CN202645592U - 在富水流砂及断层地段隧道的全断面注浆孔及止浆墙 - Google Patents

在富水流砂及断层地段隧道的全断面注浆孔及止浆墙 Download PDF

Info

Publication number
CN202645592U
CN202645592U CN 201120558829 CN201120558829U CN202645592U CN 202645592 U CN202645592 U CN 202645592U CN 201120558829 CN201120558829 CN 201120558829 CN 201120558829 U CN201120558829 U CN 201120558829U CN 202645592 U CN202645592 U CN 202645592U
Authority
CN
China
Prior art keywords
tunnel
grouting
grout
water
boring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120558829
Other languages
English (en)
Inventor
应金星
朱元生
祁世亮
陈宁
谷少琴
运飞
董军
才群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Rail Transit Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN 201120558829 priority Critical patent/CN202645592U/zh
Application granted granted Critical
Publication of CN202645592U publication Critical patent/CN202645592U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本实用新型公开了一种富水流砂及断层地段隧道的全断面注浆孔及止浆墙,解决了在断层及富水地段施开挖面涌水涌砂,造成浆液浪费和注浆凝结效果差的技术问题。包括在隧道开挖断面(36)上沿隧道轮廓线间隔地设置有外圈钻孔(37),在外圈钻孔(37)内设置有内圈钻孔(38),在内圈钻孔(38)中设置有中心点钻孔(39),外圈钻孔(37)、内圈钻孔(38)和中心点钻孔(39)均为30米深,在每个钻孔中填充有水泥水玻璃双液浆,在初始段的隧道开挖断面(36)上设置有采用锚杆挂网喷射混凝土构成的初始止浆盘(40),在隧道开挖方向上连续设置有分段注浆段,在相邻的注浆段之间均设置有相邻止浆盘(41)。固结止水快,保持围岩的稳定性好。

Description

在富水流砂及断层地段隧道的全断面注浆孔及止浆墙
技术领域
 本实用新型涉及一种隧道的全断面注浆孔,特别涉及一种在断层及富水流砂地段的隧道内为防止开挖面涌水涌砂采用的注浆孔及止浆墙。
背景技术
在断层及富水流砂地段施工隧道时,为防止开挖面涌水、涌砂,注浆方式一般采用隧道全封闭深孔预注浆,即沿隧道全断面开挖轮廓线轴向辐射状注浆孔,然后,注入按一定比例配制而成的水泥、水玻璃双液浆,浆液渗透扩散到岩层或砂层的孔隙中,并快速凝固,与周围破碎岩块结成具有一定强度的结石体,在隧道周边及开挖面形成一个固结堵水帷幕,切断地下水流通路。但现有技术在断层及富水地段施工时,由于地下水流量大,按常规布置的注浆孔使注浆的浆液极易随水流排出,浆液滞留困难,造成了浆液浪费和注浆凝结效果差。
发明内容
本实用新型提供了一种在富水流砂及断层地段隧道的全断面注浆孔及止浆墙,解决了在断层及富水地段施开挖面涌水涌砂,造成浆液浪费和注浆凝结效果差的技术问题。
本实用新型是通过以下方案解决以上问题的:
一种富水流砂及断层地段隧道的全断面注浆孔及止浆墙,包括隧道开挖断面,在隧道开挖断面上沿隧道轮廓线间隔地设置有外圈钻孔,在外圈钻孔内设置有内圈钻孔,在内圈钻孔中设置有中心点钻孔,外圈钻孔、内圈钻孔和中心点钻孔均为30米深,在每个钻孔中填充有水泥水玻璃双液浆,在初始隧道开挖断面初始段设置有采用锚杆挂网喷射混凝土构成的初始止浆盘,在隧道开挖方向上连续设置有分段注浆段,在相邻的注浆段之间均设置有相邻止浆盘。
所述的初始止浆盘和相邻止浆盘的厚度均为4米。
本实用新型特别适用于在富水流砂及断层地段隧道的全断面注浆作业中,固结止水快,保持围岩的稳定性好。
附图说明
图1是本实用新型在隧道开挖断面上的布孔纵向结构示意图;
图2是本实用新型在隧道开挖断面上的布孔及终孔交圈结构示意图;
其中:1-19表示的是外圈钻孔在注浆后形成的扩散凝结圈相互交圈的情况,20-29表示的是内圈钻孔在注浆后形成的扩散凝结圈相互交圈的情况,30-35表示的是中心钻孔在注浆后形成的扩散凝结圈相互交圈的情况;
图3是本实用新型的各注浆段与止浆盘之间连接关系的示意图。
具体实施方式
一种富水流砂及断层地段隧道的全断面注浆孔及止浆墙,包括隧道开挖断面36,在隧道开挖断面36上沿隧道轮廓线间隔地设置有外圈钻孔37,在外圈钻孔37内设置有内圈钻孔38,在内圈钻孔38中设置有中心点钻孔39,外圈钻孔37、内圈钻孔38和中心点钻孔39均为30米深,在每个钻孔中填充有水泥水玻璃双液浆,在初始隧道开挖断面36初始段设置有采用锚杆挂网喷射混凝土构成的初始止浆盘40,在隧道开挖方向上连续设置有分段注浆段,在相邻的注浆段之间设置有相邻止浆盘41。
所述的初始止浆盘40和相邻止浆盘41的厚度均为4米。
按隧道全断面开挖轮廓布孔,孔底成多层圈。本实用新型布孔35个注浆孔全断面全封闭深孔预注浆,注浆有效长度30米。注浆方式采取钻一段注浆一段的渐进式注浆,直至达到设计段长位置。注浆有效扩散范围为开挖轮廓线外4米,若遇人工填石层,注浆有效扩散范围为开挖轮廓线外5米。注浆压力,一般为地下水静压力的2-3倍。隧道富水断层初始压力2-3MPa,注浆终压值为4-5Mpa,单孔浆液的终孔扩散半径为4米。注浆量一是按注浆范围内围岩体积的5%-8%考虑。全封闭预注浆,为防止漏(跑)浆,必须在掌子面施工制作止浆盘。本实用新型开挖断面的初始段采用锚杆挂网喷射混凝土作为止浆盘。下一段止浆盘是利用已注浆段预留4-5米作为止浆盘。注浆材料选用普通硅酸盐水泥,水玻璃选用浓度为9-10玻米度,比重为1.42-1.45牛/米3,模数为2.4-2.8的水玻璃原液,缓凝剂选用磷酸氢二钠。水与水泥比:浓浆时:选0.5: 1或0.6: 1或0.8: 1,稀浆时:选1: 1 或1.25: 1或1.5: 1,水泥浆与水玻璃的体积比为1: 0.5-1: 0.7,缓凝剂为磷酸氢二钠,加入量为水泥重量的1-3%。为满足浆液扩散半径的要求,本方案注浆采用的凝结时间一般地段3分钟,富水地段为1-2分钟。注浆顺序为由下而上,由里向外,即层层“抬水”方式。将水堵到固结圈外,阻止地下水流动。注浆一般采用钻一个孔就注浆一个孔的方式,并记录注浆和注浆量。
注浆速度的选择应根据岩层的类别及破碎程度,钻孔出水量以及注浆泵的能力确定。注浆速度最好取60-80升/每分钟。注浆前标定注浆泵上电接触点压力表的最大压力指标,泵压后观察压力变化及水泥浆和水玻璃的消耗数量。注浆结束的标准是:注入量已达到设计的80%或注浆压力达到设计终压。
水泥水玻璃浆液的配比应根据所需胶凝时间而定,因同一的配合比,胶凝时间也会因环境、温度、施工的条件不同而有较大的差别。同时不同条件下的施工,对浆液的配合比和胶凝时间的要求也不同。因此,必须进行不同配合比的现场试验,以选取合理的配比。为满足浆液扩散半径的要求,本方案注浆采用的凝结时间一般地段3分钟,富水地段为1-2分钟。
水泥和水玻璃组成双液浆的凝胶时间不同于凝结时间。凝胶时间较短,是指由流动状态变为不流动状态的过程。凝结是水泥浆体开始失去可塑性的时间。浆液凝结施工控制分三种情况:
第一种情况:水灰比固定,水玻璃浓度不变,变换双液浆的比例。当水玻璃溶液所占比例由小到大,凝胶时间则由长到短,初、终凝时间由慢到快。
第二种情况:水玻璃浓度不变,双液浆的比例固定,变换水灰比。当水灰比由小到大,凝胶时间由短到长,初、终凝时间亦由快到慢。
第三种情况:水灰比不变,双液浆比固定,变换水玻璃浓度。当水玻璃浓度由高到低,凝胶时间由短到长,初、终凝时间由快到慢。

Claims (2)

1.一种富水流砂及断层地段隧道的全断面注浆孔及止浆墙,包括隧道开挖断面(36),在隧道开挖断面(36)上沿隧道轮廓线间隔地设置有外圈钻孔(37),在外圈钻孔(37)内设置有内圈钻孔(38),在内圈钻孔(38)中设置有中心点钻孔(39),其特征在于,外圈钻孔(37)、内圈钻孔(38)和中心点钻孔(39)均为30米深,在每个钻孔中填充有水泥水玻璃双液浆,在初始段的隧道开挖断面(36)上设置有采用锚杆挂网喷射混凝土构成的初始止浆盘(40),在隧道开挖方向上连续设置有分段注浆段,在相邻的注浆段之间均设置有相邻止浆盘(41)。
2.根据权利要求1所述的一种富水流砂及断层地段隧道的全断面注浆孔及止浆墙,其特征在于,所述的初始止浆盘(40)和相邻止浆盘(41)的厚度均为4米。
CN 201120558829 2011-12-28 2011-12-28 在富水流砂及断层地段隧道的全断面注浆孔及止浆墙 Expired - Fee Related CN202645592U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120558829 CN202645592U (zh) 2011-12-28 2011-12-28 在富水流砂及断层地段隧道的全断面注浆孔及止浆墙

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120558829 CN202645592U (zh) 2011-12-28 2011-12-28 在富水流砂及断层地段隧道的全断面注浆孔及止浆墙

Publications (1)

Publication Number Publication Date
CN202645592U true CN202645592U (zh) 2013-01-02

Family

ID=47414712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120558829 Expired - Fee Related CN202645592U (zh) 2011-12-28 2011-12-28 在富水流砂及断层地段隧道的全断面注浆孔及止浆墙

Country Status (1)

Country Link
CN (1) CN202645592U (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103256060A (zh) * 2013-05-18 2013-08-21 中铁十六局集团有限公司 富水软弱糜棱岩大断面隧道围岩加固及开挖方法
CN106761775A (zh) * 2016-12-14 2017-05-31 北京城建集团有限责任公司 一种止水帷幕的施工方法
CN108035740A (zh) * 2018-01-04 2018-05-15 山东交通学院 一种注浆地质模型试验止浆装置及其施工方法
CN108590715A (zh) * 2018-03-22 2018-09-28 重庆建工第七建筑工程有限责任公司 一种暗挖突涌水隧道预留岩盘全断面径向注浆施工方法
CN109083649A (zh) * 2018-10-11 2018-12-25 中国石油大学(华东) 适用复杂城市环境地铁隧道的富水砂层超前注浆加固方法
CN109184742A (zh) * 2018-09-19 2019-01-11 中国水利水电第四工程局有限公司 一种高压富水软弱围岩山岭隧道的超前预注浆方法
CN109208579A (zh) * 2018-08-28 2019-01-15 北京瑞威世纪铁道工程有限公司 集束多段水平袖阀管注浆施工方法
CN109441486A (zh) * 2018-11-30 2019-03-08 中铁隧道集团二处有限公司 用于隧道注浆加固的注浆方法
CN109519176A (zh) * 2019-01-28 2019-03-26 粤水电轨道交通建设有限公司 富水花岗岩残积土地层矿山法隧道注浆加固方法及结构
CN109681214A (zh) * 2019-03-01 2019-04-26 中国水利水电第八工程局有限公司 一种全断面注浆加固地层的施工方法
CN110529147A (zh) * 2019-06-28 2019-12-03 中铁四局集团第五工程有限公司 一种利用悬臂掘进机下穿人行通道的地铁区间施工方法
CN112392514A (zh) * 2020-12-09 2021-02-23 中国葛洲坝集团第一工程有限公司 基于富水强透水岩层的隧洞帷幕灌浆施工方法
CN113175350A (zh) * 2021-04-17 2021-07-27 中交一公局集团有限公司 一种富水砂层废水泵房施工方法
CN114320363A (zh) * 2021-12-20 2022-04-12 北京城建道桥建设集团有限公司 一种富水地区复杂地层大断面深孔注浆施工方法

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103256060A (zh) * 2013-05-18 2013-08-21 中铁十六局集团有限公司 富水软弱糜棱岩大断面隧道围岩加固及开挖方法
CN106761775A (zh) * 2016-12-14 2017-05-31 北京城建集团有限责任公司 一种止水帷幕的施工方法
CN108035740A (zh) * 2018-01-04 2018-05-15 山东交通学院 一种注浆地质模型试验止浆装置及其施工方法
CN108590715A (zh) * 2018-03-22 2018-09-28 重庆建工第七建筑工程有限责任公司 一种暗挖突涌水隧道预留岩盘全断面径向注浆施工方法
CN109208579A (zh) * 2018-08-28 2019-01-15 北京瑞威世纪铁道工程有限公司 集束多段水平袖阀管注浆施工方法
CN109184742A (zh) * 2018-09-19 2019-01-11 中国水利水电第四工程局有限公司 一种高压富水软弱围岩山岭隧道的超前预注浆方法
CN109083649B (zh) * 2018-10-11 2019-08-13 中国石油大学(华东) 适用复杂城市环境地铁隧道的富水砂层超前注浆加固方法
CN109083649A (zh) * 2018-10-11 2018-12-25 中国石油大学(华东) 适用复杂城市环境地铁隧道的富水砂层超前注浆加固方法
CN109441486A (zh) * 2018-11-30 2019-03-08 中铁隧道集团二处有限公司 用于隧道注浆加固的注浆方法
CN109519176A (zh) * 2019-01-28 2019-03-26 粤水电轨道交通建设有限公司 富水花岗岩残积土地层矿山法隧道注浆加固方法及结构
CN109519176B (zh) * 2019-01-28 2024-04-02 粤水电轨道交通建设有限公司 富水花岗岩残积土地层矿山法隧道注浆加固方法及结构
CN109681214A (zh) * 2019-03-01 2019-04-26 中国水利水电第八工程局有限公司 一种全断面注浆加固地层的施工方法
CN110529147A (zh) * 2019-06-28 2019-12-03 中铁四局集团第五工程有限公司 一种利用悬臂掘进机下穿人行通道的地铁区间施工方法
CN112392514A (zh) * 2020-12-09 2021-02-23 中国葛洲坝集团第一工程有限公司 基于富水强透水岩层的隧洞帷幕灌浆施工方法
CN113175350A (zh) * 2021-04-17 2021-07-27 中交一公局集团有限公司 一种富水砂层废水泵房施工方法
CN113175350B (zh) * 2021-04-17 2023-08-11 中交一公局集团有限公司 一种富水砂层废水泵房施工方法
CN114320363A (zh) * 2021-12-20 2022-04-12 北京城建道桥建设集团有限公司 一种富水地区复杂地层大断面深孔注浆施工方法
CN114320363B (zh) * 2021-12-20 2023-11-14 北京城建道桥建设集团有限公司 一种富水地区复杂地层大断面深孔注浆施工方法

Similar Documents

Publication Publication Date Title
CN202645592U (zh) 在富水流砂及断层地段隧道的全断面注浆孔及止浆墙
CN104453913B (zh) 一种竖井工作面超前预注浆方法
CN102587358B (zh) 一种高聚物材料后注浆挤扩灌注桩施工方法
CN107762533B (zh) 一种高压富水软弱围岩山岭隧道的超前预注浆方法
CN107642360A (zh) 全断面超前预注浆施工方法
CN103967507B (zh) 一种适于富水矿山井下开采堵水用的帷幕注浆工艺
CN103277120B (zh) 一种非全深冻结立井解冻后的涌水防治方法
CN102705005B (zh) 定向导流注浆封堵矿井突水技术
CN107722954A (zh) 一种用于钻井裂缝性漏失的堵漏剂、堵漏浆液及堵漏施工方法
CN110924967B (zh) 富水砂卵石地层盾构近接敏感建筑物精细化控制施工方法
CN102953389B (zh) 一种边坡支挡锚拉抗滑桩
CN105155563A (zh) 一种基坑软流塑地层涌水加固治理方法
CN109577989B (zh) 一种新型深部矿山竖井井壁结构及施工方法
CN102787602A (zh) 一种帷幕灌浆工艺
CN208106440U (zh) 适用于富水湿陷性黄土隧道的固化结构
CN105926624B (zh) 逆止式集合孔注浆装置及其施工方法
CN109681236A (zh) 大断面富水砂层盾构掘进同步注浆方法
CN107503362A (zh) 一种适用于库岸边坡的复合抗滑桩墙支挡结构及施工方法
CN101403209B (zh) 快速透水的停车坪用透水砖及铺设方法
CN1936270B (zh) 一种多层围岩灌浆固结圈隧洞承载结构及其施工方法
CN105731978B (zh) 一种用于细砂层顶进涵掌子面加固的注浆浆液及注浆方法
CN101225740A (zh) 冻结管与围岩间环状充填的方法
CN104790982B (zh) 一种暗挖隧道超深孔注浆用套壳料
CN208201874U (zh) 一种开孔式布袋注浆结构
CN207988997U (zh) 巨厚冲积层单井多层段注浆新型套管

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130102

Termination date: 20191228