CN104911999A - 深埋锚施工方法 - Google Patents
深埋锚施工方法 Download PDFInfo
- Publication number
- CN104911999A CN104911999A CN201510248665.9A CN201510248665A CN104911999A CN 104911999 A CN104911999 A CN 104911999A CN 201510248665 A CN201510248665 A CN 201510248665A CN 104911999 A CN104911999 A CN 104911999A
- Authority
- CN
- China
- Prior art keywords
- template
- anchor hole
- steel
- bamboo plywood
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 20
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims abstract description 32
- 235000017491 Bambusa tulda Nutrition 0.000 claims abstract description 32
- 241001330002 Bambuseae Species 0.000 claims abstract description 32
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims abstract description 32
- 239000011425 bamboo Substances 0.000 claims abstract description 32
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 28
- 239000010959 steel Substances 0.000 claims abstract description 28
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 19
- 239000004746 geotextile Substances 0.000 claims abstract description 11
- 239000004033 plastic Substances 0.000 claims abstract description 5
- 239000002002 slurry Substances 0.000 claims abstract description 5
- 230000005484 gravity Effects 0.000 claims description 16
- 230000002787 reinforcement Effects 0.000 claims description 8
- 238000007789 sealing Methods 0.000 abstract description 8
- 238000004519 manufacturing process Methods 0.000 abstract description 5
- 238000000034 method Methods 0.000 abstract description 4
- 239000011120 plywood Substances 0.000 abstract 6
- 238000010009 beating Methods 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 238000000275 quality assurance Methods 0.000 description 1
- 238000007569 slipcasting Methods 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本发明公开了深埋锚施工方法,它包括以下步骤:(1)在预留的锚孔位置安装与设计锚孔形状相适配的竹胶板模板,并将竹胶板模板与外模板固定;(2)在所述的竹胶板模板内填塞土工布以防止模板变形及混凝土浇筑时浆液流入锚孔;(3)在所述的竹胶板模板外部浇筑混凝土;(4)待竹胶板模板外部浇筑的混凝土达到100%强度时,拆除土工布及竹胶板模板,并进行预应力钢筋张拉;(5)完成预应力钢筋张拉后,采用钢模板封住锚孔口,在所述的钢模板上开有注浆口;(6)采用塑料软管通过注浆口向锚孔中送入自流平砂浆,并用木棒捶打钢模板使自流平砂浆密实,待自流平砂浆强度符合设计要求时,拆除钢模板。采用本方法降低了成本并缩短了制作周期。
Description
技术领域
本发明涉及土木工程领域,具体来说涉及深埋锚施工方法。
背景技术
随着我国综合实力的飞速发展,土木工程建设得到了大规模的开展,使得预应力施工技术日趋成熟。在桥梁进行后张法预应力施工时,深埋锚工艺被越来越多的采用。而我们传统的深埋锚施工工艺,成孔时往往采用的是钢套筒,其缺点在于成本造价高,制作周期长,施工后不能被拆除,使封锚混凝土与原混凝土中间夹一层钢板,导致钢板锈蚀严重,做好的钢套筒再次加工困难。另外,深埋锚在注浆封锚过程中通常采用的普通型号混凝土,其缺点在于封锚时,流动性差,细小空隙不能被完全填充,造成封锚强度低,空隙容易被外界雨水等侵蚀。
发明内容
本发明的目的在于克服已有技术的不足,提供一种不仅降低了施工成本,而且制作周期短,满足混凝土强度要求,而且施工速度快的深埋锚施工方法。
为达到上述目的,本发明采用下述技术方案:
本发明的深埋锚施工方法,它包括以下步骤:
(1)在预留的锚孔位置安装与设计锚孔形状相适配的竹胶板模板,并将竹胶板模板与外模板固定;
(2)在所述的竹胶板模板内填塞土工布以防止模板变形及混凝土浇筑时浆液流入锚孔;
(3)在所述的竹胶板模板外部浇筑混凝土;
(4)待竹胶板模板外部浇筑的混凝土达到100%强度时,拆除土工布及竹胶板模板,并进行预应力钢筋张拉;
(5)完成预应力钢筋张拉后,采用钢模板封住锚孔口,在所述的钢模板上开有注浆口;
(6)采用塑料软管通过注浆口向锚孔中送入自流平砂浆,并用木棒捶打钢模板使自流平砂浆密实,待自流平砂浆强度符合设计要求时,拆除钢模板。
本发明的有益效果是:
1.降低成本、缩短制作周期:采用竹胶板代替钢套筒不仅降低了施工成本,而且还解决的钢套筒制作周期长、不可重复利用的问题。
2.质量保障、绿色环保:采用自流平砂浆解决了深埋锚在封锚时强度低的问题;并且自流平砂浆是一种绿色环保产品,有利于保护环境。
附图说明
图1为本发明的深埋锚施工方法中锚孔模板安装及土工布填塞示意图;
图2为本发明深埋锚施工方法自流平砂浆封锚示意图。
具体实施方式
下面结合附图和具体实施例对本发明的使用作进一步说明。
如附图所示的本发明的深埋锚施工方法,它包括以下步骤:
(1)在预留的锚孔位置安装与设计锚孔形状相适配的竹胶板模板2,并将竹胶板模板2与外模板固定;
(2)在所述的竹胶板模板内填塞土工布1以防止模板变形及混凝土3浇筑时浆液流入锚孔;
(3)在所述的竹胶板模板外部浇筑混凝土3;
(4)待竹胶板模板外部浇筑的混凝土3达到100%强度时,拆除土工布及竹胶板模板,并进行预应力钢筋张拉;
(5)完成预应力钢筋张拉后,采用钢模板封住锚孔口,在所述的钢模板4上开有注浆口;
(6)采用塑料软管通过注浆口向锚孔中送入自流平砂浆5,并用木棒捶打钢模板使自流平砂浆密实,待自流平砂浆强度符合设计要求时,拆除钢模板。
实施例1
(1)在预留的锚孔位置安装与设计锚孔形状相适配的竹胶板模板2,并将竹胶板模板2与外模板固定;
(2)在所述的竹胶板模板内填塞土工布1以防止模板变形及混凝土3浇筑时浆液流入锚孔;
(3)在所述的竹胶板模板外部浇筑混凝土3;
(4)待竹胶板模板外部浇筑的混凝土3达到100%强度时,拆除土工布及竹胶板模板,并进行预应力钢筋张拉;
(5)完成预应力钢筋张拉后,采用钢模板封住锚孔口,在所述的钢模板4上开有注浆口;
(6)采用塑料软管通过注浆口向锚孔中送入自流平砂浆5,并用木棒捶打钢模板使自流平砂浆密实,待自流平砂浆强度符合设计要求时,拆除钢模板。
采用本方法,采用竹胶板进行成孔施工拆除方便,造价低廉,而且还可多次重复利用;采用自流平砂浆进行封锚施工,不仅能充分的填充预留孔中的各个空隙,满足强度要求,而且施工速度快,经济效益高。
Claims (1)
1.深埋锚施工方法,其特征在于,它包括以下步骤:
(1)在预留的锚孔位置安装与设计锚孔形状相适配的竹胶板模板,并将竹胶板模板与外模板固定;
(2)在所述的竹胶板模板内填塞土工布以防止模板变形及混凝土浇筑时浆液流入锚孔;
(3)在所述的竹胶板模板外部浇筑混凝土;
(4)待竹胶板模板外部浇筑的混凝土达到100%强度时,拆除土工布及竹胶板模板,并进行预应力钢筋张拉;
(5)完成预应力钢筋张拉后,采用钢模板封住锚孔口,在所述的钢模板上开有注浆口;
(6)采用塑料软管通过注浆口向锚孔中送入自流平砂浆,并用木棒捶打钢模板使自流平砂浆密实,待自流平砂浆强度符合设计要求时,拆除钢模板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510248665.9A CN104911999B (zh) | 2015-05-15 | 2015-05-15 | 深埋锚施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510248665.9A CN104911999B (zh) | 2015-05-15 | 2015-05-15 | 深埋锚施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104911999A true CN104911999A (zh) | 2015-09-16 |
CN104911999B CN104911999B (zh) | 2016-08-17 |
Family
ID=54081405
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510248665.9A Active CN104911999B (zh) | 2015-05-15 | 2015-05-15 | 深埋锚施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104911999B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106436576A (zh) * | 2016-08-24 | 2017-02-22 | 广西长长路桥建设有限公司 | 一种斜拉桥主塔环向预应力施工工法 |
CN106638307A (zh) * | 2015-11-04 | 2017-05-10 | 襄阳中铁宏吉工程技术有限公司 | 一种深埋锚具 |
CN108824198A (zh) * | 2018-06-27 | 2018-11-16 | 中国二冶集团有限公司 | 一种深埋锚孔及模板 |
CN109162287A (zh) * | 2018-11-02 | 2019-01-08 | 浙江省工程物探勘察院 | 适用于岩质边坡随机锚杆加固的外锚头结构及其施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2350429Y (zh) * | 1998-11-08 | 1999-11-24 | 周志祥 | 横张预应力砼空心板桥 |
KR20070113166A (ko) * | 2007-10-04 | 2007-11-28 | 정찬핵 | 개선된 프리스트레스트 강재보의 제작방법과 이를 이용한교량시공방법 |
CN201704628U (zh) * | 2010-03-16 | 2011-01-12 | 中国建筑土木建设有限公司 | 箱梁梁端锚穴封堵模板 |
CN202416879U (zh) * | 2011-12-27 | 2012-09-05 | 广东省长大公路工程有限公司 | 一种适用于预应力深埋锚的延长筒装置 |
KR20140076005A (ko) * | 2012-12-12 | 2014-06-20 | (주)에스앤씨산업 | 분절식 강합성 거더교 및 이의 시공방법 |
-
2015
- 2015-05-15 CN CN201510248665.9A patent/CN104911999B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2350429Y (zh) * | 1998-11-08 | 1999-11-24 | 周志祥 | 横张预应力砼空心板桥 |
KR20070113166A (ko) * | 2007-10-04 | 2007-11-28 | 정찬핵 | 개선된 프리스트레스트 강재보의 제작방법과 이를 이용한교량시공방법 |
CN201704628U (zh) * | 2010-03-16 | 2011-01-12 | 中国建筑土木建设有限公司 | 箱梁梁端锚穴封堵模板 |
CN202416879U (zh) * | 2011-12-27 | 2012-09-05 | 广东省长大公路工程有限公司 | 一种适用于预应力深埋锚的延长筒装置 |
KR20140076005A (ko) * | 2012-12-12 | 2014-06-20 | (주)에스앤씨산업 | 분절식 강합성 거더교 및 이의 시공방법 |
Non-Patent Citations (1)
Title |
---|
李维洲、文兆全: "杭州湾跨海大桥南航道桥主塔施工关键技术", 《中国港湾建设》, no. 4, 28 October 2008 (2008-10-28), pages 50 - 55 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638307A (zh) * | 2015-11-04 | 2017-05-10 | 襄阳中铁宏吉工程技术有限公司 | 一种深埋锚具 |
CN106436576A (zh) * | 2016-08-24 | 2017-02-22 | 广西长长路桥建设有限公司 | 一种斜拉桥主塔环向预应力施工工法 |
CN108824198A (zh) * | 2018-06-27 | 2018-11-16 | 中国二冶集团有限公司 | 一种深埋锚孔及模板 |
CN109162287A (zh) * | 2018-11-02 | 2019-01-08 | 浙江省工程物探勘察院 | 适用于岩质边坡随机锚杆加固的外锚头结构及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104911999B (zh) | 2016-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204826426U (zh) | 一种钢筋连接用灌浆套筒 | |
CN209339466U (zh) | 一种装配式女儿墙施工结构 | |
CN104314314A (zh) | 一种灌浆连接施工方法 | |
CN208981531U (zh) | 一种预制装配式女儿墙连接结构 | |
CN105178202A (zh) | 一种波纹钢管纤维增强粉末混凝土复合加固混凝土桥墩的方法 | |
CN208763204U (zh) | 一种低层装配式建筑预制墙板竖向连接构造 | |
CN204826429U (zh) | 一种预制混凝土构件钢筋灌浆连接件 | |
CN105064625A (zh) | 一种钢筋连接用灌浆套筒及钢筋连接方法 | |
CN104963289A (zh) | 一种异形墩柱大体积混凝土整体一次性浇筑施工方法 | |
CN104911999A (zh) | 深埋锚施工方法 | |
CN105019606A (zh) | 一种预制混凝土构件钢筋灌浆连接件及连接方法 | |
CN105970803A (zh) | 装配式桥墩的抗剪耗能装置及施工方法 | |
CN204676714U (zh) | 止水钢板带及施工缝结构 | |
CN104018614B (zh) | 预制混凝土组装板的制备和整体建筑构成方法 | |
CN103741949B (zh) | 竖向结构与水平结构之间的接缝处理方法 | |
CN205662838U (zh) | 预制节段拼装桥墩的预应力连接构造 | |
CN202164545U (zh) | 竖向预应力孔道联通压浆管 | |
CN208168479U (zh) | 一种检查坑预制柱结构 | |
CN110318463A (zh) | 一种基于磷镁材料的预制柱与梁的连接结构及施工方法 | |
CN211080782U (zh) | 一种灌浆套筒 | |
CN204238264U (zh) | 一种基础底板后浇带结构 | |
CN103088900A (zh) | 预制拼装式雨水口及其施工方法 | |
CN103243913B (zh) | 装配式剪力墙建筑上下层连接处灌浆层的封堵方法 | |
CN110424635A (zh) | 一种灌浆套筒及其施工方法 | |
CN105178451A (zh) | 装配式建筑外墙干挂节点的防腐结构及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |