CN109404005A - 暗挖隧道小洞进大洞预加固体系及施工方法 - Google Patents
暗挖隧道小洞进大洞预加固体系及施工方法 Download PDFInfo
- Publication number
- CN109404005A CN109404005A CN201811332171.9A CN201811332171A CN109404005A CN 109404005 A CN109404005 A CN 109404005A CN 201811332171 A CN201811332171 A CN 201811332171A CN 109404005 A CN109404005 A CN 109404005A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- steel tube
- section
- duck eye
- tube shed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/003—Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
Abstract
本发明涉及暗挖隧道小洞进大洞预加固体系及施工方法,位于隧道小洞进大洞的变截面处,包括大管棚、超前小导管和深孔注浆管;大管棚从小断面隧道掌子面拱顶向地层内打设至大断面隧道拱顶地层范围,并注浆加固周围地层;超前小导管从小断面隧道拱顶向地层内打设至隧道变截面地层范围,并注浆加固隧道变截面节点地层;深孔注浆管从小断面隧道掌子面变截面处向地层内打设至大断面隧道洞顶及洞身地层范围,并注浆加固周围地层。结构成型后,可满足一般地层隧道小洞进大洞的相关功能要求,确保隧道小洞进大洞安全施工,同时加大地层加固区对地面及周围重要建筑的影响较小,解决了隧道小洞进大洞施工难、效果差的问题。
Description
技术领域
本发明属于隧道建设技术领域,具体涉及一种暗挖隧道小洞进大洞预加固体系及施工方法。
背景技术
隧道在城市地下地铁工程中应用广泛,在城市地铁施工时,往往需满足不同专业要求下在隧道内扩大隧道断面,因此不可避免的隧道将会出现小洞进大洞现象。
暗挖隧道小洞进大洞时往往需要对变截面处地层进行超前加固,以减小隧道小洞进大洞施工安全,常规采用在变截面处局部扩挖方法,采取钢筋网+喷射砼的支护形式容易造成施工期间的安全隐患,或制作异形钢架;其次后期二次衬砌的施工增加工程投资。因此对于暗挖隧道小洞进大洞施工时,对施工方法及地层有效的加固提出了更高的要求。
发明内容
本发明的目的是提供一种暗挖隧道小洞进大洞预加固体系及施工方法,改变常规隧道小洞进大洞施做方式,确保隧道小洞进大洞安全施工。
本发明所采用的技术方案为:
暗挖隧道小洞进大洞预加固体系,其特征在于:
位于隧道小洞进大洞的变截面处,包括大管棚、超前小导管和深孔注浆管;
大管棚从小断面隧道掌子面拱顶向地层内打设至大断面隧道拱顶地层范围,并注浆加固周围地层;
超前小导管从小断面隧道拱顶向地层内打设至隧道变截面地层范围,并注浆加固隧道变截面节点地层;
深孔注浆管从小断面隧道掌子面变截面处向地层内打设至大断面隧道洞顶及洞身地层范围,并注浆加固周围地层。
大管棚和超前小导管为注浆钢花管;深孔注浆管为注浆PVC管。
大管棚等间距覆盖大断面隧道拱部范围。
大管棚与隧道初支护系统的钢架焊接固定。
超前小导管等间距覆盖小断面隧道拱部范围。
超前小导管与隧道初支护系统的钢架焊接固定。
超前小导管与大管棚加固区互相咬合。
深孔注浆管以间距500-800mm打设。
深孔注浆管与大管棚加固区、超前小导管加固区互相咬合。
暗挖隧道小洞进大洞预加固体系的施工方法,其特征在于:
步骤一:小断面隧道开挖施做隧道初支护系统;根据大断面隧道距离掌子面距离及大管棚打设角度确定大管棚施做位置;
步骤二:在小断面隧道拱顶适当的位置钻孔施做大管棚,以1°~2°外插角打设大管棚,大管棚钢管采用Φ108mm,壁厚6mm的无缝钢管,分节安装;向管内注浆,大管棚超前注浆加固完成后,继续开挖掌子面在大管棚施做处立一品钢架与大管棚进行焊接;
步骤三:在小断面隧道拱顶适当的位置钻孔施做超前小导管,以1°~2°外插角打设,打设置至隧道变截面处;超前小导管注浆加固完成后,继续开挖掌子面在超前小导管施做处立一品钢架与超前小导管进行焊接;
步骤四:在小断面隧道施工至变截面处,根据地层条件打设深孔注浆管并注浆加固,与大管棚、超前小导管加固范围进行咬合,确保大断面隧道进洞安全。
本发明具有以下优点:
本发明在隧道变截面处,设置管棚、小导管及深孔注浆预加固体系。根据需要灵活的确定加固范围,可据需加固地层条件确定管棚长度及深孔注浆范围,可对管棚数量及打设角度、水平间距做出适当调整;管棚注浆后需将大管棚与初支系统钢架进行有效焊接,以加强初支系统结构;超前小导管、深孔注浆浆体加固结合管棚联合作用,保证地层稳定,确保隧道小洞进大洞安全施工。不仅方便施工操作,还节省工程投资;不仅可以有效的加固地层,对周围环境影响也较小。
本发明结构成型后,可满足一般地层隧道小洞进大洞的相关功能要求,确保隧道小洞进大洞安全施工,同时加大地层加固区对地面及周围重要建筑的影响较小。如此便解决了隧道小洞进大洞施工难、效果差的问题,其在水工隧道、城市地铁隧道等建设领域均有广泛的应用价值。
附图说明
图1为隧道初支结构及管棚、小导管、深孔注浆管(横剖面)示意图。
图2为隧道初支结构及管棚、小导管、深孔注浆管(纵剖面)示意图。
图中,1-大管棚,2-超前小导管,3-深孔注浆管,4-隧道初支护系统。
具体实施方式
下面结合具体实施方式对本发明进行详细的说明。
暗挖隧道小洞进大洞时,常规采用在变截面处局部扩挖法,采取钢筋网+喷射砼的支护形式容易造成施工期间的安全隐患,或制作异形钢架;其次后期二次衬砌需耗费大量钢筋混凝土。
本发明利用管棚、超前小导管和深孔注浆对地层进行加固,增大地层的加固范围,进而减小对周边建筑物及环境的影响。本发明充分利用了管棚、深孔注浆超前预加固的可靠性,不仅施工便利、节省投资,规避了施工风险,而且还大大降低了对地面及其周边建构筑物的影响。
本发明所涉及的暗挖隧道小洞进大洞预加固体系具体结构为:大管棚1,通过在隧道拱顶施做大管棚1进行注浆加固;超前小导管2,通过在隧道拱顶施做超前小导管2进行注浆加固;深孔注浆系统,通过在隧道变截面处掌子面施做PVC管进行注浆加固与大管棚1及超前小导管2加固区进行咬合;
其中,大管棚1、超前小导管2与初期支护系统中钢架进行焊接;大管棚1、超前小导管2及深孔注浆管3钻进过程中应采用水平测斜仪经常量测管棚的偏斜度,发现偏斜值超出设计要求时,应及时纠偏;大管棚1钢管采用Φ108mm,壁厚6mm的无缝钢管,分节安装。注浆管上钻注浆孔,注浆钢管上钻注浆孔,孔径Φ10mm,孔间距200mm,呈梅花型布置。孔径注浆浆液采用水泥砂浆,初拟参数:水泥浆水灰比0.8:1~1:1,注浆压力:采用0.2~0.4MPa施工中应据实际地质情况,并通过试验确定有关施工参数。
大管棚1的施工时机需要在小断面隧道超前管棚加固的同时对大断面隧道拱部范围实现预加固;所述的大管棚需等间距覆盖大断面隧道拱部范围:注浆后需将大管棚与初支系统钢架进行有效焊接,以加强初支系统结构。
超前小导管2的施工需在小断面隧道大管棚施工后根据掌子面至端墙距离打设超前小导管至隧道变截面处,并注浆加固周围地层,加固区需与管棚加固区咬合,确保隧道变截面施工安全。所述的超前小导管需等间距覆盖小断面隧道拱部范围:注浆后需将大管棚与初支系统钢架进行有效焊接,以加强初支系统结构。
深孔注浆管3的施工时机需要在小断面隧道施工完成后,根据地层条件在小断面隧道掌子面打设深孔注浆管与管棚加固区、超前小导管加固区咬合确保变截面处地层稳定及大断面隧道进洞安全。
具体施工方法如下:
步骤一:小断面隧道开挖施做隧道初支护系统4;根据大断面隧道距离掌子面距离及大管棚1打设角度确定大管棚1施做位置;
步骤二:在小断面隧道拱顶适当的位置钻孔施做大管棚1,以1°~2°外插角打设大管棚1,大管棚1钢管采用Φ108mm,壁厚6mm的无缝钢管,分节安装;向管内注浆,大管棚1超前注浆加固完成后,继续开挖掌子面在大管棚1施做处立一品钢架与大管棚1进行焊接;
步骤三:在小断面隧道拱顶适当的位置钻孔施做超前小导管2,以1°~2°外插角打设,打设置至隧道变截面处;超前小导管2注浆加固完成后,继续开挖掌子面在超前小导管2施做处立一品钢架与超前小导管2进行焊接;
步骤四:在小断面隧道施工至变截面处,根据地层条件打设深孔注浆管3并注浆加固,与大管棚1、超前小导管2加固范围进行咬合,确保大断面隧道进洞安全。
这种暗挖隧道小洞进大洞预加固体系解决了隧道小洞进大洞施工风险大,施工困难、投资大的缺点。通过注浆体及管棚形成的加固体系确保大断面隧道进洞安全,从而降低工程风险。
本发明的内容不限于实施例所列举,本领域普通技术人员通过阅读本发明说明书而对本发明技术方案采取的任何等效的变换,均为本发明的权利要求所涵盖。
Claims (10)
1.暗挖隧道小洞进大洞预加固体系,其特征在于:
位于隧道小洞进大洞的变截面处,包括大管棚(1)、超前小导管(2)和深孔注浆管(3);
大管棚(1)从小断面隧道掌子面拱顶向地层内打设至大断面隧道拱顶地层范围,并注浆加固周围地层;
超前小导管(2)从小断面隧道拱顶向地层内打设至隧道变截面地层范围,并注浆加固隧道变截面节点地层;
深孔注浆管(3)从小断面隧道掌子面变截面处向地层内打设至大断面隧道洞顶及洞身地层范围,并注浆加固周围地层。
2.根据权利要求1所述的暗挖隧道小洞进大洞预加固体系,其特征在于:
大管棚(1)和超前小导管(2)为注浆钢花管;深孔注浆管(3)为注浆PVC管。
3.根据权利要求1所述的暗挖隧道小洞进大洞预加固体系,其特征在于:
大管棚(1)等间距覆盖大断面隧道拱部范围。
4.根据权利要求1所述的暗挖隧道小洞进大洞预加固体系,其特征在于:
大管棚(1)与隧道初支护系统(4)的钢架焊接固定。
5.根据权利要求1所述的暗挖隧道小洞进大洞预加固体系,其特征在于:
超前小导管(2)等间距覆盖小断面隧道拱部范围。
6.根据权利要求1所述的暗挖隧道小洞进大洞预加固体系,其特征在于:
超前小导管(2)与隧道初支护系统(4)的钢架焊接固定。
7.根据权利要求1所述的暗挖隧道小洞进大洞预加固体系,其特征在于:
超前小导管(2)与大管棚(1)加固区互相咬合。
8.根据权利要求1所述的暗挖隧道小洞进大洞预加固体系,其特征在于:
深孔注浆管(3)以间距500-800mm打设。
9.根据权利要求1所述的暗挖隧道小洞进大洞预加固体系,其特征在于:
深孔注浆管(3)与大管棚(1)加固区、超前小导管(2)加固区互相咬合。
10.暗挖隧道小洞进大洞预加固体系的施工方法,其特征在于:
步骤一:小断面隧道开挖施做隧道初支护系统(4);根据大断面隧道距离掌子面距离及大管棚(1)打设角度确定大管棚(1)施做位置;
步骤二:在小断面隧道拱顶适当的位置钻孔施做大管棚(1),以1°~2°外插角打设大管棚(1),大管棚(1)钢管采用Φ108mm,壁厚6mm的无缝钢管,分节安装;向管内注浆,大管棚(1)超前注浆加固完成后,继续开挖掌子面在大管棚(1)施做处立一品钢架与大管棚(1)进行焊接;
步骤三:在小断面隧道拱顶适当的位置钻孔施做超前小导管(2),以1°~2°外插角打设,打设置至隧道变截面处;超前小导管(2)注浆加固完成后,继续开挖掌子面在超前小导管(2)施做处立一品钢架与超前小导管(2)进行焊接;
步骤四:在小断面隧道施工至变截面处,根据地层条件打设深孔注浆管(3)并注浆加固,与大管棚(1)、超前小导管(2)加固范围进行咬合,确保大断面隧道进洞安全。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811332171.9A CN109404005B (zh) | 2018-11-09 | 2018-11-09 | 暗挖隧道小洞进大洞预加固体系及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811332171.9A CN109404005B (zh) | 2018-11-09 | 2018-11-09 | 暗挖隧道小洞进大洞预加固体系及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109404005A true CN109404005A (zh) | 2019-03-01 |
CN109404005B CN109404005B (zh) | 2023-09-15 |
Family
ID=65472509
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811332171.9A Active CN109404005B (zh) | 2018-11-09 | 2018-11-09 | 暗挖隧道小洞进大洞预加固体系及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109404005B (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110005442A (zh) * | 2019-04-26 | 2019-07-12 | 中铁二十三局集团第六工程有限公司 | 下穿既有建筑城市地下暗挖区间围岩加固工艺 |
CN110080784A (zh) * | 2019-05-14 | 2019-08-02 | 福建工程学院 | 一种穿越富水砂性地层的隧洞开挖及加固方法 |
CN111810200A (zh) * | 2020-08-11 | 2020-10-23 | 中铁第一勘察设计院集团有限公司 | 基于中立柱与仰拱的盾构隧道扩挖体系及其方法 |
CN112502743A (zh) * | 2020-11-30 | 2021-03-16 | 中铁二十局集团第五工程有限公司 | 富水砂层盾构区间联络通道超前注浆加固方法 |
CN112502717A (zh) * | 2020-11-30 | 2021-03-16 | 中铁二十局集团第五工程有限公司 | 富水砂层盾构区间联络通道开挖施工方法 |
CN112502731A (zh) * | 2020-11-30 | 2021-03-16 | 中铁二十局集团第五工程有限公司 | 富水砂层盾构区间联络通道地层预加固结构及方法 |
CN112963153A (zh) * | 2021-02-07 | 2021-06-15 | 中交一公局集团有限公司 | 隧道超前预支护施工方法 |
CN113389555A (zh) * | 2021-07-30 | 2021-09-14 | 中铁十二局集团有限公司 | 一种适用于暗挖隧道下穿高风险管线的施工保护方法 |
CN113446009A (zh) * | 2021-06-01 | 2021-09-28 | 北京市政建设集团有限责任公司 | 一种智能浅埋暗挖的作业方法、设备及存储介质 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104747194A (zh) * | 2015-03-10 | 2015-07-01 | 中铁九局集团有限公司 | 三线并行小间距大断面隧道群施工方法 |
CN104806267A (zh) * | 2015-04-29 | 2015-07-29 | 中铁第一勘察设计院集团有限公司 | 卵石土地层超前大管棚的盾构端头加固体系及其施工方法 |
CN205013011U (zh) * | 2015-09-28 | 2016-02-03 | 中铁二十局集团有限公司 | 碎屑流地层隧道超前支护结构 |
WO2016095630A1 (zh) * | 2014-12-15 | 2016-06-23 | 中铁第四勘察设计院集团有限公司 | 超大变断面隧道施工方法 |
CN105863648A (zh) * | 2016-04-06 | 2016-08-17 | 中铁二十三局集团第二工程有限公司 | 一种暗挖浅覆大断面隧道施工方法 |
CN107725056A (zh) * | 2017-10-13 | 2018-02-23 | 中铁五局集团有限公司 | 一种穿越淤泥质地层隧道全环超前快速注浆施工方法 |
-
2018
- 2018-11-09 CN CN201811332171.9A patent/CN109404005B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016095630A1 (zh) * | 2014-12-15 | 2016-06-23 | 中铁第四勘察设计院集团有限公司 | 超大变断面隧道施工方法 |
CN104747194A (zh) * | 2015-03-10 | 2015-07-01 | 中铁九局集团有限公司 | 三线并行小间距大断面隧道群施工方法 |
CN104806267A (zh) * | 2015-04-29 | 2015-07-29 | 中铁第一勘察设计院集团有限公司 | 卵石土地层超前大管棚的盾构端头加固体系及其施工方法 |
CN205013011U (zh) * | 2015-09-28 | 2016-02-03 | 中铁二十局集团有限公司 | 碎屑流地层隧道超前支护结构 |
CN105863648A (zh) * | 2016-04-06 | 2016-08-17 | 中铁二十三局集团第二工程有限公司 | 一种暗挖浅覆大断面隧道施工方法 |
CN107725056A (zh) * | 2017-10-13 | 2018-02-23 | 中铁五局集团有限公司 | 一种穿越淤泥质地层隧道全环超前快速注浆施工方法 |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110005442A (zh) * | 2019-04-26 | 2019-07-12 | 中铁二十三局集团第六工程有限公司 | 下穿既有建筑城市地下暗挖区间围岩加固工艺 |
CN110080784A (zh) * | 2019-05-14 | 2019-08-02 | 福建工程学院 | 一种穿越富水砂性地层的隧洞开挖及加固方法 |
CN110080784B (zh) * | 2019-05-14 | 2021-03-30 | 福建工程学院 | 一种穿越富水砂性地层的隧洞开挖及加固方法 |
CN111810200A (zh) * | 2020-08-11 | 2020-10-23 | 中铁第一勘察设计院集团有限公司 | 基于中立柱与仰拱的盾构隧道扩挖体系及其方法 |
CN112502743A (zh) * | 2020-11-30 | 2021-03-16 | 中铁二十局集团第五工程有限公司 | 富水砂层盾构区间联络通道超前注浆加固方法 |
CN112502717A (zh) * | 2020-11-30 | 2021-03-16 | 中铁二十局集团第五工程有限公司 | 富水砂层盾构区间联络通道开挖施工方法 |
CN112502731A (zh) * | 2020-11-30 | 2021-03-16 | 中铁二十局集团第五工程有限公司 | 富水砂层盾构区间联络通道地层预加固结构及方法 |
CN112963153A (zh) * | 2021-02-07 | 2021-06-15 | 中交一公局集团有限公司 | 隧道超前预支护施工方法 |
CN113446009A (zh) * | 2021-06-01 | 2021-09-28 | 北京市政建设集团有限责任公司 | 一种智能浅埋暗挖的作业方法、设备及存储介质 |
CN113446009B (zh) * | 2021-06-01 | 2023-06-27 | 北京市政建设集团有限责任公司 | 一种智能浅埋暗挖的作业方法、设备及存储介质 |
CN113389555A (zh) * | 2021-07-30 | 2021-09-14 | 中铁十二局集团有限公司 | 一种适用于暗挖隧道下穿高风险管线的施工保护方法 |
CN113389555B (zh) * | 2021-07-30 | 2023-05-26 | 中铁十二局集团有限公司 | 一种适用于暗挖隧道下穿高风险管线的施工保护方法 |
Also Published As
Publication number | Publication date |
---|---|
CN109404005B (zh) | 2023-09-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109404005A (zh) | 暗挖隧道小洞进大洞预加固体系及施工方法 | |
CN205742213U (zh) | 基坑支护结构 | |
CN104653197B (zh) | 超大变断面隧道施工方法 | |
CN103256060B (zh) | 富水软弱糜棱岩大断面隧道围岩加固及开挖方法 | |
CN103982188B (zh) | 岩质地层大断面深竖井的支护结构体系及其施工方法 | |
CN103089275A (zh) | 富水极破碎围岩隧道塌方段围岩控制方法 | |
CN110905530B (zh) | 穿越断层破碎带的富水软岩隧道稳定性控制施工方法 | |
CN102926757A (zh) | 山岭软弱大跨隧道两台阶四步开挖支护的施工方法 | |
CN110924959B (zh) | 穿越断层破碎带的富水软弱围岩隧道施工方法 | |
CN109026020B (zh) | 一种富水隧道溶洞处理与开挖方法 | |
CN111119935A (zh) | 一种巷道松软破碎构造围岩多层次注浆加固方法 | |
CN108798702A (zh) | 一种大断面软岩大变形隧道的支护方法 | |
CN108166989A (zh) | 富水地层“oc”形非对称联拱隧道中隔壁施工方法 | |
CN104405411A (zh) | 超大变断面隧道支护结构 | |
CN203879506U (zh) | 一种岩质地层大断面深竖井的支护结构体系 | |
CN110700860B (zh) | 一种穿越黄土沟谷的土石分界隧道施工方法 | |
CN109184742B (zh) | 一种高压富水软弱围岩山岭隧道的超前预注浆方法 | |
CN108915702B (zh) | 一种圆形小断面隧道内盾构接收方法 | |
CN107191206B (zh) | 一种浅埋大跨隧道两单元六步施工方法 | |
CN209339958U (zh) | 一种暗挖隧道小洞进大洞预加固体系 | |
CN105134247A (zh) | 水平层状ⅲ类围岩中的隧道支护结构和施工方法 | |
CN102606173A (zh) | 一种处理隧道变形段、加快掘进的施工方法 | |
CN202673299U (zh) | 一种软弱围岩隧道双层模筑复合式衬砌支护结构 | |
CN103775102A (zh) | 潜孔钻跟管成孔回填砼稳定临空面处理塌方施工方法 | |
CN109723446A (zh) | 微膨胀粉质粘土地层隧道四台阶加临时仰拱施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |