CN109235466A - A kind of roadbed side slope platform bar planting formula greening groove construction and installation method - Google Patents

A kind of roadbed side slope platform bar planting formula greening groove construction and installation method Download PDF

Info

Publication number
CN109235466A
CN109235466A CN201811143388.5A CN201811143388A CN109235466A CN 109235466 A CN109235466 A CN 109235466A CN 201811143388 A CN201811143388 A CN 201811143388A CN 109235466 A CN109235466 A CN 109235466A
Authority
CN
China
Prior art keywords
greening groove
prefabricated
slope
platform
side slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811143388.5A
Other languages
Chinese (zh)
Other versions
CN109235466B (en
Inventor
陈伟志
叶世斌
闵圣捷
刘名君
蒋关鲁
李安洪
姚裕春
周成
吴沛沛
周璐
曾永红
龚建辉
李宁
郭在旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201811143388.5A priority Critical patent/CN109235466B/en
Publication of CN109235466A publication Critical patent/CN109235466A/en
Application granted granted Critical
Publication of CN109235466B publication Critical patent/CN109235466B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental Sciences (AREA)
  • Cultivation Of Plants (AREA)

Abstract

It is beautiful to carry out greening to roadbed plain stage of slope with easily and effectively, effectively improves construction efficiency, and be conducive to improve green plants survival rate, it is ensured that afforestation effect for a kind of roadbed side slope platform bar planting formula greening groove construction and installation method.Closed platform confining bed is formed including plain stage of slope and to it, the laterally spaced prefabricated greening groove of setting on the platform confining bed, anchorage element is set on the both lateral sides wall of prefabricated greening groove, the upper end of anchorage element and prefabricated greening groove, which are formed, to be connected, and lower part then anchors into basic below plain stage of slope and anchor connection therewith.The plant raw-soil for planting green plants is loaded in the prefabricated greening groove.

Description

A kind of roadbed side slope platform bar planting formula greening groove construction and installation method
Technical field
The present invention relates to roadbed technical field of greening, in particular to a kind of roadbed side slope platform bar planting formula greening groove construction and Installation method.
Technical background
It is set up in many railways, highway subgrade slope platform and sets greening groove, to enhance the green aesthetic effect of roadbed.When Before, the main construction method for this greening groove is first operation platform confining bed, the one-piece casting greening groove on podium level, Then in greening groove interplantation soil and green plants is planted, main problem existing for this construction method is: 1. greening groove scene One-piece casting is time-consuming and laborious, 2. greening groove concrete curing quality be difficult to ensure, 3. greening groove implants cultivating survival rate it is not high, 4. constructing, prefabricated, assembledization degree is low, the 5. non-exchange maintenance of greening groove.In order to overcome the problems referred above, construction convenient degree is improved, There is an urgent need to improve roadbed side slope platform greening groove construction and its construction method.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of roadbed side slope platform bar planting formula greening groove constructions, with convenient Greening beauty effectively is carried out to roadbed plain stage of slope, effectively improves construction efficiency, and is conducive to raising green plants and survives Rate, it is ensured that afforestation effect.
It is as follows that the present invention solves technical solution used by above-mentioned technical problem:
A kind of present invention roadbed side slope platform bar planting formula greening groove construction, including plain stage of slope and it is formed closed flat Platform confining bed, it is characterized in that: the laterally spaced prefabricated greening groove of setting on the platform confining bed, lateral the two of prefabricated greening groove Anchorage element is set on side wall, and the upper end of anchorage element and prefabricated greening groove, which are formed, to be connected, and lower part then anchors into below plain stage of slope Basic interior and anchor connection therewith;The plant raw-soil for planting green plants is loaded in the prefabricated greening groove.
Another technical problem to be solved by this invention is to provide a kind of above-mentioned roadbed side slope platform bar planting formula greening groove structure The installation method made, this method comprises the following steps:
1. being loaded in prefabricated greening groove and planting the raw-soil, plant and plant green plants in the raw-soil, and greening is planted in the natural environment Object carries out cultivation maintenance;
2. setting plain stage of slope to order, position of sound production locating template is set in prefabricated greening groove, passes through the positioning on locating template Hole downwards basis in be drilled with anchor hole;
3. locating template is removed, to anchor hole inner wall in the transmission rod lower part insertion anchor hole by anti-corrosion, anti-corrosion processing The cement injection mortar between transmission rod outer wall;
4. casting concrete builds blockwork formation platform confining bed;
5. installing fixed prefabricated greening groove on platform confining bed.
The invention has the advantages that prefabricated greening groove realizes the factorial production, and can cultivate in the natural environment green Change plant, plant environment is adaptable, is conducive to improve green plants survival rate, it is ensured that afforestation effect;It will by anchorage element Prefabricated greening groove is fixedly mounted on plain stage of slope, is greatly improved construction efficiency, and easily and effectively flat to roadbed side slope It is beautiful that platform carries out greening;Securely and reliably, easy for construction, be conducive to save engineering-built cost.
Detailed description of the invention
This specification includes following six width attached drawing:
Fig. 1 is a kind of cross-sectional view of roadbed side slope platform bar planting formula greening groove construction of the present invention;
Fig. 2 is a kind of plan view of roadbed side slope platform bar planting formula greening groove construction of the present invention;
Fig. 3 is the cross-sectional view of the line A-A along Fig. 2;
Fig. 4 is the enlarged drawing of the part C in Fig. 3;
Fig. 5 is the enlarged drawing of the part D in Fig. 3;
Fig. 6 is the plan view of locating template in a kind of roadbed side slope platform bar planting formula greening groove construction of the present invention.
Component and corresponding label: roadbed side slope B, plain stage of slope P are shown, platform confining bed 10, greening groove 20 are planted in figure The raw-soil 21, green plants 22, casing 23, transmission rod 30, locking nut 31, cement mortar 32, locating template D0, location hole D1, Cannula center compartment is away from l0, anchorage element anchors into the depth h of platform basem;Afforest groove height h0;Platform close layer surface with Angle theta between horizontal plane.
Specific embodiment
The present invention is further illustrated below by specific embodiment and in conjunction with attached drawing.
Referring to Fig.1, Fig. 2, Fig. 3, a kind of roadbed side slope platform bar planting formula greening groove construction of the present invention, including plain stage of slope P With closed platform confining bed 10 is formed to it.The laterally spaced prefabricated greening groove 20 of setting on the platform confining bed 10, in advance Anchorage element is set on the both lateral sides wall of greening groove 20 processed, the upper end of anchorage element and prefabricated greening groove 20, which are formed, to be connected, under Portion then anchors into basic below plain stage of slope P and anchor connection therewith.Filling is for planting greening in the prefabricated greening groove 20 The plant raw-soil 21 of plant 22.The plain stage of slope P be set between adjacent two-stage roadbed side slope B and roadbed side slope B and draining Between ditch or lateral sulcus.
