CN110485557A - A kind of steel construction elevator quick assembled type vestibule - Google Patents
A kind of steel construction elevator quick assembled type vestibule Download PDFInfo
- Publication number
- CN110485557A CN110485557A CN201910862914.1A CN201910862914A CN110485557A CN 110485557 A CN110485557 A CN 110485557A CN 201910862914 A CN201910862914 A CN 201910862914A CN 110485557 A CN110485557 A CN 110485557A
- Authority
- CN
- China
- Prior art keywords
- side plate
- bottom plate
- connecting angle
- vestibule
- angle pieces
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 47
- 239000010959 steel Substances 0.000 title claims abstract description 47
- 238000010276 construction Methods 0.000 title claims abstract description 24
- 239000000945 filler Substances 0.000 claims description 3
- 239000000565 sealant Substances 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 9
- 238000011065 in-situ storage Methods 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000032683 aging Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/0046—Loggias
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0266—Enlarging
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The present invention relates to a kind of steel construction elevator quick assembled type vestibules, including vestibule bottom plate and two vestibule side plates, bottom plate is fixedly mounted in building embedded board and hoistway with steel structure main body, the four corners of bottom plate are equipped with the first connecting angle pieces, side plate is symmetrically mounted on above bottom plate by first connecting angle pieces, and the top of the side plate is fixedly connected by the second connecting angle pieces with upper layer bottom plate;Bottom plate includes chassis and upper people's bed board, and side plate includes side plate frame and decorative components.The present invention will make the bottom plate and side plate of vestibule, integrated installation is carried out into prefabricated component in factory, use for reference assembled architecture mode, scene carries out assembled installation, prefabricated component lifting and assembled in situ difficulty are low, the lifting time for reducing building site vestibule accessory can shorten the 3-5 days elevator construction period of steel construction, be conducive to resident's daily trip.
Description
Technical field
The present invention relates to steel construction elevator technology field more particularly to a kind of steel construction elevator quick assembled type vestibules.
Background technique
Aging blocks install the vestibule between elevator and stair additional, generally by girder steel site welding, then carry out interior decoration with
And extraneous adornment;Construction period counts roughly 5-7 days, has spun out the construction period of entire hoistway project, has influenced the usage experience of resident.
To solve the above problems, there are also construction parties to use frame integrated form vestibule to reduce site welding, shortening is hung
The duration is filled, still, frame integrated form vestibule is higher to environmental requirement in hoisting process, and if there is shelter, hoisting difficulty is straight
Line rises, and in this context, is highly desirable exploitation assembled vestibule technology.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of liftings and the convenient steel construction elevator of assembled in situ with fastly
Fast assembled vestibule.
In order to solve the above technical problems, the technical scheme is that a kind of steel construction elevator quick assembled type vestibule,
Including vestibule bottom plate and two vestibule side plates, the bottom plate is fixedly mounted on building embedded board and hoistway with steel structure main body
On, the four corners of the bottom plate are equipped with the first connecting angle pieces, and the side plate is symmetrically mounted on by first connecting angle pieces
Above the bottom plate, the top of the side plate is fixedly connected by the second connecting angle pieces with upper layer bottom plate;
The bottom plate includes chassis and upper people's bed board, and upper people's bed board is mounted on above the chassis;
The chassis includes:
Two bottom plate girder steels being oppositely arranged, first connecting angle pieces are mounted on the both ends of the bottom plate girder steel;
Several floor beams, the both ends of the floor beam are separately fixed on described two bottom plate girder steels;
Several bottom plates reinforce stringer, and the both ends that the bottom plate reinforces stringer are fixedly connected with two neighboring floor beam respectively;
The side plate includes side plate frame and decorative components, and the decorative components are mounted on the side plate frame:
The side plate frame includes:
Two side plate vertical beams being oppositely arranged;
It is fixedly mounted on the side plate lower beam of side plate vertical beam bottom, the side plate lower beam passes through the first connecting angle pieces and bottom
Slab beam is fixedly connected;
The side plate upper beam being fixedly mounted at the top of the side plate vertical beam, the side plate lower beam by the second connecting angle pieces with it is upper
Layer bottom plate is fixedly connected;
Be parallel to the intermediate transverse girder of the side plate upper beam and side plate lower beam or be parallel to the side plate vertical beam centre it is vertical
Beam.
The bottom plate girder steel is cut using drum steel as a preferred technical solution,.
The first connecting angle pieces and the second connecting angle pieces are that angle steel is cut as a preferred technical solution,.
The L-shaped both ends for being mounted on the bottom plate girder steel of first connecting angle pieces as a preferred technical solution, institute
Side plate is stated to be mounted on the inside of first connecting angle pieces.
Second connecting angle pieces is mounted below the bottom plate of upper layer in " Γ " shape as a preferred technical solution, the side
Plate is mounted on the outside of second connecting angle pieces.
The decorative components include integrated window frame and decorative panel, the integrated window frame and dress as a preferred technical solution,
Plaque is mounted on inside the region that the side plate frame surrounds.
The gap between the bottom plate and side plate is filled by filler or sealant as a preferred technical solution,.
By adopting the above-described technical solution, the beneficial effects of the present invention are: the present invention by make vestibule bottom plate and
Side plate carries out integrated installation into prefabricated component in factory, uses for reference assembled architecture mode, live can carry out assembled installation, prefabricated
Part lifting and installation difficulty are low, can shorten project duration.The present invention is convenient for fast hoisting, reduces the construction period of building site vestibule,
On-site hoisting difficulty is reduced, the 3-5 days elevator construction period of steel construction is shortened, is conducive to resident's daily trip.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention without any creative labor, may be used also for those of ordinary skill in the art
To obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of the bottom plate of the embodiment of the present invention;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the structural schematic diagram of the side plate of the embodiment of the present invention;
Fig. 4 is the assembling schematic diagram of the embodiment of the present invention;
Fig. 5 is the scheme of installation of side plate and bottom plate;
Fig. 6 is the scheme of installation of side plate Yu upper layer bottom plate.
Specific embodiment
As shown in Figures 1 to 6, a kind of steel construction elevator quick assembled type vestibule, including vestibule bottom plate 1 and two vestibules
Side plate 2, bottom plate 1 are fixedly mounted in building embedded board and hoistway with steel structure main body, and the four corners of bottom plate 1 are equipped with first
Connecting angle pieces 3, side plate 2 are symmetrically mounted on 1 top of bottom plate by the first connecting angle pieces 3, and the top of side plate 2 passes through the second joint angle
Part 4 is fixedly connected with upper layer bottom plate 5.
As depicted in figs. 1 and 2, bottom plate 1 includes chassis and upper people's bed board 11, and upper people's bed board 11 is mounted on chassis
Top.
Chassis includes:
Two bottom plate girder steels 12 being oppositely arranged, the first connecting angle pieces 3 are mounted on the both ends of bottom plate girder steel 12;
Several floor beams 13, the both ends of floor beam 13 are separately fixed on two bottom plate girder steels 12;
Several bottom plates reinforce stringer 14, and the both ends that bottom plate reinforces stringer 14 are fixed with two neighboring floor beam 13 respectively to be connected
It connects.
Wherein, constituting that the bottom plate girder steel 12 of chassis, floor beam 13 and bottom plate reinforce between stringer 14 can be with
It is fixed in such a way that welding or bolt are fixed.
As shown in figure 3, side plate 2 includes side plate frame and decorative components, decorative components are mounted on side plate frame.
Side plate frame includes:
Two side plate vertical beams 21 being oppositely arranged;
It is fixedly mounted on the side plate lower beam 22 of 21 bottom of side plate vertical beam, side plate lower beam 22 passes through the first connecting angle pieces 4 and bottom
Slab beam 12 is fixedly connected;
Be fixedly mounted on the side plate upper beam 23 at the top of side plate vertical beam 21, side plate upper beam 23 by the second connecting angle pieces 4 with it is upper
Layer bottom plate 5 is fixedly connected, and side plate upper transverse material 23 is equipped with the mounting hole 6 connecting with connecting angle pieces 4;
It is parallel to the intermediate transverse girder 24 of side plate upper beam 23 and side plate lower beam 22 or is parallel to the intermediate longitudinal girder of side plate vertical beam
(in the present embodiment, being not provided with intermediate longitudinal girder).
Decorative components include integrated window frame 25 and decorative panel 26, and integrated window frame 25 and decorative panel 26 are mounted on side plate frame and enclose
At region inside.
Constitute the side plate vertical beam 21 of side plate frame, side plate lower beam 22, side plate upper beam 23, intermediate transverse girder 24 or in
Between welding can also be used between stringer or the fixed mode of bolt is fixed.
In the present embodiment, bottom plate girder steel is cut using drum steel, and the first connecting angle pieces and the second connecting angle pieces are
Angle steel is cut.
The L-shaped both ends for being mounted on bottom plate girder steel 12 of first connecting angle pieces 3, side plate 2 are mounted in the first connecting angle pieces 3
Side, the first connecting angle pieces 3 are fixed with bottom plate 1 and side plate 2 by screw bolt and nut.
Second connecting angle pieces 4 is mounted on 5 lower section of upper layer bottom plate in " Γ " shape, and side plate 2 is mounted on outside the second connecting angle pieces 4
Side, the second connecting angle pieces 4 are fixed with upper layer bottom plate 4 and side plate 2 also by screw bolt and nut.
Gap between bottom plate 1 and side plate 2 is filled by filler 7, in the present invention, the gap between bottom plate 1 and side plate 2
It can be filled by sealant or other materials.
In the present invention, side 2 and bottom plate 1 are completed in factory process, integrate the installation in advance of window frame 25 and decorative panel 26
Complete, aging blocks install additional steel construction elevator project in, scene only need will bottom plate 1 lift after be welded to building embedded board and
In hoistway with steel structure main body, then two panels side 2 is lifted on bottom plate girder steel, is fastened bottom plate 1 and side 2 by bolt,
Realize the purpose of Fast Installation.
The above shows and describes the basic principle, main features and advantages of the invention.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this
The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its
Equivalent thereof.
Claims (7)
1. a kind of steel construction elevator quick assembled type vestibule, it is characterised in that: including vestibule bottom plate and two vestibule side plates, institute
It states bottom plate to be fixedly mounted in building embedded board and hoistway with steel structure main body, the four corners of the bottom plate are equipped with first and connect
Corner fittings is connect, the side plate is symmetrically mounted on above the bottom plate by first connecting angle pieces, is passed through at the top of the side plate
Second connecting angle pieces is fixedly connected with upper layer bottom plate;
The bottom plate includes chassis and upper people's bed board, and upper people's bed board is mounted on above the chassis;
The chassis includes:
Two bottom plate girder steels being oppositely arranged, first connecting angle pieces are mounted on the both ends of the bottom plate girder steel;
Several floor beams, the both ends of the floor beam are separately fixed on described two bottom plate girder steels;
Several bottom plates reinforce stringer, and the both ends that the bottom plate reinforces stringer are fixedly connected with two neighboring floor beam respectively;
The side plate includes side plate frame and decorative components, and the decorative components are mounted on the side plate frame;
The side plate frame includes:
Two side plate vertical beams being oppositely arranged;
It is fixedly mounted on the side plate lower beam of side plate vertical beam bottom, the side plate lower beam passes through the first connecting angle pieces and bottom
Slab beam is fixedly connected;
The side plate upper beam being fixedly mounted at the top of the side plate vertical beam, the side plate lower beam by the second connecting angle pieces with it is upper
Layer bottom plate is fixedly connected;
Be parallel to the intermediate transverse girder of the side plate upper beam and side plate lower beam or be parallel to the side plate vertical beam centre it is vertical
Beam.
2. a kind of steel construction elevator quick assembled type vestibule as described in claim 1, it is characterised in that: the bottom plate girder steel
It is cut using drum steel.
3. a kind of steel construction elevator quick assembled type vestibule as described in claim 1, it is characterised in that: the first connecting angle pieces
It is that angle steel is cut with the second connecting angle pieces.
4. a kind of steel construction elevator quick assembled type vestibule as described in claim 1, it is characterised in that: first connection
The L-shaped both ends for being mounted on the bottom plate girder steel of corner fittings, the side plate are mounted on the inside of first connecting angle pieces.
5. a kind of steel construction elevator quick assembled type vestibule as described in claim 1, it is characterised in that: second connection
Corner fittings is mounted below the bottom plate of upper layer in " Γ " shape, and the side plate is mounted on the outside of second connecting angle pieces.
6. a kind of steel construction elevator quick assembled type vestibule as described in claim 1, it is characterised in that: the decorative components
It is mounted on inside the region that the side plate frame surrounds including integrated window frame and decorative panel, the integrated window frame and decorative panel.
7. a kind of steel construction elevator quick assembled type vestibule as described in claim 1, it is characterised in that: the bottom plate and side
It is filled by filler or sealant in gap between plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910862914.1A CN110485557A (en) | 2019-09-12 | 2019-09-12 | A kind of steel construction elevator quick assembled type vestibule |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910862914.1A CN110485557A (en) | 2019-09-12 | 2019-09-12 | A kind of steel construction elevator quick assembled type vestibule |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110485557A true CN110485557A (en) | 2019-11-22 |
Family
ID=68557785
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910862914.1A Pending CN110485557A (en) | 2019-09-12 | 2019-09-12 | A kind of steel construction elevator quick assembled type vestibule |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110485557A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111188507A (en) * | 2020-01-13 | 2020-05-22 | 余冲 | Corridor structure of elevator hoistway and installation method thereof |
CN112942886A (en) * | 2021-02-04 | 2021-06-11 | 广东世纪达建设集团有限公司 | Construction method for additionally building corridor in old building |
CN114541796A (en) * | 2021-12-23 | 2022-05-27 | 广东奥菱电梯有限公司 | Installation method for additionally installing elevator corridor |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04368525A (en) * | 1991-06-18 | 1992-12-21 | Sonoda Seisakusho:Kk | Structure for building outer corridor |
JP2004244208A (en) * | 2003-02-17 | 2004-09-02 | Nippon Steel Corp | External elevator and method of its construction |
JP2007204219A (en) * | 2006-02-01 | 2007-08-16 | Watahan Technos Kk | Construction method of elevator shaft building |
CN109184150A (en) * | 2018-10-29 | 2019-01-11 | 张云天 | A kind of existing multi-storey building of cold district installs the prefabricated assembled hoistway of elevator and its construction method additional |
CN208996395U (en) * | 2018-10-29 | 2019-06-18 | 张云天 | A kind of existing multi-storey building installation prefabricated assembled hoistway of elevator of cold district |
CN210827818U (en) * | 2019-09-12 | 2020-06-23 | 潍坊达福嘉建筑配套工程有限公司 | Steel construction is rapid Assembly formula vestibule for elevator |
-
2019
- 2019-09-12 CN CN201910862914.1A patent/CN110485557A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04368525A (en) * | 1991-06-18 | 1992-12-21 | Sonoda Seisakusho:Kk | Structure for building outer corridor |
JP2004244208A (en) * | 2003-02-17 | 2004-09-02 | Nippon Steel Corp | External elevator and method of its construction |
JP2007204219A (en) * | 2006-02-01 | 2007-08-16 | Watahan Technos Kk | Construction method of elevator shaft building |
CN109184150A (en) * | 2018-10-29 | 2019-01-11 | 张云天 | A kind of existing multi-storey building of cold district installs the prefabricated assembled hoistway of elevator and its construction method additional |
CN208996395U (en) * | 2018-10-29 | 2019-06-18 | 张云天 | A kind of existing multi-storey building installation prefabricated assembled hoistway of elevator of cold district |
CN210827818U (en) * | 2019-09-12 | 2020-06-23 | 潍坊达福嘉建筑配套工程有限公司 | Steel construction is rapid Assembly formula vestibule for elevator |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111188507A (en) * | 2020-01-13 | 2020-05-22 | 余冲 | Corridor structure of elevator hoistway and installation method thereof |
CN112942886A (en) * | 2021-02-04 | 2021-06-11 | 广东世纪达建设集团有限公司 | Construction method for additionally building corridor in old building |
CN114541796A (en) * | 2021-12-23 | 2022-05-27 | 广东奥菱电梯有限公司 | Installation method for additionally installing elevator corridor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110485557A (en) | A kind of steel construction elevator quick assembled type vestibule | |
CN202400710U (en) | Lift well wall assembled by adopting combined well frame | |
CN101845849B (en) | Large-span steel gallery erected between new building and old building and construction method thereof | |
CN203113553U (en) | Prefabricated concrete frame-shear wall structure | |
CN105178433A (en) | Precast concrete shear wall structure and construction method thereof | |
CN102180394A (en) | Integrated building-block-type lift of strip steel structure | |
CN212535440U (en) | Integrally prefabricated external window, connected node of wafing | |
CN105645223A (en) | Integrated lift of steel structure | |
CN111927248A (en) | Integrally prefabricated external hanging bay window, connecting node and manufacturing method | |
CN205475863U (en) | Roof beam wall composite member | |
CN204917549U (en) | Steel construction integration elevator | |
CN207129800U (en) | A kind of female elevator | |
CN210827818U (en) | Steel construction is rapid Assembly formula vestibule for elevator | |
CN111255059A (en) | Assembly type concrete house structure and node connection method thereof | |
CN208430715U (en) | A kind of prefabricated assembled concrete-steel stair of jack welding | |
CN208037786U (en) | Elevator assistance platform | |
CN209293173U (en) | Module-type steel structure trestle external verandahs | |
CN108316530A (en) | The assembled steel reinforced concrete composite floor and installation method connected using self-locking | |
CN208430635U (en) | A kind of dismountable assembled architecture combined member | |
CN205858049U (en) | Be suitable to the prefabricated assembled windowsill of people's Cargo Lift | |
CN109267645A (en) | Module-type steel structure trestle external verandahs | |
CN106013421A (en) | Building method for steel-wood combined assembling type fiber concrete building | |
CN205653885U (en) | Reinforced concrete prefabricated house integrates | |
CN209538376U (en) | Assembled vestibule | |
CN218715464U (en) | Prefabricated house unit of assembled composite building with terrace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |