CN109184150A - A kind of existing multi-storey building of cold district installs the prefabricated assembled hoistway of elevator and its construction method additional - Google Patents

A kind of existing multi-storey building of cold district installs the prefabricated assembled hoistway of elevator and its construction method additional Download PDF

Info

Publication number
CN109184150A
CN109184150A CN201811270137.3A CN201811270137A CN109184150A CN 109184150 A CN109184150 A CN 109184150A CN 201811270137 A CN201811270137 A CN 201811270137A CN 109184150 A CN109184150 A CN 109184150A
Authority
CN
China
Prior art keywords
hoistway
steel
storey building
existing multi
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811270137.3A
Other languages
Chinese (zh)
Inventor
张云天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811270137.3A priority Critical patent/CN109184150A/en
Publication of CN109184150A publication Critical patent/CN109184150A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/005Lift shafts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

A kind of existing multi-storey building of cold district installs the prefabricated assembled hoistway of elevator and its construction method additional, is related to a kind of elevator shaft and its construction method.Pre-buried foundation pit is set on foundation platform and is connected thereto and is integrated, bottom hoistway is fixed on pre-buried foundation pit, a fixed at least segment standard layer hoistway is installed above bottom hoistway, fixed top layer hoistway is installed above the index bed hoistway of the top, bottom hoistway, top layer hoistway and index bed hoistway are the cuboid framework structure of steel-pipe welding, and it is perfused with concrete in four vertical steel pipes of cuboid framework structure and constitutes steel core concrete column, two steel coupling beam horizontal alignments are arranged and existing multi-storey building and hoistway with steel structure component groups are fixedly connected, vestibule ground layer is equipped in two steel coupling beams.Structure is simple, high construction efficiency, easy for installation, using prefabricated construction, can effectively shorten the duration, simple and convenient, saves cost.

Description

A kind of existing multi-storey building of cold district installs the prefabricated assembled hoistway of elevator additional and its applies Work method
Technical field
The present invention relates to a kind of elevator shaft and its construction method, especially a kind of existing multi-storey building of cold district is installed additional The prefabricated assembled hoistway of elevator and its construction method.
Background technique
With the quickening of aging of population process and the increasingly raising of Living consumption, existing multi-storey building installs elevator additional Demand increase increasingly.The extremely frigid zones of cold district especially northern China, general existing multi-storey building is by economic development water Gentle technical specification limitation, not set elevator or reserved elevator shaft, have not adapted to the people to accessible and easypro The pursuit of the living quality of adaptive installs the current demand that elevator has become resident additional to existing multi-storey building.
It installs elevator additional and first has to independently installed hoistway, install elevator additional at present and be commonly hoistway with steel structure, generally use profile Assembly is not only constructed cumbersome, but also consumes a large amount of working hours, and the expense of generation is also more.
With the rise and development of assembled architecture, new direction also is opened to install elevator additional, therefore, designs a kind of knot Structure is simple, high construction efficiency, prefabricated assembled hoistway easy for installation, is a technical problem to be solved urgently.
Summary of the invention
The purpose of the present invention is to provide a kind of existing multi-storey building of cold district install additional the prefabricated assembled hoistway of elevator and Its construction method, its structure is simple, high construction efficiency, easy for installation, using prefabricated construction, can effectively shorten the duration, letter Folk prescription just, saves cost.
Realize that above-mentioned purpose, the present invention take following technical proposals: a kind of existing multi-storey building installation elevator of cold district Prefabricated assembled hoistway, pit basis, hoistway with steel structure component groups and multiple steel knots including being prefabricated construction Structure vestibule, the pit basis include be reinforced concrete structure and mutually matched pre-buried foundation pit and foundation platform, it is described Foundation platform is embedded in the external ground of existing multi-storey building, and the pre-buried foundation pit is set on foundation platform and is connected thereto It is integrated, the hoistway with steel structure component groups include bottom hoistway, top layer hoistway and an at least segment standard layer hoistway, the bottom Hoistway is fixed on pre-buried foundation pit, and the fixed at least segment standard layer hoistway of installation, is located at most upper above bottom hoistway The fixed top layer hoistway of installation above the index bed hoistway of side, the height point of bottom hoistway, top layer hoistway and index bed hoistway Layer height not with the first floor of existing multi-storey building, top layer and index bed is arranged in a one-to-one correspondence, bottom hoistway, top layer hoistway and standard Layer hoistway is the cuboid framework structure of steel-pipe welding, and is perfused in four vertical steel pipes of cuboid framework structure mixed Solidifying soil constitutes steel core concrete column, and each Steel corridor includes vestibule ground layer and two steel coupling beams, and described two Steel coupling beam horizontal alignment setting and by the corresponding position phase fixed of the wall face of existing multi-storey building and hoistway with steel structure component groups It is fixed, vestibule ground layer is equipped in two steel coupling beams.
A kind of existing multi-storey building of cold district of the invention installs the construction method of the prefabricated assembled hoistway of elevator additional, including Following steps:
Step 1: pit basis, hoistway with steel structure component groups and Steel corridor are prefabrication, and it is existing that fission is transported to construction , it is lifted in order to designated position, splicing is assembled, and every layer of wall face suitable location of existing multi-storey building, which opens up, enters Mouthful, and elevator pit is dug in external ground corresponding position, foundation platform lifting is lain in into bottom in elevator pit in place, basis is held Platform upper surface is levelling by sitting slurry processes progress, lifts pre-buried foundation pit later and is mounted on foundation platform, passes through welded reinforcement end The two is connected as one with the mode of teeming concrete, in the pre-buried junction steel plate in pre-buried foundation pit opening end face quadrangle;
Step 2: by the bottom hoistway lifting junction steel plate welding pre-buried in place and with pre-buried foundation pit opening end face quadrangle or bolt It is fixed, index bed hoistway and top layer hoistway are successively lifted according to the number of plies of existing multi-storey building later, welded by connector Fixation is connect or is bolted, while installation fixed standard layer hoistway every time, by two steel coupling beams of a Steel corridor It is fixedly connected by pre-embedded bolt and the wall face of existing multi-storey building and the corresponding position of hoistway with steel structure component groups, two steel Vestibule ground layer is laid in coupling beam.
Compared with prior art, the beneficial effects of the present invention are: the present invention can be solution cold district especially China The existing multi-storey building in the north installs elevator additional and provides convenience, and structure is simple, high construction efficiency, easy for installation, using prefabricated assembled knot Structure, can effectively shorten the duration, simple and convenient, save cost, and using steel core concrete column, bearing capacity is high, and moulding and good toughness resist Shock stability is strong, has high promotional value.
Detailed description of the invention
Fig. 1 is the axonometric drawing of bottom hoistway of the invention;
Fig. 2 is the axonometric drawing of index bed hoistway of the invention;
Fig. 3 is the axonometric drawing of top layer hoistway of the invention;
Fig. 4 is the structural schematic diagram for the construction method that specific embodiment nine discloses;
Fig. 5 is the attachment structure schematic diagram of Steel corridor of the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, is clearly and completely retouched to the technical solution in the present invention It states, it is clear that described embodiment is only a part of the embodiment of invention, instead of all the embodiments, based in the present invention Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, It shall fall within the protection scope of the present invention.
Specific embodiment 1: the invention discloses a kind of existing multi-storey buildings of cold district to install additional as shown in Fig. 1 ~ Fig. 5 The prefabricated assembled hoistway of elevator, pit basis, hoistway with steel structure component groups and multiple including being prefabricated construction Steel corridor, the pit basis is including being reinforced concrete structure and mutually matched pre-buried foundation pit 1 and foundation platform 2, the foundation platform 2 is embedded in the external ground of existing multi-storey building, and the pre-buried foundation pit 1 is set on foundation platform 2 And be connected thereto and be integrated, the hoistway with steel structure component groups include bottom hoistway 3, top layer hoistway 4 and an at least segment standard layer Hoistway 5, the bottom hoistway 3 are fixed on pre-buried foundation pit 1, and a fixed at least segment mark is installed above bottom hoistway 3 Quasi- layer hoistway 5 installs the fixed top layer hoistway 4, bottom hoistway 3, top layer hoistway above the index bed hoistway 5 of the top 4 and layer height of the height respectively with the first floor of existing multi-storey building, top layer and index bed of index bed hoistway 5 be arranged in a one-to-one correspondence, Bottom hoistway 3, top layer hoistway 4 and index bed hoistway 5 are the cuboid framework structure of steel-pipe welding, and cuboid framework structure Four vertical steel pipes in be perfused with concrete and constitute steel core concrete column 8, each Steel corridor includes vestibule Face base 6 and two steel coupling beams 7, two steel coupling beams, 7 horizontal alignment setting and by the wall face and steel of existing multi-storey building The corresponding position of structure hoistway component groups is fixedly connected, and is equipped with vestibule ground layer 6 in two steel coupling beams 7.
Specific embodiment 2: as shown in figure 4, present embodiment is made furtherly to specific embodiment one Bright, the hoistway with steel structure component groups and multiple Steel corridors are mounted on curtain wall 13.
Specific embodiment 3: as shown in figure 4, present embodiment is made furtherly to specific embodiment two It is bright, deformation joint is equipped between the corresponding curtain wall 13 of each Steel corridor and the wall face of existing multi-storey building.
Specific embodiment 4: as shown in Figure 1, 2, 3, present embodiment is to specific embodiment one or specific embodiment party The further explanation that formula two is made, the side corresponding with Steel corridor of index bed hoistway 5 are fixed with door by steel-pipe welding Head beam 9 and two doorway columns 10, excess-three side middle position are fixed with web beam 11, the bottom hoistway by steel-pipe welding 3 and its four piece steel core concrete column 8 lower ends lengthening setting composition four support legs 12 identical as index bed hoistway 5, it is described 4 four side middle position of top layer hoistway equally passes through steel-pipe welding and is fixed with web beam 11.
Specific embodiment 5: as shown in figure 4, present embodiment is made furtherly to specific embodiment four Bright, four support legs 12 that the pre-buried 1 open end face quadrangle of foundation pit is embedded with junction steel plate and bottom hoistway 3 are connected and fixed, 2 upper surface of foundation platform is levelling by sitting slurry processes progress.
Specific embodiment 6: as shown in figure 4, present embodiment is made furtherly to specific embodiment five Bright, between the bottom hoistways 3 of the hoistway with steel structure component groups, top layer hoistway 4 and an at least segment standard layer hoistway 5 connection position It sets and is welded or be bolted respectively fixation by connector, two 7 both ends of steel coupling beam point of each Steel corridor It is not fixedly connected by pre-embedded bolt and the wall face of existing multi-storey building and the corresponding position of hoistway with steel structure component groups.
Specific embodiment 7: as shown in Figure 1, 2, 3, present embodiment be specific embodiment one is made it is further Illustrate, the cross section of four steel core concrete columns 8 of the bottom hoistway 3, top layer hoistway 4 and index bed hoistway 5 is rectangular Or it is round.
Specific embodiment 8: as shown in figure 4, present embodiment is made furtherly to specific embodiment one Bright, the vestibule ground layer 6 can use prefabricated board, and be laid with cold-proof polyphenyl foam plastic plate insulating layer and cast-in-place on it Concrete leveling layer.
Specific embodiment 9: as shown in Fig. 1 ~ Fig. 5, present embodiment is disclosed described in a kind of specific embodiment one A kind of existing multi-storey building of cold district installs the construction method of the prefabricated assembled hoistway of elevator additional, and the construction method includes as follows Step:
Step 1: pit basis, hoistway with steel structure component groups and Steel corridor are prefabrication, and it is existing that fission is transported to construction , it is lifted in order to designated position, splicing is assembled, and every layer of wall face suitable location of existing multi-storey building, which opens up, enters Mouthful, and elevator pit is dug in external ground corresponding position, the lifting of foundation platform 2 is lain in into bottom in elevator pit in place, basis 2 upper surface of cushion cap is levelling by sitting slurry processes progress, lifts pre-buried foundation pit 1 later and is mounted on foundation platform 2, passes through welded reinforcement The two is connected as one by end and the mode of teeming concrete, in the pre-buried 1 pre-buried junction steel plate in open end face quadrangle of foundation pit;
Step 2: the junction steel plate welding or spiral shell pre-buried in place and with pre-buried 1 open end face quadrangle of foundation pit by the lifting of bottom hoistway 3 Bolt is fixed, and successively lifts index bed hoistway 5 and top layer hoistway 4 according to the number of plies of existing multi-storey building later, by connector into Row welding is bolted fixation, while installation fixed standard layer hoistway 5 every time, by two steel of a Steel corridor Coupling beam 7 is fixedly connected by pre-embedded bolt and the wall face of existing multi-storey building and the corresponding position of hoistway with steel structure component groups, Vestibule ground layer 6 is laid in two steel coupling beams 7.
Specific embodiment 10: present embodiment is the further explanation made to specific embodiment nine, steel construction connects Vertical elliptical aperture can be used in the corresponding mounting hole of the pre-embedded bolt of corridor, be finely adjusted pre-embedded bolt can in vertical orientation, with The additional stress generated due to Steel corridor, hoistway with steel structure component groups and existing multi-storey building differential settlement is discharged, together When can reduce destruction caused by the imperative coordination distortional stress as caused by earthquake load, temperature load etc., Steel corridor Collar tie beam lateral surface may be selected with the link position of existing multi-storey building, guarantee attachment degree and bonding strength, improve hoistway with steel structure The overall stability of component groups.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in the form of others dress body.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that by all in the meaning and scope for the condition of equivalent for falling in claim Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (10)

1. a kind of existing multi-storey building of cold district installs the prefabricated assembled hoistway of elevator additional, it is characterised in that: including being prefabricated Pit basis, hoistway with steel structure component groups and the multiple Steel corridors of fabricated construction, the pit basis include being Reinforced concrete structure and mutually matched pre-buried foundation pit (1) and foundation platform (2), the foundation platform (2) are embedded in existing In the external ground of multi-storey building, the pre-buried foundation pit (1), which is set on foundation platform (2) and is connected thereto, to be integrated, described Hoistway with steel structure component groups include bottom hoistway (3), top layer hoistway (4) and an at least segment standard layer hoistway (5), the bottom well Road (3) is fixed on pre-buried foundation pit (1), the fixed at least segment standard layer hoistway of installation above bottom hoistway (3) (5), the fixed top layer hoistway (4) of installation, bottom hoistway (3), top layer hoistway above the index bed hoistway (5) of the top (4) and the height of index bed hoistway (5) is set with the layer height of the first floor of existing multi-storey building, top layer and index bed one-to-one correspondence respectively It sets, bottom hoistway (3), top layer hoistway (4) and index bed hoistway (5) are the cuboid framework structure of steel-pipe welding, and rectangular It is perfused with concrete in four vertical steel pipes of body frame structure and constitutes steel core concrete column (8), each steel construction connects Corridor includes vestibule ground layer (6) and two steel coupling beams (7), and two steel coupling beams (7) horizontal alignment is arranged and will be existing more The wall face of layer house and the corresponding position of hoistway with steel structure component groups are fixedly connected, and are equipped with vestibule on two steel coupling beams (7) Ground layer (6).
2. the existing multi-storey building of a kind of cold district according to claim 1 installs the prefabricated assembled hoistway of elevator additional, special Sign is: the hoistway with steel structure component groups and multiple Steel corridors are mounted on curtain wall (13).
3. the existing multi-storey building of a kind of cold district according to claim 2 installs the prefabricated assembled hoistway of elevator additional, special Sign is: being equipped with deformation joint between the corresponding curtain wall (13) of each Steel corridor and the wall face of existing multi-storey building.
4. the existing multi-storey building of a kind of cold district according to claim 1 or 2 installs the prefabricated assembled hoistway of elevator additional, Be characterized in that: index bed hoistway (5) side corresponding with Steel corridor is fixed with Men Touliang (9) and two by steel-pipe welding Root doorway column (10), excess-three side middle position are fixed with web beam (11) by steel-pipe welding, the bottom hoistway (3) with Index bed hoistway (5) is identical and its four steel core concrete column (8) lower ends lengthen setting and constitute four support legs (12), institute It states (4) four side middle position of top layer hoistway and equally passes through steel-pipe welding and be fixed with web beam (11).
5. the existing multi-storey building of a kind of cold district according to claim 4 installs the prefabricated assembled hoistway of elevator additional, special Sign is: pre-buried foundation pit (1) open end face quadrangle is embedded with four support legs (12) of junction steel plate Yu bottom hoistway (3) It is connected and fixed, foundation platform (2) upper surface is levelling by sitting slurry processes progress.
6. the existing multi-storey building of a kind of cold district according to claim 5 installs the prefabricated assembled hoistway of elevator additional, special Sign is: bottom hoistway (3), top layer hoistway (4) and an at least segment standard layer hoistway (5) for the hoistway with steel structure component groups it Between link position pass through connector respectively and welded or be bolted fixation, two steel of each Steel corridor connect Beam (7) both ends pass through the wall face of pre-embedded bolt and existing multi-storey building and the corresponding position phase of hoistway with steel structure component groups respectively Fixed is fixed.
7. the existing multi-storey building of a kind of cold district according to claim 1 installs the prefabricated assembled hoistway of elevator additional, special Sign is: the bottom hoistway (3), top layer hoistway (4) and index bed hoistway (5) four steel core concrete columns (8) it is transversal Face is rectangular or round.
8. the existing multi-storey building of a kind of cold district according to claim 1 installs the prefabricated assembled hoistway of elevator additional, special Sign is: the vestibule ground layer (6) can use prefabricated board, and be laid with cold-proof polyphenyl foam plastic plate insulating layer on it And cast-in-place concrete screed-coat.
9. the construction that a kind of existing multi-storey building of cold district according to claim 1 installs the prefabricated assembled hoistway of elevator additional Method, it is characterised in that: the construction method includes the following steps:
Step 1: pit basis, hoistway with steel structure component groups and Steel corridor are prefabrication, and it is existing that fission is transported to construction , it is lifted in order to designated position, splicing is assembled, and every layer of wall face suitable location of existing multi-storey building, which opens up, enters Mouthful, and elevator pit is dug in external ground corresponding position, foundation platform (2) lifting is lain in into bottom in elevator pit, base in place Plinth cushion cap (2) upper surface is levelling by sitting slurry processes progress, lifts pre-buried foundation pit (1) later and is mounted on foundation platform (2), passes through The two is connected as one by welded reinforcement end and the mode of teeming concrete, pre-buried in pre-buried foundation pit (1) open end face quadrangle Junction steel plate;
Step 2: by bottom hoistway (3) lifting, the junction steel plate pre-buried in place and with pre-buried foundation pit (1) open end face quadrangle is welded Or bolt is fixed, and is successively lifted index bed hoistway (5) and top layer hoistway (4) according to the number of plies of existing multi-storey building later, is passed through Connector is welded or is bolted fixation, and while installation fixed standard layer hoistway (5) every time, a steel construction is connected Two steel coupling beams (7) of corridor pass through the corresponding position of pre-embedded bolt and the wall face of existing multi-storey building and hoistway with steel structure component groups It sets and is fixedly connected, be laid with vestibule ground layer (6) on two steel coupling beams (7).
10. construction method according to claim 9, it is characterised in that: the corresponding installation of the pre-embedded bolt of Steel corridor Vertical elliptical aperture can be used in hole, be finely adjusted pre-embedded bolt can in vertical orientation, to discharge due to Steel corridor, steel knot The additional stress that structure hoistway component groups and existing multi-storey building differential settlement generate, at the same can reduce due to earthquake load, It is destroyed caused by imperative coordination distortional stress caused by temperature load etc., the link position of Steel corridor and existing multi-storey building Collar tie beam lateral surface may be selected, guarantee attachment degree and bonding strength, improve the overall stability of hoistway with steel structure component groups.
CN201811270137.3A 2018-10-29 2018-10-29 A kind of existing multi-storey building of cold district installs the prefabricated assembled hoistway of elevator and its construction method additional Pending CN109184150A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811270137.3A CN109184150A (en) 2018-10-29 2018-10-29 A kind of existing multi-storey building of cold district installs the prefabricated assembled hoistway of elevator and its construction method additional

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811270137.3A CN109184150A (en) 2018-10-29 2018-10-29 A kind of existing multi-storey building of cold district installs the prefabricated assembled hoistway of elevator and its construction method additional

Publications (1)

Publication Number Publication Date
CN109184150A true CN109184150A (en) 2019-01-11

Family

ID=64944276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811270137.3A Pending CN109184150A (en) 2018-10-29 2018-10-29 A kind of existing multi-storey building of cold district installs the prefabricated assembled hoistway of elevator and its construction method additional

Country Status (1)

Country Link
CN (1) CN109184150A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109941867A (en) * 2019-03-01 2019-06-28 北京筑福国际抗震技术有限责任公司 A kind of additional elevator shaft of existing building is using assembled steel-frame structure and its construction method
CN110485557A (en) * 2019-09-12 2019-11-22 潍坊达福嘉建筑配套工程有限公司 A kind of steel construction elevator quick assembled type vestibule
CN110778145A (en) * 2019-12-11 2020-02-11 杭州西奥电梯现代化更新有限公司 Steel frame connecting structure and method for integrally assembled additional elevator
CN110924630A (en) * 2019-12-05 2020-03-27 北京亟光电梯科技有限公司 Integrated steel structure hoistway with waiting hall and construction process thereof
CN111350372A (en) * 2020-03-23 2020-06-30 河北省建筑科学研究院有限公司 Assembly type rapid reconstruction method for existing house with additionally-installed elevator
CN115788103A (en) * 2023-02-08 2023-03-14 集束智能装配科技有限公司 Construction method of elevator shaft modular assembly structure system

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007204219A (en) * 2006-02-01 2007-08-16 Watahan Technos Kk Construction method of elevator shaft building
CN101845849A (en) * 2010-06-22 2010-09-29 中国建筑第二工程局有限公司 Large-span steel structure corridor erected between new and old buildings and construction method thereof
CN106677334A (en) * 2017-03-09 2017-05-17 吴方伯 Novel fabricated residence balcony
CN107060275A (en) * 2017-05-26 2017-08-18 广东易佳梯科技有限公司 A kind of modularization elevator hoistways construction technology
CN107386447A (en) * 2017-07-19 2017-11-24 天津大学 A kind of assembled Mixed Architecture suitable for high residential building
CN107675792A (en) * 2017-09-08 2018-02-09 杭州江润科技有限公司 Steel construction is encorbelmented gallery structure and construction method
CN207597814U (en) * 2018-04-19 2018-07-10 同圆设计集团有限公司 A kind of assembling type steel structure elevator device for existing apartment
CN108277997A (en) * 2018-02-27 2018-07-13 同济大学 Modular assembly formula elevator-integrated system of balcony with complementary antidetonation/vibration absorption unit
CN108532769A (en) * 2018-06-29 2018-09-14 华城(天津)建筑科技有限公司 A kind of jack-up construction method of the additional elevator shaft structure of assembled
CN208996395U (en) * 2018-10-29 2019-06-18 张云天 A kind of existing multi-storey building installation prefabricated assembled hoistway of elevator of cold district

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007204219A (en) * 2006-02-01 2007-08-16 Watahan Technos Kk Construction method of elevator shaft building
CN101845849A (en) * 2010-06-22 2010-09-29 中国建筑第二工程局有限公司 Large-span steel structure corridor erected between new and old buildings and construction method thereof
CN106677334A (en) * 2017-03-09 2017-05-17 吴方伯 Novel fabricated residence balcony
CN107060275A (en) * 2017-05-26 2017-08-18 广东易佳梯科技有限公司 A kind of modularization elevator hoistways construction technology
CN107386447A (en) * 2017-07-19 2017-11-24 天津大学 A kind of assembled Mixed Architecture suitable for high residential building
CN107675792A (en) * 2017-09-08 2018-02-09 杭州江润科技有限公司 Steel construction is encorbelmented gallery structure and construction method
CN108277997A (en) * 2018-02-27 2018-07-13 同济大学 Modular assembly formula elevator-integrated system of balcony with complementary antidetonation/vibration absorption unit
CN207597814U (en) * 2018-04-19 2018-07-10 同圆设计集团有限公司 A kind of assembling type steel structure elevator device for existing apartment
CN108532769A (en) * 2018-06-29 2018-09-14 华城(天津)建筑科技有限公司 A kind of jack-up construction method of the additional elevator shaft structure of assembled
CN208996395U (en) * 2018-10-29 2019-06-18 张云天 A kind of existing multi-storey building installation prefabricated assembled hoistway of elevator of cold district

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109941867A (en) * 2019-03-01 2019-06-28 北京筑福国际抗震技术有限责任公司 A kind of additional elevator shaft of existing building is using assembled steel-frame structure and its construction method
CN110485557A (en) * 2019-09-12 2019-11-22 潍坊达福嘉建筑配套工程有限公司 A kind of steel construction elevator quick assembled type vestibule
CN110924630A (en) * 2019-12-05 2020-03-27 北京亟光电梯科技有限公司 Integrated steel structure hoistway with waiting hall and construction process thereof
CN110778145A (en) * 2019-12-11 2020-02-11 杭州西奥电梯现代化更新有限公司 Steel frame connecting structure and method for integrally assembled additional elevator
CN111350372A (en) * 2020-03-23 2020-06-30 河北省建筑科学研究院有限公司 Assembly type rapid reconstruction method for existing house with additionally-installed elevator
CN115788103A (en) * 2023-02-08 2023-03-14 集束智能装配科技有限公司 Construction method of elevator shaft modular assembly structure system

Similar Documents

Publication Publication Date Title
CN109184150A (en) A kind of existing multi-storey building of cold district installs the prefabricated assembled hoistway of elevator and its construction method additional
CN208996395U (en) A kind of existing multi-storey building installation prefabricated assembled hoistway of elevator of cold district
Nair Belt Trusses and Basements as Virtual; Outriggers for Tall Buildings
CN108560719B (en) Supporting and mounting method for super-large-span double-layer bidirectional suspension cable structure
CN103696577B (en) Overhead steel-beam stress platform and construction method thereof
CN105971304B (en) A kind of building structure strengthening transformation jacketing frame
CN103991773A (en) Design and installation method of assembly-type modularized steel structure elevator shaft
CN102180397A (en) Module-type steel structure lift shaft
CN109113306A (en) A kind of modularization elevator shaft and its construction method
CN109252538A (en) A kind of existing multi-storey building installs the prefabricated assembled steel construction pit basis of elevator and construction method additional
CN214399425U (en) Newly-increased double-elevator supporting structure for reconstruction and extension project
CN113737936A (en) Connecting structure and construction method of prefabricated combined duplex balcony
CN103741961B (en) To boost sales after the prefabricated circular hole slab of existing building the dark seismic strengthening of beams method of key
WO2003048469A1 (en) Method for constructing tier building and special jack equipment thereof
CN209066475U (en) A kind of prefabricated assembled steel construction pit basis of existing multi-storey building installation elevator
CN110904992B (en) Elevator foundation member for integrally assembling elevator and construction method thereof
Ali et al. Study of Strength of RC Shear Wall at Different Location on Multi-Storied Residential Building
CN205822454U (en) Welding lattice column device
CN211201184U (en) Assembled steel structure system
CN209685096U (en) A kind of construction elevator attached wall truss auxiliary stand
CN207525769U (en) A kind of installation elevator pit
CN206486988U (en) A kind of temporary steel structural support
JP2011241559A (en) Aseismatic reinforcement structure of existing reinforced concrete apartment house
CN210393329U (en) Assembled well of existing building with additional elevator
CN203640308U (en) High-altitude erected steel beam stress platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination