CN105587113A - Movable construction platform adapting to different slope surfaces - Google Patents

Movable construction platform adapting to different slope surfaces Download PDF

Info

Publication number
CN105587113A
CN105587113A CN201410653848.4A CN201410653848A CN105587113A CN 105587113 A CN105587113 A CN 105587113A CN 201410653848 A CN201410653848 A CN 201410653848A CN 105587113 A CN105587113 A CN 105587113A
Authority
CN
China
Prior art keywords
platform
operation platform
construction platform
construction
walking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410653848.4A
Other languages
Chinese (zh)
Inventor
王科
曹中升
李国建
孟德志
盛信平
乐运红
关小猛
王小勇
常胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN201410653848.4A priority Critical patent/CN105587113A/en
Publication of CN105587113A publication Critical patent/CN105587113A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

The invention relates to a movable construction platform adapting to different slope surfaces. Two sets of rear walking wheels are fixed to the rear end of the bottom of the construction platform, and two sets of adjustable walking wheel devices are arranged at the front end of the bottom of the construction platform. A steel wire rope of a winch is connected with the construction platform through a guide wheel. Front walking wheels are arranged at the front ends of the adjustable walking wheel devices, the middles of the adjustable walking wheel devices are connected with an inclined rod at the bottom of the construction platform through rotary shafts, and cross connecting rods are arranged at the rear ends of the adjustable walking wheel devices so that the two sets of adjustable walking wheel devices can be connected into a whole. The adjustable walking wheel devices and chain hoists are used cooperatively, the front walking wheels of the construction platform can be adjusted to adapt to the changes of the gradient of the slope surfaces, the construction platform and a scaffold steel pipe operation platform on the upper portion of the construction platform are in a horizontal state all the time, and operation of construction personnel is facilitated. The construction platform is pulled by the winch and the guide wheel to move and walk on the slope surfaces with the gradient changes, and the problems that due to the fact that a fastener type scaffold or a movable scaffold is erected for operation, the construction investment is high, the construction period is long, and the safety performance is low are solved.

Description

A kind of domatic removable operation platforms of difference that adapt to
Technical field
The present invention relates to a kind of operation platform, be specifically related to a kind of different domatic removable operation platforms that adapt to.
Background technology
In hydraulic structure, operated by rotary motion has the runners such as bottom outlet, mesopore or table hole, for ensureing that the runner of building moulding meets design requirement, and need carry out defect processing work to aperture side wall and underplate concrete. The common practice is to set up design of coupler scaffold or movable Scaffold carries out operation. It is large that design of coupler scaffold is set up quantities, and materials demand amount is many, and taking to tear open wastes time and energy, and can not move, and work efficiency is low, also need bury the anchoring pieces such as locating cone underground at both sides abutment wall, fixes scaffold by locating cone, affects runner side wall repairing quality. The castor of traveling centering is set directly at scaffold upright rod bottom, larger to vertical rod stability influence, security reduce, and scaffold may because of bottom surface out-of-flatness occur deflection, clash into and damage side wall, affect construction quality; And runner bottom surface, aperture is curved surface and the domatic composition that is generally variation, the easy run-off the straight of traveling centering in the time of the slope change of bottom surface, construction safety hidden danger is large.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of different domatic removable operation platforms that adapt to, and can realize on slope change domatic and draw movably operation platform, carries out the defect processing work of side wall and underplate concrete. And simple in structure, flexible operation is set, security performance is high, improved efficiency of construction, reduced cost input, ensured construction safety.
For solving the problems of the technologies described above, the technical scheme that the present invention takes is: a kind of domatic removable operation platforms of difference that adapt to, comprise operation platform, rear end, operation platform bottom is fixed with two groups of walking trailing wheels, front ends two groups of adjustable caster devices, the steel wire rope of hoist engine is connected with operation platform by directive wheel, and traction construction platform can make it on the slope of slope change, be movably walking; Described adjustable caster device front end has walking front-wheel, and middle part is connected by turning cylinder with the oblique rod member of operation platform bottom, and rear end is provided with transverse link two groups of adjustable caster devices are connected into entirety.
Operation platform top is provided with many group bottle gouards moved by hands, the transverse link that the chain of bottle gouard moved by hands arranges through adjustable caster device rear end, and chain tail end is fixed in the internal rod of operation platform.
Described operation platform is triangular frame structure.
Described operation platform top is fixed with scaffolding steel pipe job platform.
Operation platform two sides of tail is provided with crashproof wheel.
A kind of different domatic removable operation platforms that adapt to provided by the invention, be used in conjunction with by adjustable caster device and bottle gouard moved by hands, the walking front-wheel that can adjust operation platform adapts to the variation of the slope gradient, make the scaffolding steel pipe job platform on operation platform and top thereof all the time in level, convenient construction personnel carry out operation at an upper portion thereof; The hoist engine and the directive wheel that arrange can be movably walking by traction construction platform on the slope of slope change, have solved the problems such as design of coupler scaffold is set up in employing or movable Scaffold carries out operation, and construction has high input, the construction period is long, security performance is low.
Brief description of the drawings
Below in conjunction with drawings and Examples, the invention will be further described:
Fig. 1 is the structure chart before slope change of the present invention.
Fig. 2 is the structure chart after slope change of the present invention.
Fig. 3 is the A-A cutaway view of Fig. 2.
Fig. 4 is operation platform front view.
Fig. 5 is operation platform right side view.
Fig. 6 is operation platform top plane view.
In figure: operation platform 1, steel pipe job platform 2, slope 3, hoist engine 4, directive wheel 5, steel wire rope 6, walking trailing wheel 7, walking front-wheel 8, adjustable caster device 9, bottle gouard moved by hands 10, turning cylinder 11, transverse link 12, chain 13, crashproofly takes turns 14, oblique rod member 15, side wall 16.
Detailed description of the invention
Structure of the present invention as shown in Figures 1 to 6, comprise operation platform 1, operation platform 1 rear end, bottom is fixed with two groups of walking trailing wheels 7, front ends two groups of adjustable caster devices 9, the steel wire rope 6 of hoist engine 4 is connected with operation platform 1 by directive wheel 5, and traction construction platform 1 can make it on the slope 3 of slope change, be movably walking; Described adjustable caster device 9 front ends have walking front-wheel 8, middle part is connected by turning cylinder 11 with the oblique rod member 15 of operation platform 1 bottom, adjustable caster device 9 can rotate centered by turning cylinder 11, thereby adjusts the variation of position adaptation slope 3 gradients of walking front-wheel 8; Rear end is provided with transverse link 12 two groups of adjustable caster devices 9 is connected into entirety, ensures that two groups of adjustable caster devices 9 rotate with equal angular.
Described operation platform 1 top is fixed with scaffolding steel pipe job platform 2, and the height of the height of steel pipe putting up platform and side wall 16 adapts, and workmen carries out the operations such as the reinforcement of concrete defect of side wall 16 at an upper portion thereof. The scaffolding steel pipe bottom of platform is welded and fixed firmly with operation platform 1 end face, and while preventing traction construction platform 1, steel pipe job platform 2 is shifted or topples, and ensures construction safety.
Described operation platform 1 is triangular frame structure, preferably adopts the strength and stiffness of section steel manufacture guarantee operation platform, the load that can bear upper falsework steel pipe job platform 2 and workmen and construction equipment.
Operation platform 1 top is provided with many group bottle gouards moved by hands 10, the transverse link 12 that the chain 13 of bottle gouard moved by hands 10 arranges through adjustable caster device 9 rear ends, and chain 13 tail ends are fixed in the internal rod of operation platform 1. In operation platform 1 walking process, in the time of slope 3 slope change, change chain 13 length of bottle gouard moved by hands 10 through transverse link 12, adjustable caster device 9 rotates centered by turning cylinder 11, thereby the position of adjusting walking front-wheel 8 adapts to the gradient after slope 3 changes, and makes the scaffolding steel pipe job platform 2 on operation platform 1 and top thereof all the time in level.
Operation platform 1 two sides of tail is provided with crashproofly takes turns 14, is to prevent from clashing into side wall 16 in operation platform 1 moving process, ensures that construction safety and protection side wall 16 are not damaged.
Described walking trailing wheel 7, walking front-wheel 8 and the crashproof 14 preferred solid rubber wheels of taking turns are to avoid damaging in wheel walking process base plate and side wall concrete.
In use procedure, as shown in Figure 1, apparatus of the present invention are in place, and hoist engine 4 traction construction platforms 1 move on slope, and workmen carries out the operation of side wall 16 and base plate on the scaffolding steel pipe job platform 2 on operation platform 1 and top. As shown in Figure 2, in the time of slope 3 slope change, workmen adjusts chain 13 length of bottle gouard moved by hands 10 through transverse link 12 on operation platform 1 end face, and adjustable caster device 9 is rotated centered by turning cylinder 11, thereby the position of adjusting walking front-wheel 8 adapts to the gradient after slope 3 changes, and the scaffolding steel pipe job platform 2 on operation platform 1 and top thereof ensures level all the time, on domatic after variation of traction construction chassis 1, move workmen's operation on scaffolding steel pipe job platform 2.

Claims (5)

1. one kind adapts to different domatic removable operation platforms, it is characterized in that, comprise operation platform (1), rear end, operation platform (1) bottom is fixed with two groups of walking trailing wheels (7), front end has two groups of adjustable caster devices (9), the steel wire rope (6) of hoist engine (4) is connected with operation platform (1) by directive wheel (5), and traction construction platform (1) can make to be movably walking on its slope in slope change (3); Described adjustable caster device (9) front end has walking front-wheel (8), middle part is connected by turning cylinder (11) with the oblique rod member (15) of operation platform (1) bottom, and rear end is provided with transverse link (12) two groups of adjustable caster devices (9) are connected into entirety.
2. the domatic removable operation platforms of difference that adapt to according to claim 1, it is characterized in that, operation platform (1) top is provided with many group bottle gouards moved by hands (10), the transverse link (12) that the chain (13) of bottle gouard moved by hands (10) arranges through adjustable caster device (9) rear end, chain (13) tail end is fixed in the internal rod of operation platform (1).
3. the domatic removable operation platforms of difference that adapt to according to claim 1, is characterized in that, described operation platform (1) is triangular frame structure.
4. according to the different domatic removable operation platforms of the adaptation described in claim 1 or 3, it is characterized in that, described operation platform (1) top is fixed with scaffolding steel pipe job platform (2).
5. adapt to according to claim 4 different domatic removable operation platforms, it is characterized in that: operation platform (1) two sides of tail is provided with crashproof wheel (14).
CN201410653848.4A 2014-11-18 2014-11-18 Movable construction platform adapting to different slope surfaces Pending CN105587113A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410653848.4A CN105587113A (en) 2014-11-18 2014-11-18 Movable construction platform adapting to different slope surfaces

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410653848.4A CN105587113A (en) 2014-11-18 2014-11-18 Movable construction platform adapting to different slope surfaces

Publications (1)

Publication Number Publication Date
CN105587113A true CN105587113A (en) 2016-05-18

Family

ID=55926994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410653848.4A Pending CN105587113A (en) 2014-11-18 2014-11-18 Movable construction platform adapting to different slope surfaces

Country Status (1)

Country Link
CN (1) CN105587113A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419733A (en) * 2017-06-15 2017-12-01 中国水利水电第五工程局有限公司 A kind of side slope down-the-hole drill drilling operation platform
CN109281323A (en) * 2018-10-23 2019-01-29 中交二公局第三工程有限公司 A kind of roadbed side slope rockbolt installation device
CN110700555A (en) * 2019-10-17 2020-01-17 黄子峰 Slope antiskid
CN112302534A (en) * 2020-10-19 2021-02-02 中交第二航务工程局有限公司 Slope anchor rod construction device and rapid construction method
CN112960610A (en) * 2021-02-01 2021-06-15 西安航空学院 Mountain slope is subsided and is restoreed and use draw gear
CN113089991A (en) * 2021-03-03 2021-07-09 芮海平 High-safety stall-time self-locking construction platform for slope construction
CN113107176A (en) * 2021-05-24 2021-07-13 中国十九冶集团有限公司 Method for erecting slope operation platform with various gradients
CN113187209A (en) * 2021-05-24 2021-07-30 中国十九冶集团有限公司 Slope operation platform
CN113279557A (en) * 2021-05-28 2021-08-20 青海送变电工程有限公司 Slope operating platform
CN115217312A (en) * 2022-08-25 2022-10-21 中国十七冶集团有限公司 Movable and adjustable slope operation platform and construction method thereof
CN116220329A (en) * 2023-05-08 2023-06-06 哈瑞克斯(南通)建筑科技有限公司 Spherical structural surface construction platform building device and building method thereof

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419733A (en) * 2017-06-15 2017-12-01 中国水利水电第五工程局有限公司 A kind of side slope down-the-hole drill drilling operation platform
CN109281323A (en) * 2018-10-23 2019-01-29 中交二公局第三工程有限公司 A kind of roadbed side slope rockbolt installation device
CN110700555B (en) * 2019-10-17 2021-08-03 义乌市丹航科技有限公司 Slope antiskid
CN110700555A (en) * 2019-10-17 2020-01-17 黄子峰 Slope antiskid
CN112302534A (en) * 2020-10-19 2021-02-02 中交第二航务工程局有限公司 Slope anchor rod construction device and rapid construction method
CN112960610A (en) * 2021-02-01 2021-06-15 西安航空学院 Mountain slope is subsided and is restoreed and use draw gear
CN113089991A (en) * 2021-03-03 2021-07-09 芮海平 High-safety stall-time self-locking construction platform for slope construction
CN113107176A (en) * 2021-05-24 2021-07-13 中国十九冶集团有限公司 Method for erecting slope operation platform with various gradients
CN113187209A (en) * 2021-05-24 2021-07-30 中国十九冶集团有限公司 Slope operation platform
CN113279557A (en) * 2021-05-28 2021-08-20 青海送变电工程有限公司 Slope operating platform
CN115217312A (en) * 2022-08-25 2022-10-21 中国十七冶集团有限公司 Movable and adjustable slope operation platform and construction method thereof
CN116220329A (en) * 2023-05-08 2023-06-06 哈瑞克斯(南通)建筑科技有限公司 Spherical structural surface construction platform building device and building method thereof
CN116220329B (en) * 2023-05-08 2023-09-22 南通宏梁建筑科技有限公司 Spherical structural surface construction platform building device and building method thereof

Similar Documents

Publication Publication Date Title
CN105587113A (en) Movable construction platform adapting to different slope surfaces
CN107338727B (en) Integrally-disassembled and assembled anti-collision wall template and walking type rail hanging and moving system thereof
CN104564104B (en) A kind of table system for tunnel-liner
CN102071798B (en) Hydraulic climbing system for wall-attached support frame
CN107191676B (en) Buried pipeline construction method
CN203923919U (en) Support cast-in-place case beam side sliding system
CN102659029B (en) Combined type movable hanger
CN202529736U (en) Combined movable lifting frame
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN204199658U (en) A kind ofly adapt to different domatic removable operation platform
CN205443933U (en) Be used for bridge to detect and maintain reinforcement equipment
CN108002244B (en) Hoisting system and method for high pier column steel bar formwork
CN203247031U (en) Hoisting device for curtain board transporting
CN104499706B (en) Hoistway formwork platform and construction method thereof
CN202176343U (en) Self-propelled multifunctional template trolley combining device
CN203795311U (en) Multi-leg high pier and slip form construction device
CN203904856U (en) Movable construction platform for construction outside bridge guardrail
CN203147030U (en) Mobile under-hanging operating platform for construction of laying gas pipeline along bridge
CN104372746B (en) The prefabricated post stretching Simple T-Girders note concrete form support of railroad bridge and mounting process thereof
CN207176732U (en) Segmented moves simple rack chassis
CN203613464U (en) Slip form construction cargo transportation device
CN204324739U (en) XJ type manual gate type hoisting crane
CN106351441A (en) Chimney creeping formwork construction device and construction method
CN103669219B (en) Many limbs height pier is with sliding construction equipment
CN204551277U (en) Tunnel Bridge Erector telescopic support leg device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160518

WD01 Invention patent application deemed withdrawn after publication