CN203640308U - High-altitude erected steel beam stress platform - Google Patents

High-altitude erected steel beam stress platform Download PDF

Info

Publication number
CN203640308U
CN203640308U CN201320828775.9U CN201320828775U CN203640308U CN 203640308 U CN203640308 U CN 203640308U CN 201320828775 U CN201320828775 U CN 201320828775U CN 203640308 U CN203640308 U CN 203640308U
Authority
CN
China
Prior art keywords
steel
girder steel
main
main girder
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320828775.9U
Other languages
Chinese (zh)
Inventor
李俊
毛子成
范孝俊
李涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai Construction No 5 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 5 Group Co Ltd filed Critical Shanghai Construction No 5 Group Co Ltd
Priority to CN201320828775.9U priority Critical patent/CN203640308U/en
Application granted granted Critical
Publication of CN203640308U publication Critical patent/CN203640308U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a high-altitude erected steel beam stress platform and belongs to the field of building construction. The high-altitude erected steel beam stress platform is erected between two buildings and comprises a plurality of main steel beams, a plurality of branch steel beams, steel pipe formworks and a steel pipe bent frame, wherein the main steel beams are parallelly arranged, the branch steel beams are parallelly arranged, the main steel beams and the branch steel beams are vertically connected to form steel beam frame plates, the steel pipe formworks are arranged on the steel beam frame plates, the steel pipe bent frame is arranged on the branch steel beams, and two ends of each main steel beam are respectively and firmly erected on the buildings on two sides. According to different structural situations of main steel beam placing point positions of erected floors of the buildings on two sides, one or two modes are selected to achieve firm main steel beam erection, a characteristic of safe, reliable, simple and easy construction is embodied, the recoverability of various steel members is ensured, and the construction cost is effectively saved.

Description

The stressed platform of formula girder steel is set up in high-altitude
Technical field
The present invention relates to the realm of building construction, be specifically related to high-altitude and set up the stressed platform of formula girder steel.
Background technology
Along with the development of building trade in recent years, increasing highrise building is selected the appearance forrns of aerial gallery structure or unsettled concrete structure.In the time of this structure construction, often need under it, set up supporting facility, the stressed platform of for example girder steel, carries out in order to auxiliary formwork engineering, smoothly to realize the construction of aerial gallery structure or unsettled concrete structure.
Under normal circumstances, before main girder steel is set up, all on the floor face of setting up floor, arrange various embedded parts or bearing, main girder steel is directly held on to install to set up on flooring and is welded to connect with described embedded part or bearing.
But, the form of structure development variation of modern architecture, when the stressed putting up platform of girder steel, the structure node that is unfavorable for installation will be run into, according to the feature at each position, select applicable treatment measures, so that safe and reliable execution conditions to be provided, obtain significant economic benefit, be the technical problem of the main solution of Modern Construction Technology.
Summary of the invention
The object of the present invention is to provide high-altitude to set up the stressed platform of formula girder steel, to solve setting up floor and should not directly setting up the problem of main girder steel of the main girder steel that sets up the stressed platform of girder steel in high-altitude, thereby it is reliable, simple and can guarantee the object of the recoverable of each girder steel element to realize construction safety.
In order to solve the problems of the technologies described above, the invention provides a kind of high-altitude and set up the stressed platform of formula girder steel, be set up between two buildings, comprise some main girder steels, several times girder steel, steel pipe template and steel pipe framed bent, described some main girder steels be arranged in parallel, described time girder steel be arranged in parallel, and described main girder steel and described the vertical girder steel frame plate that is connected to form of girder steel, described steel pipe template-setup is on described girder steel frame plate, described steel pipe framed bent is arranged on described girder steel, and two ends of every main girder steel are firmly erected on respectively the architectural of both sides.
Optionally, when main girder steel corresponding set up floor and cannot meet carrying condition time, on this sets up the substructure post of floor, a Reinforced Concrete Corbels for fixing main girder steel is set.Optionally, described Reinforced Concrete Corbels is built and is formed by the main muscle of bracket and bracket stirrup, and the main muscle of described bracket anchors in described substructure post.
Optionally, in the time that the floor height of setting up floor of main girder steel both sides is different, on the lower floor face of structural elevation by the padded level to the higher floor face place of structural elevation of little steel column is set.Optionally, described little steel column is together with structure wallboard drawknot.
Optionally, when main girder steel corresponding set up floor and there is Core Walls Structure shear wall time, on described shear wall, hole to be provided is established in the position of corresponding main girder steel, and in hole to be provided pre-buried the first pre-embedded steel slab, the end of described main girder steel is stretched in described hole to be provided and is fixedly connected with described the first pre-embedded steel slab.
The stressed platform of formula girder steel is set up in a kind of high-altitude provided by the invention, be set up between two buildings, comprise some main girder steels, several times girder steel, steel pipe template and steel pipe framed bent, described some main girder steels be arranged in parallel, described time girder steel be arranged in parallel, and described main girder steel and described the vertical girder steel frame plate that is connected to form of girder steel, described steel pipe template-setup is on described girder steel frame plate, described steel pipe framed bent is arranged on described girder steel, two ends of every main girder steel are firmly erected on respectively the architectural of both sides, there is construction safety reliable, simple and can guarantee the advantage of the recoverable of each girder steel element.In addition, in the time of girder steel putting up platform, to different structure feature position, take corresponding processing mode, realize the safe and reliable mounting condition of main girder steel, whole process has embodied reliable, the simple feature of construction safety, and has guaranteed the recoverable of each Steel section member, effectively save construction cost, do not affected construction speed.
Accompanying drawing explanation
Fig. 1 is the structural representation that one embodiment of the invention high and medium sets up the stressed platform of formula girder steel;
Fig. 2 is the main girder steel distribution schematic diagram that one embodiment of the invention high and medium sets up the stressed platform of formula girder steel;
Fig. 3 is the primary and secondary girder steel distribution schematic diagram that one embodiment of the invention high and medium sets up the stressed platform of formula girder steel;
Fig. 4 is the shear wall hole to be provided detail drawing of one embodiment of the invention;
Fig. 5 is the concrete bracket detail drawing of one embodiment of the invention.
Fig. 6 is the padded detail of construction of the medium and small steel column of one embodiment of the invention;
Fig. 7 is the medium and small steel column drawknot of one embodiment of the invention detail drawing;
In figure: the main girder steel of 1-, 2-girder steel, 3-steel pipe template, 4-steel pipe framed bent, 5-shear wall, 51-hole to be provided, 52-the first pre-embedded steel slab, 6-substructure post, 61-steel pipe column, 7-Reinforced Concrete Corbels, the main muscle of 71-bracket, the curved anchor of 711-, 72-bracket stirrup, the little steel column of 8-, 9-the second pre-embedded steel slab, 10-the 3rd steel plate, 11-splicing seams, 12-structure wallboard, 13-channel-section steel, 14-the 4th pre-embedded steel slab, 15-the 5th pre-embedded steel slab, 16-catch net, the 17-outrigger of constructing.
The specific embodiment
High-altitude the present invention being proposed below in conjunction with the drawings and specific embodiments is set up the stressed platform of formula girder steel and is described in further detail.According to the following describes and claims, advantages and features of the invention will be clearer.It should be noted that, accompanying drawing all adopts very the form of simplifying and all uses non-ratio accurately, only in order to convenient, the object of the aid illustration embodiment of the present invention lucidly.
As shown in Figure 1 to Figure 3, the stressed platform of formula girder steel is set up in the high-altitude of one embodiment of the invention, be arranged between two highrise buildings, and be unsettled concrete structure construction for the aerial gallery structure between highrise building.The stressed platform of formula girder steel is set up in described high-altitude, comprise some main girder steels 1, several times girder steel 2, steel pipe template 3 and steel pipe framed bent 4, described some main girder steels 1 be arranged in parallel, described time girder steel 2 be arranged in parallel, and described main girder steel 1 and described the vertical girder steel frame plate that is connected to form of girder steel 2, described steel pipe template 3 is arranged on described girder steel frame plate, and described steel pipe framed bent 4 is arranged on described girder steel 2, and two ends of every main girder steel 1 are firmly erected on respectively the architectural of both sides.So arrange, by two ends of every main girder steel 1 are firmly erected on respectively to the architectural of both sides, high-altitude can be set up the stressed platform safety of formula girder steel be arranged at reliably two architectural, thereby can utilize this high-altitude to set up the stressed platform of formula girder steel, realize the construction of aerial gallery structure.
Owing to setting up the stressed platform of formula girder steel and need to use many main girder steels 1 in high-altitude, Fig. 2 shows one embodiment of the invention high and medium and sets up the main girder steel distribution schematic diagram of the stressed platform of formula girder steel, the syndeton of setting up that has simultaneously also shown each main girder steel 1 of the present embodiment, one has four kinds sets up syndeton A (shear wall box out), B(bracket), C(is padded) and D(directly shelve).Every main girder steel 1 to set up residing structural condition different, can select a kind of or both are suitable sets up syndeton according to each concrete structural condition, thereby realize firmly setting up of main girder steel 1, finally be conducive to form stable, a reliable high-altitude and set up the stressed platform of formula girder steel, for the construction of aerial gallery structure.
Optionally, as shown in Figure 4, in the time of the setting up floor and have Core Walls Structure shear wall 5 of main girder steel 1 correspondence, conventional main steel girder erection fixing means is hindered, and can not implement.In the present embodiment, syndeton A is set up in employing, on described shear wall 5, hole to be provided 51 is established in the position of corresponding main girder steel 1, and at interior pre-buried the first pre-embedded steel slab 52 of hole to be provided 51, the end of described main girder steel 1 is stretched in described hole to be provided 51 and is fixedly connected with by welding manner with described the first pre-embedded steel slab 52.Easy to connect between main girder steel 1 and the first pre-embedded steel slab 52, dismounting is also convenient, has guaranteed the recoverable of main girder steel 1, has effectively saved construction cost.
Optionally, as shown in Figure 5, in the time of the setting up floor and cannot meet carrying condition of main girder steel 1 correspondence, for example, when the setting up floor and be cantilevered plate structure of main girder steel 1 correspondence, syndeton B is set up in employing, and a Reinforced Concrete Corbels for fixing main girder steel is set on this sets up the substructure post 6 of floor.That is to say, a Reinforced Concrete Corbels 7 for fixing main girder steel 1 is set on the substructure post 6 of cantilevered plate structure.Because the bearing capacity of cantilevered plate structure is limited, the base surface that must not shelve as main girder steel, in unavoidable situation, manufactures one and is beneficial to the condition that main steel girder erection is set up by Reinforced Concrete Corbels 7 is set.Optionally, described Reinforced Concrete Corbels 7 is built and is formed by the main muscle 71 of bracket and bracket stirrup 72, the main muscle 71 of described bracket anchors in described substructure post 6, so, the more firm safety of connection that can make Reinforced Concrete Corbels 7 and described substructure post is set.
Optionally, as shown in Figure 6 and Figure 7, in the time that the floor height of setting up floor of main girder steel 1 both sides is different,, on the lower floor face of structural elevation by the padded level to the higher floor face place of structural elevation of little steel column 8 is set.On the lower floor face of structural elevation for pre-buried second pre-embedded steel slab 9 in position of little steel column 8 is set, the lower end of described little steel column 8 is fixedly connected with described the second pre-embedded steel slab 9, for example connect by welding manner, the upper end of described little steel column 8 is fixedly connected with described main girder steel 1 by the 3rd steel plate 10.Described little steel column 8 can be by the welding manner formation that is stitched together for two steel I-columns, and splicing seams 11 as shown in Figure 7.Preferably, please continue to refer to Fig. 6 and Fig. 7, described little steel column 8, together with structure wallboard 12 drawknots, to guarantee the stability of little steel column 8, is set up with the safety and firmness that is conducive to main girder steel 1.Concrete, between described little steel column 8 and structure wallboard 12, pass through together with channel-section steel 13 drawknots.One end of described channel-section steel 13 is fixedly connected with the 4th pre-embedded steel slab 14 being preset on structure wall column 12, the other end vertically stretches in little steel column 8 and is fixed together with little steel column 8, thereby guarantee the steadiness of little steel column 8, and then further improve the stability of setting up of main girder steel 1.Main girder steel 1 and the 3rd steel plate 10 and between easy to connect, dismounting is also convenient, has guaranteed the recoverable of main girder steel 1, has effectively saved construction cost.That is to say, adopt and set up syndeton C at the lower floor face of structural elevation, teach high floor face to adopt in structural elevation and set up syndeton D.
As Fig. 1 shows the schematic diagram of setting up syndeton D, the floor face of setting up floor of described building is provided with the 5th pre-embedded steel slab 15, the described end of described main girder steel 1 is fixedly connected with described the 5th pre-embedded steel slab 15, and described main girder steel 1 is directly shelved and is fixed on described the 5th pre-embedded steel slab 15.Certainly, described the 5th pre-embedded steel slab 15 also can be arranged to bearing (not shown), as long as can directly be connected just passable with main girder steel 1.
Please continue to refer to Fig. 1 to Fig. 7, corresponding, the construction method of the stressed platform of formula girder steel is set up in described high-altitude, sets up the stressed platform of formula girder steel for set up high-altitude between two buildings, comprises the steps:
Step 1, set up each main girder steel 1, shelve the residing different structure situation in a position according to the main girder steel of setting up floor of both sides building, select following a kind of or two kinds of modes to realize firmly setting up of main girder steel 1: (1) is in the time that the floor height of setting up floor of main girder steel 1 both sides is different, when the structural elevation of setting up floor of main girder steel 1 one sides is during lower than the structural elevation of setting up floor of opposite side, by the padded floor face lower structural elevation level to the higher floor face place of structural elevation; (2) in the time that main girder steel 1 need to be set up Core Walls Structure shear wall 5; in the time of the setting up floor and there is Core Walls Structure shear wall 5 of main girder steel 1 correspondence; on shear wall 5, offer hole to be provided 51; and at interior default the first pre-embedded steel slab 52 of hole to be provided 52; when installation; tower crane (not shown) is directly slowly pulled main girder steel 1 in hole to be provided 51, and the end of main girder steel 1 and the first pre-embedded steel slab 52 are welded and fixed; (3) when main girder steel 1 correspondence set up position cannot meet carrying condition time, for example, when the setting up floor and be cantilevered plate structure of main girder steel 1 correspondence, on substructure post 6, arrange one for shelving the Reinforced Concrete Corbels 7 of main girder steel 1; (4), except above three kinds of situations, main girder steel 1 can be shelved and be fixed on the floor face of setting up floor;
Step 2: lift girder steel 2 each time, by main girder steel 1 and time vertical girder steel frame plate that is connected to form of girder steel 2;
Step 3: lay steel pipe template 3 on girder steel frame plate;
Step 4: set up steel pipe framed bent 4 on inferior girder steel 2.
Optionally, described Reinforced Concrete Corbels 7 is built and is formed by the main muscle 71 of bracket and bracket stirrup 72 as described in Figure 5, and the main muscle 71 of described bracket anchors in described substructure post 6 by code requirement.So, the more firm safety of connection that can make Reinforced Concrete Corbels 7 and described substructure post is set.
Optionally, as shown in Figure 6 and Figure 7, when the structural elevation of setting up floor of main girder steel 1 one sides is during lower than the structural elevation of setting up floor of opposite side, on the lower floor face of structural elevation by the padded level to the higher floor face place of structural elevation of little steel column 8 is set, described little steel column 8 is together with structure wallboard 12 drawknots, to guarantee the stability of little steel column 8, set up with the safety and firmness that is conducive to main girder steel 1.Concrete, between described little steel column 8 and structure wallboard 12, pass through together with channel-section steel 13 drawknots.One end of described channel-section steel 13 is fixedly connected with the 4th pre-embedded steel slab 14 being preset on structure wall column 12, the other end vertically stretches in little steel column 8 and is fixed together with little steel column 8, thereby guarantee the steadiness of little steel column 8, and then further improve the stability of setting up of main girder steel 1.
The stressed platform of formula girder steel is set up in a kind of high-altitude provided by the invention, be set up between two buildings, comprise some main girder steels, several times girder steel, steel pipe template and steel pipe framed bent, described some main girder steels be arranged in parallel, described time girder steel be arranged in parallel, and described main girder steel and described the vertical girder steel frame plate that is connected to form of girder steel, described steel pipe template-setup is on described girder steel frame plate, described steel pipe framed bent is arranged on described girder steel, two ends of every main girder steel are firmly erected on respectively the architectural of both sides, there is construction safety reliable, simple and can guarantee the advantage of the recoverable of each girder steel element.In addition, in the time of girder steel putting up platform, to different structure feature position, take corresponding processing mode, realize the safe and reliable mounting condition of main girder steel, the process of whole construction method has embodied reliable, the simple feature of construction safety, and has guaranteed the recoverable of each Steel section member, effectively save construction cost, do not affected construction speed.
Foregoing description is only the description to preferred embodiment of the present invention, the not any restriction to the scope of the invention, and any change, modification that the those of ordinary skill in field of the present invention does according to above-mentioned disclosure, all belong to the protection domain of claims.

Claims (6)

1. the stressed platform of formula girder steel is set up in a high-altitude, be set up between two buildings, it is characterized in that, comprise some main girder steels, several times girder steel, steel pipe template and steel pipe framed bent, described some main girder steels be arranged in parallel, described time girder steel be arranged in parallel, and described main girder steel and described the vertical girder steel frame plate that is connected to form of girder steel, described steel pipe template-setup is on described girder steel frame plate, described steel pipe framed bent is arranged on described girder steel, and two ends of every main girder steel are firmly erected on respectively the architectural of both sides.
2. the stressed platform of formula girder steel is set up in high-altitude according to claim 1, it is characterized in that, when main girder steel corresponding set up floor and cannot meet carrying condition time, on this sets up the substructure post of floor, arrange one for shelving the Reinforced Concrete Corbels of main girder steel.
3. the stressed platform of formula girder steel is set up in high-altitude according to claim 2, it is characterized in that, described Reinforced Concrete Corbels is built and formed by the main muscle of bracket and bracket stirrup, and the main muscle of described bracket anchors in described substructure post.
4. the stressed platform of formula girder steel is set up in high-altitude according to claim 1, it is characterized in that, in the time that the floor height of setting up floor of main girder steel both sides is different, on the lower floor face of structural elevation by the padded level to the higher floor face place of structural elevation of little steel column is set.
5. the stressed platform of formula girder steel is set up in high-altitude according to claim 4, it is characterized in that, described little steel column is together with structure wallboard drawknot.
6. the stressed platform of formula girder steel is set up in high-altitude according to claim 1, it is characterized in that, when main girder steel corresponding set up floor and there is Core Walls Structure shear wall time, on described shear wall, hole to be provided is established in the position of corresponding main girder steel, and in hole to be provided pre-buried the first pre-embedded steel slab, the end of described main girder steel is stretched in described hole to be provided and is fixedly connected with described the first pre-embedded steel slab.
CN201320828775.9U 2013-12-16 2013-12-16 High-altitude erected steel beam stress platform Withdrawn - After Issue CN203640308U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320828775.9U CN203640308U (en) 2013-12-16 2013-12-16 High-altitude erected steel beam stress platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320828775.9U CN203640308U (en) 2013-12-16 2013-12-16 High-altitude erected steel beam stress platform

Publications (1)

Publication Number Publication Date
CN203640308U true CN203640308U (en) 2014-06-11

Family

ID=50871564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320828775.9U Withdrawn - After Issue CN203640308U (en) 2013-12-16 2013-12-16 High-altitude erected steel beam stress platform

Country Status (1)

Country Link
CN (1) CN203640308U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103696577A (en) * 2013-12-16 2014-04-02 上海建工五建集团有限公司 Overhead steel-beam stress platform and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103696577A (en) * 2013-12-16 2014-04-02 上海建工五建集团有限公司 Overhead steel-beam stress platform and construction method thereof
CN103696577B (en) * 2013-12-16 2015-07-22 上海建工五建集团有限公司 Overhead steel-beam stress platform and construction method thereof

Similar Documents

Publication Publication Date Title
CN103696577B (en) Overhead steel-beam stress platform and construction method thereof
CN102733606A (en) Construction method of high large cantilever structure
CN110512719B (en) Construction method of large-span interval corridor high-altitude formwork steel platform for high-rise residence
CN104818772B (en) A kind of large span long cantilever conjoined structure and construction technology
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN104389419A (en) Cantilevered formwork platform installation structure and construction method
CN208996395U (en) A kind of existing multi-storey building installation prefabricated assembled hoistway of elevator of cold district
CN109138452A (en) Heavy construction bolt sphere steel pipe rack entirety fast lifting construction technology
CN103291065B (en) A kind of assembly concrete bracing or strutting arrangement and lifting localization method
CN102864934A (en) Construction method of back-bolt type dry hanging stone curtain wall
CN205907812U (en) Take steel frame structure that encorbelments greatly of pull rod
CN203257090U (en) Framework system of cantilever slab
CN108104260B (en) Construction method of cantilever component of fabricated building
CN203640308U (en) High-altitude erected steel beam stress platform
CN102312563A (en) Method for connecting external scaffold with wall for large-span and ultra-story-height structures
CN105464215A (en) Reverse construction method construction method of hanging structure incapable of being provided with vertical temporary support
CN104831928B (en) High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method
CN109989590A (en) For the auxiliary fixing device of roof overlength steel girder erection and the hanging method of girder steel
CN214302807U (en) Attached lifting scaffold supported by specially-made stand columns
CN205531393U (en) Pier stud construction system
CN210216415U (en) Positioning device for bridge pile foundation steel casing in deepwater and rapid stream area
CN109441088B (en) Steel structure operation platform for super high-rise building core tube construction
CN202913705U (en) Large curtain wall unit plate track lifting device
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure
CN105257005A (en) Method for segmenting steel-structured transfer truss and segmented steel-structured transfer truss

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140611

Effective date of abandoning: 20150722

RGAV Abandon patent right to avoid regrant