Referring to Fig.1, the prefabricated greening groove 20 is reinforced concrete structure or is formed by resinous material is prefabricated, is realized The factorial production and in-site installation.The prefabricated effect of greening groove 20 is to store soil and moisture, is that green plants 22 provide abundance Nutrient and moisture, greening groove 20 can be made into a variety of different appearance styles, to meet greening aesthetic requirements.And it can be in nature Green plants 22 are cultivated in environment, plant environment is adaptable, is conducive to the survival rate for improving green plants 22, it is ensured that greening effect Fruit.Pre-buried vertically communicated casing 23 on the both lateral sides wall of prefabricated greening groove 20.In general, described sleeve pipe 23 be set to it is prefabricated green The intermediate position for changing 20 both lateral sides wall of slot, using pvc pipe or aluminium-alloy pipe.
Referring to Fig. 3, Fig. 4 and Fig. 5, the anchorage element is made of the locking nut 31 of the upper end of transmission rod 30, transmission rod 30 lower parts penetrate below plain stage of slope P in the anchor hole on basis, and by being poured between 30 outer wall of anchor hole inner wall and transmission rod Cement mortar 32 and lower section basis form anchor connection.The top of the prefabricated 20 both lateral sides wall of greening groove of 30 upper end exposure of transmission rod Face, and axial force is applied by locking nut 31, prefabricated greening groove 20 is fixedly secured on platform confining bed 10.Anchorage element Effect be for sliding force that prefabricated greening groove 20 generates to be transferred to the ground on basis below plain stage of slope P by transmission rod 30 Body prevents the prefabricated downslide of greening groove 20 from falling into junior's side slope or gutter.It is i.e. by anchorage element that prefabricated greening groove 20 is fixed It is mounted on plain stage of slope, is greatly improved construction efficiency, and greening beauty easily and effectively is carried out to roadbed plain stage of slope, Securely and reliably, easy for construction, be conducive to save engineering-built cost.
Referring to Fig. 3, the platform confining bed 10 is formed by concreting, or is built by blockwork.Reference Fig. 6, the anchor hole location platform confining bed 10 passes through locating template D0 before applying and positions determination on the surface plain stage of slope P, fixed The center of corresponding location hole D1, the center location hole D1 and spacing and prefabricated 20 middle sleeve 23 of greening groove is arranged in position template D0 Position and spacing are consistent.
The depth that anchorage element anchors into the basis plain stage of slope P should comprehensively consider prefabricated 20 self weight of greening groove, plant growth, pre- The combined influence of rubbing action between greening groove 20 and platform confining bed 10 processed, concerning prefabricated greening groove whether determining accurate 20 safe and reasonable design.Anchorage element anchors into the depth h on basis below plain stage of slope PmIt is determined by following formula:
In formula, hm is the depth that anchorage element anchors into the basis plain stage of slope P, unit m;χ is plant growth mobile load increase system Number, takes 1.1~1.5;G is greening groove 20, the total weight for planting the raw-soil 21 and green plants 22, unit kN;H0 is that greening groove 20 is high Degree, unit m;θ is the angle closed between layer surface and horizontal plane, unit rad;μ rubbing between greening groove 20 and confining bed Wipe coefficient;Bp is the calculating width of anchorage element, unit m;M is proportionality coefficient of the coefficient of subgrade reaction with change in depth, unit kN/ m4;φ is anchorage element corner, and unit 10-3rad takes 0.5~1.0.
Referring to FIG. 1, FIG. 2 and FIG. 3, a kind of installation method of roadbed side slope platform bar planting formula greening groove construction of the present invention, packet Include following steps:
1. being loaded in prefabricated greening groove 20 and planting the raw-soil 21, plants and plant green plants 22 in the raw-soil 21, and in the natural environment Cultivation maintenance is carried out to green plants 22;
2. setting plain stage of slope P to order, position of sound production locating template D0 is set in prefabricated greening groove (20), passes through locating template D0 On location hole D1 downwards basis in be drilled with anchor hole;
3. locating template D0 is removed, to anchor hole in 30 lower part of the transmission rod insertion anchor hole by anti-corrosion, anti-corrosion processing Cement injection mortar 32 between 30 outer wall of inner wall and transmission rod makes transmission rod 30 and lower section basis form anchor connection;
4. casting concrete builds blockwork formation platform confining bed 10;
5. installing fixed prefabricated greening groove 20 on platform confining bed 10.
The above is only using illustrating a kind of roadbed side slope platform bar planting formula greening groove of present invention construction and quickly Some principles of installation method are not intended to for the present invention being confined in shown and described specific structure and the scope of application, therefore All all corresponding modifications that may be utilized and equivalent, belong to the applied the scope of the patents of the present invention.

Claims (8)

1. a kind of roadbed side slope platform bar planting formula greening groove construction, including plain stage of slope (P) and closed platform envelope is formed to it Layer (10) are closed, it is characterized in that: the laterally spaced prefabricated greening groove (20) of setting, prefabricated greening groove on the platform confining bed (10) (20) anchorage element is set on both lateral sides wall, and the upper end of anchorage element and prefabricated greening groove (20), which are formed, to be connected, and lower part is then Anchor into basic interior and anchor connection therewith below plain stage of slope (P);Filling is for planting greening in the prefabricated greening groove (20) The plant raw-soil (21) of plant (22).
2. a kind of roadbed side slope platform bar planting formula greening groove construction as described in claim 1, it is characterized in that: the prefabricated greening Slot (20) is reinforced concrete structure or is formed by resinous material is prefabricated, pre-buried vertically communicated set on both lateral sides wall It manages (23).
3. a kind of roadbed side slope platform bar planting formula greening groove construction as claimed in claim 2, it is characterized in that: described sleeve pipe (23) It is set to the intermediate position of prefabricated greening groove (20) both lateral sides wall, using pvc pipe or aluminium-alloy pipe.
4. a kind of roadbed side slope platform bar planting formula greening groove construction as claimed in claim 2, it is characterized in that: the anchorage element It is made of the locking nut (31) of the upper end of transmission rod (30), transmission rod (30) lower part penetrates basis below plain stage of slope (P) In anchor hole, and the cement mortar (32) by being poured between anchor hole inner wall and transmission rod (30) outer wall and lower section basis form anchor It is solidly connected;The top surface of transmission rod (30) upper end exposure prefabricated greening groove (20) both lateral sides wall, and applied by locking nut (31) Add axial force that prefabricated greening groove (20) is fixedly secured on platform confining bed (10).
5. a kind of roadbed side slope platform bar planting formula greening groove construction as described in claim 1, it is characterized in that: the plain stage of slope (P) it is set between adjacent two-stage roadbed side slope (B) and between roadbed side slope (B) and gutter or lateral sulcus.
6. a kind of roadbed side slope platform bar planting formula greening groove construction as described in claim 1, it is characterized in that: the platform is closed Layer (10) is formed by concreting, or is built by blockwork.
7. a kind of roadbed side slope platform bar planting formula greening groove construction as described in claim 1, it is characterized in that: the anchorage element Anchor into the depth h on basis below plain stage of slope (P)mIt is determined by following formula:
In formula, hmThe depth on the basis plain stage of slope (P), unit m are anchored into for anchorage element;χ is plant growth mobile load enhancement coefficient, Take 1.1~1.5;G is greening groove (20), plants the total weight of the raw-soil (21) and green plants (22), unit kN;h0For greening groove (20) height, unit m;θ is the angle closed between layer surface and horizontal plane, unit rad;μ is greening groove (20) and confining bed Between coefficient of friction;BpFor the calculating width of anchorage element, unit m;M is proportionality coefficient of the coefficient of subgrade reaction with change in depth, Unit kN/m4;φ is anchorage element corner, unit 10-3Rad takes 0.5~1.0.
8. a kind of installation method of roadbed side slope platform bar planting formula greening groove construction, packet as described in 1 to 7 any one of claim Include following steps:
1. being loaded in prefabricated greening groove (20) and planting the raw-soil (21), plants in the raw-soil (21) and plant green plants (22), and in natural ring Cultivation maintenance is carried out to green plants (22) in border;
2. setting plain stage of slope (P) to order, position of sound production locating template (D0) is set in prefabricated greening groove (20), passes through locating template (D0) location hole (D1) on is drilled with anchor hole in basis downwards;
3. locating template (D0) is removed, to anchor hole in transmission rod (30) the lower part insertion anchor hole by anti-corrosion, anti-corrosion processing Cement injection mortar (32) between inner wall and transmission rod (30) outer wall makes transmission rod (30) and lower section basis form anchor connection;
4. casting concrete builds blockwork formation platform confining bed (10);
5. installing fixed prefabricated greening groove (20) on platform confining bed (10).
CN201811143388.5A 2018-09-28 2018-09-28 Roadbed slope platform bar planting type greening groove structure and installation method Active CN109235466B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811143388.5A CN109235466B (en) 2018-09-28 2018-09-28 Roadbed slope platform bar planting type greening groove structure and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811143388.5A CN109235466B (en) 2018-09-28 2018-09-28 Roadbed slope platform bar planting type greening groove structure and installation method

Publications (2)

Publication Number Publication Date
CN109235466A true CN109235466A (en) 2019-01-18
CN109235466B CN109235466B (en) 2023-09-22

Family

ID=65054064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811143388.5A Active CN109235466B (en) 2018-09-28 2018-09-28 Roadbed slope platform bar planting type greening groove structure and installation method

Country Status (1)

Country Link
CN (1) CN109235466B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114223427A (en) * 2021-12-07 2022-03-25 禹智环保科技(深圳)有限公司 Prefabricated water-retention plant-growing pervious concrete and preparation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005325662A (en) * 2004-05-12 2005-11-24 Landscape Tamaki:Kk Holding body of slope and slope greening method
CN2911014Y (en) * 2006-06-30 2007-06-13 浙江省交通规划设计研究院 Plantable ecological wall
CN108374423A (en) * 2016-11-09 2018-08-07 中国瑞林工程技术有限公司 Slope ecological recovery system and its implementation
CN209066457U (en) * 2018-09-28 2019-07-05 中铁二院工程集团有限责任公司 A kind of roadbed side slope platform bar planting formula greening groove construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005325662A (en) * 2004-05-12 2005-11-24 Landscape Tamaki:Kk Holding body of slope and slope greening method
CN2911014Y (en) * 2006-06-30 2007-06-13 浙江省交通规划设计研究院 Plantable ecological wall
CN108374423A (en) * 2016-11-09 2018-08-07 中国瑞林工程技术有限公司 Slope ecological recovery system and its implementation
CN209066457U (en) * 2018-09-28 2019-07-05 中铁二院工程集团有限责任公司 A kind of roadbed side slope platform bar planting formula greening groove construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114223427A (en) * 2021-12-07 2022-03-25 禹智环保科技(深圳)有限公司 Prefabricated water-retention plant-growing pervious concrete and preparation method thereof
CN114223427B (en) * 2021-12-07 2023-12-08 禹智环保科技(深圳)有限公司 Prefabricated water-retaining plant-growing water-permeable concrete and preparation method thereof

Also Published As

Publication number Publication date
CN109235466B (en) 2023-09-22

Similar Documents

Publication Publication Date Title
CN101831914B (en) Method for protecting and greening rocky side slope
CN203795439U (en) Ecological revetment structure used for soil fixing and moisturizing of high-liquid-limit soil slope
CN204753297U (en) Ecological grass planting brick parking area
CN204780949U (en) Rock slope is planted living concrete and is moulded stone and combines ecological landscape protective structure
CN207295737U (en) Suitable for the ecological revetment system in plateau mountainous region
CN203113374U (en) Strengthening type verdurization retaining wall
CN201826318U (en) Simple ecological slope protecting structure for loose soil of road
CN109811776A (en) A kind of assembled lattice Vierendeel girder
CN209066457U (en) A kind of roadbed side slope platform bar planting formula greening groove construction
KR20100053270A (en) Retaining wall and its construction method using tensioning anchor, pre-cast panel and pre-cast reinforcing panel
CN202899064U (en) Improved road greening guardrail
CN109235466A (en) A kind of roadbed side slope platform bar planting formula greening groove construction and installation method
CN212175819U (en) Slope greening structure
CN206090589U (en) Vegetation concrete double protection selvage slope ecological greening system
CN207201564U (en) A kind of raising plantation survival rate heels in storage seedling device
CN103590301B (en) The construction method of Cushion-layer-free permeable ecological grassing terrace
CN207672606U (en) A kind of green retaining wall structure
CN204898693U (en) Domatic slope ecological protection structure who is equipped with groove hole
CN205000346U (en) Slope frame for slope reinforcement and water drainage
CN2903184Y (en) Self fastening steel reinforced concrete precast block soil resisting wall
CN209243751U (en) A kind of low-rise building
CN209179028U (en) Slope inclined insertion plate type green protection system
CN205444205U (en) Wall -hanging afforestation groove
CN106436683A (en) Dredger fill plastic drainage plate planting device
CN202559492U (en) Natural drainage system for step of side slope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant