CN205895138U - Supplementary utensil of side slope stock frame roof beam drilling - Google Patents

Supplementary utensil of side slope stock frame roof beam drilling Download PDF

Info

Publication number
CN205895138U
CN205895138U CN201620806032.5U CN201620806032U CN205895138U CN 205895138 U CN205895138 U CN 205895138U CN 201620806032 U CN201620806032 U CN 201620806032U CN 205895138 U CN205895138 U CN 205895138U
Authority
CN
China
Prior art keywords
dolly
side slope
drilling
drilling machine
boring machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620806032.5U
Other languages
Chinese (zh)
Inventor
张渠
翟瑞军
赵峰
闫绍国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Transportation Engineering Branch of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Transportation Engineering Branch of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Transportation Engineering Branch of China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201620806032.5U priority Critical patent/CN205895138U/en
Application granted granted Critical
Publication of CN205895138U publication Critical patent/CN205895138U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to the technical field of the attached stock frame roof beam drilling of slope, traditional side slope stock frame roof beam drilling construction method wastes time and energy in order to solve, the construction progress slowly reaches drilling and hangs down straightness and be difficult to the technical problem that guarantees, provides a supplementary utensil of side slope stock frame roof beam drilling, walking track including two parallel arrangement, the drilling machine that can follow the rail -engaging that walks shiies the dolly, the baffle, scalable elevation regulator and electric block, the drilling machine shiies the dolly below left and right sides and installs the universal wheel, the drilling machine shiies the dolly and erects on two parallel arrangement's walking track through the universal wheel, the last wire rope of electric block shiies the dolly with the drilling machine and links to each other, the top front and back both ends that the drilling machine shiied the dolly are provided with the baffle that is used for fixed drilling machine respectively, the drilling machine shiies between the top baffle of dolly respectively, and the interval is provided with two scalable elevation regulators. The utility model has the characteristics of easy operation, labour saving and time saving, high, the pore -forming precision height of work efficiency.

Description

Side slope Anchored frame beam hole drilling auxiliary device has
Technical field
This utility model belongs to roadbed side slope attached Anchored frame beam drilling technique field and in particular to a kind of side slope anchor pole Vierendeel girder hole drilling auxiliary device has.
Background technology
In current railway bed work progress, roadbed appurtenant work quality directly affects railway operation safety, for this I For roadbed is attached, multiple side slope protection engineerings are provided with according to side slope strata condition, such as roadbed arched framework, pile plate wall, A series of protection form such as gravity retaining wall, Anchored frame beam, hollow brick, purpose is provided to Slope Stability and carries out adding Gu, prevent slope failure, considerable safety quality accident, impact passenger and national wealth safety, current anchor caused to railway operation Bar Vierendeel girder is a kind of conventional side slope protection form, needs to be holed before Anchored frame beam construction, puts into essence bundle after boring Screw-thread steel carries out tensioning mud jacking, and in boring procedure, workman needs to lift bored machine and walk on hillside, because side slope is high suddenly, Make bored machine mobile inconvenience on hillside, need four or five workmen's cooperations to be constructed in work progress, waste time and energy, In addition need to set up steel pipe frame to adjust the perpendicularity of boring when holing, using setting up the perpendicularity that steel pipe frame to adjust boring not Only borehole perpendicularity is difficult to ensure that, and construction speed is slow, furthermore, a drilling construction enters next boring after finishing During operating cost when, workmen cannot be guaranteed safely.
Content of the invention
This utility model be solve traditional side slope Anchored frame beam drilling construction method waste time and energy, construction speed slow And the technical problem that borehole perpendicularity is difficult to ensure that, there is provided a kind of side slope Anchored frame beam hole drilling auxiliary device tool.
The technical solution adopted in the utility model is as follows:
A kind of side slope Anchored frame beam hole drilling auxiliary device tool, the walking track be arrangeding in parallel includings two, can be along track of walking The boring machine carrying dolly of walking, baffle plate, scalable elevation regulator and electric block, two parallel walking tracks are arranged on side slope On slope, electric block is arranged on side slope top, below boring machine carrying dolly the left and right sides before and after be separately installed with universal Wheel, boring machine carrying dolly is located on the two walking tracks be arrangeding in parallel by Universal castor, the steel wire rope on electric block and The front portion of boring machine carrying dolly is connected, and the top rear and front end of boring machine carrying dolly is separately provided for fixing boring machine The baffle plate of tool, is respectively provided with two scalable elevation regulators between the top baffle plate of boring machine carrying dolly.
Described scalable elevation regulator includes sleeve, the adjusting rod being set in sleeve and the Fixed latches of bottom, set Longitudinally spaced on cylinder be provided with some adjustment holes, Fixed latches insertion adjusts in the hole and adjusting rod is fixed in sleeve.
The beneficial effects of the utility model:
1. this utility model have simple to operate, using this utility model can quickly, accurately by boring machine carrying Carriage walking, to the boring hole position measured in advance, decreases the time of mobile drilling machine, the working time has saved three points Two, improve work efficiency.
2. this utility model easy to use and flexible, it is vertical that this utility model is easy to hole position using scalable elevation regulator The regulation of degree, ensure that hole position gradient with traditional construction technics comparing, strengthens the integral construction quality of Anchored frame beam.
Brief description
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of scalable elevation regulator;
In figure: 1- walking track, 2- boring machine carrying dolly, 3- baffle plate, the scalable elevation regulator of 4-, the electronic calabash of 5- Reed, 6- universal wheel, 7- drilling machine, 8- sleeve, 9- adjusting rod, 10- Fixed latches, 11- adjustment hole, 12- track connector, 13- side slope.
Specific embodiment
As shown in figure 1, a kind of side slope Anchored frame beam hole drilling auxiliary device tool, the walking track 1 be arrangeding in parallel including two, can Boring machine carrying dolly 2, baffle plate 3, scalable elevation regulator 4 and the electric block 5 walked along walking track 1, two parallel row Walk track 1 to be arranged on side slope 13 slope, electric block 5 is arranged on side slope 13 top, boring machine carrying dolly 2 lower section left and right two It is separately installed with universal wheel 6, boring machine carrying dolly 2 is erected at the two walking rails be arrangeding in parallel by universal wheel 6 before and after side On road 1, the steel wire rope on electric block 5 is connected with the front portion of boring machine carrying dolly 2, before the top of boring machine carrying dolly 2 Two ends are separately provided for the baffle plate 3 of fixing drilling machine 7 afterwards, between the top baffle plate 3 of boring machine carrying dolly 2 between difference Every being provided with two scalable elevation regulators 4.
As shown in Fig. 2 described scalable elevation regulator 4 sleeve 8 including bottom, the adjusting rod 9 being set in sleeve 8 With Fixed latches 10, longitudinally spaced on sleeve 8 be provided with some adjustment holes 11, will adjust in Fixed latches 10 insertion adjustment hole 11 Bar 9 is fixed in sleeve 8.
The acting as of each part in this utility model: walking track 1 is mainly boring machine carrying dolly on walking track Walking;Boring machine carrying dolly 2 is a kind of equipment of skidding a rig;Boring machine carrying dolly Universal wheel 6 is that a kind of help is bored The device of hole airborne fortune dolly walking in orbit;Baffle plate 3 is to fix drilling machine on boring machine carrying dolly, and baffle plate can be left Right transverse shifting;Scalable elevation regulator 4 is used for the perpendicularity of adjustment boring, and making hole position and side slope perpendicularity meet design will Ask;The acting as of Fixed latches 10: after drilling machine perpendicularity is adjusted in place by scalable elevation regulator, using Fixed latches The hole inserting on scalable elevation regulator fixes scalable elevation regulator;Minisize electric hoist 5 is to pull boring airborne Fortune dolly moves up and down;Drilling machine 7 is to bore anchor pole hole equipment.
Using method of the present utility model: first install walking track 1 on side slope 13 is domatic, then drilling machine 7 is put On boring machine carrying dolly 2,3 drilling machines 7 of controllable register are fixed on boring machine carrying dolly 2, then by electronic calabash Reed 5 is fixed on side slope 13 top, and the steel wire rope on electric block 5 is connected at boring machine carrying dolly 2 connection ring, to control brill Hole airborne fortune dolly 2 moves up and down climbing, and when at boring machine carrying dolly 2 running to the good hole position of setting-out in advance, adopting can The design angle to adjust boring for the flexible elevation regulator 4.Walking track 1 joint length is set to 6m, runs into side slope higher Place is attached using track connector 12, to facilitate boring machine carrying dolly 2 to walk on walking track 1, universal wheel 6 side Just boring carrying dolly 2 transverse shifting in side slope 13.During construction, workman walks in side slope without lifting drilling machine again, bores It not be used in during hole and set up steel pipe frame to adjust hole position perpendicularity, decrease mobile drilling machine and adjust drilling machine perpendicularity Time, improve the perpendicularity of work efficiency and hole position.
When this utility model solves the boring of side slope Anchored frame beam, when workman is because being often drilled the mobile extremely next hole in a hole Work efficiency lowly take a lot of work arduously, become hole perpendicularity precision not high, the problems such as hole position perpendicularity can not guarantee.Therefore, with background Technology is compared, and this utility model has feature simple to operate, time saving and energy saving, high working efficiency, pore-forming accuracy are high.

Claims (2)

1. a kind of side slope Anchored frame beam hole drilling auxiliary device tool it is characterised in that: include the two walking tracks (1) be arrangeding in parallel, Boring machine carrying dolly (2), baffle plate (3), scalable elevation regulator (4) and the electric block that can walk along walking track (1) (5), two parallel walkings track (1) are arranged on side slope (13) slope, and electric block (5) is arranged on side slope (13) top, boring Below airborne fortune dolly (2) left and right sides before and after be separately installed with universal wheel (6), boring machine carrying dolly (2) passes through universal Wheel (6) is erected on the two walking tracks (1) be arrangeding in parallel, the steel wire rope on electric block (5) and boring machine carrying dolly (2) Front portion be connected, the top rear and front end of boring machine carrying dolly (2) is separately provided for the baffle plate of fixing drilling machine (7) (3), it is respectively provided with two scalable elevation regulators (4) between the top baffle plate (3) of boring machine carrying dolly (2).
2. a kind of side slope Anchored frame beam hole drilling auxiliary device tool according to claim 1 it is characterised in that: described scalable Elevation regulator (4) includes sleeve (8), the adjusting rod (9) being set in sleeve (8) and the Fixed latches (10) of bottom, sleeve (8) upper longitudinally spaced be provided with some adjustment holes (11), in Fixed latches (10) insertion adjustment hole (11), adjusting rod (9) is fixing In sleeve (8).
CN201620806032.5U 2016-07-29 2016-07-29 Supplementary utensil of side slope stock frame roof beam drilling Active CN205895138U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620806032.5U CN205895138U (en) 2016-07-29 2016-07-29 Supplementary utensil of side slope stock frame roof beam drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620806032.5U CN205895138U (en) 2016-07-29 2016-07-29 Supplementary utensil of side slope stock frame roof beam drilling

Publications (1)

Publication Number Publication Date
CN205895138U true CN205895138U (en) 2017-01-18

Family

ID=57786081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620806032.5U Active CN205895138U (en) 2016-07-29 2016-07-29 Supplementary utensil of side slope stock frame roof beam drilling

Country Status (1)

Country Link
CN (1) CN205895138U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108286412A (en) * 2017-12-29 2018-07-17 交通运输部科学研究院 A kind of slope surface punching mechanical equipment
CN108755718A (en) * 2018-08-20 2018-11-06 刘道满 High Slope on Expressway beats anchor shaft anchor cable apparatus for work
CN109281323A (en) * 2018-10-23 2019-01-29 中交二公局第三工程有限公司 A kind of roadbed side slope rockbolt installation device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108286412A (en) * 2017-12-29 2018-07-17 交通运输部科学研究院 A kind of slope surface punching mechanical equipment
CN108755718A (en) * 2018-08-20 2018-11-06 刘道满 High Slope on Expressway beats anchor shaft anchor cable apparatus for work
CN109281323A (en) * 2018-10-23 2019-01-29 中交二公局第三工程有限公司 A kind of roadbed side slope rockbolt installation device

Similar Documents

Publication Publication Date Title
CN205895138U (en) Supplementary utensil of side slope stock frame roof beam drilling
CN103541308A (en) Variable cross-section cantilever bridge box girder self-locking synchronization pushing system and construction method
CN104989272B (en) Upward inverse well drilling process
CN102587830A (en) Side slope anchoring hole drilling construction equipment and side slope anchoring hole drilling construction method
CN110318763A (en) Multi-platform car-type excavation expansion of inclined well method
CN103670286B (en) A kind of electric power pylon composite foundation anchoring drilling machine all-around mobile base
CN110578476B (en) Slope drilling construction platform
CN203822175U (en) Drilling machine rack
CN215057116U (en) Anchor rod frame roof beam drilling construction platform dolly
CN102305025B (en) Anchor cable rig bracket
CN207363604U (en) A kind of portion of tunnel side anchor cable rig auxiliary stand
CN112302534B (en) Slope anchor rod construction device and rapid construction method
WO2016033707A1 (en) Walker-type traveling rotary drilling rig
CN110778279A (en) Lifting type synchronous drilling equipment
CN108756743A (en) A kind of sampling of soil in-situ direct-push with repair integrated drilling machine
CN203175574U (en) Walking straight girder supporting device for concrete lining steel form carrier
CN202560097U (en) Side slope anchoring drill construction device
CN110004953B (en) Slope or retaining wall construction trolley
CN103130103A (en) Lifting device suitable for underground ally and chamber
CN110107302A (en) A kind of multi-functional trolley suitable for drill bursting construction
CN106050125B (en) A kind of portable all-hydraulic engineering investigation drilling machine
CN214944030U (en) Locking and fixing device suitable for bridge pile foundation percussion drill
CN112609678B (en) Construction method of low-clearance underground continuous steel wall locking profile steel
CN204059197U (en) Hanging Basket running gear
CN211446903U (en) Drilling, guiding and hammering integrated machine in PHC (prestressed high-strength concrete) pipe pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant