CN106050052B - Prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift - Google Patents

Prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift Download PDF

Info

Publication number
CN106050052B
CN106050052B CN201610518853.3A CN201610518853A CN106050052B CN 106050052 B CN106050052 B CN 106050052B CN 201610518853 A CN201610518853 A CN 201610518853A CN 106050052 B CN106050052 B CN 106050052B
Authority
CN
China
Prior art keywords
prefabricated
prefabricated panel
construction
windowsill
people
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610518853.3A
Other languages
Chinese (zh)
Other versions
CN106050052A (en
Inventor
龙莉波
马跃强
许瑾
许崇伟
徐辉
王恒
赵波
宋毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201610518853.3A priority Critical patent/CN106050052B/en
Publication of CN106050052A publication Critical patent/CN106050052A/en
Application granted granted Critical
Publication of CN106050052B publication Critical patent/CN106050052B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/70Sills; Thresholds
    • E06B1/702Window sills
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/0007Implements for finishing work on buildings for mounting doors, windows or frames; their fitting
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention provides a kind of prefabricated assembled windowsills and its construction method suitable for people's Cargo Lift, it is prefabricated that prefabricated assembled windowsill splits into two parts progress, first part's prefabricated panel be positioned at reserved window punch upside top be located at reserved window punch two sides left and right portion assembly, second part prefabricated panel is the lower part of downside of punching positioned at reserved window, and the left and right side of second part prefabricated panel is able to mutually splice with the medial surface in the left and right portion of first part prefabricated panel.During corresponding floor needs user's Cargo Lift conveying people and construction material, it is capable of providing the hole passed in and out convenient for construction personnel and construction material, and when the floor does not need user's Cargo Lift, live it can carry out firm assembly, hole is blocked, complete prefabricated assembled windowsill is formed, to solve the problems, such as that the windowsill at people's Cargo Lift installation position in the prior art needs later period cast-in-place formwork, and effectively improves the prefabricated rate of assembled architecture.

Description

Prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift
Technical field
The present invention relates to building engineering field more particularly to a kind of prefabricated assembled windowsill suitable for people's Cargo Lift and its apply Work method.
Background technique
Prefabrication is new model building form indeed, and currently, China is in Social Transformation Period, and construction industry, which also faces, to be turned The pressure of type upgrading, therefore, prefabrication are to realize in evolutionary path and the direction that current and future is all construction industry The important content of building industrialization.
Prefabrication be in the factory by concrete component in advance according to engineering project the characteristics of it is prefabricated, then Transport to construction site carries out assembling combination into firm structural system.The construction method has efficient, energy-saving and environmental protection spies Point, can be improved construction quality and construction efficiency.In prefabrication, common prefabricated components have Side fascia, overlapping Plate, air-conditioning plate, balcony slab, staircase boards, internal shear force wall, non bearing structure column etc., using for these components makes construction site Wet construction amount substantially reduces, since by the way of lifting combination, the labor intensity of worker is also minimized.
People's Cargo Lift, that is, building hoist is generally located on Lou Dong windowing position.For convenience of the disengaging of people or building materials, people's goods Bench-table plate at terraced installation position all generally remains subsequent cast-in-place construction at present, and this aspect reduces prefabrication Prefabricated rate cannot reflect the superiority of assembled mode of construction, on the other hand due between building there are large stretch of neutral gear, after Phase pouring construction formwork measure, it is very ugly, influence construction site appearance.
Therefore, the prefabricated rate of assembled architecture can be improved to avoid later period cast-in-place formwork construction by how providing one kind, be improved The prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift of construction quality and construction efficiency, it has also become construction circle The technical issues of needing further improvement and optimization.
Summary of the invention
For in the prior art, the problem that windowsill needs the later period to pour, prefabricated rate is low at people's Cargo Lift laying, the present invention is mentioned A kind of prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift has been supplied, has been solved at the laying of people's Cargo Lift after windowsill needs The problem of phase cast-in-place formwork construction, the wet construction amount of construction site is effectively reduced, the prefabricated of prefabrication is improved Rate, construction efficiency and construction quality.
In order to solve the above technical problems, the invention provides the following technical scheme:
A kind of prefabricated assembled windowsill suitable for people's Cargo Lift, the prefabricated assembled windowsill split into two parts progress It is prefabricated, wherein first part's prefabricated panel is that punch positioned at the reserved window top of upside punches two sides with reserved window is located at Left and right portion assembly, second part prefabricated panel is the lower part of downside of punching positioned at reserved window, and the second part is pre- The left and right side of wallboard processed is able to mutually splice with the medial surface in the left and right portion of first part prefabricated panel.
Preferably, in the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift, first part's prefabricated panel Upper surface can mutually splice with the lower end surface of the second part prefabricated panel of prefabricated assembled windowsill adjacent and above;Described It the lower end surface of two partial precast wallboards can be upper with first part's prefabricated panel of the prefabricated assembled windowsill of adjacent lower section Mutually splice end face.
Preferably, in the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift, first part's prefabricated panel Upper surface and the lower end surface of the second part prefabricated panel of prefabricated assembled windowsill adjacent and above pass through grout sleeve mode Splicing, first part's dry wall of the prefabricated assembled windowsill of the lower end surface and adjacent lower section of the second part prefabricated panel Spliced by grout sleeve mode the upper surface of plate.
Preferably, in the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift, first part's prefabricated panel Upper surface is embedded with is spelled for the lower end surface of the second part prefabricated panel with prefabricated assembled windowsill adjacent and above The grout sleeve connect, it is reserved that the lower end surface of the second part prefabricated panel is equipped with the sleeve for connecting with the grout sleeve Reinforcing bar.
Preferably, in the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift, the second part prefabricated panel Medial surface of the left and right side respectively with the left and right portion of first part prefabricated panel is bolted.
Preferably, in the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift, the second part prefabricated panel Left and right side is respectively equipped with connection sheet, the medial surface in the left and right portion of first part's prefabricated panel be correspondingly provided with for the company The bolted coupling nut of contact pin.
Preferably, in the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift, first part's prefabricated panel Two sides are able to mutually splice with the two sides of first part's prefabricated panel of adjacent prefabricated assembled windowsill.
The invention also discloses a kind of construction method suitable for the prefabricated assembled windowsill of people's Cargo Lift as described above, packets Include following steps:
One, determine first according to the prefabricated assembled windowsill board size at the installation position of construction site building hoist, The size of second part prefabricated panel is transported to construction site after the first, second partial precast wallboard is prefabricated;
Two, high according to the weight of second part prefabricated panel and floor layer, determine the clear height and counterweight of construction hanger The weight and number of block;
Three, assembled first part's prefabricated panel, meanwhile, second part prefabricated panel is also risen to hanging in corresponding floor gap and put It is good spare;
Four, when floor gap no longer needs building hoist to carry out operation, in the floor gap on-site consolidation one construction hanger;
Five, second part prefabricated panel is risen using construction hanger and hangs in corresponding position progress assembly, stitching position carries out Corresponding connection, forms the prefabricated assembled windowsill that there is the reserved window to punch;
Six, after to floor construction, construction hanger is disassembled into component, a floor is carried to and carries out adjacent and above The construction of prefabricated assembled windowsill, such bottom right are supreme until prefabricated at the installation position of the building hoist of all floors The construction of assembling window platen finishes.
Preferably, in the construction method of the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift, the construction hanger Including being spliced to form loading frame, lower grillage and two sides grillage, the left and right sides of the loading frame and lower grillage by channel steel respectively Between connected respectively by the side plate frame, clump weight is set as needed on the lower grillage, the loading frame has opposite The extension of the lower grillage protruding certain distance in the horizontal direction, the extension is equipped with a derricking gear, under described The lower section of grillage is equipped with idler wheel.
Preferably, in the construction method of the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift, the stitching position The step of accordingly being connected includes: the lower end surface of the second part prefabricated panel and the prefabricated assembled windowsill of adjacent lower section The upper surface of first part's prefabricated panel of plate is spliced by grout sleeve mode, the second part prefabricated panel it is left and right Medial surface of the side respectively with the left and right portion of first part prefabricated panel is bolted.
Preferably, in the construction method of the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift, the derricking gear For chain block.
Beneficial effects of the present invention are as follows:
One, a kind of prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift provided by the invention, the prefabricated dress With formula windowsill during corresponding floor needs to use building hoist conveying people and construction material, it is capable of providing one and is convenient for The hole of construction personnel and construction material disengaging, and when the floor is not needed using building hoist, it live can carry out steady Solid assembly, hole is blocked, complete prefabricated assembled windowsill is formed and is mentioned to solve the problems, such as later period cast-in-place formwork The prefabricated rate of high assembled architecture improves construction quality and construction efficiency.
Two, a kind of prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift provided by the invention, first, second Vertical piece is connected through a screw thread between partial precast wallboard and between contiguous prefabricated assembling window platen, is had simple and convenient The advantages of, pass through grouting between the horizontal piece between the first, second partial precast wallboard, that is, contiguous prefabricated assembling window platen Sleeve fashion connection, has the advantages that solid and reliable, two kinds of connection types are applied in combination, and are advantageously implemented entire assembled architecture It is quick, effective, be reliably connected.
Three, the construction method of a kind of prefabricated assembled windowsill suitable for people's Cargo Lift provided by the invention is applied by setting The second part prefabricated panel being located in floor is lifted by crane and is installed on first part's prefabricated panel by work hanger, avoid due to The problem of prefabricated windowsill for being present such that the position of building hoist can not be lifted using live tower crane.Using applying Work hanger lifts second part prefabricated panel, compares manual handling, so that construction is more convenient for later period second part prefabricated panel, Labor intensity is effectively reduced, a large amount of manpowers has been saved, has effectively increased construction efficiency.In addition, construction hanger is spelled using channel steel Composition is connect, it is convenient for disassembly and assembly, it is light-weight, convenient for being carried in floor gap, to realize that the circulation construction of construction hanger, reduction are constructed into This.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the prefabricated assembled windowsill suitable for people's Cargo Lift of one embodiment of the invention;
Fig. 2 is the structural schematic diagram of first part's prefabricated panel in one embodiment of the invention;
Fig. 3 is the structural schematic diagram of second part prefabricated panel in one embodiment of the invention;
Fig. 4 is the structural schematic diagram of construction hanger in one embodiment of the invention;
In figure: 1- first part prefabricated panel, 2- second part prefabricated panel, 3- grout sleeve, 4- sleeve reserved steel bar, Grillage, 9- side plate frame, 10- clump weight, 11- idler wheel, 12- chain block under 5- connection sheet, 6- coupling nut, 7- loading frame, 8-.
Specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.According to following explanation and right Claim, advantages and features of the invention will become apparent from.This hair will be described in detail by cited embodiment combination attached drawing below Bright technology contents and feature.Need in addition it illustrate, attached drawing is all made of very simplified form and uses non-accurate ratio Example, only for the purpose of facilitating and clarifying the purpose of the embodiments of the invention.For sake of convenience, "upper" described below, "lower" is consistent with the upper and lower direction of attached drawing, but this can't be the limitation of technical solution of the present invention.
Core of the invention thought is: it is directed in the construction of current prefabrication, people's Cargo Lift (or risen for construction Drop machine) the floor windowsill at installation position mostly uses greatly the later period cast-in-place rather than prefabricated panel, reduce prefabricated assembled build Windowsill fractionation at the position at the people's Cargo Lift installation position is prefabricated into two parts component by the problem of prefabricated rate built, Middle a part of existing assembly, reserved punch facilitate construction personnel and other building materials user Cargo Lift to carry out other works in floor gap Industry.Design simultaneously it is a kind of it is detachable it is low into it is empty can be in the upending frame of floor gap hoisting heavy, convenient for the later period in the fast Speed Pinyin of floor gap Another part component of prefabricated windowsill is filled, to improve prefabricated rate and construction efficiency.
It please refers to Fig.1 to Fig.3, present embodiment discloses a kind of prefabricated assembled windowsills suitable for people's Cargo Lift, this is prefabricated Assembling window platen is located at the installation position of people's Cargo Lift of entire proposed assembled architecture, and the prefabricated assembled windowsill is torn open Be divided into two parts carry out it is prefabricated, wherein first part's prefabricated panel 1 be punch positioned at reserved window upside top be located at it is pre- Stay window punch two sides left and right portion assembly, second part prefabricated panel 2 be positioned at reserved window punch downside under Portion, the left and right side of the second part prefabricated panel 2 are able to the inside with the left and right portion of first part prefabricated panel 1 Face is mutually spliced, i.e., the left side of the described second part prefabricated panel 2 be able to in the left part of first part prefabricated panel 1 Side is mutually spliced, the right side of the second part prefabricated panel 2 be able to in the right part of first part prefabricated panel 1 Side is mutually spliced, so that first part's prefabricated panel 1 and second part prefabricated panel 2 form one with reserved after splicing The prefabricated assembled windowsill that window punches improves the integral strength and stability of prefabricated assembled windowsill.
The present embodiment splits into two by that will be located at the prefabricated assembled windowsill at the installation position of building hoist Divide progress prefabricated, which first only lifts first part's prefabricated panel 1, uses construction corresponding to floor needs During elevator conveying people and construction material, which provides one convenient for construction personnel and construction material Expect that the hole of disengaging, the hole include that reserved window punches the area to punch with second part prefabricated panel position, realizes and utilize Building hoist is the purpose that This floor transports construction personnel and construction material;And it does not need in the floor using building hoist When, live firm the first, second partial precast of assembly wallboard 1,2 can be carried out, hole is blocked, form complete prefabricated dress With formula windowsill, to avoid the problem that the later period for the construction cast-in-place formwork of second part prefabricated panel 2, improves assembled architecture Prefabricated rate improves construction quality and construction efficiency.
Preferably, in the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift, first part's prefabricated panel 1 Upper surface can mutually splice with the lower end surface of the second part prefabricated panel 2 of prefabricated assembled windowsill adjacent and above;It is described It the lower end surface of second part prefabricated panel 2 can be with first part's prefabricated panel 1 of the prefabricated assembled windowsill of adjacent lower section Upper surface mutually splice so that between contiguous floors positioned at elevator installation position above and below corresponding prefabricated assembled window Platen can splice, to improve the integral strength and stability of entire prefabrication.
Preferably, in the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift, first part's prefabricated panel 1 Upper surface and the lower end surface of the second part prefabricated panel 2 of prefabricated assembled windowsill adjacent and above pass through 3 side of grout sleeve Formula splicing, the first part of the prefabricated assembled windowsill of the lower end surface and adjacent lower section of the second part prefabricated panel 2 are pre- Spliced by 3 mode of grout sleeve the upper surface of wallboard 1 processed.Splice by using grout sleeve mode, so that first part is pre- Between the lower end surface of the second part prefabricated panel 2 of the upper surface of wallboard 1 processed and prefabricated assembled windowsill adjacent and above with And first part's prefabricated panel of the prefabricated assembled windowsill of the lower end surface of the second part prefabricated panel 2 and adjacent lower section Connection between 1 upper surface formation is relatively reliable, so as to realize between neighbouring prefabricated assembled windowsill Be reliably connected.Second of the upper surface of above-mentioned first part's prefabricated panel 1 and prefabricated assembled windowsill adjacent and above The lower end surface of piece and the second part prefabricated panel 2 between the lower end surface of point prefabricated panel 2 is pre- with adjacent lower section Piece between the upper surface formation of first part's prefabricated panel 1 of assembling window platen processed, is horizontal piece, using filling Sleeve fashion splicing is starched, not only facilitate but also may be implemented is reliable permanently connected.
Preferably, in the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift, first part's prefabricated panel 1 Upper surface is embedded with is spelled for the lower end surface of the second part prefabricated panel 2 with prefabricated assembled windowsill adjacent and above The grout sleeve 3 connect, the lower end surface of the second part prefabricated panel 2 are equipped with the sleeve for connecting with the grout sleeve 3 Reserved steel bar 4, so as to avoid evagination during corresponding floor needs to use building hoist conveying people and construction material Sleeve reserved steel bar 4 influence personnel disengaging and construction material transport, further increase construction efficiency.
Preferably, in the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift, the second part prefabricated panel 2 Medial surface of the left and right side respectively with the left and right portion of first part prefabricated panel 1 is bolted.It is i.e. described positioned at reserved The punch lower part of downside of window is bolted with positioned at the punch left and right portion of two sides of reserved window.It is bolted, it can In order to realize the inside of the left and right side of second part prefabricated panel 2 respectively with the left and right portion of first part prefabricated panel 1 Vertical piece is reliably connected between face.
Preferably, in the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift, the second part prefabricated panel 2 Left and right side is respectively equipped with connection sheet 5, the medial surface in the left and right portion of first part's prefabricated panel 1 be correspondingly provided with for it is described The bolted coupling nut 6 of connection sheet 5.That is, it is described positioned at reserved window punch downside lower part two sides difference Equipped with connection sheet 5, it is described positioned at reserved window punch two sides left and right portion be correspondingly provided with for 5 bolt of connection sheet connect The coupling nut 6 connect.The connection sheet of evagination 5 is not set on the medial surface in left and right portion of first part's prefabricated panel 1, But it is set to the left and right side of the second part prefabricated panel 2, so as to need in corresponding floor using construction lifting During machine conveying people and construction material, avoids the 5 influence personnel of connection sheet of evagination from passing in and out and transported with construction material, further mentioned High construction efficiency.
In order to enable the connection between neighbouring prefabricated assembled windowsill is stronger, each prefabricated assembled windowsill It is respectively arranged with grout sleeve 3 on the bottom surface of left and right two of first part's prefabricated panel 1 of plate, corresponds to the prefabricated assembled of lower section The sleeve reserved steel bar 4 connecting with the grout sleeve 3 is arranged in the top surface corresponding position of first part's prefabricated panel 1 of windowsill, It is uniformly distributed between the two so that connecting stress point between neighbouring prefabricated assembled windowsill, further increases two The connection reliability of person.
The two sides of first part's prefabricated panel 1 are able to first with adjacent prefabricated assembled windowsill The two sides of prefabricated panel 1 are divided mutually to splice.Due to the two sides of first part's prefabricated panel 1 be able to it is adjacent pre- It is vertical piece between the two sides of first part's prefabricated panel 1 of assembling window platen processed, spiral shell as described above can be used Line connection type.For example, the two sides of first part's prefabricated panel 1 of each prefabricated assembled windowsill are correspondingly arranged connection sheet 5 with coupling nut 6, to realize the reliable splicing between the contiguous prefabricated assembling window platen in left and right.
Vertical piece passes through between first, second partial precast wallboard 1,2 and between contiguous prefabricated assembling window platen Be threadedly coupled, have the advantages that it is simple and convenient, the first, second partial precast wallboard 1,2 i.e. contiguous prefabricated assembling window platen it Between horizontal piece between connected by grout sleeve mode, have the advantages that solid and reliable, be advantageously implemented entire assembled Building it is quick, effective, be reliably connected.
The construction method of prefabricated assembled windowsill suitable for people's Cargo Lift of the invention referring to FIG. 1 to FIG. 4, including such as Lower step:
One, determine first according to the prefabricated assembled windowsill board size at the installation position of construction site building hoist, The size of second part prefabricated panel 1,2 is transported to construction site after first, second partial precast wallboard 1,2 is prefabricated.
Two, high according to the weight of second part prefabricated panel 2 and floor layer, determine the clear height and counterweight of construction hanger The weight and number of block 10.
Three, assembled first part prefabricated panel 1, meanwhile, second part prefabricated panel 2 is also risen and hangs in corresponding floor gap It puts well spare.In this step, first part's prefabricated panel 1 of assembled each prefabricated assembled windowsill of layer layer-by-layer from the bottom to top.
Four, when floor gap no longer needs building hoist to carry out operation, in the floor gap on-site consolidation one construction hanger.
Five, second part prefabricated panel 2 is risen using construction hanger and hangs in corresponding position progress assembly, stitching position carries out Corresponding connection, forms the prefabricated assembled windowsill that there is the reserved window to punch.
Six, after to floor construction, construction hanger is disassembled into component, a floor is carried to and carries out adjacent and above The construction of prefabricated assembled windowsill, such bottom right are supreme until prefabricated at the installation position of the building hoist of all floors The construction of assembling window platen finishes.
This is suitable for the construction method of the prefabricated assembled windowsill of people's Cargo Lift, first only lifts first part's prefabricated panel 1, The prefabricated assembled windowsill is capable of providing during corresponding floor needs to use building hoist conveying people and construction material One hole passed in and out convenient for construction personnel and construction material, and when the floor is not needed using building hoist, Ke Yixian Second part prefabricated panel 2 is lifted to first part's prefabricated panel 1 using construction hanger, hole is blocked, formed it is complete, Firm prefabricated assembled windowsill, thus solve the problems, such as that windowsill needs later period cast-in-place formwork at people's Cargo Lift installation position, The prefabricated rate of assembled architecture is effectively improved, construction quality and construction efficiency are improved.
Preferably, in the construction method of the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift, the construction hanger Including being spliced to form loading frame 7, lower grillage 8 and two sides grillage 9, a left side for the loading frame 7 and lower grillage 8 by channel steel respectively It is connected respectively by the side plate frame 9 between right two sides, clump weight 10, the upper plate is set as needed on the lower grillage 8 Frame 7 has the extension of the relatively described lower grillage 8 protruding certain distance in the horizontal direction, and the extension is equipped with a lifting The lower section of mechanism, the lower grillage 8 is equipped with idler wheel 11.Preferably, in the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift Construction method in, the derricking gear be chain block 12.
The second part prefabricated panel 2 being located in floor is lifted by crane and is installed on by setting construction hanger by the present embodiment On first part's prefabricated panel 1, avoid being present such that the prefabricated windowsill at the position can not use due to building hoist The problem of live tower crane is lifted.Second part prefabricated panel 2 is lifted using construction hanger, compares manual handling, so that after Construction is more convenient for phase second part prefabricated panel 2, effectively reduces labor intensity, has saved a large amount of manpowers, has effectively increased Construction efficiency.In addition, construction hanger is formed using channel steel splicing, and it is convenient for disassembly and assembly, it is light-weight, convenient for being carried in floor gap, with reality The now circulation construction of construction hanger, reduces construction cost.
Preferably, in the construction method of the above-mentioned prefabricated assembled windowsill suitable for people's Cargo Lift, the stitching position The step of accordingly being connected includes: the lower end surface of the second part prefabricated panel 2 and the prefabricated assembled window of adjacent lower section The upper surface of first part's prefabricated panel 1 of platen is spliced by 3 mode of grout sleeve, the second part prefabricated panel 2 Medial surface of the left and right side respectively with the left and right portion of first part prefabricated panel 1 is bolted.First, second part is pre- Vertical piece is connected through a screw thread between wallboard 1,2 processed and between contiguous prefabricated assembling window platen, simple and convenient, first, Connected between horizontal piece between second part prefabricated panel 1,2 i.e. contiguous prefabricated assembling window platen by grout sleeve mode Connect, it is solid and reliable, be advantageously implemented entire assembled architecture it is quick, effective, be reliably connected.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Range.

Claims (9)

1. a kind of construction method of the prefabricated assembled windowsill suitable for people's Cargo Lift, which is characterized in that the prefabricated assembled window Platen split into two parts carry out it is prefabricated, wherein first part's prefabricated panel be positioned at reserved window punch upside top with It punches the assembly in the left and right portion of two sides positioned at reserved window, second part prefabricated panel is the downside that punches positioned at reserved window Lower part, the left and right side of the second part prefabricated panel is able in the left and right portion with first part prefabricated panel Side is mutually spliced, and the construction method includes the following steps:
One, first, second is determined according to the prefabricated assembled windowsill board size at the installation position of construction site building hoist The size of partial precast wallboard is transported to construction site after the first, second partial precast wallboard is prefabricated;
Two, high according to the weight of second part prefabricated panel and floor layer, determine the clear height and clump weight of construction hanger Weight and number;
Three, assembled first part's prefabricated panel, meanwhile, second part prefabricated panel is also risen hang in corresponding floor gap put well it is standby With;
Four, when floor gap no longer needs building hoist to carry out operation, in the floor gap on-site consolidation one construction hanger;
Five, second part prefabricated panel is risen using construction hanger and hangs in corresponding position progress assembly, stitching position carries out corresponding Connection forms the prefabricated assembled windowsill that there is the reserved window to punch;
Six, after to floor construction, construction hanger is disassembled into component, it is prefabricated adjacent and above to be carried to floor progress The construction of assembling window platen, the supreme prefabrication and assembly construction at the installation position of the building hoist of all floors in such bottom right The construction of formula windowsill finishes.
2. the construction method suitable for the prefabricated assembled windowsill of people's Cargo Lift as described in claim 1, which is characterized in that described Construction hanger includes being spliced to form loading frame, lower grillage and two sides grillage, the loading frame and lower grillage by channel steel respectively It is connected respectively by the side plate frame between the left and right sides, clump weight, the loading frame is set as needed on the lower grillage Extension with the relatively described lower grillage protruding certain distance in the horizontal direction, the extension are equipped with a lifting machine The lower section of structure, the lower grillage is equipped with idler wheel.
3. the construction method suitable for the prefabricated assembled windowsill of people's Cargo Lift as claimed in claim 2, which is characterized in that described The step of stitching position is accordingly connected includes: the lower end surface of the second part prefabricated panel and the prefabricated dress of adjacent lower section The upper surface of first part's prefabricated panel with formula windowsill is spliced by grout sleeve mode, the second part prefabricated panel Medial surface of the left and right side respectively with the left and right portion of first part prefabricated panel be bolted.
4. the construction method suitable for the prefabricated assembled windowsill of people's Cargo Lift as described in claim 1, which is characterized in that described It the upper surface of first part's prefabricated panel can be with the second part prefabricated panel of prefabricated assembled windowsill adjacent and above Mutually splice lower end surface;It the lower end surface of the second part prefabricated panel can be with the of the prefabricated assembled windowsill of adjacent lower section Mutually splice the upper surface of a part of prefabricated panel.
5. the construction method suitable for the prefabricated assembled windowsill of people's Cargo Lift as claimed in claim 4, which is characterized in that described The lower end of the upper surface of first part's prefabricated panel and the second part prefabricated panel of prefabricated assembled windowsill adjacent and above Face is spliced by grout sleeve mode, the lower end surface of the second part prefabricated panel and the prefabricated assembled windowsill of adjacent lower section Spliced by grout sleeve mode the upper surface of first part's prefabricated panel of plate.
6. the construction method suitable for the prefabricated assembled windowsill of people's Cargo Lift as claimed in claim 5, which is characterized in that described The upper surface of first part's prefabricated panel is embedded with for prefabricated with the second part of prefabricated assembled windowsill adjacent and above The grout sleeve that the lower end surface of wallboard is spliced, the lower end surface of the second part prefabricated panel be equipped with for the grouting The sleeve reserved steel bar of sleeve connection.
7. the construction method suitable for the prefabricated assembled windowsill of people's Cargo Lift as described in claim 1, which is characterized in that described The left and right side of second part prefabricated panel passes through bolt with the medial surface in the left and right portion of first part prefabricated panel respectively and connects It connects.
8. the construction method suitable for the prefabricated assembled windowsill of people's Cargo Lift as claimed in claim 7, which is characterized in that described The left and right side of second part prefabricated panel is respectively equipped with connection sheet, the medial surface pair in the left and right portion of first part's prefabricated panel Should be equipped with for the bolted coupling nut of the connection sheet.
9. the construction method suitable for the prefabricated assembled windowsill of people's Cargo Lift as described in claim 1, which is characterized in that described The two sides of first part's prefabricated panel are able to and first part's prefabricated panel of adjacent prefabricated assembled windowsill Mutually splice two sides.
CN201610518853.3A 2016-07-05 2016-07-05 Prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift Active CN106050052B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610518853.3A CN106050052B (en) 2016-07-05 2016-07-05 Prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610518853.3A CN106050052B (en) 2016-07-05 2016-07-05 Prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift

Publications (2)

Publication Number Publication Date
CN106050052A CN106050052A (en) 2016-10-26
CN106050052B true CN106050052B (en) 2019-01-15

Family

ID=57201745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610518853.3A Active CN106050052B (en) 2016-07-05 2016-07-05 Prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift

Country Status (1)

Country Link
CN (1) CN106050052B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4419089B2 (en) * 2005-07-04 2010-02-24 清水建設株式会社 Seismic reinforcement structure for buildings
CN201785894U (en) * 2010-07-28 2011-04-06 沈阳万科房地产开发有限公司 Prefabricated cast-in-place combined-type laminated shear wall
EP2495374A1 (en) * 2011-03-04 2012-09-05 Lib Industries SAS Construction with bearing walls and floors made from pre-fabricated concrete panels and production moulds
CN204940885U (en) * 2015-09-16 2016-01-06 沈世春 Partition wall fitting machine
CN205858049U (en) * 2016-07-05 2017-01-04 上海建工二建集团有限公司 Be suitable to the prefabricated assembled windowsill of people's Cargo Lift

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8677698B2 (en) * 2008-03-06 2014-03-25 Stuart C. Segall Relocatable habitat unit

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4419089B2 (en) * 2005-07-04 2010-02-24 清水建設株式会社 Seismic reinforcement structure for buildings
CN201785894U (en) * 2010-07-28 2011-04-06 沈阳万科房地产开发有限公司 Prefabricated cast-in-place combined-type laminated shear wall
EP2495374A1 (en) * 2011-03-04 2012-09-05 Lib Industries SAS Construction with bearing walls and floors made from pre-fabricated concrete panels and production moulds
CN204940885U (en) * 2015-09-16 2016-01-06 沈世春 Partition wall fitting machine
CN205858049U (en) * 2016-07-05 2017-01-04 上海建工二建集团有限公司 Be suitable to the prefabricated assembled windowsill of people's Cargo Lift

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
地下室顶板上预留设备吊装孔;无间道;《土木在线论坛》;20120530;3楼无间道发言

Also Published As

Publication number Publication date
CN106050052A (en) 2016-10-26

Similar Documents

Publication Publication Date Title
CN203188121U (en) Cast-in-place bridge floor suspending mold of half-through or through arch bridge
CN108033367B (en) Synchronous lifting device and lifting method for steel column and cylinder frame alternately supported steel platform and tower crane
CN104213714A (en) Hoisting point reinforcing structure and hoisting construction method for ultra-large type roof
CN106241618A (en) A kind of curtain wall profiles boom hoisting
CN104695337A (en) Self-lifting sliding and turnover construction system and construction method
CN101566005B (en) Chimney hydraulic mould lifting device
CN203878965U (en) Device for construction of elevator shaft
CN105317205B (en) The construction method and equipment therefor of a kind of elevator
CN106088493A (en) A kind of pin key connects mounting structure and the construction thereof of prefabricated bench
CN201334769Y (en) Attached type lifting scaffold with double guide rails
CN105256728A (en) Cable-stayed bridge warren steel truss cantilever erection method
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN103669872B (en) A kind of walling method and walling equipment
CN115538792A (en) Residential building machine installation construction method and structure
CN105347142B (en) A kind of building hoist is mounted on the threading installation method on basement roof
CN107514145A (en) A kind of removable steel roofing liner installation construction device and method
CN202064281U (en) Slip form frame
JP3074765U (en) Pillar building construction system equipment
CN106050052B (en) Prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift
CN102677907A (en) Method for manually installing steel beam at top of silo
CN202401753U (en) Sliding die device
CN205858049U (en) Be suitable to the prefabricated assembled windowsill of people's Cargo Lift
CN115126254A (en) Construction method of assembled composite floor slab support
CN204626965U (en) For the steel stair template of poured up at a time between architectural stair
CN204492173U (en) Elevator shaft integral lifting template operation platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant