CN106050052A - Prefabricated and assembled window board applicable to passenger and goods elevators and construction method thereof - Google Patents
Prefabricated and assembled window board applicable to passenger and goods elevators and construction method thereof Download PDFInfo
- Publication number
- CN106050052A CN106050052A CN201610518853.3A CN201610518853A CN106050052A CN 106050052 A CN106050052 A CN 106050052A CN 201610518853 A CN201610518853 A CN 201610518853A CN 106050052 A CN106050052 A CN 106050052A
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- prefabricated panel
- construction
- windowsill
- people
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B1/00—Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
- E06B1/70—Sills; Thresholds
- E06B1/702—Window sills
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/0007—Implements for finishing work on buildings for mounting doors, windows or frames; their fitting
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention provides a prefabricated and assembled window board applicable to passenger and goods elevators and a construction method thereof. The prefabricated and assembled window board is discounted into two parts to be prefabricated; a first part prefabricated wall board is a combination body of an upper part positioned at the upper side of a reserved window hole and the left and right parts positioned at the two sides of the reserved window hole; a second part prefabricated wall board is positioned at the lower part of the lower side of the reserved window hole; and the left side surface and the right side surface of the second part prefabricated wall board can be spliced with the inner side surfaces of the left part and the right part of the first part prefabricated wall board. In a period that passenger and goods elevators need to be used for transporting personnel and construction materials on corresponding floors, a hole through which construction personnel and construction materials can conveniently go in or go out can be provided; when the passenger and goods elevators do not need to be used on the floor, the stable and firm splicing can be performed in the field; the hole is plugged; and a complete prefabricated and assembled window board is formed, so that the problem of need of later-stage cast-in-situ formwork supporting of the window board in the arrangement position of the passenger and goods elevators in the prior art is solved; and the prefabrication rate of the assembled building is effectively improved.
Description
Technical field
The present invention relates to building engineering field, particularly relate to the prefabricated assembled windowsill of a kind of people's of being suitable to Cargo Lift and execute
Work method.
Background technology
Prefabrication is new model building form indeed, and currently, China is in Social Transformation Period, and building industry also faces and turns
The pressure of type upgrading, therefore, prefabrication, in evolutionary path and the direction that current and future is all building industry, is to realize
The important content of building industrialization.
Prefabrication be in the factory by concrete component in advance feature according to engineering project prefabricated, then
Transport carries out the structural system that assembling combination becomes firm to job site.This construction method has efficiently, the spy of energy-saving and environmental protection
Point, it is possible to increase construction quality and efficiency of construction.In prefabrication, common prefabricated components have Side fascia, overlapping
Plate, air-conditioning plate, balcony slab, staircase boards, interior shear wall, non bearing structure post etc., the use of these components makes job site
Wet trade amount is substantially reduced, and owing to using the mode of lifting combination, the labor intensity of workman is also minimized.
People's Cargo Lift i.e. building hoist is generally located on Lou Dong and windows position.For convenience of people or the turnover of building materials, people's goods
Bench-table plate at ladder installation position the most generally remains follow-up cast-in-place construction at present, and on the one hand this reduce prefabrication
Prefabricated rate, it is impossible to the superiority of reflection assembled mode of construction, on the other hand owing to leaving the neutral gear of sheet between building, after
Phase pouring construction formwork measure, the most ugly, affect job site appearance.
Therefore, how to provide one can avoid later stage cast-in-place formwork construction, improve the prefabricated rate of assembled architecture, improve
Construction quality and the prefabricated assembled windowsill being suitable to people's Cargo Lift of efficiency of construction and construction method thereof, it has also become construction circle
Need the technical problem of further improvement and optimization.
Summary of the invention
For in prior art, the problem that at people's Cargo Lift laying, windowsill needs the later stage to pour, prefabricated rate is low, the present invention carries
A kind of prefabricated assembled windowsill being suitable to people's Cargo Lift and construction method thereof are supplied, after windowsill needs at solution people's Cargo Lift laying
The problem of phase cast-in-place formwork construction, effectively reduces the wet trade amount of job site, improves the prefabricated of prefabrication
Rate, efficiency of construction and construction quality.
For solving above-mentioned technical problem, the present invention provides following technical scheme:
A kind of prefabricated assembled windowsill being suitable to people's Cargo Lift, described prefabricated assembled windowsill splits into two parts to be carried out
Prefabricated, wherein, Part I prefabricated panel be positioned at reserved window punch upside top be positioned at reserved window and punch both sides
The assembly in left and right portion, Part II prefabricated panel is to be positioned at reserved window to punch the bottom of downside, and described Part II is pre-
The left and right side of wallboard processed is able to the medial surface in the left and right portion with Part I prefabricated panel and splices mutually.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part I prefabricated panel
Upper surface can be spliced mutually with the lower surface of the Part II prefabricated panel of prefabricated assembled windowsill adjacent and above;Described
The lower surface of two partial precast wallboards can upper with the Part I prefabricated panel of the prefabricated assembled windowsill of adjacent lower section
End face splices mutually.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part I prefabricated panel
The lower surface of the Part II prefabricated panel of upper surface and prefabricated assembled windowsill adjacent and above is by grout sleeve mode
Splicing, the Part I dry wall of the lower surface of described Part II prefabricated panel and the prefabricated assembled windowsill of adjacent lower section
The upper surface of plate is spliced by grout sleeve mode.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part I prefabricated panel
Upper surface is embedded with for spelling with the lower surface of the Part II prefabricated panel of prefabricated assembled windowsill adjacent and above
The grout sleeve connect, the lower surface of described Part II prefabricated panel is provided with the sleeve for being connected with described grout sleeve and reserves
Reinforcing bar.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part II prefabricated panel
Left and right side medial surface with the left and right portion of Part I prefabricated panel respectively is bolted.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part II prefabricated panel
Left and right side is respectively equipped with connection sheet, the medial surface in the left and right portion of Part I prefabricated panel be correspondingly provided with for described company
The bolted coupling nut of contact pin.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part I prefabricated panel
Two sides are able to splice mutually with the two sides of the Part I prefabricated panel of adjacent prefabricated assembled windowsill.
The invention also discloses the construction method of a kind of prefabricated assembled windowsill being suitable to people's Cargo Lift as above, bag
Include following steps:
One, determine first according to the prefabricated assembled windowsill size at the installation position of job site building hoist,
The size of Part II prefabricated panel, after first, second partial precast wallboard is prefabricated, is transported to job site;
Two, according to weight and the floor floor height of Part II prefabricated panel, clear height and the counterweight of construction suspension bracket is determined
The weight of block and number;
Three, assembled Part I prefabricated panel, meanwhile, also acts hanging in corresponding floor gap and put by Part II prefabricated panel
Good standby;
Four, until floor gap be no longer necessary to building hoist carry out operation time, construct suspension bracket at this floor gap on-site consolidation one;
Five, using construction suspension bracket to be risen by Part II prefabricated panel to hang in correspondence position and carry out assembly, stitching position is carried out
Corresponding connection, is formed and has the prefabricated assembled windowsill that described reserved window punches;
Six, after treating the construction of this floor, construction suspension bracket is disassembled into component, is carried to a floor and carries out adjacent and above
The construction of prefabricated assembled windowsill, such bottom right supreme until all floors building hoist installation position at prefabricated
The construction of assembling window platen is complete.
Preferably, in the above-mentioned construction method of prefabricated assembled windowsill being suitable to people's Cargo Lift, described construction suspension bracket
Including the left and right sides being spliced to form loading frame, lower grillage and both sides grillage, described loading frame and lower grillage respectively by channel-section steel
Between respectively by described side plate frame connect, described lower grillage is arranged as required to balancing weight, described loading frame has relatively
The extension of the described the most protruding certain distance of lower grillage, described extension is provided with a derricking gear, described under
The lower section of grillage is provided with roller.
Preferably, in the above-mentioned construction method of prefabricated assembled windowsill being suitable to people's Cargo Lift, described stitching position
The step connected accordingly includes: the lower surface of described Part II prefabricated panel and the prefabricated assembled windowsill of adjacent lower section
The upper surface of the Part I prefabricated panel of plate is spliced by grout sleeve mode, described Part II prefabricated panel left and right
Side medial surface with the left and right portion of Part I prefabricated panel respectively is bolted.
Preferably, in the above-mentioned construction method of prefabricated assembled windowsill being suitable to people's Cargo Lift, described derricking gear
For chain block.
Beneficial effects of the present invention is as follows:
One, the present invention provide a kind of prefabricated assembled windowsill being suitable to people's Cargo Lift and construction method, this prefabricated dress
Join formula windowsill during corresponding floor needs to use building hoist conveying people and construction material, using the teaching of the invention it is possible to provide be easy to for one
Workmen and the hole of construction material turnover, and when this floor need not use building hoist, can carry out surely at scene
Solid assembly, hole is blocked, forms complete prefabricated assembled windowsill, thus solve the problem of later stage cast-in-place formwork, carry
The prefabricated rate of high assembled architecture, improves construction quality and efficiency of construction.
Two, the present invention provide a kind of prefabricated assembled windowsill being suitable to people's Cargo Lift and construction method, first, second
Vertical piece is threaded connection between partial precast wallboard and between contiguous prefabricated assembling window platen, has simple and convenient
Advantage, between the horizontal piece between first, second partial precast wallboard the most contiguous prefabricated assembling window platen by grouting
Sleeve fashion connects, and has solid and reliable advantage, and two kinds of connected modes are applied in combination, and are advantageously implemented whole assembled architecture
Quick, effective, be reliably connected.
Three, the construction method of a kind of prefabricated assembled windowsill being suitable to people's Cargo Lift that the present invention provides, is executed by setting
Work suspension bracket, will be located in the Part II prefabricated panel in floor and lifts by crane and be installed on Part I prefabricated panel, it is to avoid due to
The prefabricated windows platen being present such that this position of building hoist cannot use the problem that on-the-spot tower crane carries out lifting.Employing is executed
Work suspension bracket lifting Part II prefabricated panel, compares a dead lift so that the construction of later stage Part II prefabricated panel is easier,
Effectively reduce labor intensity, saved a large amount of manpower, be effectively increased efficiency of construction.Additionally, construction suspension bracket uses channel-section steel to spell
Connecing composition, easy accessibility, lightweight, it is simple to carry at floor gap, to realize the circulation construction of construction suspension bracket, reduction is constructed into
This.
Accompanying drawing explanation
Fig. 1 is the structural representation of the prefabricated assembled windowsill being suitable to people's Cargo Lift of one embodiment of the invention;
Fig. 2 is the structural representation of Part I prefabricated panel in one embodiment of the invention;
Fig. 3 is the structural representation of Part II prefabricated panel in one embodiment of the invention;
Fig. 4 is the structural representation of suspension bracket of constructing in one embodiment of the invention;
In figure: 1-Part I prefabricated panel, 2-Part II prefabricated panel, 3-grout sleeve, 4-sleeve reserved steel bar,
5-connects grillage, 9-side plate frame, 10-balancing weight, 11-roller, 12-chain block under sheet, 6-coupling nut, 7-loading frame, 8-.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.According to description below and right
Claim, advantages and features of the invention will be apparent from.Hereinafter will be combined accompanying drawing by cited embodiment, describe this in detail
Bright technology contents and feature.Need to additionally illustrate, accompanying drawing all use the form simplified very much and all use non-accurately than
Example, only in order to facilitate, to aid in illustrating lucidly the purpose of the embodiment of the present invention.For sake of convenience, described below " on ",
The upper and lower direction of D score and accompanying drawing is consistent, but this can not become the restriction of technical solution of the present invention.
The core concept of the present invention is: in constructing for current prefabrication, people's Cargo Lift (or it is referred to as liter of constructing
Fall machine) floor windowsill at installation position uses the later stage cast-in-place rather than prefabricated panel mostly, reduces prefabricated assembled building
The problem of the prefabricated rate built, splits the windowsill of this position at this people's Cargo Lift installation position and is prefabricated into two parts component, its
Middle a part of existing assembly, the reserved convenient construction personnel that punch make employment Cargo Lift carry out other works at floor gap with other building materials
Industry.Design simultaneously a kind of the lowest enter sky can be at the upending frame of floor gap hoisting heavy, it is simple to the later stage is in the fast Speed Pinyin of floor gap
Another part component of dress prefabricated windows platen, thus improve prefabricated rate and efficiency of construction.
Referring to Fig. 1 to Fig. 3, present embodiment discloses a kind of prefabricated assembled windowsill being suitable to people's Cargo Lift, this is prefabricated
Assembling window platen is positioned at the installation position of the whole people's Cargo Lift planning to build assembled architecture, and described prefabricated assembled windowsill is torn open
Be divided into two parts and carry out prefabricated, wherein, Part I prefabricated panel 1 be positioned at reserved window punch upside top be positioned at pre-
Staying window to punch the assembly in left and right portion of both sides, Part II prefabricated panel 2 punches under downside for being positioned at reserved window
Portion, the left and right side of described Part II prefabricated panel 2 is able to the inner side in the left and right portion with Part I prefabricated panel 1
Face is spliced mutually, the left surface of the most described Part II prefabricated panel 2 be able to in the left part of Part I prefabricated panel 1
Side is spliced mutually, the right flank of described Part II prefabricated panel 2 be able to in the right part of Part I prefabricated panel 1
Side is spliced mutually, has reserved so that Part I prefabricated panel 1 forms one after splicing with Part II prefabricated panel 2
The prefabricated assembled windowsill that window punches, improves bulk strength and the stability of prefabricated assembled windowsill.
The present embodiment, by will be located in the prefabricated assembled windowsill at the installation position of building hoist, splits into two
Point carry out prefabricated, this prefabricated assembled windowsill the most only lifting Part I prefabricated panel 1, need to use construction at corresponding floor
During elevator conveying people and construction material, this Part I prefabricated panel 1 provides one to be easy to workmen and construction material
The hole of material turnover, this hole includes that reserved window punches the area punched with Part II prefabricated panel position, it is achieved utilize
Building hoist is This floor transport workmen and the purpose of construction material;And need not use building hoist at this floor
Time, on-the-spot can carry out the assembly first, second partial precast wallboard 1,2 consolidated, hole be blocked, forms complete prefabricated dress
Join formula windowsill, thus the problem avoiding the later stage to be the construction cast-in-place formwork of Part II prefabricated panel 2, improve assembled architecture
Prefabricated rate, improves construction quality and efficiency of construction.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part I prefabricated panel 1
Upper surface can be spliced mutually with the lower surface of the Part II prefabricated panel 2 of prefabricated assembled windowsill adjacent and above;Described
The lower surface of Part II prefabricated panel 2 can be with the Part I prefabricated panel 1 of the prefabricated assembled windowsill of adjacent lower section
Upper surface splice mutually, so that be positioned at the installation position of elevator prefabricated assembled window corresponding up and down between contiguous floors
Platen can splice, to improve bulk strength and the stability of whole prefabrication.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part I prefabricated panel 1
The lower surface of the Part II prefabricated panel 2 of upper surface and prefabricated assembled windowsill adjacent and above is by grout sleeve 3 side
Formula is spliced, and the lower surface of described Part II prefabricated panel 2 is pre-with the Part I of the prefabricated assembled windowsill of adjacent lower section
The upper surface of wallboard 1 processed is spliced by grout sleeve 3 mode.By using grout sleeve mode to splice so that Part I is pre-
Between the lower surface of the Part II prefabricated panel 2 of the upper surface of wallboard 1 processed and prefabricated assembled windowsill adjacent and above with
And the Part I prefabricated panel of the lower surface of described Part II prefabricated panel 2 and the prefabricated assembled windowsill of adjacent lower section
Connection between the upper surface of 1 is formed is relatively reliable, such that it is able to realize between neighbouring prefabricated assembled windowsill
Be reliably connected.Second of the upper surface of above-mentioned Part I prefabricated panel 1 and prefabricated assembled windowsill adjacent and above
Piece between the lower surface of point prefabricated panel 2, and the lower surface of described Part II prefabricated panel 2 and adjacent lower section is pre-
Piece between the upper surface formation of the Part I prefabricated panel 1 of assembling window platen processed, is horizontal piece, uses and fill
Slurry sleeve fashion splicing, not only facilitates but also can realize the most permanently connected.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part I prefabricated panel 1
Upper surface is embedded with for spelling with the lower surface of the Part II prefabricated panel 2 of prefabricated assembled windowsill adjacent and above
The grout sleeve 3 connect, the lower surface of described Part II prefabricated panel 2 is provided with the sleeve for being connected with described grout sleeve 3
Reserved steel bar 4, such that it is able to during corresponding floor needs to use building hoist conveying people and construction material, it is to avoid evagination
Sleeve reserved steel bar 4 affect personnel turnover and construction material transport, improve efficiency of construction further.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part II prefabricated panel 2
Left and right side medial surface with the left and right portion of Part I prefabricated panel 1 respectively is bolted.It is positioned at reserved described in i.e.
The punch bottom of downside of window is bolted with being positioned at the punch left and right portion of both sides of reserved window.It is bolted, can
So that realize the left and right side of Part II prefabricated panel 2 respectively with the inner side in the left and right portion of Part I prefabricated panel 1
Between face, vertical piece is reliably connected.
Preferably, in the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift, described Part II prefabricated panel 2
Left and right side is respectively equipped with connection sheet 5, and the medial surface in the left and right portion of Part I prefabricated panel 1 is correspondingly provided with for described
Connect the bolted coupling nut of sheet 56.Be positioned at described in it is to say, reserved window punch downside bottom both sides respectively
Be provided with connection sheet 5, described in be positioned at the punch left and right portion of both sides of reserved window and be correspondingly provided with for being connected sheet 5 bolt even with described
The coupling nut 6 connect.The sheet 5 that connects of evagination is not arranged on the medial surface in left and right portion of Part I prefabricated panel 1,
And be disposed on the left and right side of described Part II prefabricated panel 2, such that it is able to need to use construction lifting at corresponding floor
During machine conveying people and construction material, it is to avoid the connection sheet 5 of evagination affects personnel's turnover and construction material transports, and carries further
High efficiency of construction.
So that the connection between neighbouring prefabricated assembled windowsill is more firm, each prefabricated assembled windowsill
Two, the left and right of the Part I prefabricated panel 1 of plate is respectively arranged with grout sleeve 3 on bottom surface, prefabricated assembled below correspondence
The end face corresponding position of the Part I prefabricated panel 1 of windowsill arranges the sleeve reserved steel bar 4 being connected with described grout sleeve 3,
It is uniformly distributed between the two so that connect stress point between neighbouring prefabricated assembled windowsill, improves two further
The connection reliability of person.
The two sides of described Part I prefabricated panel 1 are able to and first of adjacent prefabricated assembled windowsill
The two sides dividing prefabricated panel 1 are spliced mutually.Owing to the two sides of described Part I prefabricated panel 1 are able to pre-with adjacent
It is vertical piece between the two sides of the Part I prefabricated panel 1 of assembling window platen processed, spiral shell as above can be used
Stricture of vagina connected mode.Such as, the two sides of the Part I prefabricated panel 1 of each prefabricated assembled windowsill are correspondingly arranged connection sheet
5 with coupling nut 6, to realize the reliable splicing between the contiguous prefabricated assembling window platen of left and right.
Vertical piece passes through between first, second partial precast wallboard 1,2 and between contiguous prefabricated assembling window platen
Threaded, there is advantage simply and easily, the first, second that is contiguous prefabricated assembling window platen of partial precast wallboard 1,2 it
Between horizontal piece between connected by grout sleeve mode, there is solid and reliable advantage, be advantageously implemented whole assembled
Building quick, effective, be reliably connected.
Referring to Fig. 1 to Fig. 4, the construction method of the prefabricated assembled windowsill being suitable to people's Cargo Lift of the present invention, including such as
Lower step:
One, determine first according to the prefabricated assembled windowsill size at the installation position of job site building hoist,
The size of Part II prefabricated panel 1,2, after first, second partial precast wallboard 1,2 is prefabricated, is transported to job site.
Two, according to weight and the floor floor height of Part II prefabricated panel 2, clear height and the counterweight of construction suspension bracket is determined
The weight of block 10 and number.
Three, assembled Part I prefabricated panel 1, meanwhile, also rises Part II prefabricated panel 2 and hangs in corresponding floor gap
Put well standby.In this step, the Part I prefabricated panel 1 of the most assembled prefabricated assembled windowsill of each layer.
Four, until floor gap be no longer necessary to building hoist carry out operation time, construct suspension bracket at this floor gap on-site consolidation one.
Five, using construction suspension bracket that Part II prefabricated panel 2 is hung in correspondence position and carry out assembly, stitching position is carried out
Corresponding connection, is formed and has the prefabricated assembled windowsill that described reserved window punches.
Six, after treating the construction of this floor, construction suspension bracket is disassembled into component, is carried to a floor and carries out adjacent and above
The construction of prefabricated assembled windowsill, such bottom right supreme until all floors building hoist installation position at prefabricated
The construction of assembling window platen is complete.
This is suitable to the construction method of prefabricated assembled windowsill of people's Cargo Lift, the most only lifting Part I prefabricated panel 1,
This prefabricated assembled windowsill is during corresponding floor needs to use building hoist conveying people and construction material, using the teaching of the invention it is possible to provide
One hole being easy to workmen and construction material turnover, and when this floor need not use building hoist, Ke Yixian
Field utilizes construction suspension bracket to lift Part II prefabricated panel 2 to Part I prefabricated panel 1, is blocked at hole, formed completely,
Firm prefabricated assembled windowsill, thus solve windowsill at people's Cargo Lift installation position and need the problem of later stage cast-in-place formwork,
It is effectively improved the prefabricated rate of assembled architecture, improves construction quality and efficiency of construction.
Preferably, in the above-mentioned construction method of prefabricated assembled windowsill being suitable to people's Cargo Lift, described construction suspension bracket
Including being spliced to form loading frame 7, lower grillage 8 and both sides grillage 9, described loading frame 7 and a left side for lower grillage 8 by channel-section steel respectively
Connected by described side plate frame 9 respectively between right both sides, described lower grillage 8 is arranged as required to balancing weight 10, described upper plate
Frame 7 has the extension of the most described the most protruding certain distance of lower grillage 8, and described extension is provided with a lifting
Mechanism, the lower section of described lower grillage 8 is provided with roller 11.Preferably, at the above-mentioned prefabricated assembled windowsill being suitable to people's Cargo Lift
Construction method in, described derricking gear is chain block 12.
The present embodiment is by arranging construction suspension bracket, and the Part II prefabricated panel 2 that will be located in floor lifts by crane and is installed on
On Part I prefabricated panel 1, it is to avoid owing to the prefabricated windows platen being present such that this position of building hoist cannot use
The problem that on-the-spot tower crane carries out lifting.Use construction suspension bracket lifting Part II prefabricated panel 2, compare a dead lift so that after
Phase Part II prefabricated panel 2 is constructed easier, effectively reduces labor intensity, has saved a large amount of manpower, has been effectively increased
Efficiency of construction.Additionally, construction suspension bracket uses channel-section steel splicing to form, easy accessibility, lightweight, it is simple to carry at floor gap, with reality
Now construct suspension bracket circulation construction, reduce construction cost.
Preferably, in the above-mentioned construction method of prefabricated assembled windowsill being suitable to people's Cargo Lift, described stitching position
The step connected accordingly includes: the lower surface of described Part II prefabricated panel 2 and the prefabricated assembled window of adjacent lower section
The upper surface of the Part I prefabricated panel 1 of platen is spliced by grout sleeve 3 mode, described Part II prefabricated panel 2
Left and right side medial surface with the left and right portion of Part I prefabricated panel 1 respectively is bolted.First, second part is pre-
Vertical piece is threaded connection between wallboard 1,2 processed and between contiguous prefabricated assembling window platen, simple and convenient, first,
Between horizontal piece between that is contiguous prefabricated assembling window platen of Part II prefabricated panel 1,2 by grout sleeve mode even
Connect, solid and reliable, be advantageously implemented whole assembled architecture quick, effective, be reliably connected.
Foregoing description is only the description to present pre-ferred embodiments, not any restriction to the scope of the invention, this
Any change that the those of ordinary skill in bright field does according to the disclosure above content, modification, belong to the protection of claims
Scope.
Claims (10)
1. the prefabricated assembled windowsill being suitable to people's Cargo Lift, it is characterised in that described prefabricated assembled windowsill splits into
Two parts carry out prefabricated, wherein, Part I prefabricated panel be positioned at reserved window punch upside top be positioned at reservation window
Mouth punches the assembly in left and right portion of both sides, and Part II prefabricated panel is to be positioned at reserved window to punch the bottom of downside, described
The left and right side of Part II prefabricated panel is able to the medial surface in the left and right portion with Part I prefabricated panel and splices mutually.
Be suitable to the prefabricated assembled windowsill of people's Cargo Lift the most as claimed in claim 1, it is characterised in that described Part I is pre-
The upper surface of wallboard processed can be spelled mutually with the lower surface of the Part II prefabricated panel of prefabricated assembled windowsill adjacent and above
Connect;The lower surface of described Part II prefabricated panel can be prefabricated with the Part I of the prefabricated assembled windowsill of adjacent lower section
The upper surface of wallboard is spliced mutually.
Be suitable to the prefabricated assembled windowsill of people's Cargo Lift the most as claimed in claim 2, it is characterised in that described Part I is pre-
The lower surface of the Part II prefabricated panel of the upper surface of wallboard processed and prefabricated assembled windowsill adjacent and above is by grouting
Sleeve fashion splices, first of the lower surface of described Part II prefabricated panel and the prefabricated assembled windowsill of adjacent lower section
The upper surface dividing prefabricated panel is spliced by grout sleeve mode.
Be suitable to the prefabricated assembled windowsill of people's Cargo Lift the most as claimed in claim 3, it is characterised in that described Part I is pre-
The upper surface of wallboard processed is embedded with for the lower end with the Part II prefabricated panel of prefabricated assembled windowsill adjacent and above
Face carries out the grout sleeve spliced, and the lower surface of described Part II prefabricated panel is provided with for being connected with described grout sleeve
Sleeve reserved steel bar.
Be suitable to the prefabricated assembled windowsill of people's Cargo Lift the most as claimed in claim 1, it is characterised in that described Part II is pre-
The left and right side of wallboard processed medial surface with the left and right portion of Part I prefabricated panel respectively is bolted.
Be suitable to the prefabricated assembled windowsill of people's Cargo Lift the most as claimed in claim 5, it is characterised in that described Part II is pre-
The left and right side of wallboard processed is respectively equipped with connection sheet, the medial surface in the left and right portion of Part I prefabricated panel be correspondingly provided with for
It is connected the bolted coupling nut of sheet with described.
Be suitable to the prefabricated assembled windowsill of people's Cargo Lift the most as claimed in claim 1, it is characterised in that described Part I is pre-
The two sides of wallboard processed are able to spell mutually with the two sides of the Part I prefabricated panel of adjacent prefabricated assembled windowsill
Connect.
8. the construction party of the prefabricated assembled windowsill being suitable to people's Cargo Lift as described in any one in claim 1-7
Method, it is characterised in that comprise the steps:
One, first, second is determined according to the prefabricated assembled windowsill size at the installation position of job site building hoist
The size of partial precast wallboard, after first, second partial precast wallboard is prefabricated, is transported to job site;
Two, according to weight and the floor floor height of Part II prefabricated panel, the construction clear height of suspension bracket and balancing weight are determined
Weight and number;
Three, assembled Part I prefabricated panel, meanwhile, also acts hanging in corresponding floor gap and put well standby by Part II prefabricated panel
With;
Four, until floor gap be no longer necessary to building hoist carry out operation time, construct suspension bracket at this floor gap on-site consolidation one;
Five, using construction suspension bracket to be risen by Part II prefabricated panel to hang in correspondence position and carry out assembly, stitching position is carried out accordingly
Connect, formed and there is the prefabricated assembled windowsill that described reserved window punches;
Six, after treating the construction of this floor, construction suspension bracket is disassembled into component, is carried to a floor and carries out the most prefabricated
The construction of assembling window platen, such bottom right supreme until all floors building hoist installation position at prefabrication and assembly construction
The construction of formula windowsill is complete.
Be suitable to the construction method of the prefabricated assembled windowsill of people's Cargo Lift the most as claimed in claim 8, it is characterised in that described
Construction suspension bracket includes being spliced to form loading frame, lower grillage and both sides grillage, described loading frame and lower grillage by channel-section steel respectively
Connected by described side plate frame respectively between the left and right sides, described lower grillage is arranged as required to balancing weight, described loading frame
Having the extension of the most described the most protruding certain distance of lower grillage, described extension is provided with a lifting machine
Structure, the lower section of described lower grillage is provided with roller.
Be suitable to the construction method of the prefabricated assembled windowsill of people's Cargo Lift the most as claimed in claim 9, it is characterised in that institute
State the step that stitching position connects accordingly to include: the lower surface of described Part II prefabricated panel is prefabricated with adjacent lower section
The upper surface of the Part I prefabricated panel of assembling window platen is spliced by grout sleeve mode, described Part II dry wall
The left and right side of plate medial surface with the left and right portion of Part I prefabricated panel respectively is bolted.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610518853.3A CN106050052B (en) | 2016-07-05 | 2016-07-05 | Prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610518853.3A CN106050052B (en) | 2016-07-05 | 2016-07-05 | Prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106050052A true CN106050052A (en) | 2016-10-26 |
CN106050052B CN106050052B (en) | 2019-01-15 |
Family
ID=57201745
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610518853.3A Active CN106050052B (en) | 2016-07-05 | 2016-07-05 | Prefabricated assembled windowsill and its construction method suitable for people's Cargo Lift |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106050052B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4419089B2 (en) * | 2005-07-04 | 2010-02-24 | 清水建設株式会社 | Seismic reinforcement structure for buildings |
CN201785894U (en) * | 2010-07-28 | 2011-04-06 | 沈阳万科房地产开发有限公司 | Prefabricated cast-in-place combined-type laminated shear wall |
EP2495374A1 (en) * | 2011-03-04 | 2012-09-05 | Lib Industries SAS | Construction with bearing walls and floors made from pre-fabricated concrete panels and production moulds |
US20140202114A1 (en) * | 2008-03-06 | 2014-07-24 | Stuart C. Segall | Relocatable Habitat Unit and Method of Assembly |
CN204940885U (en) * | 2015-09-16 | 2016-01-06 | 沈世春 | Partition wall fitting machine |
CN205858049U (en) * | 2016-07-05 | 2017-01-04 | 上海建工二建集团有限公司 | Be suitable to the prefabricated assembled windowsill of people's Cargo Lift |
-
2016
- 2016-07-05 CN CN201610518853.3A patent/CN106050052B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4419089B2 (en) * | 2005-07-04 | 2010-02-24 | 清水建設株式会社 | Seismic reinforcement structure for buildings |
US20140202114A1 (en) * | 2008-03-06 | 2014-07-24 | Stuart C. Segall | Relocatable Habitat Unit and Method of Assembly |
CN201785894U (en) * | 2010-07-28 | 2011-04-06 | 沈阳万科房地产开发有限公司 | Prefabricated cast-in-place combined-type laminated shear wall |
EP2495374A1 (en) * | 2011-03-04 | 2012-09-05 | Lib Industries SAS | Construction with bearing walls and floors made from pre-fabricated concrete panels and production moulds |
CN204940885U (en) * | 2015-09-16 | 2016-01-06 | 沈世春 | Partition wall fitting machine |
CN205858049U (en) * | 2016-07-05 | 2017-01-04 | 上海建工二建集团有限公司 | Be suitable to the prefabricated assembled windowsill of people's Cargo Lift |
Non-Patent Citations (2)
Title |
---|
吴忠义: "《砖瓦抹灰工应知应会》", 29 February 1984 * |
无间道: "地下室顶板上预留设备吊装孔", 《土木在线论坛》 * |
Also Published As
Publication number | Publication date |
---|---|
CN106050052B (en) | 2019-01-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201411900Y (en) | Hydraulic die lifter for chimneys | |
CN102913002B (en) | Integral steel structure prefabricated house and mounting method thereof | |
CN103195256A (en) | Hanging column type steel structure jig frame construction method | |
CN114232805B (en) | Construction method of ultrahigh-height large-span steel concrete beam hanging structure | |
CN101566005B (en) | Chimney hydraulic mould lifting device | |
CN115538792A (en) | Residential building machine installation construction method and structure | |
CN105442773A (en) | Technology and construction platform for installing and constructing inner plates of metal roof | |
CN205858049U (en) | Be suitable to the prefabricated assembled windowsill of people's Cargo Lift | |
CN110485557A (en) | A kind of steel construction elevator quick assembled type vestibule | |
CN205100082U (en) | Prefabricated assembly type steel reinforced concrete combination beam bridge | |
CN104790564A (en) | Assembly type concrete stairwell external wall structure and construction method thereof | |
CN103821375A (en) | Hanging boat auxiliary hung ceiling curtain wall installing method | |
CN202401753U (en) | Sliding die device | |
CN210659200U (en) | High-rise building elevator shaft operation platform | |
CN106050052A (en) | Prefabricated and assembled window board applicable to passenger and goods elevators and construction method thereof | |
CN111648555A (en) | Laminated precast concrete elevator shaft way | |
CN103482493A (en) | Internal climbing tower crane | |
CN216042835U (en) | Layer adding device with light wall board for raising frame structure | |
CN109736514A (en) | A kind of connecting structure and preparation method thereof of prefabricated daughter's wallboard | |
CN214217850U (en) | Assembled elevator well and elevator thereof | |
CN211143319U (en) | Building structure composed of beam column framework for multi-layer steel structure building | |
Gaidukov et al. | Technological aspects of lift-slab method in high-rise-building construction. | |
CN210827907U (en) | PCF local coincide inter-window wall structure | |
CN210152143U (en) | A connection structure for concrete cladding panel hoist and mount construction | |
CN205531262U (en) | Steel construction construction platform can rise automatically |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |