CN215057116U - Anchor rod frame roof beam drilling construction platform dolly - Google Patents

Anchor rod frame roof beam drilling construction platform dolly Download PDF

Info

Publication number
CN215057116U
CN215057116U CN202121484948.0U CN202121484948U CN215057116U CN 215057116 U CN215057116 U CN 215057116U CN 202121484948 U CN202121484948 U CN 202121484948U CN 215057116 U CN215057116 U CN 215057116U
Authority
CN
China
Prior art keywords
bottom plate
construction platform
slope
anchor rod
drilling construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121484948.0U
Other languages
Chinese (zh)
Inventor
高士亮
李洪江
杨鲁坡
丛义营
王海东
郭许宁
马希见
闫金刚
李宗田
王海峰
李显
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of China Railway 14th Bureau Co Ltd
China Railway 14th Bureau Group Qingdao Engineering Co Ltd
Original Assignee
Fifth Engineering Co Ltd of China Railway 14th Bureau Co Ltd
China Railway 14th Bureau Group Qingdao Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of China Railway 14th Bureau Co Ltd, China Railway 14th Bureau Group Qingdao Engineering Co Ltd filed Critical Fifth Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority to CN202121484948.0U priority Critical patent/CN215057116U/en
Application granted granted Critical
Publication of CN215057116U publication Critical patent/CN215057116U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

The utility model discloses an anchor frame roof beam drilling construction platform dolly, including automobile body and side slope, be provided with the track of two parallels on the slope of side slope, the automobile body bottom is taken through removing the wheel and is established on the track of two parallels, and the automobile body includes the bottom plate, and the bottom plate upper end is equipped with flexible adjusting part, and flexible adjusting part is including fixing the sleeve on the bottom plate, and the sleeve is inside to run through to be equipped with the regulation pole, adjusts the pole upper end and rotates through the universal joint and be equipped with propulsion assembly, and the propulsion assembly upper end is equipped with drilling assembly. Through removing the wheel and moving along the side slope on the track, drive wire rope through electric block and zoom and carry out the upper and lower climbing of automobile body, compare with traditional construction, improved the operation efficiency, practiced thrift the cost that the scaffold was set up, the hole site straightness's that hangs down regulation of being convenient for through setting up of flexible adjustment mechanism and universal joint has been compared with traditional construction and has been guaranteed the hole site gradient, has improved the suitability.

Description

Anchor rod frame roof beam drilling construction platform dolly
Technical Field
The utility model relates to a frame roof beam construction technical field specifically is an anchor rod frame roof beam drilling construction platform dolly.
Background
In the current railway roadbed construction process, roadbed attachment engineering quality directly influences railway operation safety, and therefore various slope protection projects are arranged according to the situation of a slope stratum aiming at roadbed attachment, the purpose is to reinforce slope stability, prevent slope collapse, cause major safety quality accidents to railway operation and influence passenger and national property safety.
The conventional anchor rod frame beam anchor rod drilling method is characterized in that double rows of scaffolds are erected and an anchor rod drilling machine is installed on a construction operation platform. This mode site operation is complicated, the construction cycle is long, the application cost is high, the construction receives the restriction in working face place, the workman need lift drilling machine and walk on the hillside among the drilling process, because the side slope is steep, make drilling machine move inconvenience on the hillside, need four five constructors cooperation to be under construction in the work progress, waste time and energy, need set up the steel-pipe frame during drilling in addition and adjust the straightness that hangs down of drilling, the straightness that hangs down that the adoption was set up the steel-pipe frame and was adjusted drilling not only is difficult to guarantee, and the construction progress is slow.
Therefore, the anchor rod frame beam drilling construction platform trolley is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an anchor frame roof beam drilling construction platform dolly to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the anchor rod frame beam drilling construction platform trolley comprises a trolley body and a side slope, wherein two parallel rails are arranged on the slope of the side slope, the bottom end of the trolley body is erected on the two parallel rails through moving wheels, the trolley body comprises a bottom plate, and a telescopic adjusting assembly is arranged at the upper end of the bottom plate;
the telescopic adjusting assembly comprises a sleeve fixed on the bottom plate, an adjusting rod penetrates through the sleeve, a pushing assembly is arranged at the upper end of the adjusting rod in a rotating mode through a universal joint, and a drilling assembly is arranged at the upper end of the pushing assembly.
Preferably, the side of the sleeve is provided with a slot, the side of the adjusting rod is provided with a plurality of through holes, a bolt is arranged in the slot, and the bolt is inserted into any one of the through holes.
Preferably, the propelling assembly comprises an electric telescopic rod, guide rods are arranged on two sides of the electric telescopic rod, two ends of each guide rod are connected through a baffle, one end of the electric telescopic rod is fixedly connected to the middle of one of the baffles, a movable plate is fixedly connected to the other end of the electric telescopic rod, the movable plate penetrates through the two guide rods in a movable mode, and a handle is arranged on the other side of the baffle.
Preferably, the drilling assembly comprises a motor, the motor is fixedly connected to the moving plate through a connecting plate, a drill rod is fixedly connected to the output end of the motor, and the drill rod is arranged along the length direction of the bottom plate.
Preferably, the bottom plate is provided with a protection assembly, the protection assembly comprises supporting rods fixed to the periphery of the side face of the bottom plate, and protective nets are arranged on the rear end face and the left side face and the right side face of each supporting rod.
Preferably, the middle part of the front end of the bottom plate and the two measuring surfaces are fixedly provided with electric hoists, the side slope is provided with a connecting group, and steel wire ropes on the electric hoists are fixedly connected to the connecting group.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the movable wheels move along the side slope on the track, and the electric hoist drives the steel wire rope to zoom and retract so as to climb the vehicle body up and down, so that compared with the traditional construction, the working efficiency is improved, and the cost for erecting a scaffold is saved;
2. the telescopic adjusting mechanism and the universal joint are arranged, so that the perpendicularity of the hole positions can be adjusted conveniently, the hole position gradient is ensured compared with the traditional construction, and the applicability is improved;
3. drive the drilling subassembly through advancing the subassembly and drill, need not a plurality of constructors and cooperate, practiced thrift the human cost, convenient operation has shortened construction cycle.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the internal structure of the vehicle body of the present invention;
FIG. 3 is an enlarged structural view of the structure at A in FIG. 2 according to the present invention;
fig. 4 is the schematic view of the slope structure of the present invention.
In the figure: the device comprises a vehicle body 1, an electric hoist 2, a telescopic adjusting mechanism 3, a universal joint 4, a drilling assembly 5, a propelling assembly 6, a slope 7, a track 8, a connecting group 9, a bottom plate 10, a movable wheel 11, a protective part 12, a supporting rod 120, a protective net 121, a steel wire rope 20, a sleeve 30, a slotting 300, an adjusting rod 31, a through hole 310, a bolt 32, a motor 50, a connecting plate 500, a drill rod 51, an electric telescopic rod 60, a guide rod 61, a movable plate 62, a baffle 63 and a handle 64.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be understood that the terms "upper", "lower", "top", "bottom", "inner", "outer", "front", "rear", "left", "right", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in fig. 1, and are only for convenience of description and simplification of description, but do not indicate or imply that a device or structure to be referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and therefore should not be construed as limiting the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides an anchor rod frame roof beam drilling construction platform dolly, including automobile body 1 and side slope 7, be provided with the track 8 of two parallels on the slope of side slope 7, 1 bottom of automobile body sets up on the track 8 of two parallels through removing wheel 11, and automobile body 1 includes bottom plate 10, bottom plate 10 upper end is equipped with flexible adjusting part 3, flexible adjusting part 3 is including fixing sleeve 30 on bottom plate 10, sleeve 30 is inside to run through and is equipped with regulation pole 31, fluting 300 has been seted up to sleeve 30 side, it has seted up a plurality of through-hole 310 to adjust pole 31 side, be equipped with bolt 32 in fluting 300, bolt 32 pegs graft in arbitrary one through-hole 310, it is equipped with propulsion subassembly 6 to adjust the pole 31 upper end through universal joint 4 rotation, fix through using bolt 32, with the cooperation of universal joint 4, adjust the design angle of drilling, propulsion subassembly 6 upper end is equipped with drilling subassembly 5.
Propulsion assembly 6 includes electric telescopic handle 60, electric telescopic handle 60 both sides are equipped with guide bar 61, guide bar 61 plays the effect of direction, the both ends of two guide bars 61 are all connected through baffle 63, electric telescopic handle 60 one end fixed connection is in one of them baffle 63 middle part, its other end fixedly connected with movable plate 62, movable plate 62 activity runs through on two guide bars 61, baffle 63 opposite side is equipped with handle 64, hold handle 64, drive movable plate 62 through electric telescopic handle 60 and promote forward.
Drilling subassembly 5 includes motor 50, and motor 50 passes through connecting plate 500 fixed connection on movable plate 62, and motor 50's output fixedly connected with drilling rod 51, and drilling rod 51 sets up along the length direction of bottom plate 10, promotes through movable plate 62, drives motor 50 and promotes forward, drives drilling rod 51 through motor 50 and rotates and punch.
The protection component 12 is arranged on the bottom plate 10, the protection component 12 comprises supporting rods 120 fixed on the periphery of the side face of the bottom plate 10, protective nets 121 are arranged on the rear end face and the left side face and the right side face of each supporting rod 120, and safety of construction personnel can be guaranteed due to the arrangement of the protective nets 121.
Bottom plate 10 front end middle part and two equal fixed mounting of survey face have electric block 2, are provided with the connecting group 9 on the side slope 7, and the equal fixed connection of wire rope 20 on the electric block 2 is on connecting group 9, drives wire rope 20 through electric block 2 and zooms and carries out the climbing from top to bottom of automobile body 1.
The working principle is as follows: the utility model discloses when using, at first installing track 8 and linkage 9 on side slope 7, then install drilling subassembly 5 on the automobile body, remove along side slope 7 on track 8 through removing wheel 11, drive wire rope 20 through electric block 2 and zoom and carry out the upper and lower climbing of automobile body 1, when automobile body 1 moves to the well hole site of laying out a design in advance, hold handle 64, make propulsion subassembly 6 drive drilling subassembly 5 rotate along universal joint 4, slide in sleeve 30 through adjusting pole 31, use bolt 32 to fix, adjust the design angle of drilling, then drive motor 50 on the movable plate 62 through electric telescopic handle 60 and promote forward, it punches to drive drilling rod 51 through motor 50 and rotate, the construction is simple and convenient, economical and practical, collect drilling and platform in an organic whole, save resources, efficiency is improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an anchor rod frame roof beam drilling construction platform dolly, includes automobile body (1) and slope (7), its characterized in that: two parallel rails (8) are arranged on the slope of the side slope (7), the bottom end of the vehicle body (1) is erected on the two parallel rails (8) through moving wheels (11), the vehicle body (1) comprises a bottom plate (10), and a telescopic adjusting component (3) is arranged at the upper end of the bottom plate (10);
the telescopic adjusting assembly (3) comprises a sleeve (30) fixed on the bottom plate (10), an adjusting rod (31) penetrates through the inside of the sleeve (30), the upper end of the adjusting rod (31) is provided with a propelling assembly (6) in a rotating mode through a universal joint (4), and the upper end of the propelling assembly (6) is provided with a drilling assembly (5).
2. The anchor rod frame beam drilling construction platform trolley of claim 1, characterized in that: the side of the sleeve (30) is provided with a slot (300), the side of the adjusting rod (31) is provided with a plurality of through holes (310), a bolt (32) is arranged in the slot (300), and the bolt (32) is inserted into any one of the through holes (310).
3. The anchor rod frame beam drilling construction platform trolley of claim 1, characterized in that: propelling component (6) includes electric telescopic handle (60), electric telescopic handle (60) both sides are equipped with guide bar (61), two the both ends of guide bar (61) are all connected through baffle (63), one end fixed connection of electric telescopic handle (60) is in one of them baffle (63) middle part, its other end fixedly connected with movable plate (62), movable plate (62) activity runs through two on guide bar (61), baffle (63) opposite side is equipped with handle (64).
4. The anchor rod frame beam drilling construction platform trolley of claim 3, wherein: the drilling assembly (5) comprises a motor (50), the motor (50) is fixedly connected to the moving plate (62) through a connecting plate (500), a drill rod (51) is fixedly connected to the output end of the motor (50), and the drill rod (51) is arranged along the length direction of the bottom plate (10).
5. The anchor rod frame beam drilling construction platform trolley of claim 1, characterized in that: the protective component (12) is arranged on the bottom plate (10), the protective component (12) comprises supporting rods (120) fixed to the periphery of the side face of the bottom plate (10), and protective nets (121) are arranged on the rear end face and the left side face and the right side face of each supporting rod (120).
6. The anchor rod frame beam drilling construction platform trolley of claim 1, characterized in that: bottom plate (10) front end middle part and two survey equal fixed mounting of face have electric block (2), be provided with on slope (7) connection group (9), the equal fixed connection of wire rope (20) on electric block (2) is in on connection group (9).
CN202121484948.0U 2021-07-01 2021-07-01 Anchor rod frame roof beam drilling construction platform dolly Active CN215057116U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121484948.0U CN215057116U (en) 2021-07-01 2021-07-01 Anchor rod frame roof beam drilling construction platform dolly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121484948.0U CN215057116U (en) 2021-07-01 2021-07-01 Anchor rod frame roof beam drilling construction platform dolly

Publications (1)

Publication Number Publication Date
CN215057116U true CN215057116U (en) 2021-12-07

Family

ID=79227454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121484948.0U Active CN215057116U (en) 2021-07-01 2021-07-01 Anchor rod frame roof beam drilling construction platform dolly

Country Status (1)

Country Link
CN (1) CN215057116U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115637922A (en) * 2022-10-31 2023-01-24 湖北广元岩土工程有限公司 Anchor rod drilling machine for slope support
CN115898267A (en) * 2022-11-22 2023-04-04 中交四航工程研究院有限公司 Anchoring and drilling device and system for slope reinforcement construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115637922A (en) * 2022-10-31 2023-01-24 湖北广元岩土工程有限公司 Anchor rod drilling machine for slope support
CN115637922B (en) * 2022-10-31 2023-09-01 湖北广元岩土工程有限公司 Anchor rod drilling machine for side slope support
CN115898267A (en) * 2022-11-22 2023-04-04 中交四航工程研究院有限公司 Anchoring and drilling device and system for slope reinforcement construction

Similar Documents

Publication Publication Date Title
CN215057116U (en) Anchor rod frame roof beam drilling construction platform dolly
CN203796297U (en) Temporary supporting device of driving working face
CN108798727B (en) Tunnel self-propelled waterproof board cloth hanging steel bar positioning integrated multifunctional trolley and application
CN210856969U (en) Movable telescopic cantilever hanging basket
CN101943004B (en) Hydraulic self-running inclined-hole ordinary-state concrete casting trolley
CN208870611U (en) A kind of multi-functional trolley of tunnel self-propelled splash guard dossal reinforcing bar positioning one
CN211735442U (en) Slope protection construction work platform
CN205895138U (en) Supplementary utensil of side slope stock frame roof beam drilling
CN209941704U (en) Side slope or retaining wall construction trolley
CN101845952B (en) Movable three-arm top-assisting anchor rod and anchor cable construction drill carriage
CN105863686A (en) Invert formwork hosting traveling trolley
CN113530553B (en) Three-step construction process based on tunnel excavation and support integrated trolley
CN210977498U (en) Excavation operation rack suitable for construction of full section method and micro-step method of tunnel
CN210712584U (en) Movable supporting bracket for road and bridge construction
CN210370694U (en) Tunnel secondary lining template trolley
CN211524104U (en) Novel bridge girder erection machine
CN203114308U (en) Gantry self-propelled anchoring and supporting machine
CN210264517U (en) Intelligent tunnel drilling equipment
CN209799993U (en) Novel tunnel bow member installation platform truck
CN220955643U (en) Multifunctional comprehensive operation trolley for arch-collecting installation
CN218371653U (en) Self-propelled climbing frame convenient to side slope anchor rod construction
CN110748163A (en) Novel bridge girder erection machine
CN215761720U (en) Be provided with multi-functional rack of assembled of crawler travel unit
CN216951968U (en) Level-adjustable climbing type pipe erecting machine
CN216741550U (en) Road bridge tunnel construction trolley with support reinforced structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant