A kind of roadbed side slope rockbolt installation device Download PDFInfo
- Publication number
- CN109281323A CN109281323A CN201811235117.2A CN201811235117A CN109281323A CN 109281323 A CN109281323 A CN 109281323A CN 201811235117 A CN201811235117 A CN 201811235117A CN 109281323 A CN109281323 A CN 109281323A
- Authority
- CN
- China
- Prior art keywords
- hoist engine
- operating platform
- side slope
- long rails
- installation device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 31
- 238000005553 drilling Methods 0.000 claims abstract description 21
- 238000010276 construction Methods 0.000 abstract description 10
- 238000000034 method Methods 0.000 abstract description 7
- 230000008901 benefit Effects 0.000 abstract description 4
- 230000001681 protective effect Effects 0.000 description 3
- 238000004140 cleaning Methods 0.000 description 2
- 239000000428 dust Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 241001074085 Scophthalmus aquosus Species 0.000 description 1
- 238000007664 blowing Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Earth Drilling (AREA)
Abstract
The present invention provides a kind of roadbed side slope rockbolt installation device, including control system, hole-drilling system, operating platform, long rails, cross track, hoist engine, the long rails and cross track are arranged in side slope plane, the hole-drilling system setting is on the operational platform, the hoist engine includes hoist engine A and hoist engine B, the operating platform is parallel to ground and is arranged on long rails, bottom is fixedly connected with A-frame, the long rails bottom is removably set on cross track, the hoist engine A is arranged in operating platform bottom, control operating platform moves up and down on long rails, the hoist engine B is arranged in cross track bottom, transversely track laterally moves control long rails.Processing cost of the present invention is low, easy to operate, can effectively solve the problem that complex process existing for conventional anchor installation in the process, installation speed are slow, worker's physical power loss is big, ineffective problem, improves construction efficiency, while improving economic benefit.
Description
Technical field
The invention belongs to technical field of road construction, and in particular to a kind of roadbed side slope rockbolt installation device.
Background technique
When roadbed side slope protective mooring rod is installed, generally use manually installed.Side slope protection rockbolt installation Job Operations method
It is as follows: before construction, to set up scaffold, manual cleaning surface surface dust and loosening rock, while construction survey along slope surface, make anchor
Rod aperture position, worker stand on scaffold, are added using air rock drill by design aperture, design angle with Soil Anchor Design length
0.2m or so drills, and drilling terminates, and using high-pressure blast aperture blowing, then dust in cleaning hole starts to install anchor pole.
Currently, conventional anchor installation process is complicated, installation speed is slow, worker's physical power loss is big, working efficiency
It is low.
Summary of the invention
The present invention provides a kind of roadbed side slope rockbolt installation device, overcomes existing work during conventional anchor installation
Skill is complicated, installation speed is slow, worker's physical power loss is big, ineffective problem.
The technical scheme is that a kind of roadbed side slope rockbolt installation device, including control system, hole-drilling system, behaviour
Make platform, long rails, cross track, hoist engine, the long rails and cross track are arranged in side slope plane, the brill
Hole system is arranged on the operational platform, and the hoist engine includes hoist engine A and hoist engine B, and the operating platform is parallel to ground
It is arranged on long rails, bottom is fixedly connected with A-frame, and the long rails bottom is removably set on cross track
On, the hoist engine A setting controls operating platform and moves up and down on long rails in operating platform bottom, the hoist engine B
Setting is in cross track bottom, and controlling long rails, transversely track laterally moves.
Scheme further, the cross track include the bottom for being separately positioned on slope height, at 1/3, at 2/3 and top
Four rail at end.
Further, the operating platform top is surrounded by enclosing to scheme.
Further, the control system is connect scheme with hole-drilling system, hoist engine, control hole-drilling system drilling, control
Hoist engine work.
Further, the hole-drilling system includes cart and down-the-hole drill to scheme.
Further, the A-frame bottom is set there are four pulley scheme, facilitates the movement of operating platform.
Further, the operating platform is equipped with hand-operated brake to scheme.
Further, electric hoist is installed at the top of the long rails to scheme, passes through wirerope attended operation platform, control
Operating platform moves up and down.
The invention has the advantages that this roadbed side slope protective mooring rod mounting device provided by the invention, processing cost is low, makes
With easy to operate, it can effectively solve the problem that existing complex process during conventional anchor installation, installation speed be slow, Gong Renti
Big, ineffective problem is lost in power, improves construction efficiency, while improving economic benefit.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Wherein: 1, control system, 2, hole-drilling system, 3, operating platform, 4, hoist engine A, 5, A-frame, 6, pulley, 7, elevator
Machine B, 8, long rails, 9, cross track, 10, side slope, 11, enclosing.
Specific embodiment
Clear and complete description is done to the present invention with reference to the accompanying drawing, so that those skilled in the art is not needing to make
Under conditions of creative work, it can sufficiently implement the present invention.
A specific embodiment of the invention: as shown in Figure 1, a kind of roadbed side slope rockbolt installation device, including control system
1, hole-drilling system 2, operating platform 3, long rails 8, cross track 9, hoist engine, the long rails 8 and cross track 9 are arranged
In 10 plane of side slope, the hole-drilling system 2 is arranged on operating platform 3, and the hoist engine includes hoist engine A4 and hoist engine
B7, the operating platform 3 are parallel to ground and are arranged on long rails 8, and bottom is fixedly connected with A-frame 5, the longitudinal direction
8 bottom of track is removably set on cross track 9, and the hoist engine A4 setting controls operating platform in 3 bottom of operating platform
3 move up and down on long rails 8, and the hoist engine B7 setting controls the transversely rail of long rails 8 in 9 bottom of cross track
Road 9 laterally moves.
Further, the cross track 9 include the bottom for being separately positioned on 10 height of side slope, at 1/3, at 2/3 and top
Four rail at end.
Further, 3 top of operating platform is surrounded by enclosing 11, protection construction personnel's safety.
Further, the control system 1 is connect with hole-drilling system 2, hoist engine, and control hole-drilling system 2 drills, control volume
Raise machine work.
Further, the hole-drilling system 2 includes cart and down-the-hole drill, and down-the-hole drill is on cart, control system control
Down-the-hole drill processed drills in side slope 11.
Further, 3 bottom of A-frame is set there are four pulley 6, facilitates the movement of operating platform 3.
Further, the operating platform 3 is equipped with hand-operated brake, and double insurance guarantees construction safety.
Further, electric hoist is installed at the top of the long rails 8, by wirerope attended operation platform 3, is controlled manually
Operating platform 3 processed moves up and down, and carries out double insurance.
In the use of the present invention, being placed in 10 slope surface of slope construction before carrying out the operation of roadbed side slope rockbolt installation
A kind of roadbed side slope rockbolt installation device, hole-drilling system 2 are arranged on movable operation platform 3, and operating platform 3 is located at longitudinal rail
On road 8, there is a hoist engine A4 in 3 bottom lower end of operating platform, cross track 9 be the bottom for being located at 10 height of side slope, at 1/3,
Four rail at 2/3 and top are located at side slope perpendicular to having another hoist engine B7 on the slope foot rail under operating platform 3
On the lateral rail of the bottom of 10 height.
When rockbolt installation operation, there is a hoist engine A4 in 3 bottom lower end of operating platform, controls operating platform 3 along longitudinal direction
Track 8 is moved up and down to construction survey and is made at anchor pole hole location, and control system 1 controls down-the-hole drill and drills and pacify in side slope 10
Anchor pole is filled, after this root rockbolt installation, repeats above procedure until this row rockbolt installation finishes, perpendicular under operating platform 3
Slope foot rail on have another hoist engine B7, control long rails 8 drive operating platform 3 to move left and right along cross track 9
To next row rockbolt installation position.In this way, existing complex process, installation speed during avoiding conventional anchor installation
Degree is slow, worker's physical power loss is big, ineffective problem, the manually installed anchor pole of general subgrade side slope protection, vertical every row 4
The anchor pole of length 11.5m, daily 12 workers can install 4 row's anchor poles, totally 16, be pacified using this roadbed side slope protective mooring rod
Install it is standby, daily only need 4 workers, 6 row's anchor poles can be installed, totally 24,2/3 labour is saved, shorten 1/3 peace
ETL estimated time of loading improves construction efficiency, while improving economic benefit.
Presently preferred embodiments of the present invention is described above, it should be pointed out that the invention is not limited to above-mentioned
Particular implementation, devices and structures not described in detail herein should be understood as gives reality with the common mode in this field
It applies;Anyone skilled in the art, without departing from the scope of the technical proposal of the invention, technology according to the present invention
Essence any simple modifications, equivalents, and modifications made to the above embodiment still fall within technical solution of the present invention protection
In the range of.
Claims (8)
1. a kind of roadbed side slope rockbolt installation device, which is characterized in that including control system, hole-drilling system, operating platform, longitudinal direction
Track, cross track, hoist engine, the long rails and cross track are arranged in side slope plane, the hole-drilling system setting
On the operational platform, the hoist engine includes hoist engine A and hoist engine B, and the operating platform is parallel to ground and is arranged in longitudinal direction
On track, bottom is fixedly connected with A-frame, and the long rails bottom is removably set on cross track, the elevator
Machine A setting controls operating platform and moves up and down on long rails, the hoist engine B is arranged in transverse direction in operating platform bottom
Rail base, transversely track laterally moves control long rails.
2. a kind of roadbed side slope rockbolt installation device according to claim 1, which is characterized in that the cross track includes point
The bottom of slope height is not set, at 1/3, at 2/3 and four rail on top.
3. a kind of roadbed side slope rockbolt installation device according to claim 2, which is characterized in that the control system and drilling
System, hoist engine connection, control hole-drilling system drilling, control hoist engine work.
4. a kind of roadbed side slope rockbolt installation device according to claim 3, which is characterized in that the operating platform top four
Week is equipped with enclosing.
5. a kind of roadbed side slope rockbolt installation device according to claim 3, which is characterized in that the hole-drilling system includes pushing away
Vehicle and down-the-hole drill.
6. a kind of roadbed side slope rockbolt installation device according to claim 3, which is characterized in that the A-frame bottom is set
There are four pulleys, facilitate the movement of operating platform.
7. a kind of roadbed side slope rockbolt installation device according to claim 3, which is characterized in that the operating platform is equipped with
Hand-operated brake.
8. a kind of roadbed side slope rockbolt installation device according to claim 3, which is characterized in that the top of the long rails
Electric hoist is installed, by wirerope attended operation platform, operating platform is controlled and moves up and down.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811235117.2A CN109281323A (en) | 2018-10-23 | 2018-10-23 | A kind of roadbed side slope rockbolt installation device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811235117.2A CN109281323A (en) | 2018-10-23 | 2018-10-23 | A kind of roadbed side slope rockbolt installation device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109281323A true CN109281323A (en) | 2019-01-29 |
Family
ID=65178326
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811235117.2A Pending CN109281323A (en) | 2018-10-23 | 2018-10-23 | A kind of roadbed side slope rockbolt installation device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109281323A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110004953A (en) * | 2019-05-10 | 2019-07-12 | 涪特智能装备(重庆)有限公司 | A kind of side slope or retaining wall construction trolley |
CN110723692A (en) * | 2019-09-30 | 2020-01-24 | 中国一冶集团有限公司 | Movable operation platform for slope construction |
CN113846657A (en) * | 2021-09-18 | 2021-12-28 | 中国一冶集团有限公司 | Supplementary side slope protection step device |
CN113931132A (en) * | 2021-11-11 | 2022-01-14 | 浙江钱塘江水利建筑工程有限公司 | A ecological bag piles and builds device for ecological bank protection of hydraulic engineering |
CN114215335A (en) * | 2021-12-02 | 2022-03-22 | 中国水利水电第五工程局有限公司 | Movable construction platform for rock anchor beam of underground factory building |
CN114411816A (en) * | 2022-01-24 | 2022-04-29 | 江苏翰林正川工程技术有限公司 | Intelligent well lid tool to lock of two separation and reunion |
CN117684874A (en) * | 2024-02-04 | 2024-03-12 | 中国建筑第五工程局有限公司 | Drilling equipment of side slope |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005076404A (en) * | 2003-09-03 | 2005-03-24 | Kyodo Kensetsu Fujimuragumi:Kk | Transferable platform for slope drilling device |
CN203855967U (en) * | 2014-06-09 | 2014-10-01 | 中国葛洲坝集团股份有限公司 | Drilling and filling trolley on slope gallery |
CN105587113A (en) * | 2014-11-18 | 2016-05-18 | 中国葛洲坝集团股份有限公司 | Movable construction platform adapting to different slope surfaces |
CN205895138U (en) * | 2016-07-29 | 2017-01-18 | 中铁三局集团有限公司 | Supplementary utensil of side slope stock frame roof beam drilling |
CN107419733A (en) * | 2017-06-15 | 2017-12-01 | 中国水利水电第五工程局有限公司 | A kind of side slope down-the-hole drill drilling operation platform |
CN108468330A (en) * | 2018-05-04 | 2018-08-31 | 日照天泰建筑安装工程有限公司 | Pier roof-bolter |
CN207847548U (en) * | 2018-01-16 | 2018-09-11 | 中铁十九局集团第七工程有限公司 | A kind of movable drilling platform of side slope construction |
CN209308048U (en) * | 2018-10-23 | 2019-08-27 | 中交二公局第三工程有限公司 | A kind of roadbed side slope rockbolt installation device |
-
2018
- 2018-10-23 CN CN201811235117.2A patent/CN109281323A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005076404A (en) * | 2003-09-03 | 2005-03-24 | Kyodo Kensetsu Fujimuragumi:Kk | Transferable platform for slope drilling device |
CN203855967U (en) * | 2014-06-09 | 2014-10-01 | 中国葛洲坝集团股份有限公司 | Drilling and filling trolley on slope gallery |
CN105587113A (en) * | 2014-11-18 | 2016-05-18 | 中国葛洲坝集团股份有限公司 | Movable construction platform adapting to different slope surfaces |
CN205895138U (en) * | 2016-07-29 | 2017-01-18 | 中铁三局集团有限公司 | Supplementary utensil of side slope stock frame roof beam drilling |
CN107419733A (en) * | 2017-06-15 | 2017-12-01 | 中国水利水电第五工程局有限公司 | A kind of side slope down-the-hole drill drilling operation platform |
CN207847548U (en) * | 2018-01-16 | 2018-09-11 | 中铁十九局集团第七工程有限公司 | A kind of movable drilling platform of side slope construction |
CN108468330A (en) * | 2018-05-04 | 2018-08-31 | 日照天泰建筑安装工程有限公司 | Pier roof-bolter |
CN209308048U (en) * | 2018-10-23 | 2019-08-27 | 中交二公局第三工程有限公司 | A kind of roadbed side slope rockbolt installation device |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110004953A (en) * | 2019-05-10 | 2019-07-12 | 涪特智能装备(重庆)有限公司 | A kind of side slope or retaining wall construction trolley |
CN110004953B (en) * | 2019-05-10 | 2023-11-21 | 涪特智能装备(重庆)有限公司 | Slope or retaining wall construction trolley |
CN110723692A (en) * | 2019-09-30 | 2020-01-24 | 中国一冶集团有限公司 | Movable operation platform for slope construction |
CN113846657A (en) * | 2021-09-18 | 2021-12-28 | 中国一冶集团有限公司 | Supplementary side slope protection step device |
CN113931132A (en) * | 2021-11-11 | 2022-01-14 | 浙江钱塘江水利建筑工程有限公司 | A ecological bag piles and builds device for ecological bank protection of hydraulic engineering |
CN114215335A (en) * | 2021-12-02 | 2022-03-22 | 中国水利水电第五工程局有限公司 | Movable construction platform for rock anchor beam of underground factory building |
CN114411816A (en) * | 2022-01-24 | 2022-04-29 | 江苏翰林正川工程技术有限公司 | Intelligent well lid tool to lock of two separation and reunion |
CN114411816B (en) * | 2022-01-24 | 2023-09-15 | 江苏翰林正川工程技术有限公司 | Intelligent well lid tool to lock of two separation and reunions |
CN117684874A (en) * | 2024-02-04 | 2024-03-12 | 中国建筑第五工程局有限公司 | Drilling equipment of side slope |
CN117684874B (en) * | 2024-02-04 | 2024-04-19 | 中国建筑第五工程局有限公司 | Drilling equipment of side slope |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109281323A (en) | A kind of roadbed side slope rockbolt installation device | |
CN201664775U (en) | Long-distance drilling device of top plate | |
CN104879061A (en) | Multifunctional self-propelled portal wagon drill | |
CN104384160A (en) | Device and method for cleaning vertical feeding pipe | |
CN102704707B (en) | Automatic wall dismantling device | |
CN209308048U (en) | A kind of roadbed side slope rockbolt installation device | |
CN105256704A (en) | Machine-mounted bush hammer and concrete surface bush hammering method | |
CN102797485B (en) | Rotary accommodating platform for hydraulic support for fully mechanized mining for coal mine | |
CN202900291U (en) | Rotation placing platform of coal mine combined mining hydraulic support | |
CN205152766U (en) | Machine carries formula chisel hair machine | |
CN209941704U (en) | Side slope or retaining wall construction trolley | |
CN106192621A (en) | High-speed railway track plate lays precision high-speed adjustment device and method | |
CN217106994U (en) | Electric-driven movable mining raise tunneling working platform | |
CN213475232U (en) | Automatic installation equipment of construction protection network | |
CN206128160U (en) | Operation device that open caisson sinks unearthedly | |
CN101537982B (en) | Underground orbital transfer hydraulic crane truck | |
CN202055748U (en) | Rotary drilling rig | |
CN103387114B (en) | A kind of chute installation device of drag conveyer at front part of coalface | |
KR101599698B1 (en) | Tunnel Operation Platform | |
CN210152652U (en) | Multifunctional trolley suitable for drilling and blasting construction | |
CN114293548A (en) | Auxiliary device for anchor rod construction and using method thereof | |
CN202806903U (en) | Under-pressure operating vehicle lifting wellhead cab device | |
CN202645043U (en) | Automatic wall dismantling device | |
CN214485773U (en) | Quick precipitation equipment of water conservancy construction | |
JP3134591U (en) | Slope drilling device using an external operation panel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |