CN109296204A - 剪力墙钢结构预埋件免剔凿施工方法 - Google Patents
剪力墙钢结构预埋件免剔凿施工方法 Download PDFInfo
- Publication number
- CN109296204A CN109296204A CN201811347246.0A CN201811347246A CN109296204A CN 109296204 A CN109296204 A CN 109296204A CN 201811347246 A CN201811347246 A CN 201811347246A CN 109296204 A CN109296204 A CN 109296204A
- Authority
- CN
- China
- Prior art keywords
- built
- fitting
- shear wall
- template
- positioning screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Abstract
本发明公开了一种剪力墙钢结构预埋件免剔凿施工方法,本方法制作带有定位螺杆的预埋件,定位螺杆采用固定螺母和活动螺母紧固,剪力墙钢筋绑扎完毕后,将预埋件临时固定于剪力墙的设计位置,然后开始支设剪力墙混凝土浇筑模板,并使预埋件的钢板抵靠模板;模板在预埋件的定位螺杆位置开孔,使得预埋件的定位螺杆穿出模板的孔位;浇筑剪力墙混凝土,待达到拆模条件后,依次将活动螺母、模板和定位螺杆拆除,完成预埋件施工。本方法克服传统剪力墙内预埋件施工的缺陷,在剪力墙混凝土浇筑后免剔凿即可实施钢结构与预埋件连接,有效提高了施工速度及效率。
Description
技术领域
本发明涉及一种剪力墙钢结构预埋件免剔凿施工方法。
背景技术
钢结构具有自重轻、抗震性能好、施工速度快的优点,且钢结构是绿色建筑材料,可被回收利用,故钢结构具有广阔的应用前景。在剪力墙施工中,钢结构通常采用预埋件与混凝土剪力墙结构相连接,即在浇筑混凝土剪力墙之前,先将预埋件固定在剪力墙的设计位置,待混凝土浇筑完毕后再将预埋件剔凿出来,最后将钢结构与预埋件进行连接。由于预埋件在浇筑混凝土过程中被混凝土所覆盖,混凝土凝固后剔凿出预埋件,增加了剔凿作业的工作量及劳动强度,严重降低施工速度及效率。
发明内容
本发明所要解决的技术问题是提供一种剪力墙钢结构预埋件免剔凿施工方法,本方法克服传统剪力墙内预埋件施工的缺陷,在剪力墙混凝土浇筑后免剔凿即可实施钢结构与预埋件连接,有效提高了施工速度及效率。
为解决上述技术问题,本发明剪力墙钢结构预埋件免剔凿施工方法包括如下步骤:
步骤一、制作预埋件,预埋件包括钢板及间隔设于钢板背面的锚固杆,钢板上方和下方分别开有通孔,固定螺母焊接于钢板背面并且位于通孔位置,定位螺杆穿入通孔后拧于固定螺母,活动螺母拧于定位螺杆并且位于钢板正面,定位螺杆通过固定螺母和活动螺母紧固;
步骤二、剪力墙钢筋绑扎完毕后,将预埋件临时固定于剪力墙的设计位置,然后开始支设剪力墙混凝土浇筑模板,并使预埋件的钢板抵靠模板;
步骤三、剪力墙混凝土浇筑模板在预埋件的定位螺杆位置开孔,使得预埋件的定位螺杆穿出模板的孔位,活动螺母拧于定位螺杆并且抵靠模板表面;
步骤四、浇筑剪力墙混凝土,待达到拆模条件后,依次将活动螺母、模板和定位螺杆拆除,完成预埋件施工。
进一步,所述模板表面与活动螺母之间设置弹性垫片,提高定位螺杆紧固的可靠性。
由于本发明剪力墙钢结构预埋件免剔凿施工方法采用了上述技术方案,即本方法制作带有定位螺杆的预埋件,定位螺杆采用固定螺母和活动螺母紧固,剪力墙钢筋绑扎完毕后,将预埋件临时固定于剪力墙的设计位置,然后开始支设剪力墙混凝土浇筑模板,并使预埋件的钢板抵靠模板;模板在预埋件的定位螺杆位置开孔,使得预埋件的定位螺杆穿出模板的孔位;浇筑剪力墙混凝土,待达到拆模条件后,依次将活动螺母、模板、和定位螺杆拆除,完成预埋件施工。本方法克服传统剪力墙内预埋件施工的缺陷,在剪力墙混凝土浇筑后免剔凿即可实施钢结构与预埋件连接,有效提高了施工速度及效率。
附图说明
下面结合附图和实施方式对本发明作进一步的详细说明:
图1为本方法中预埋件结构示意图;
图2为本方法中预埋件在剪力墙钢筋内位置示意图;
图3为本方法中剪力墙混凝土模板支设示意图;
图4为采用本方法施工后预埋件设置于剪力墙的示意图。
具体实施方式
实施例如图1至图4所示,本发明剪力墙钢结构预埋件免剔凿施工方法包括如下步骤:
步骤一、制作预埋件,预埋件包括钢板1及间隔设于钢板1背面的锚固杆2,钢板1上方和下方分别开有通孔,固定螺母3焊接于钢板1背面并且位于通孔位置,定位螺杆4穿入通孔后拧于固定螺母3,活动螺母5拧于定位螺杆4并且位于钢板1正面,定位螺杆4通过固定螺母3和活动螺母5紧固;
步骤二、剪力墙钢筋7绑扎完毕后,将预埋件临时固定于剪力墙的设计位置,然后开始支设剪力墙混凝土浇筑模板8,并使预埋件的钢板1抵靠模板;
步骤三、剪力墙混凝土浇筑模板8在预埋件的定位螺杆4位置开孔,使得预埋件的定位螺杆4穿出模板8的孔位,活动螺母5拧于定位螺杆4并且抵靠模板8表面;
步骤四、浇筑剪力墙混凝土,待达到拆模条件后,依次将活动螺母5、模板8和定位螺杆4拆除,完成预埋件施工。
优选的,所述模板8表面与活动螺母5之间设置弹性垫片6,提高定位螺杆4紧固的可靠性。
本方法在剪力墙钢筋绑扎完毕后、剪力墙模板支撑前,首先将预埋件临时固定在设计位置上;然后在预埋件上拧入定位螺杆;开始支撑模板,模板上事先钻好孔,正好能容定位螺杆穿过;然后拧上活动螺母及弹性垫片,从而将预埋件与模板固定在一起;最后浇筑混凝土,待达到拆模条件后将活动螺母、垫片、模板和定位螺杆依次拆除即完成施工。
通过本方法设置的预埋件在剪力墙混凝土浇筑模板拆模后即可直接与钢结构连接,避免了混凝土剔凿工序,其施工工艺简单,便于施工现场的实际操作,且确保预埋件的施工质量,极大提高了施工速度及效率,节省了混凝土剔凿的人力成本。
Claims (2)
1.一种剪力墙钢结构预埋件免剔凿施工方法,其特征在于本方法包括如下步骤:
步骤一、制作预埋件,预埋件包括钢板及间隔设于钢板背面的锚固杆,钢板上方和下方分别开有通孔,固定螺母焊接于钢板背面并且位于通孔位置,定位螺杆穿入通孔后拧于固定螺母,活动螺母拧于定位螺杆并且位于钢板正面,定位螺杆通过固定螺母和活动螺母紧固;
步骤二、剪力墙钢筋绑扎完毕后,将预埋件临时固定于剪力墙的设计位置,然后开始支设剪力墙混凝土浇筑模板,并使预埋件的钢板抵靠模板;
步骤三、剪力墙混凝土浇筑模板在预埋件的定位螺杆位置开孔,使得预埋件的定位螺杆穿出模板的孔位,活动螺母拧于定位螺杆并且抵靠模板表面;
步骤四、浇筑剪力墙混凝土,待达到拆模条件后,依次将活动螺母、模板和定位螺杆拆除,完成预埋件施工。
2.根据权利要求1所述的剪力墙钢结构预埋件免剔凿施工方法,其特征在于:所述模板表面与活动螺母之间设置弹性垫片,提高定位螺杆紧固的可靠性。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811347246.0A CN109296204A (zh) | 2018-11-13 | 2018-11-13 | 剪力墙钢结构预埋件免剔凿施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811347246.0A CN109296204A (zh) | 2018-11-13 | 2018-11-13 | 剪力墙钢结构预埋件免剔凿施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109296204A true CN109296204A (zh) | 2019-02-01 |
Family
ID=65145890
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811347246.0A Pending CN109296204A (zh) | 2018-11-13 | 2018-11-13 | 剪力墙钢结构预埋件免剔凿施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109296204A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110005073A (zh) * | 2019-05-05 | 2019-07-12 | 江苏南通二建集团有限公司 | 一种非焊接平板固定预埋件及其固定方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101892738A (zh) * | 2010-08-20 | 2010-11-24 | 中太建设集团股份有限公司 | 一种预埋式脚手架连墙件及其施工方法 |
CN203684398U (zh) * | 2013-12-16 | 2014-07-02 | 中国建筑第六工程局有限公司 | 一种用于钢筋混凝土结构预埋件定位的装置 |
CN206815540U (zh) * | 2017-06-09 | 2017-12-29 | 廖永基 | 一种用于混凝土结构预埋件的定位装置 |
-
2018
- 2018-11-13 CN CN201811347246.0A patent/CN109296204A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101892738A (zh) * | 2010-08-20 | 2010-11-24 | 中太建设集团股份有限公司 | 一种预埋式脚手架连墙件及其施工方法 |
CN203684398U (zh) * | 2013-12-16 | 2014-07-02 | 中国建筑第六工程局有限公司 | 一种用于钢筋混凝土结构预埋件定位的装置 |
CN206815540U (zh) * | 2017-06-09 | 2017-12-29 | 廖永基 | 一种用于混凝土结构预埋件的定位装置 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110005073A (zh) * | 2019-05-05 | 2019-07-12 | 江苏南通二建集团有限公司 | 一种非焊接平板固定预埋件及其固定方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110847044B (zh) | 一种半预制装配式盖梁施工方法 | |
CN105569224A (zh) | 钢管混凝土边缘约束叠合整体式剪力墙及制备和安装方法 | |
CN106284655A (zh) | 预制混凝土梁柱栓接连接节点及连接方法 | |
CN105970803B (zh) | 装配式桥墩的抗剪耗能装置及施工方法 | |
CN205839985U (zh) | 装配式剪力墙连接装置 | |
CN107152104A (zh) | 装配式空腔剪力墙水平接缝齿槽式湿式连接结构 | |
CN204983669U (zh) | 一种与圈梁连接的构造柱的浇筑装置 | |
CN108005255A (zh) | 一种墙体的施工方法 | |
CN108775114A (zh) | 钢筋机械连接的预制装配混凝土梁柱连接结构及方法 | |
CN205976167U (zh) | 基于可拆卸式定位控制件现浇楼板结构 | |
CN205662838U (zh) | 预制节段拼装桥墩的预应力连接构造 | |
CN109296204A (zh) | 剪力墙钢结构预埋件免剔凿施工方法 | |
CN109440925A (zh) | 一种装配式混凝土结构节点连接预制件及其连接方式 | |
CN209243965U (zh) | 一种外墙板与楼板的装配节点 | |
CN204475714U (zh) | 一种快装式预制楼梯 | |
CN106049760A (zh) | 震后快速修复预制混凝土柱脚及其施工、维护方法 | |
CN106223477A (zh) | 一种预制钢筋混凝土构件连接方法 | |
CN105951987A (zh) | 次框架外置永久性铝板外模后浇节点及施工方法 | |
CN217000873U (zh) | 一种飘窗组件 | |
CN215563552U (zh) | 一种基于超高性能混凝土模板的预制墙板竖向连接构造 | |
CN206158192U (zh) | 一种砼面上混凝土泵管的简易固定装置 | |
CN104911999A (zh) | 深埋锚施工方法 | |
CN205382595U (zh) | 钢管混凝土边缘约束叠合整体式剪力墙 | |
CN209538423U (zh) | 外墙浇筑保温模板 | |
CN207846677U (zh) | 首层竖向构件与地下室顶板的延性连接构造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190201 |
|
RJ01 | Rejection of invention patent application after publication |