inclined seam working face is from open-off cut back production Supporting;
2. carrying out first time cream to goaf when the inclined seam face advanced distance close breaking down for the first time step pitch directly pushed up Body strip filling, band tendency arrangement (multiple operation face), band lower end to the non-back production side of haulage way, band upper end to track Gallery back production side, strip width 3-10m, ointment material are the mixture of drift-sand, cement, flyash and water-reducing agent composition, The ratio of mud is 0.5;
3. drift-sand is transported to goaf via track gallery using overturning carriage-type mine car, drift-sand is discharged by paste body filling The U-shaped space of band, open-off cut coal wall and the non-back production side lane side composition of haulage way, since drift-sand has from slipping property, this inclines Oblique U-shaped space will be gradually filled with from bottom to top;
4. wall constructed to drift-sand filling band in track gallery back production side after drift-sand is full of above-mentioned inclination U-shaped space Upper end is closed, and closing wall construction material is the ointment material described in 2., and closing thickness of wall body is 3-5m, wall outer side Should with 2. described in lotion band upper end flush;
5. the work of lotion strip filling, the work of drift-sand strip filling and drift-sand fill with constantly pushing ahead for working face It fills out band upper end closed wall and constructs work and successively carry out, lotion band spacing should be less than the breaking down for the first time step pitch directly pushed up.
It is described 1. in the advanced Anchor reinforced support parameter of track gallery: anchor cable diameter is 22mm, and anchor cable length is 4- 8m, between anchor cable, array pitch be respectively between former suspension roof support, 1-2 times of array pitch, anchorage cable anchoring mode is resin explosive roll the extensible bolting, Design parameter presses size to determine according to Roof rock feature, back production height, mining depth and ground.
It is described 2. in lotion strip width and filling material proportion according to Roof rock feature, back production height, mining depth, press Size and Roof Control require to determine.
It is described 4. in closing thickness of wall body according to Roof rock feature, back production height, mining depth, press size and ointment material Proportion determines.
It is described 5. in front of drift-sand strip filling, progress linked network need to directly push up to locally broken goaf and is temporarily propped up Shield guarantees the density of the integrality directly pushed up and drift-sand filling band.
Beneficial effect of the invention is that the alternate filling of the hard and soft band in inclined seam goaf is logical without coal column continuous mining method Cross and replace the higher strip filling material of part price using northwest development cheap drift-sand from a wealth of sources, reduce filling at This while, makes full use of what the slipping property certainly of drift-sand ensure that drift-sand dry stowing to connect top effect, improves filling band Overall stability, ensure that obturation to inclined seam goaf top plate it is long when control effect.Moreover, while filling Remain section track gallery, the section track gallery of reservation can be the back production service of subsequent work face, realize between working face No coal column is continuously exploited.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings.
Fig. 1, which is that the hard and soft band in inclined seam goaf is alternate, fills the top view constructed without coal column continuous mining method.
Fig. 2 is the alternate filling of the hard and soft band in inclined seam goaf without moving towards direction side view in coal column continuous mining method (I-I position in Fig. 1).
Fig. 3 is that the alternate filling of the hard and soft band in inclined seam goaf is being filled without drift-sand band in coal column continuous mining method Fill out place's tendency direction side view (II-II position in Fig. 1).
Fig. 4 is the alternate filling of the hard and soft band in inclined seam goaf without tendency side at sand off in coal column continuous mining method To side view (III-III position in Fig. 1).
In figure, 1. track gallerys, 2. tracks, 3. roll-over box mine cars, 4. closing walls, 5. working faces, 6. cream Body band, 7. drift-sand bands, 8. directly push up, 9. haulage ways, 10. open-off cut coal walls.
Specific embodiment
Alternate operating procedure of the filling without coal column continuous mining method of the hard and soft band in inclined seam goaf in the figure are as follows:
1. the about 30-60m of working face 5 that exceeds the time limit carries out anchor cable to track gallery 1 after inclined seam working face 5 is from open-off cut back production Strengthening supporting;
2. carrying out first to goaf close to when directly pushing up 8 breaking down for the first time step pitch when 5 advance distance of inclined seam working face Secondary lotion strip filling, the tendency arrangement of band 6 (multiple operation face 5), the non-back production side of 6 lower end of band to haulage way 9, band 6 upper ends to the back production side of track gallery 1,6 width of band are 3-10m, and ointment material is drift-sand, cement, flyash and diminishing The mixture of agent composition, the ratio of mud 0.5;
3. drift-sand is transported to goaf via track gallery 1 using overturning carriage-type mine car 3, drift-sand is discharged by lotion The U-shaped space for filling band 6, open-off cut coal wall 10 and 9 non-back production side lane side of haulage way composition is slipped certainly since drift-sand has Property, which will be gradually filled with from bottom to top;
4. wall constructed to drift-sand filling item in 1 back production side of track gallery after drift-sand is full of above-mentioned inclination U-shaped space 7 upper end of band is closed, closing wall 4 construction material be 2. described in ointment material, closing wall 4 with a thickness of 3- 5m, close wall 4 on the outside of should with 2. described in 6 upper end of lotion band flush;
5. with constantly pushing ahead for working face 5,6 filling operation of lotion band, 7 filling operation of drift-sand band and aeolian accumulation The work of constructing of sand filling 7 upper end closed wall 4 of band successively carries out, and the spacing of lotion band 6 should be less than the first of direct top 8 Caving angle.
It is described 1. in the advanced Anchor reinforced support parameter of track gallery 1: anchor cable diameter is 22mm, and anchor cable length is 4- 8m, between anchor cable, array pitch be respectively between former suspension roof support, 1-2 times of array pitch, anchorage cable anchoring mode is resin explosive roll the extensible bolting, Design parameter presses size to determine according to Roof rock feature, back production height, mining depth and ground.
It is described 2. in lotion band 6 width and filling material proportion according to Roof rock feature, back production height, mining depth, Size and Roof Control is pressed to require to determine in ground.
It is described 4. in closing wall 4 thickness according to Roof rock feature, back production height, mining depth, press size and lotion Material mixture ratio determines.
It is described 5. in front of the filling of drift-sand band 7,8 need to directly push ups to locally broken goaf, and to carry out linked networks interim Supporting guarantees the density of the directly integrality on top 8 and drift-sand filling band 7.

Claims (5)

1. after inclined seam working face (5) is from open-off cut back production, the working face that exceeds the time limit (5) about 30-60m to track gallery (1) into Row Anchor reinforced support;When inclined seam working face (5) advance distance is close to the directly breaking down for the first time step pitch on top (8), to adopting Dead zone carries out first time lotion strip filling, band (6) tendency arrangement (multiple operation face (5)), and band (6) lower end is extremely transported flat The non-back production side in lane (9), band (6) upper end to the back production side of track gallery (1), band (6) width are 3-10m, ointment material For the mixture of drift-sand, cement, flyash and water-reducing agent composition, the ratio of mud 0.5;Then overturning carriage-type mine car is utilized (3) drift-sand is transported to goaf via track gallery (1), drift-sand is discharged by paste body filling band (6), open-off cut coal wall (10) and the U-shaped space of haulage way (9) non-back production side lane side composition, since drift-sand has from slipping property, the inclination U-shaped space It will be gradually filled with from bottom to top;After drift-sand is full of above-mentioned inclination U-shaped space, wall is constructed in track gallery (1) back production side Body (4) closes drift-sand filling band (7) upper end, and closing wall (4) construction material is the ointment material described in 2., Wall (4) are closed with a thickness of 3-5m, close on the outside of wall (4) should with 2. described in lotion band (6) upper end flush;With work Face (5) is constantly pushed ahead, and lotion band (6) filling operation, (7) filling operation of drift-sand band and drift-sand fill band (7) work of constructing of upper end closed wall (4) successively carries out, and the spacing of lotion band (6) should be less than directly pushing up collapsing for the first time for (8) Fall step pitch.
2. the alternate filling of the hard and soft band in inclined seam goaf is without coal column continuous mining method according to claim 1;Its feature Be: to the advanced Anchor reinforced support parameter of track gallery (1): anchor cable diameter is 22mm, and anchor cable length is 4-8m, between anchor cable, Array pitch is respectively between former suspension roof support, 1-2 times of array pitch, and anchorage cable anchoring mode is resin explosive roll the extensible bolting, design parameter root It is determined according to Roof rock feature, back production height, mining depth and ground pressure size.
3. the alternate filling of the hard and soft band in inclined seam goaf is without coal column continuous mining method according to claim 1;Its feature Be: the width of lotion band (6) and the proportion of filling material according to Roof rock feature, back production height, mining depth, press size and top Plate control requires to determine.
4. the alternate filling of the hard and soft band in inclined seam goaf is without coal column continuous mining method according to claim 1;Its feature Be: closing wall (4) thickness according to Roof rock feature, back production height, mining depth, press size and lotion material mixture ratio true It is fixed.
5. the alternate filling of the hard and soft band in inclined seam goaf is without coal column continuous mining method according to claim 1;Its feature It is: before drift-sand band (7) filling, need to directly pushes up (8) to locally broken goaf and carry out linked network gib, guarantee The directly density of the integrality on top (8) and drift-sand filling band (7).
CN201811471156.2A 2018-12-04 2018-12-04 Method for alternately filling rigid and flexible strips in inclined coal seam goaf without coal pillars and continuously mining Active CN109322669B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811471156.2A CN109322669B (en) 2018-12-04 2018-12-04 Method for alternately filling rigid and flexible strips in inclined coal seam goaf without coal pillars and continuously mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811471156.2A CN109322669B (en) 2018-12-04 2018-12-04 Method for alternately filling rigid and flexible strips in inclined coal seam goaf without coal pillars and continuously mining

Publications (2)

Publication Number Publication Date
CN109322669A true CN109322669A (en) 2019-02-12
CN109322669B CN109322669B (en) 2021-02-02

Family

ID=65256474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811471156.2A Active CN109322669B (en) 2018-12-04 2018-12-04 Method for alternately filling rigid and flexible strips in inclined coal seam goaf without coal pillars and continuously mining

Country Status (1)

Country Link
CN (1) CN109322669B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110486082A (en) * 2019-09-09 2019-11-22 河北充填采矿技术有限公司 A kind of method that goaf different materials alternately fill
CN111156000A (en) * 2020-04-07 2020-05-15 北京中矿创新联盟能源环境科学研究院 Low seam coal-pillar-free retreating type coal mining method
CN111594263A (en) * 2020-05-14 2020-08-28 山东康格能源科技有限公司 Dry-wet combined gangue filling method
CN112412459A (en) * 2020-12-17 2021-02-26 贵州大学 Special strip type filling mining method
CN114165234A (en) * 2022-02-11 2022-03-11 中煤科工能源科技发展有限公司 Strip face pack mining method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2068498C1 (en) * 1994-01-10 1996-10-27 Юлий Давидович Торф Method of slant coal seams development
RU2382883C1 (en) * 2008-12-17 2010-02-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Erection method of filling connection strap
CN102392644A (en) * 2010-11-30 2012-03-28 淄博市王庄煤矿 Stripped fluid expansion filling mining method for below middle thick coal seam
CN103939137A (en) * 2014-05-07 2014-07-23 中国矿业大学 Method for filling aeolian sand empty field of western desert mining area shallow coal seam
CN104948191A (en) * 2015-07-15 2015-09-30 辽宁工程技术大学 Method for preventing and treating rock burst by using filling mode
CN108757023A (en) * 2018-07-09 2018-11-06 中国矿业大学 A method of exploiting displacement coal column using spoil strip filling

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2068498C1 (en) * 1994-01-10 1996-10-27 Юлий Давидович Торф Method of slant coal seams development
RU2382883C1 (en) * 2008-12-17 2010-02-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Erection method of filling connection strap
CN102392644A (en) * 2010-11-30 2012-03-28 淄博市王庄煤矿 Stripped fluid expansion filling mining method for below middle thick coal seam
CN103939137A (en) * 2014-05-07 2014-07-23 中国矿业大学 Method for filling aeolian sand empty field of western desert mining area shallow coal seam
CN104948191A (en) * 2015-07-15 2015-09-30 辽宁工程技术大学 Method for preventing and treating rock burst by using filling mode
CN108757023A (en) * 2018-07-09 2018-11-06 中国矿业大学 A method of exploiting displacement coal column using spoil strip filling

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110486082A (en) * 2019-09-09 2019-11-22 河北充填采矿技术有限公司 A kind of method that goaf different materials alternately fill
CN111156000A (en) * 2020-04-07 2020-05-15 北京中矿创新联盟能源环境科学研究院 Low seam coal-pillar-free retreating type coal mining method
CN111594263A (en) * 2020-05-14 2020-08-28 山东康格能源科技有限公司 Dry-wet combined gangue filling method
CN112412459A (en) * 2020-12-17 2021-02-26 贵州大学 Special strip type filling mining method
CN112412459B (en) * 2020-12-17 2022-07-12 贵州大学 Special strip type filling mining method
CN114165234A (en) * 2022-02-11 2022-03-11 中煤科工能源科技发展有限公司 Strip face pack mining method
CN114165234B (en) * 2022-02-11 2022-04-29 中煤科工能源科技发展有限公司 Strip face pack mining method

Also Published As

Publication number Publication date
CN109322669B (en) 2021-02-02

Similar Documents

Publication Publication Date Title
CN109322669A (en) The alternate filling of the hard and soft band in inclined seam goaf is without coal column continuous mining method
CN108222938B (en) Combined grouting filling mining method for large-inclination-angle coal seam goaf
CN108518222B (en) Paste body filling combination top plate presplitting second mining super high seam stops the method for adopting line coal column
CN103016053B (en) Method of local filling to control surface subsidence in gob
CN103821558B (en) Coal mine gob filling mining and gob side entry retaining filling process
CN109356582B (en) A kind of filling mining method for comprehensive extracting and caving face
CN105317459B (en) A kind of subregion placement method for being used to control tight roof large area caving disaster
CN104358572B (en) Non-pillar mining technology by spontaneous caving filling roadway at large inclined angle steeply inclined seam
CN108087021A (en) A kind of method that filling coal mining recycling leaves coal column and water-resisting key strata is controlled to stablize
CN102383857A (en) Gob-side entry retaining process for solid-filling, coal-mining and laying gangue wall
CN109630112B (en) N00 mining method of cut top filling
CN108979638B (en) Composite gob-side entry retaining method for wedge-shaped regenerated wall and single-leg shed beam of coal mining roadway
CN108049896B (en) A kind of fully mechanized coal face gob-side entry retaining method
CN102900449B (en) Support method for underground goaf roof of coal mine
CN113914860B (en) Roof-cutting gob-side entry retaining method for non-compact solid filling working face
CN112360550A (en) Method for injecting and filling coal-based solid waste paste in low-position roof separation zone in gob-side entry retaining
CN108756882A (en) A kind of district sublevel entry adopts recovery method without the short length of filling of driving formula
CN101749020A (en) Forward coal mining by filling method
CN109538210A (en) A kind of soft extremely irregularcoal seam fully mechanized coal face gob-side entry retaining method of high methane three
CN102720498A (en) Gob-side entry retaining mining process for coal face
CN105756702A (en) Roadway-side mesh cage filling supporting gob-side entry retaining method
CN109869150A (en) A kind of mine resources are segmented the full office of adopting and fill recovery method
CN103993881A (en) Long-wall roadway type cemented filling mining method
CN112593939A (en) Method for mining 'three lower' coal seam by replacing all coal pillars through gangue double filling
CN103161498B (en) Method for filling coal pillar beside roadway in steep coal seam section

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant