CN109184742A - 一种高压富水软弱围岩山岭隧道的超前预注浆方法 - Google Patents

一种高压富水软弱围岩山岭隧道的超前预注浆方法 Download PDF

Info

Publication number
CN109184742A
CN109184742A CN201811091573.4A CN201811091573A CN109184742A CN 109184742 A CN109184742 A CN 109184742A CN 201811091573 A CN201811091573 A CN 201811091573A CN 109184742 A CN109184742 A CN 109184742A
Authority
CN
China
Prior art keywords
tunnel
grouting
wall
surrounding rock
pressure water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811091573.4A
Other languages
English (en)
Other versions
CN109184742B (zh
Inventor
吴江涛
史静
匡伟军
候奇
林占平
李效全
刘潼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN201811091573.4A priority Critical patent/CN109184742B/zh
Publication of CN109184742A publication Critical patent/CN109184742A/zh
Application granted granted Critical
Publication of CN109184742B publication Critical patent/CN109184742B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete

Abstract

本发明公开了隧道工程建筑技术领域的一种高压富水软弱围岩山岭隧道的超前预注浆方法,该方法的具体步骤如下:S1:开挖隧道导坑左上段面并支护;S2:开挖隧道导坑左下段面并支护;S3:回填片石砼,支护后浇注仰拱衬砌;S4:开挖隧道拱顶并做初期支护;S5:施做止浆墙并将其通过钢筋网与隧道壁固定;S6:在钻孔内设置孔口管,并将其通过钢筋网固定;S7:利用小导管斜向前方对开挖轮廓线注浆;S8:设计注浆压力并选择注浆水泥浆,本发明解决了高压富水软弱围岩山岭隧道的注浆难题,利于降低注浆施工成本,同时提高高压富水软弱围岩山岭隧道施工的安全度,减少不必要的人员损失,其措施合理、安全可控。

Description

一种高压富水软弱围岩山岭隧道的超前预注浆方法
技术领域
本发明公开了一种高压富水软弱围岩山岭隧道的超前预注浆方法,具体为隧道工程建筑技术领域。
背景技术
目前,随着国家基础设施投资建设的力度加大,地铁项目以及山岭隧道项目逐渐增多,在这些隧道项目中有很大一部分涉及软弱围岩中的隧道施工。软弱围岩的自支护能力较弱,甚至没有自支护能力。因此,在软弱围岩施工中最重要的是提高围岩的自支护能力,而超前预注浆加固底层作为一种切实可行的稳定撑子面的方法在隧道建设领域得到了广泛的运用。
但是,在注浆加固底层的过程中,如何控制注浆的质量,控制注浆与开挖之间的间隔时间并没有形成一个统一的标准,注浆效果无法得到准确的评价,成为了制约软弱围岩开挖的一个关键问题,针对高水压、大水量的软弱围岩采用全面帷幕注浆进行超前预注浆,需要的注浆压力大,在注浆时可能会出现注浆盲区,降低注浆效果。为此,我们提出了一种高压富水软弱围岩山岭隧道的超前预注浆方法投入使用,以解决上述问题。
发明内容
本发明的目的在于提供一种高压富水软弱围岩山岭隧道的超前预注浆方法,以解决上述背景技术中提出的问题。
为实现上述目的,本发明提供如下技术方案:一种高压富水软弱围岩山岭隧道的超前预注浆方法,该方法的具体步骤如下:
S1:开挖山岭隧道的单侧壁导坑左上半面,施做初期支护、锁脚锚杆;
S2:开挖山岭隧道的单侧壁导坑左下半面,施做初期支护,浇注仰拱衬砌,回填片石砼;
S3:在山岭隧道的单侧壁左下半部分回填完片石砼后开挖右侧导洞上半断面,施做初期支护,浇注仰拱衬砌,并在右侧导洞下半断面回填片石砼;
S4:随后开挖拱顶核心土,施做拱顶初期支护,并浇注仰拱砼;
S5:在上台阶掌子面用砂袋封堵,封堵到中台阶后,沿隧道洞内掌子面砂袋面施做混凝土止浆墙,并在止浆墙与洞口侧壁配双层钢筋网固定;
S6:在注浆钻孔内设置孔口管,并将孔口管预埋入止浆墙中,通过止浆墙内的钢筋网固定其位置;
S7:在止浆墙与已建隧道衬砌间采用支撑钢管纵向支撑,在隧道掌子面拱部采用小导管斜向前方对开挖轮廓线外预注浆区域进行注浆;
S8:测定隧道钻孔内的静水压,并在静水压的基础上增加0.5-1MPa的压力作为注浆压力,注浆完成后,待水泥浆液稳定后再进行掌子面开挖。
优选的,所述步骤S5中,止浆墙的外轮廓与隧道的开挖面相同,其倾角为60-70°。
优选的,所述步骤S5中,止浆墙的厚度为1-2m,钢筋网采用φ14钢筋捆扎而成,双层钢筋网间距50-60cm,钢筋网距墙面10-15cm。
优选的,所述步骤S6中,孔口管为φ120mm无缝钢管,壁厚为5mm,管长3m,注浆孔的终孔直径为φ91mm,孔深24m。
优选的,所述步骤S7中,小导管外插角为10-30°,长度4-6m,环向间距为1m。
优选的,所述步骤S8中,注浆采用的水泥为普通硅酸盐水泥浆或水泥单液浆。
与现有技术相比,本发明的有益效果是:本发明能够克服软弱围岩隧道施工注浆效果无法准确评价的不足,能够对注浆过程实时监控,能够针对高压富水软弱围岩隧道的开挖过程中高水压、大水量的特点进行超前预注浆,解决了高压富水软弱围岩山岭隧道的注浆难题,利于降低注浆施工成本,同时提高高压富水软弱围岩山岭隧道施工的安全度,减少不必要的人员损失,其措施合理、安全可控。
附图说明
图1为本发明注浆流程图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1,本发明提供一种技术方案:一种高压富水软弱围岩山岭隧道的超前预注浆方法,该方法的具体步骤如下:
S1:开挖山岭隧道的单侧壁导坑左上半面,施做初期支护、锁脚锚杆;
S2:开挖山岭隧道的单侧壁导坑左下半面,施做初期支护,浇注仰拱衬砌,回填片石砼;
S3:在山岭隧道的单侧壁左下半部分回填完片石砼后开挖右侧导洞上半断面,施做初期支护,浇注仰拱衬砌,并在右侧导洞下半断面回填片石砼;
S4:随后开挖拱顶核心土,施做拱顶初期支护,并浇注仰拱砼;
S5:在上台阶掌子面用砂袋封堵,封堵到中台阶后,沿隧道洞内掌子面砂袋面施做混凝土止浆墙,并在止浆墙与洞口侧壁配双层钢筋网固定,止浆墙的外轮廓与隧道的开挖面相同,其倾角为60-70°,止浆墙的厚度为1-2m,钢筋网采用φ14钢筋捆扎而成,双层钢筋网间距50-60cm,钢筋网距墙面10-15cm;
S6:在注浆钻孔内设置孔口管,并将孔口管预埋入止浆墙中,通过止浆墙内的钢筋网固定其位置,孔口管为φ120mm无缝钢管,壁厚为5mm,管长3m,注浆孔的终孔直径为φ91mm,孔深24m;
S7:在止浆墙与已建隧道衬砌间采用支撑钢管纵向支撑,在隧道掌子面拱部采用小导管斜向前方对开挖轮廓线外预注浆区域进行注浆,小导管外插角为10-30°,长度4-6m,环向间距为1m;
S8:测定隧道钻孔内的静水压,并在静水压的基础上增加0.5-1MPa的压力作为注浆压力,注浆完成后,待水泥浆液稳定后再进行掌子面开挖,注浆采用的水泥为普通硅酸盐水泥浆或水泥单液浆。
本发明能够克服软弱围岩隧道施工注浆效果无法准确评价的不足,能够对注浆过程实时监控,能够针对高压富水软弱围岩隧道的开挖过程中高水压、大水量的特点进行超前预注浆,解决了高压富水软弱围岩山岭隧道的注浆难题,利于降低注浆施工成本,同时提高高压富水软弱围岩山岭隧道施工的安全度,减少不必要的人员损失,其措施合理、安全可控。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。

Claims (6)

1.一种高压富水软弱围岩山岭隧道的超前预注浆方法,其特征在于:该方法的具体步骤如下:
S1:开挖山岭隧道的单侧壁导坑左上半面,施做初期支护、锁脚锚杆;
S2:开挖山岭隧道的单侧壁导坑左下半面,施做初期支护,浇注仰拱衬砌,回填片石砼;
S3:在山岭隧道的单侧壁左下半部分回填完片石砼后开挖右侧导洞上半断面,施做初期支护,浇注仰拱衬砌,并在右侧导洞下半断面回填片石砼;
S4:随后开挖拱顶核心土,施做拱顶初期支护,并浇注仰拱砼;
S5:在上台阶掌子面用砂袋封堵,封堵到中台阶后,沿隧道洞内掌子面砂袋面施做混凝土止浆墙,并在止浆墙与洞口侧壁配双层钢筋网固定;
S6:在注浆钻孔内设置孔口管,并将孔口管预埋入止浆墙中,通过止浆墙内的钢筋网固定其位置;
S7:在止浆墙与已建隧道衬砌间采用支撑钢管纵向支撑,在隧道掌子面拱部采用小导管斜向前方对开挖轮廓线外预注浆区域进行注浆;
S8:测定隧道钻孔内的静水压,并在静水压的基础上增加0.5-1MPa的压力作为注浆压力,注浆完成后,待水泥浆液稳定后再进行掌子面开挖。
2.根据权利要求1所述的一种高压富水软弱围岩山岭隧道的超前预注浆方法,其特征在于:所述步骤S5中,止浆墙的外轮廓与隧道的开挖面相同,其倾角为60-70°。
3.根据权利要求1所述的一种高压富水软弱围岩山岭隧道的超前预注浆方法,其特征在于:所述步骤S5中,止浆墙的厚度为1-2m,钢筋网采用φ14钢筋捆扎而成,双层钢筋网间距50-60cm,钢筋网距墙面10-15cm。
4.根据权利要求1所述的一种高压富水软弱围岩山岭隧道的超前预注浆方法,其特征在于:所述步骤S6中,孔口管为φ120mm无缝钢管,壁厚为5mm,管长3m,注浆孔的终孔直径为φ91mm,孔深24m。
5.根据权利要求1所述的一种高压富水软弱围岩山岭隧道的超前预注浆方法,其特征在于:所述步骤S7中,小导管外插角为10-30°,长度4-6m,环向间距为1m。
6.根据权利要求1所述的一种高压富水软弱围岩山岭隧道的超前预注浆方法,其特征在于:所述步骤S8中,注浆采用的水泥为普通硅酸盐水泥浆或水泥单液浆。
CN201811091573.4A 2018-09-19 2018-09-19 一种高压富水软弱围岩山岭隧道的超前预注浆方法 Active CN109184742B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811091573.4A CN109184742B (zh) 2018-09-19 2018-09-19 一种高压富水软弱围岩山岭隧道的超前预注浆方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811091573.4A CN109184742B (zh) 2018-09-19 2018-09-19 一种高压富水软弱围岩山岭隧道的超前预注浆方法

Publications (2)

Publication Number Publication Date
CN109184742A true CN109184742A (zh) 2019-01-11
CN109184742B CN109184742B (zh) 2020-04-07

Family

ID=64908159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811091573.4A Active CN109184742B (zh) 2018-09-19 2018-09-19 一种高压富水软弱围岩山岭隧道的超前预注浆方法

Country Status (1)

Country Link
CN (1) CN109184742B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110656953A (zh) * 2019-10-18 2020-01-07 中铁八局集团第六工程有限公司 一种增强高地应力软岩隧道仰拱结构稳定性的加固方法
CN111472804A (zh) * 2020-05-29 2020-07-31 中铁隧道局集团有限公司 一种位于基坑中的上软下硬地层越江隧道进洞口施工方法
CN113803077A (zh) * 2021-11-18 2021-12-17 中铁九局集团第七工程有限公司 一种水平节理泥质页岩富水隧道超前支护施工方法

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19807036C1 (de) * 1998-02-19 1999-12-02 Schoendorfer Bau Und Umwelttec Verfahren zur vollflächigen Abdichtung eines mit Tübbingen ausgekleideten Tunnels sowie danach hergestellte Abdichtung
JP2005344346A (ja) * 2004-06-02 2005-12-15 Japan Railway Construction Transport & Technology Agency 鋼管打設工法
CN101638987A (zh) * 2009-07-24 2010-02-03 中铁二十一局集团有限公司 用帷幕注浆加止浆墙穿越高压富水断裂带的隧道施工方法
CN101749031A (zh) * 2009-12-24 2010-06-23 北京交通大学 海底隧道穿越富水砂层复合注浆加固方法
CN101798930A (zh) * 2010-03-24 2010-08-11 中铁十二局集团有限公司 一种隧道高压富水断层带的快速施工方法
CN101994513A (zh) * 2010-10-30 2011-03-30 中铁十二局集团第二工程有限公司 上半断面完成全断面帷幕注浆隧道施工方法
CN102278130A (zh) * 2011-09-05 2011-12-14 中铁隧道集团有限公司 隧道高压富水溶腔加筋注浆工艺方法
CN102493822A (zh) * 2011-12-29 2012-06-13 中铁二十三局集团有限公司 一种通过富水断层影响带的隧道的帷幕注浆施工方法
CN202645592U (zh) * 2011-12-28 2013-01-02 中铁十九局集团轨道交通工程有限公司 在富水流砂及断层地段隧道的全断面注浆孔及止浆墙
JP2013129985A (ja) * 2011-12-21 2013-07-04 Hikari Keikaku Sekkei Jimusyo Co Ltd トンネル内巻補強覆工による耐震補強工法
CN103256060A (zh) * 2013-05-18 2013-08-21 中铁十六局集团有限公司 富水软弱糜棱岩大断面隧道围岩加固及开挖方法
CN103334770A (zh) * 2013-06-09 2013-10-02 中铁隧道集团有限公司 一种长大反坡隧道超高水压富水破碎带施工方法
CN103628886A (zh) * 2013-11-28 2014-03-12 中铁十三局集团有限公司 富水高地应力条件下软弱围岩隧道的开挖方法
CN108442943A (zh) * 2018-03-05 2018-08-24 北京市政建设集团有限责任公司 一种渡线段隧道双侧壁导坑法施工方法

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19807036C1 (de) * 1998-02-19 1999-12-02 Schoendorfer Bau Und Umwelttec Verfahren zur vollflächigen Abdichtung eines mit Tübbingen ausgekleideten Tunnels sowie danach hergestellte Abdichtung
JP2005344346A (ja) * 2004-06-02 2005-12-15 Japan Railway Construction Transport & Technology Agency 鋼管打設工法
CN101638987A (zh) * 2009-07-24 2010-02-03 中铁二十一局集团有限公司 用帷幕注浆加止浆墙穿越高压富水断裂带的隧道施工方法
CN101749031A (zh) * 2009-12-24 2010-06-23 北京交通大学 海底隧道穿越富水砂层复合注浆加固方法
CN101798930A (zh) * 2010-03-24 2010-08-11 中铁十二局集团有限公司 一种隧道高压富水断层带的快速施工方法
CN101994513A (zh) * 2010-10-30 2011-03-30 中铁十二局集团第二工程有限公司 上半断面完成全断面帷幕注浆隧道施工方法
CN102278130A (zh) * 2011-09-05 2011-12-14 中铁隧道集团有限公司 隧道高压富水溶腔加筋注浆工艺方法
JP2013129985A (ja) * 2011-12-21 2013-07-04 Hikari Keikaku Sekkei Jimusyo Co Ltd トンネル内巻補強覆工による耐震補強工法
CN202645592U (zh) * 2011-12-28 2013-01-02 中铁十九局集团轨道交通工程有限公司 在富水流砂及断层地段隧道的全断面注浆孔及止浆墙
CN102493822A (zh) * 2011-12-29 2012-06-13 中铁二十三局集团有限公司 一种通过富水断层影响带的隧道的帷幕注浆施工方法
CN103256060A (zh) * 2013-05-18 2013-08-21 中铁十六局集团有限公司 富水软弱糜棱岩大断面隧道围岩加固及开挖方法
CN103334770A (zh) * 2013-06-09 2013-10-02 中铁隧道集团有限公司 一种长大反坡隧道超高水压富水破碎带施工方法
CN103628886A (zh) * 2013-11-28 2014-03-12 中铁十三局集团有限公司 富水高地应力条件下软弱围岩隧道的开挖方法
CN108442943A (zh) * 2018-03-05 2018-08-24 北京市政建设集团有限责任公司 一种渡线段隧道双侧壁导坑法施工方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
包德勇: "《高压富水隧道断层破碎带突涌水分析与工程对策》", 《现代隧道技术》 *
张健儒: "《山岭隧道高压富水断层破碎带注浆施工技术》", 《铁道工程学报》 *
张健明等: "《软弱围岩下小净距隧道成洞技术研究》", 《公路交通科技》 *
杨晓君等: "《复杂岩溶隧道涌水突泥处理技术》", 《隧道与地下工程》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110656953A (zh) * 2019-10-18 2020-01-07 中铁八局集团第六工程有限公司 一种增强高地应力软岩隧道仰拱结构稳定性的加固方法
CN111472804A (zh) * 2020-05-29 2020-07-31 中铁隧道局集团有限公司 一种位于基坑中的上软下硬地层越江隧道进洞口施工方法
CN113803077A (zh) * 2021-11-18 2021-12-17 中铁九局集团第七工程有限公司 一种水平节理泥质页岩富水隧道超前支护施工方法

Also Published As

Publication number Publication date
CN109184742B (zh) 2020-04-07

Similar Documents

Publication Publication Date Title
CN102606162B (zh) 隧道软弱围岩浅埋易坍塌区快速施工方法
CN103089275B (zh) 富水极破碎围岩隧道塌方段围岩控制方法
CN107762533B (zh) 一种高压富水软弱围岩山岭隧道的超前预注浆方法
CN103334770B (zh) 一种长大反坡隧道超高水压富水破碎带施工方法
CN102606167B (zh) 浅埋暗挖隧道横向注浆导管沉降控制施工方法
CN106194196B (zh) 一种横穿隧道洞身的大型溶洞处理与开挖方法
CN102926757A (zh) 山岭软弱大跨隧道两台阶四步开挖支护的施工方法
CN110017144B (zh) 一种考虑基底加固处理的黄土隧道三台阶施工方法
CN108643935A (zh) 富水浅埋地质下隧道的施工方法
CN107313431A (zh) 临近不等高基坑同步施工方法
CN101709651A (zh) 海底隧道的注浆堵水方法
CN109404005A (zh) 暗挖隧道小洞进大洞预加固体系及施工方法
CN109184742A (zh) 一种高压富水软弱围岩山岭隧道的超前预注浆方法
CN102606168B (zh) 防止浅埋暗挖隧道开挖时沉降变形的施工方法
CN105781573A (zh) 铁路下穿公路隧道双层套管加筋双管棚跟管钻进施工方法
CN109026020B (zh) 一种富水隧道溶洞处理与开挖方法
CN104533451A (zh) 在散体碎石土及破碎围岩中的隧道超前预支护技术
CN113073983B (zh) 海底隧道穿越富水断层破碎带的围挡式注浆施工方法
CN107965325B (zh) 一种小净距浅埋隧道初支拱架更换施工方法
CN110685714A (zh) 千枚岩地质下浅埋偏压隧道微台阶预留核心土施工结构及方法
CN106246191B (zh) 一种洞体深浚、充填丰满的大型溶洞处理及隧道开挖方法
CN208965598U (zh) 灌浆帷幕与地下洞室相交部位的防渗处理结构
CN205895242U (zh) 一种小角度交叉口隧道结构
CN107420104A (zh) 浅埋隧道超大直径水平预钻孔静态爆破开挖施工方法
Shi et al. Mechanics parameter optimization and evaluation of curtain grouting material in deep, water-rich karst tunnels

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant