CN205858049U - Be suitable to the prefabricated assembled windowsill of people's Cargo Lift - Google Patents

Be suitable to the prefabricated assembled windowsill of people's Cargo Lift Download PDF

Info

Publication number
CN205858049U
CN205858049U CN201620694396.9U CN201620694396U CN205858049U CN 205858049 U CN205858049 U CN 205858049U CN 201620694396 U CN201620694396 U CN 201620694396U CN 205858049 U CN205858049 U CN 205858049U
Authority
CN
China
Prior art keywords
prefabricated
prefabricated panel
windowsill
people
cargo lift
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620694396.9U
Other languages
Chinese (zh)
Inventor
龙莉波
马跃强
许瑾
许崇伟
徐辉
王恒
赵波
宋毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201620694396.9U priority Critical patent/CN205858049U/en
Application granted granted Critical
Publication of CN205858049U publication Critical patent/CN205858049U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This utility model provides a kind of prefabricated assembled windowsill being suitable to people's Cargo Lift, prefabricated assembled windowsill splits into two parts and carries out prefabricated, Part I prefabricated panel be positioned at reserved window punch upside top be positioned at reserved window and punch the assembly in left and right portion of both sides, Part II prefabricated panel be positioned at reserved window punch downside bottom, the left and right side of Part II prefabricated panel is able to the medial surface in the left and right portion with Part I prefabricated panel and splices mutually.During corresponding floor needs to make employment Cargo Lift conveying people and construction material, one hole being easy to workmen and construction material turnover can be provided, and when this floor need not make employment Cargo Lift, on-the-spot can carry out the assembly consolidated, hole is blocked, form complete prefabricated assembled windowsill, thus solve in prior art the windowsill at people's Cargo Lift installation position and need the problem of later stage cast-in-place formwork, and be effectively improved the prefabricated rate of assembled architecture.

Description

Be suitable to the prefabricated assembled windowsill of people's Cargo Lift
Technical field
This utility model relates to building engineering field, particularly relates to a kind of prefabricated assembled windowsill being suitable to people's Cargo Lift.
Background technology
Prefabrication is new model building form indeed, and currently, China is in Social Transformation Period, and building industry also faces and turns The pressure of type upgrading, therefore, prefabrication, in evolutionary path and the direction that current and future is all building industry, is to realize The important content of building industrialization.
Prefabrication be in the factory by concrete component in advance feature according to engineering project prefabricated, then Transport carries out the structural system that assembling combination becomes firm to job site.This construction method has efficiently, the spy of energy-saving and environmental protection Point, it is possible to increase construction quality and efficiency of construction.In prefabrication, common prefabricated components have Side fascia, overlapping Plate, air-conditioning plate, balcony slab, staircase boards, interior shear wall, non bearing structure post etc., the use of these components makes job site Wet trade amount is substantially reduced, and owing to using the mode of lifting combination, the labor intensity of workman is also minimized.
People's Cargo Lift i.e. building hoist is generally located on Lou Dong and windows position.For convenience of people or the turnover of building materials, people's goods Bench-table plate at ladder installation position the most generally remains follow-up cast-in-place construction at present, and on the one hand this reduce prefabrication Prefabricated rate, it is impossible to the superiority of reflection assembled mode of construction, on the other hand owing to leaving the neutral gear of sheet between building, after Phase pouring construction formwork measure, the most ugly, affect job site appearance.
Therefore, how to provide one can avoid later stage cast-in-place formwork construction, improve the prefabricated rate of assembled architecture, improve Construction quality and the prefabricated assembled windowsill being suitable to people's Cargo Lift of efficiency of construction, it has also become construction circle needs the most perfect The technical problem optimized.
Utility model content
For in prior art, the problem that at people's Cargo Lift laying, windowsill needs the later stage to pour, prefabricated rate is low, this practicality is new Type provides a kind of prefabricated assembled windowsill being suitable to people's Cargo Lift, and solving windowsill at people's Cargo Lift laying needs cast-in-place of later stage The problem of mould construction, effectively reduces the wet trade amount of job site, improves the prefabricated rate of prefabrication, construction effect Rate and construction quality.
For solving above-mentioned technical problem, this utility model following technical scheme of offer:
A kind of prefabricated assembled windowsill being suitable to people's Cargo Lift, described prefabricated assembled windowsill splits into two parts to be carried out Prefabricated, wherein, Part I prefabricated panel be positioned at reserved window punch upside top be positioned at reserved window and punch both sides The assembly in left and right portion, Part II prefabricated panel is to be positioned at reserved window to punch the bottom of downside, and described Part II is pre- The left and right side of wallboard processed is able to the medial surface in the left and right portion with Part I prefabricated panel and splices mutually.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part I prefabricated panel Upper surface can be spliced mutually with the lower surface of the Part II prefabricated panel of prefabricated assembled windowsill adjacent and above;Described The lower surface of two partial precast wallboards can upper with the Part I prefabricated panel of the prefabricated assembled windowsill of adjacent lower section End face splices mutually.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part I prefabricated panel The lower surface of the Part II prefabricated panel of upper surface and prefabricated assembled windowsill adjacent and above is by grout sleeve mode Splicing, the Part I dry wall of the lower surface of described Part II prefabricated panel and the prefabricated assembled windowsill of adjacent lower section The upper surface of plate is spliced by grout sleeve mode.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part I prefabricated panel Upper surface is embedded with for spelling with the lower surface of the Part II prefabricated panel of prefabricated assembled windowsill adjacent and above The grout sleeve connect, the lower surface of described Part II prefabricated panel is provided with the sleeve for being connected with described grout sleeve and reserves Reinforcing bar.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part II prefabricated panel Left and right side medial surface with the left and right portion of Part I prefabricated panel respectively is bolted.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part II prefabricated panel Left and right side is respectively equipped with connection sheet, the medial surface in the left and right portion of Part I prefabricated panel be correspondingly provided with for described company The bolted coupling nut of contact pin.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part I prefabricated panel Two sides are able to splice mutually with the two sides of the Part I prefabricated panel of adjacent prefabricated assembled windowsill.
The beneficial effects of the utility model are as follows:
One, a kind of prefabricated assembled windowsill being suitable to people's Cargo Lift that this utility model provides, this prefabricated assembled windowsill Plate is during corresponding floor needs to use building hoist conveying people and construction material, using the teaching of the invention it is possible to provide be easy to workmen for one The hole passed in and out with construction material, and when this floor need not use building hoist, the assembly consolidated on-the-spot can be carried out, Hole is blocked, forms complete prefabricated assembled windowsill, thus solve the problem of later stage cast-in-place formwork, improve assembled and build The prefabricated rate built, improves construction quality and efficiency of construction.
Two, a kind of prefabricated assembled windowsill being suitable to people's Cargo Lift that this utility model provides, first, second partial precast Vertical piece is threaded connection between wallboard and between contiguous prefabricated assembling window platen, has advantage simply and easily, By grout sleeve mode between horizontal piece between first, second partial precast wallboard the most contiguous prefabricated assembling window platen Connect, there is solid and reliable advantage, two kinds of connected modes are applied in combination, be advantageously implemented whole assembled architecture quick, Effectively, it is reliably connected.
Accompanying drawing explanation
Fig. 1 is the structural representation of the prefabricated assembled windowsill being suitable to people's Cargo Lift of this utility model one embodiment;
Fig. 2 is the structural representation of Part I prefabricated panel in this utility model one embodiment;
Fig. 3 is the structural representation of Part II prefabricated panel in this utility model one embodiment;
Fig. 4 is the structural representation of suspension bracket of constructing in this utility model one embodiment;
In figure: 1-Part I prefabricated panel, 2-Part II prefabricated panel, 3-grout sleeve, 4-sleeve reserved steel bar, 5-connects grillage, 9-side plate frame, 10-balancing weight, 11-roller, 12-chain block under sheet, 6-coupling nut, 7-loading frame, 8-.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, this utility model is described in further detail.According to description below and Claims, advantage of the present utility model and feature will be apparent from.Hereinafter will be combined accompanying drawing by cited embodiment, in detail Technology contents of the present utility model and feature are described.Need to additionally illustrate, accompanying drawing all uses the form simplified very much and all makes By non-ratio accurately, only in order to purpose convenient, aid illustration this utility model embodiment lucidly.For sake of convenience, under Described in literary composition " on ", the upper and lower direction of D score and accompanying drawing consistent, but this can not become the limit of technical solutions of the utility model System.
Core concept of the present utility model is: in constructing for current prefabrication, people's Cargo Lift (or be referred to as executing Work elevator) floor windowsill at installation position uses the later stage cast-in-place rather than prefabricated panel mostly, reduces prefabrication and assembly construction The problem of the prefabricated rate of formula building, splits the windowsill of this position at this people's Cargo Lift installation position and is prefabricated into two parts structure Part, the existing assembly of a portion, the reserved convenient construction personnel that punch make employment Cargo Lift carry out it at floor gap with other building materials His operation.Design simultaneously a kind of the lowest enter sky can be at the upending frame of floor gap hoisting heavy, it is simple to the later stage is fast at floor gap Another part component of Speed Pinyin dress prefabricated windows platen, thus improve prefabricated rate and efficiency of construction.
Referring to Fig. 1 to Fig. 3, present embodiment discloses a kind of prefabricated assembled windowsill being suitable to people's Cargo Lift, this is prefabricated Assembling window platen is positioned at the installation position of the whole people's Cargo Lift planning to build assembled architecture, and described prefabricated assembled windowsill is torn open Be divided into two parts and carry out prefabricated, wherein, Part I prefabricated panel 1 be positioned at reserved window punch upside top be positioned at pre- Staying window to punch the assembly in left and right portion of both sides, Part II prefabricated panel 2 punches under downside for being positioned at reserved window Portion, the left and right side of described Part II prefabricated panel 2 is able to the inner side in the left and right portion with Part I prefabricated panel 1 Face is spliced mutually, the left surface of the most described Part II prefabricated panel 2 be able to in the left part of Part I prefabricated panel 1 Side is spliced mutually, the right flank of described Part II prefabricated panel 2 be able to in the right part of Part I prefabricated panel 1 Side is spliced mutually, has reserved so that Part I prefabricated panel 1 forms one after splicing with Part II prefabricated panel 2 The prefabricated assembled windowsill that window punches, improves bulk strength and the stability of prefabricated assembled windowsill.
The present embodiment, by will be located in the prefabricated assembled windowsill at the installation position of building hoist, splits into two Point carry out prefabricated, this prefabricated assembled windowsill the most only lifting Part I prefabricated panel 1, need to use construction at corresponding floor During elevator conveying people and construction material, this Part I prefabricated panel 1 provides one to be easy to workmen and construction material The hole of material turnover, this hole includes that reserved window punches the area punched with Part II prefabricated panel position, it is achieved utilize Building hoist is This floor transport workmen and the purpose of construction material;And need not use building hoist at this floor Time, on-the-spot can carry out the assembly first, second partial precast wallboard 1,2 consolidated, hole be blocked, forms complete prefabricated dress Join formula windowsill, thus the problem avoiding the later stage to be the construction cast-in-place formwork of Part II prefabricated panel 2, improve assembled architecture Prefabricated rate, improves construction quality and efficiency of construction.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part I prefabricated panel 1 Upper surface can be spliced mutually with the lower surface of the Part II prefabricated panel 2 of prefabricated assembled windowsill adjacent and above;Described The lower surface of Part II prefabricated panel 2 can be with the Part I prefabricated panel 1 of the prefabricated assembled windowsill of adjacent lower section Upper surface splice mutually, so that be positioned at the installation position of elevator prefabricated assembled window corresponding up and down between contiguous floors Platen can splice, to improve bulk strength and the stability of whole prefabrication.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part I prefabricated panel 1 The lower surface of the Part II prefabricated panel 2 of upper surface and prefabricated assembled windowsill adjacent and above is by grout sleeve 3 side Formula is spliced, and the lower surface of described Part II prefabricated panel 2 is pre-with the Part I of the prefabricated assembled windowsill of adjacent lower section The upper surface of wallboard 1 processed is spliced by grout sleeve 3 mode.By using grout sleeve mode to splice so that Part I is pre- Between the lower surface of the Part II prefabricated panel 2 of the upper surface of wallboard 1 processed and prefabricated assembled windowsill adjacent and above with And the Part I prefabricated panel of the lower surface of described Part II prefabricated panel 2 and the prefabricated assembled windowsill of adjacent lower section Connection between the upper surface of 1 is formed is relatively reliable, such that it is able to realize between neighbouring prefabricated assembled windowsill Be reliably connected.Second of the upper surface of above-mentioned Part I prefabricated panel 1 and prefabricated assembled windowsill adjacent and above Piece between the lower surface of point prefabricated panel 2, and the lower surface of described Part II prefabricated panel 2 and adjacent lower section is pre- Piece between the upper surface formation of the Part I prefabricated panel 1 of assembling window platen processed, is horizontal piece, uses and fill Slurry sleeve fashion splicing, not only facilitates but also can realize the most permanently connected.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part I prefabricated panel 1 Upper surface is embedded with for spelling with the lower surface of the Part II prefabricated panel 2 of prefabricated assembled windowsill adjacent and above The grout sleeve 3 connect, the lower surface of described Part II prefabricated panel 2 is provided with the sleeve for being connected with described grout sleeve 3 Reserved steel bar 4, such that it is able to during corresponding floor needs to use building hoist conveying people and construction material, it is to avoid evagination Sleeve reserved steel bar 4 affect personnel turnover and construction material transport, improve efficiency of construction further.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part II prefabricated panel 2 Left and right side medial surface with the left and right portion of Part I prefabricated panel 1 respectively is bolted.It is positioned at reserved described in i.e. The punch bottom of downside of window is bolted with being positioned at the punch left and right portion of both sides of reserved window.It is bolted, can So that realize the left and right side of Part II prefabricated panel 2 respectively with the inner side in the left and right portion of Part I prefabricated panel 1 Between face, vertical piece is reliably connected.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part II prefabricated panel 2 Left and right side is respectively equipped with connection sheet 5, and the medial surface in the left and right portion of Part I prefabricated panel 1 is correspondingly provided with for described Connect the bolted coupling nut of sheet 56.Be positioned at described in it is to say, reserved window punch downside bottom both sides respectively Be provided with connection sheet 5, described in be positioned at the punch left and right portion of both sides of reserved window and be correspondingly provided with for being connected sheet 5 bolt even with described The coupling nut 6 connect.The sheet 5 that connects of evagination is not arranged on the medial surface in left and right portion of Part I prefabricated panel 1, And be disposed on the left and right side of described Part II prefabricated panel 2, such that it is able to need to use construction lifting at corresponding floor During machine conveying people and construction material, it is to avoid the connection sheet 5 of evagination affects personnel's turnover and construction material transports, and carries further High efficiency of construction.
So that the connection between neighbouring prefabricated assembled windowsill is more firm, each prefabricated assembled windowsill Two, the left and right of the Part I prefabricated panel 1 of plate is respectively arranged with grout sleeve 3 on bottom surface, prefabricated assembled below correspondence The end face corresponding position of the Part I prefabricated panel 1 of windowsill arranges the sleeve reserved steel bar 4 being connected with described grout sleeve 3, It is uniformly distributed between the two so that connect stress point between neighbouring prefabricated assembled windowsill, improves two further The connection reliability of person.
The two sides of described Part I prefabricated panel 1 are able to and first of adjacent prefabricated assembled windowsill The two sides dividing prefabricated panel 1 are spliced mutually.Owing to the two sides of described Part I prefabricated panel 1 are able to pre-with adjacent It is vertical piece between the two sides of the Part I prefabricated panel 1 of assembling window platen processed, spiral shell as above can be used Stricture of vagina connected mode.Such as, the two sides of the Part I prefabricated panel 1 of each prefabricated assembled windowsill are correspondingly arranged connection sheet 5 with coupling nut 6, to realize the reliable splicing between the contiguous prefabricated assembling window platen of left and right.
Vertical piece passes through between first, second partial precast wallboard 1,2 and between contiguous prefabricated assembling window platen Threaded, there is advantage simply and easily, the first, second that is contiguous prefabricated assembling window platen of partial precast wallboard 1,2 it Between horizontal piece between connected by grout sleeve mode, there is solid and reliable advantage, be advantageously implemented whole assembled Building quick, effective, be reliably connected.
Refer to Fig. 1 to Fig. 4, the construction method of the prefabricated assembled windowsill being suitable to people's Cargo Lift of the present utility model, bag Include following steps:
One, determine first according to the prefabricated assembled windowsill size at the installation position of job site building hoist, The size of Part II prefabricated panel 1,2, after first, second partial precast wallboard 1,2 is prefabricated, is transported to job site.
Two, according to weight and the floor floor height of Part II prefabricated panel 2, clear height and the counterweight of construction suspension bracket is determined The weight of block 10 and number.
Three, assembled Part I prefabricated panel 1, meanwhile, also rises Part II prefabricated panel 2 and hangs in corresponding floor gap Put well standby.In this step, the Part I prefabricated panel 1 of the most assembled prefabricated assembled windowsill of each layer.
Four, until floor gap be no longer necessary to building hoist carry out operation time, construct suspension bracket at this floor gap on-site consolidation one.
Five, using construction suspension bracket that Part II prefabricated panel 2 is hung in correspondence position and carry out assembly, stitching position is carried out Corresponding connection, is formed and has the prefabricated assembled windowsill that described reserved window punches.
Six, after treating the construction of this floor, construction suspension bracket is disassembled into component, is carried to a floor and carries out adjacent and above The construction of prefabricated assembled windowsill, such bottom right supreme until all floors building hoist installation position at prefabricated The construction of assembling window platen is complete.
This is suitable to the construction method of prefabricated assembled windowsill of people's Cargo Lift, the most only lifting Part I prefabricated panel 1, This prefabricated assembled windowsill is during corresponding floor needs to use building hoist conveying people and construction material, using the teaching of the invention it is possible to provide One hole being easy to workmen and construction material turnover, and when this floor need not use building hoist, Ke Yixian Field utilizes construction suspension bracket to lift Part II prefabricated panel 2 to Part I prefabricated panel 1, is blocked at hole, formed completely, Firm prefabricated assembled windowsill, thus solve windowsill at people's Cargo Lift installation position and need the problem of later stage cast-in-place formwork, It is effectively improved the prefabricated rate of assembled architecture, improves construction quality and efficiency of construction.
Preferably, in the present embodiment, described construction suspension bracket includes being spliced to form loading frame 7, lower grillage by channel-section steel respectively 8 and both sides grillage 9, it is connected by described side plate frame 9 respectively between described loading frame 7 with the left and right sides of lower grillage 8, institute Stating and be arranged as required to balancing weight 10 on lower grillage 8, it is the most outside that described loading frame 7 has the most described lower grillage 8 Stretching out the extension of certain distance, described extension is provided with a derricking gear, and the lower section of described lower grillage 8 is provided with roller 11.Excellent Choosing, in the above-mentioned construction method of prefabricated assembled windowsill being suitable to people's Cargo Lift, described derricking gear is chain block 12。
The present embodiment is by arranging construction suspension bracket, and the Part II prefabricated panel 2 that will be located in floor lifts by crane and is installed on On Part I prefabricated panel 1, it is to avoid owing to the prefabricated windows platen being present such that this position of building hoist cannot use The problem that on-the-spot tower crane carries out lifting.Use construction suspension bracket lifting Part II prefabricated panel 2, compare a dead lift so that after Phase Part II prefabricated panel 2 is constructed easier, effectively reduces labor intensity, has saved a large amount of manpower, has been effectively increased Efficiency of construction.Additionally, construction suspension bracket uses channel-section steel splicing to form, easy accessibility, lightweight, it is simple to carry at floor gap, with reality Now construct suspension bracket circulation construction, reduce construction cost.
Preferably, in the above-mentioned construction method of prefabricated assembled windowsill being suitable to people's Cargo Lift, described stitching position The step connected accordingly includes: the lower surface of described Part II prefabricated panel 2 and the prefabricated assembled window of adjacent lower section The upper surface of the Part I prefabricated panel 1 of platen is spliced by grout sleeve 3 mode, described Part II prefabricated panel 2 Left and right side medial surface with the left and right portion of Part I prefabricated panel 1 respectively is bolted.First, second part is pre- Vertical piece is threaded connection between wallboard 1,2 processed and between contiguous prefabricated assembling window platen, simple and convenient, first, Between horizontal piece between that is contiguous prefabricated assembling window platen of Part II prefabricated panel 1,2 by grout sleeve mode even Connect, solid and reliable, be advantageously implemented whole assembled architecture quick, effective, be reliably connected.
Foregoing description is only the description to this utility model preferred embodiment, not any limit to this utility model scope Fixed, any change that the those of ordinary skill in this utility model field does according to the disclosure above content, modification, belong to right and want Seek the protection domain of book.

Claims (7)

1. the prefabricated assembled windowsill being suitable to people's Cargo Lift, it is characterised in that described prefabricated assembled windowsill splits into Two parts carry out prefabricated, wherein, Part I prefabricated panel be positioned at reserved window punch upside top be positioned at reservation window Mouth punches the assembly in left and right portion of both sides, and Part II prefabricated panel is to be positioned at reserved window to punch the bottom of downside, described The left and right side of Part II prefabricated panel is able to the medial surface in the left and right portion with Part I prefabricated panel and splices mutually.
Be suitable to the prefabricated assembled windowsill of people's Cargo Lift the most as claimed in claim 1, it is characterised in that described Part I is pre- The upper surface of wallboard processed can be spelled mutually with the lower surface of the Part II prefabricated panel of prefabricated assembled windowsill adjacent and above Connect;The lower surface of described Part II prefabricated panel can be prefabricated with the Part I of the prefabricated assembled windowsill of adjacent lower section The upper surface of wallboard is spliced mutually.
Be suitable to the prefabricated assembled windowsill of people's Cargo Lift the most as claimed in claim 2, it is characterised in that described Part I is pre- The lower surface of the Part II prefabricated panel of the upper surface of wallboard processed and prefabricated assembled windowsill adjacent and above is by grouting Sleeve fashion splices, first of the lower surface of described Part II prefabricated panel and the prefabricated assembled windowsill of adjacent lower section The upper surface dividing prefabricated panel is spliced by grout sleeve mode.
Be suitable to the prefabricated assembled windowsill of people's Cargo Lift the most as claimed in claim 3, it is characterised in that described Part I is pre- The upper surface of wallboard processed is embedded with for the lower end with the Part II prefabricated panel of prefabricated assembled windowsill adjacent and above Face carries out the grout sleeve spliced, and the lower surface of described Part II prefabricated panel is provided with for being connected with described grout sleeve Sleeve reserved steel bar.
Be suitable to the prefabricated assembled windowsill of people's Cargo Lift the most as claimed in claim 1, it is characterised in that described Part II is pre- The left and right side of wallboard processed medial surface with the left and right portion of Part I prefabricated panel respectively is bolted.
Be suitable to the prefabricated assembled windowsill of people's Cargo Lift the most as claimed in claim 5, it is characterised in that described Part II is pre- The left and right side of wallboard processed is respectively equipped with connection sheet, the medial surface in the left and right portion of Part I prefabricated panel be correspondingly provided with for It is connected the bolted coupling nut of sheet with described.
Be suitable to the prefabricated assembled windowsill of people's Cargo Lift the most as claimed in claim 1, it is characterised in that described Part I is pre- The two sides of wallboard processed are able to spell mutually with the two sides of the Part I prefabricated panel of adjacent prefabricated assembled windowsill Connect.
CN201620694396.9U 2016-07-05 2016-07-05 Be suitable to the prefabricated assembled windowsill of people's Cargo Lift Expired - Fee Related CN205858049U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620694396.9U CN205858049U (en) 2016-07-05 2016-07-05 Be suitable to the prefabricated assembled windowsill of people's Cargo Lift

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620694396.9U CN205858049U (en) 2016-07-05 2016-07-05 Be suitable to the prefabricated assembled windowsill of people's Cargo Lift

Publications (1)

Publication Number Publication Date
CN205858049U true CN205858049U (en) 2017-01-04

Family

ID=57644407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620694396.9U Expired - Fee Related CN205858049U (en) 2016-07-05 2016-07-05 Be suitable to the prefabricated assembled windowsill of people's Cargo Lift

Country Status (1)

Country Link
CN (1) CN205858049U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050052A (en) * 2016-07-05 2016-10-26 上海建工二建集团有限公司 Prefabricated and assembled window board applicable to passenger and goods elevators and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050052A (en) * 2016-07-05 2016-10-26 上海建工二建集团有限公司 Prefabricated and assembled window board applicable to passenger and goods elevators and construction method thereof
CN106050052B (en) * 2016-07-05 2019-01-15 上海建工二建集团有限公司 Prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift

Similar Documents

Publication Publication Date Title
CN202227476U (en) High-altitude large-span overhung corridor-type reinforced concrete structure
CN203924471U (en) Precast concrete external wall panel
CN105178604A (en) Construction method of assembly type superimposed floor slab
CN102913002A (en) Integrated steel structure movable room and mounting method thereof
CN206109960U (en) Steel that can be under construction fast concrete integrated configuration bridge
CN205858049U (en) Be suitable to the prefabricated assembled windowsill of people's Cargo Lift
CN205100082U (en) Prefabricated assembly type steel reinforced concrete combination beam bridge
CN107514145A (en) A kind of removable steel roofing liner installation construction device and method
CN106869328A (en) A kind of suspension type modular architectural structural and its construction method
CN202401753U (en) Sliding die device
WO2015135442A1 (en) Prefabricated reinforced concrete member
CN111648555A (en) Laminated precast concrete elevator shaft way
CN209243934U (en) A kind of regulating system for the assembling of building block unit
CN106050052B (en) Prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift
CN109736514A (en) A kind of connecting structure and preparation method thereof of prefabricated daughter's wallboard
CN109469210A (en) A kind of foundation level adjusting support connection device
Gaidukov et al. Technological aspects of lift-slab method in high-rise-building construction.
CN211143319U (en) Building structure composed of beam column framework for multi-layer steel structure building
CN204626965U (en) For the steel stair template of poured up at a time between architectural stair
CN106760100A (en) A kind of floor system framework and floor system
CN109235904B (en) A kind of building block unit assembly mold
CN203320922U (en) Supporting device for forming of elevator shaft template
CN209223355U (en) A kind of welding structure using interior lining panel
CN206319463U (en) A kind of floor system framework and floor system
CN111648556A (en) Laminated precast concrete elevator shaft way connecting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170104

Termination date: 20190705

CF01 Termination of patent right due to non-payment of annual fee