CN204626965U - For the steel stair template of poured up at a time between architectural stair - Google Patents

For the steel stair template of poured up at a time between architectural stair Download PDF

Info

Publication number
CN204626965U
CN204626965U CN201520087462.1U CN201520087462U CN204626965U CN 204626965 U CN204626965 U CN 204626965U CN 201520087462 U CN201520087462 U CN 201520087462U CN 204626965 U CN204626965 U CN 204626965U
Authority
CN
China
Prior art keywords
stair
steel
mould bases
marking time
side form
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520087462.1U
Other languages
Chinese (zh)
Inventor
张耀忠
沈宏生
王鹏飞
张裕忠
张孝明
赵海雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Construction Industry Co., Ltd.
Original Assignee
LONGXIN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LONGXIN CONSTRUCTION GROUP CO Ltd filed Critical LONGXIN CONSTRUCTION GROUP CO Ltd
Priority to CN201520087462.1U priority Critical patent/CN204626965U/en
Application granted granted Critical
Publication of CN204626965U publication Critical patent/CN204626965U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model discloses a kind of steel stair template for poured up at a time between architectural stair, belong to the realm of building construction.Comprise two and can be erected at cant beam between adjacent levels stair turntable and multiple side form of marking time; Between two cant beams, parallel interval is arranged, between two cant beams, corresponding two ends are connected and fixed respectively by crossbeam, forms mould bases; The two ends setting height(from bottom) adjusting device of mould bases; Multiple side forms of marking time are intervally fixed on the below of mould bases from top to bottom, and side form length of marking time is greater than the width of mould bases; Steel plate is adopted to carry out full envelope between arbitrary same side of multiple side form of marking time; The top of steel plate is provided with the wing limit perpendicular with steel plate.The utility model is easy for installation, construction is simple, processing ease, achieves stair and staircase body of wall is built simultaneously, avoids secondary embedded bar, ensure that staircase globality, achieve the tool of staircase structure construction, standardized work.

Description

For the steel stair template of poured up at a time between architectural stair
Technical field
The utility model relates to a kind of for steel stair template between architectural stair, is specifically a kind of steel stair template for poured up at a time between architectural stair, belongs to the realm of building construction.
Background technology
In recent years, architectural industrialization is carried out energetically by country, relies on scientific and technological advances and technological innovation, promotes architectural industrialization level, finally realizes energy-saving and emission-reduction, green construction, realize the sustainable development of builing industry.
In construction work, stair, as main construction passage, are the central core of circulation of accident such as building reply power-off, fire etc., each side's inspection, so the quality of staircase construction quality plays key effect to building safety.In traditional building construction process, staircase and main body are usually separated and are constructed, and need to carry out secondary joint bar, strengthen the expenditure of construction complexity and construction cost, reduce efficiency of construction; Meanwhile, have impact on staircase degree of plainness for wall surface, reduce the globality of staircase.In addition, the stair wood used in prior art template strength of marking time is lower, easily occurs " fried mould " phenomenon in work progress; Wood template of marking time also cannot reuse, and causes the waste of timber resources, have impact on efficiency of construction.
Utility model content
Technical problem to be solved in the utility model is to overcome prior art defect, provides a kind of construction convenient, poured up at a time steel stair template between the architectural stair that effectively can promote staircase globality and efficiency of construction.
In order to solve the problems of the technologies described above, the steel stair template for poured up at a time between architectural stair that the utility model provides, comprises two and can be erected at cant beam between adjacent levels stair turntable and multiple side form of marking time; Between described two cant beams, parallel interval is arranged, between two cant beams, corresponding two ends are connected and fixed respectively by crossbeam, forms mould bases; The two ends setting height(from bottom) adjusting device of described mould bases; Described multiple side form of marking time is intervally fixed on the below of mould bases from top to bottom, described in side form length of marking time be greater than the width of mould bases; Steel plate is adopted to carry out full envelope between arbitrary same side of described multiple side form of marking time; The top of described steel plate is provided with the wing limit perpendicular with steel plate.
The utility model steel stair model sheetinstallat is convenient, construction is simple, processing ease, achieve stair and staircase body of wall is built simultaneously, avoid secondary embedded bar, ensure that staircase globality, achieve the tool of staircase structure construction, standardized work, not only economy but also safety.
Accompanying drawing explanation
Fig. 1 is the utility model steel stair stencil plane schematic diagram;
Fig. 2 is the utility model steel stair formwork sides schematic diagram;
Fig. 3 is the utility model wall form scheme of installation;
Fig. 4 is the utility model body of wall exterior sheathing and steel stair template connecting joint point diagram.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
The utility model is applicable to construct between all reinforced concrete stairs, is particularly useful for the construction of typical floor.
As illustrated in fig. 1 and 2, in the utility model, steel stair template comprises two cant beams 1 that can be erected between adjacent levels stair turntable, between two cant beams 1, parallel interval is arranged, be connected and fixed respectively by two crossbeams 2 between the two ends that two cant beams 1 are corresponding, two crossbeams 2 are parallel to each other, and form rectangular mould bases.The outside (i.e. the two ends of mould bases) of two crossbeams 2 fixedly mounts two nuts, 6, two nut 6 intervals respectively and arranges, and each nut 6 is all screwed into and regulates screw mandrel 7 pairs of mould bases to support, rotate the height regulating screw mandrel 7 can adjust mould bases.The below of mould bases from top to bottom (namely from the top of mould bases to bottom) uniform intervals arranges nine side forms of marking time; Side form of marking time is made up of side template 3 and stiffening girder 5, and back and the stiffening girder 5 of side template 3 are connected and fixed, and side form of marking time is parallel with crossbeam 2; The both sides of stiffening girder 5 are connected and fixed respectively by montant 4 and cant beam 1.The length of side form of marking time is greater than the width of mould bases.Adjacent marking time between side form on the right of mould bases outside the side of staircase body of wall (namely near) cant beam 1 adopts steel plate to connect, and namely goes up one and to mark time the bottom of side form and the top junction steel plate of next side form of marking time; Adopt steel plate 10 to carry out full envelope between the lateral surface of adjacent side form of marking time, the top of steel plate is fixedly connected with angle steel as wing limit 8, and wing limit 8 is perpendicular with steel plate 10, and wing limit 8 is parallel with cant beam 1; Wing limit 8 has several perforates, for being connected with staircase wall form.Two crossbeams 2 install 2 reinforcing bar suspension ring respectively, for lifting and the movement of steel stair template.
Cant beam 1 in the present embodiment and crossbeam 2 adopt 10# channel-section steel, and side template 3 adopts 6 steel plates, and stiffening girder 5 adopts 8# channel-section steel, and montant 4 adopts 5# angle steel, and wing limit 8 adopts 4# angle steel, and reinforcing bar suspension ring adopt 20mm reinforcing bar.Side form of marking time in the present embodiment is nine, steel stair template should be known as those of ordinary skill in the art, side form quantity of marking time, adjacent Distance geometry selection of marking time between side form can according to practice of construction need carry out changing or adjusting.
In the present embodiment, adjacent marking time between side form on the right of mould bases outside cant beam 1 adopts steel plate to connect, adopt steel plate 10 to carry out full envelope between the lateral surface of adjacent side form of marking time, the top of steel plate 10 is fixedly connected with angle steel as wing limit 8 for being connected with staircase wall form.In practice of construction process, can according to the difference in disparity items stair direction, steel plate is adopted to connect adjacent the marking time between side form outside mould bases left side cant beam 1, adopt steel plate 10 to carry out full envelope between the lateral surface of adjacent side form of marking time, the top of steel plate 10 is fixedly connected with angle steel as wing limit 8 for being connected with staircase body of wall exterior sheathing.As principle, steel stair mould upper limb limit 8 must near staircase body of wall side, with staircase body of wall exterior sheathing Connecting groups mould.
As shown in Figure 3, staircase wall form comprises body of wall exterior sheathing 19 and wall internal mould plate 16; Wall form all adopts 6 thick steel facings, steel facing has screw hole spaced apart, and the back side of steel facing adopts vertical back cord 15 to reinforce, and back cord 15 spacing is about 450mm; The surrounding at the steel facing back side adopts 4# angle steel 20 bound edge, and angle steel 20 is provided with multiple perforate.The lower side of body of wall exterior sheathing 19 is relative corresponding with wing limit 8 structure of steel stair template, perforate on the lower side angle steel 20 of body of wall exterior sheathing 19 with wing limit 8 on position of opening corresponding, during group mould body of wall exterior sheathing 19 lower side on angle steel 20 be connected and fixed by screw 21 with the wing limit 8 of steel stair template.
The construction sequence of carrying out poured up at a time between architectural stair of above-mentioned steel stair template and staircase wall form is utilized to be:
Absolute altitude, the size of the staircase 1, provided according to Architecture and structure working drawing, design the size of template, according to staircase wall internal mould plate and the exterior sheathing of size processing said structure.
2, the processing of steel stair template is completed according to design size and said structure.
3, colligation stair reinforcing bar qualified by inspection after, first by after steel stair formwork hoisting to the position of setting, pad respectively in the below of four adjusting screws 7 and establish and treat the concrete pad of concreting with label, adopt the position of crow bar adjustment stair template, adjusted the absolute altitude of marking time by adjusting screw 7, ensure the accurate of its position.
4, as shown in Figure 3, colligation staircase wall steel bar and qualified by inspection after, first prop up vertical staircase inner side template 16, and on reinforcing bar, arrange cement support, cement support interval 1000mm, in quincuncial arrangement; Then, lifting the positive facade exterior sheathing of staircase and both sides exterior sheathing successively according to joining mould drawing, after rigging out, adopting iron wire to be undertaken temporary fixed by exterior sheathing 19 and wall steel bar; Subsequently, the wing limit 8 in steel stair template is fixed by screw 21 with the angle steel 20 on exterior sheathing 19 lower side on correspondence position; Positive for staircase facade exterior sheathing and both sides exterior sheathing are connected and fixed by screw 21 mutually.
5, as shown in Figure 4, after staircase body of wall inner and outer template installs, wall bushing 18 and connecting bolt 11, main back cord 14 after adjusting mold plate verticality, tighten tapered cup nut 12 are installed successively, pad 13 is set between tapered cup nut 12 and inner and outer template, realizes fixing between inner and outer template; In work progress, main back cord 14 is installed its horizontal absolute altitude and must be ensured unanimously, simultaneously above stair step with mark time the main back cord 14 that be arranged in parallel.
6, according to the label of design, disposable integral concreting is carried out to staircase body of wall and stair;
7, after staircase concreting, when intensity reaches 1Mpa(4Mpa in winter) start to remove body of wall inner and outer template, first remove the tapered cup nut 12 on bolt 11, remove main back cord 14, connecting bolt 11 from top to bottom successively, mark time and exterior sheathing connecting screw 21, connecting screw 21 between exterior sheathing, then body of wall inner and outer template is prized gently with crowbar, make template leave body of wall, vertical transportation machinery such as recycling tower crane etc. is transported to stockyard, after tear steel stair template open.
The above is only preferred embodiment of the present utility model; should be understood that; for those skilled in the art, can also make some improvement under the prerequisite not departing from the utility model principle, these improvement also should be considered as protection domain of the present utility model.

Claims (1)

1. for a steel stair template for poured up at a time between architectural stair, it is characterized in that: comprise two and can be erected at cant beam between adjacent levels stair turntable and multiple side form of marking time; Between described two cant beams, parallel interval is arranged, between two cant beams, corresponding two ends are connected and fixed respectively by crossbeam, forms mould bases; The two ends setting height(from bottom) adjusting device of described mould bases; Described multiple side form of marking time is intervally fixed on the below of mould bases from top to bottom, described in side form length of marking time be greater than the width of mould bases; Steel plate is adopted to carry out full envelope between arbitrary same side of described multiple side form of marking time; The top of described steel plate is provided with the wing limit perpendicular with steel plate.
CN201520087462.1U 2015-02-09 2015-02-09 For the steel stair template of poured up at a time between architectural stair Expired - Fee Related CN204626965U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520087462.1U CN204626965U (en) 2015-02-09 2015-02-09 For the steel stair template of poured up at a time between architectural stair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520087462.1U CN204626965U (en) 2015-02-09 2015-02-09 For the steel stair template of poured up at a time between architectural stair

Publications (1)

Publication Number Publication Date
CN204626965U true CN204626965U (en) 2015-09-09

Family

ID=54046005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520087462.1U Expired - Fee Related CN204626965U (en) 2015-02-09 2015-02-09 For the steel stair template of poured up at a time between architectural stair

Country Status (1)

Country Link
CN (1) CN204626965U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104675112A (en) * 2015-02-09 2015-06-03 龙信建设集团有限公司 Steel stair formwork and constructing method for once pouring forming of building staircase
CN109025275A (en) * 2018-07-25 2018-12-18 中国十七冶集团有限公司 A kind of shear wall side regularization stair punching block and installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104675112A (en) * 2015-02-09 2015-06-03 龙信建设集团有限公司 Steel stair formwork and constructing method for once pouring forming of building staircase
CN109025275A (en) * 2018-07-25 2018-12-18 中国十七冶集团有限公司 A kind of shear wall side regularization stair punching block and installation method

Similar Documents

Publication Publication Date Title
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN103161126A (en) Road bridge variable section hollow high pier slip-form construction method
CN105804395B (en) Stair continuously poured in one molding construction method based on monoblock type typified form
CN104675112A (en) Steel stair formwork and constructing method for once pouring forming of building staircase
CN109404010B (en) Aluminum tunnel mold system and operation method thereof
CN106088493A (en) A kind of pin key connects mounting structure and the construction thereof of prefabricated bench
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN107143076A (en) A kind of Prefabricated stacking floor with side flanging and its construction method for being used to drop plate region
CN204510650U (en) A kind of precast splice type stringer type stairway
CN105155836B (en) Aluminum alloy mould plate for building and its using method
CN204098486U (en) The concrete of building basement roof ater-casting hangs mould
CN102505839A (en) Arc-shaped mold plate for casting arc-shaped shear wall of industrial factory building and manufacture method of arc-shaped mold plate
CN109797969B (en) Construction method of post-cast strip tool type advanced formwork lifting system
CN107401279A (en) Disposable one-piece casting staircase wall ladder combined steel formwork installation construction method
CN204626965U (en) For the steel stair template of poured up at a time between architectural stair
CN203462754U (en) Free-disassembly suspension template
CN107152112A (en) A kind of modularization Prefabricated stacking floor and its construction method for being used to drop plate region
CN210025768U (en) A operation platform system for caisson template installation
CN106522544A (en) Root-rotting-preventing compensating device for formwork
CN104131635B (en) Method and platform for constructing peripheral shear wall of prefabricated staircase
CN207244961U (en) A kind of Prefabricated stacking floor with side flanging for being used to drop plate region
CN104295089A (en) Support system of cast-in-place concrete GBF honeycomb core dense-rib floor system
CN105804396A (en) Precast stair flight manufactured by non-established and circularly-used template system and construction method
CN205476468U (en) Non - design, can all rotary die plate bodys be prefabricated staircase bench template
CN207110035U (en) Assembled steel tendon concrete frame structure based on steel plate connection joint

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160727

Address after: Binjiang street Jinjiang road 226100 Jiangsu Haimen city of Nantong province No. 88 in 4.

Patentee after: Jiangsu Construction Industry Co., Ltd.

Address before: Haimen City, Jiangsu province 226102 Rui Jiang Road Nantong City No. 318

Patentee before: Longxin Construction Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909

Termination date: 20210209

CF01 Termination of patent right due to non-payment of annual fee