CN109168385A - A kind of high precipitous rock slope Ecosystem restoration system and implementation method - Google Patents

A kind of high precipitous rock slope Ecosystem restoration system and implementation method Download PDF

Info

Publication number
CN109168385A
CN109168385A CN201810874391.8A CN201810874391A CN109168385A CN 109168385 A CN109168385 A CN 109168385A CN 201810874391 A CN201810874391 A CN 201810874391A CN 109168385 A CN109168385 A CN 109168385A
Authority
CN
China
Prior art keywords
water
improve
soil moved
original
rock slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810874391.8A
Other languages
Chinese (zh)
Inventor
高育慧
周文君
田雪
王业春
张正蕊
任娜娜
李军娟
曾鹏飞
胡文强
朱喜礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Wenke Landscape Co Ltd
Original Assignee
Shenzhen Wenke Landscape Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Wenke Landscape Co Ltd filed Critical Shenzhen Wenke Landscape Co Ltd
Priority to CN201810874391.8A priority Critical patent/CN109168385A/en
Publication of CN109168385A publication Critical patent/CN109168385A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • A01B79/02Methods for working soil combined with other agricultural processing, e.g. fertilising, planting
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B13/00Irrigation ditches, i.e. gravity flow, open channel water distribution systems
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Soil Sciences (AREA)
  • Environmental Sciences (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The invention belongs to slope ecologicals to repair field, the system includes water storage type gutter, solar energy automatic irrigation system, protection against erosion soil moved in improve the original reconstructing system, water storage type gutter includes gutter, storage chamber and dmp filter grid, solar energy automatic irrigation system includes solar energy automatic control system, water pipe, water pump, and micro- profit pipe, protection against erosion soil moved in improve the original reconstructing system includes flexible ecological stick, U-shaped anchor pole, high-tensile steel wires protective net, soil moved in improve the original matrix, and plant species sublayer, the invention also includes the implementation methods of the system, pass through the implementation of the system, the soil moved in improve the original matrix structure of resistance to erosion can be established on rock side slope, it is constructed using the vegetation system of indigenous plant, in addition the automatic irrigation system of solar control, the ecological vegetation of high precipitous rock slope can effectively be rebuild, achieve the purpose that restoration of the ecosystem.

Description

A kind of high precipitous rock slope Ecosystem restoration system and implementation method
Technical field
The invention belongs to the restorations of the ecosystem that slope ecological repairs field more particularly to high precipitous rock slope.
Background technique
High precipitous rock slope refer to the gradient be greater than 60 °, highly be greater than 15m rock side slope, often come across mining, The engineering projects such as stone pit, water conservancy and hydropower.Soil primary condition of the high precipitous rock slope due to lacking plant growth, so solving Soil moved in improve the original attachment issue is the key point of its restoration of the ecosystem, mainly includes building planting trough, sash beam and linked network in existing technology Alien earth sparging three categories type, the development trend of present mainstream are, the constructions simple with structure using linked network Seed spraying technology Convenient, the at low cost, advantages such as ecological recovery effect is good, but linked network Seed spraying technology is applied to still have when high gradient slope Problem is mainly reflected in soil moved in improve the original matrix and is easy to fall off, pours maintenance problem, this all seriously limits the popularization and use of the technology. The final purpose of restoration of the ecosystem is the natural deduction of realization side slope vegetation, and the selection of plant is just particularly important, and current High gradient slope restoration of the ecosystem rests on again the green stage mostly, and plant variety is single, and vegetation is easy to degenerate, and there is artificial long-term essence The phenomenon that thin maintenance, the big phase front yard diameter of original intention with restoration of the ecosystem.
Summary of the invention
The object of the present invention is to provide a kind of high precipitous rock slope Ecosystem restoration system and implementation methods, it is intended to solve existing The deficiency of technology, make linked network Seed spraying technology it is simpler, conveniently and effectively be applied to high precipitous rock slope restoration of the ecosystem, It solves the problems, such as how quickly to form the less natural deduction vegetation of human intervention simultaneously.
To achieve the goals above, the present invention provides a kind of high precipitous rock slope Ecosystem restoration system, which is characterized in that should System includes water storage type gutter, solar energy automatic irrigation system, protection against erosion soil moved in improve the original reconstructing system;Water storage type gutter includes row Ditch, storage chamber and dmp filter grid;Solar energy automatic irrigation system includes solar energy automatic control system, water pipe, water Pump and micro- profit pipe;Protection against erosion soil moved in improve the original reconstructing system includes flexible ecological stick, J-type anchor pole, high-tensile steel wires protective net, soil moved in improve the original Matrix and plant species sublayer.
Preferably, the water storage type gutter is located at side slope riding track platform, and the storage chamber is solar energy automatic-watering system The water source of system.
Preferably, the water pipe is connect with storage chamber, water pump and micro- profit pipe, the solar energy automatic control system and water pump Connection, and opening or closing for water pump is controlled according to the water level conditions of weather and storage chamber.
Preferably, micro- profit pipe is installed in the center cavity of flexible ecological stick, and micro- profit pipe is in certain pressure item Under part, moisture is by being distributed in the nanometer level microporous carry out water-seepage type pouring of tube wall.
Preferably, the flexible ecological stick is hollow cylindrical body, and cylindrical body is made of water penetration host material, ecological rod Diameter be 8-10cm, single length be 1.5-2m.
Preferably, the flexible ecological stick complies with palisades tendency, is close to palisades installation, and be fixed by J-type anchor pole, The spacing of vertical direction two rows ecological rod is 10-15cm.
Preferably, the gap of two rows of flexible ecological sticks is filled by soil moved in improve the original matrix, soil moved in improve the original stromal thickness and flexible ecological stick Diameter is identical.
Preferably, the high-tensile steel wires protective net is located on the outside of flexible ecological stick, for compressing flexible ecological stick and preventing Soil moved in improve the original matrix is protected, and is fixed by J-type anchor pole.
Preferably, the plant species sublayer is located at most surface layer, is made of indigenous plant seed, nutrient matrix, binder etc..
The implementation method of foregoing high precipitous rock slope Ecosystem restoration system, its step are as follows: (1) building water storage type Gutter: first clearing up riding track platform, and molding simultaneously pours riding track gutter, storage chamber and riding track barricade, and reserved water pipe Then channel carries out water-proofing treatment to storage chamber, finally install riding track cover board;(2) solar energy automatic irrigation system is installed: first will Water pipe accesses storage chamber, and fixed solar energy automatic control system is connected in riding track edge, and with water pump, water pipe water outlet with it is micro- Moisten pipe connection;(3) protection against erosion soil moved in improve the original reconstructing system: side slope is cleared up first, removes danger stone, is then bored with inflation drilling row Hole then carries out the installation of flexible ecological stick, and using the fixed flexible ecological stick of the J-type anchor pole of φ 8mm reinforcement fabrication, it is long that anchor pole enters rock 10cm is spent, micro- profit pipe is passed through out of flexible ecological stick cavity, the laying of high-tensile steel wires protective net is then carried out, using φ 16mm steel The J-type anchor pole of muscle production is fixed, and anchor pole enters rock length 40cm, is finally carried out soil moved in improve the original matrix and is sowed grass seeds by duster;(4) plant species sublayer is sowed grass seeds by duster, Plant species sublayer is made of indigenous plant seed, nutrient matrix, binder, thickness about 0.5-1cm.
Preferably, the soil moved in improve the original matrix is by loam, high polymer binder, foaming agent, plant fiber, bentonite, nitrogenous fertilizer, calcium The substances such as magnesium-phosphorus fertilizer and water mix in proportion.
Preferably, the indigenous plant seed includes Egyptian grass, Paspalum distichum, Raphiolepis indica, the fruit of a cubeb litsea tree, hill gooseberry etc., with And precipice ginger spore, it is mixed in proportion using sowing combination.
Effect of the invention is: high precipitous rock slope Ecosystem restoration system provided by the invention and implementation method, can not only Enough soil moved in improve the original matrix structures that resistance to erosion is established on rock side slope, solve the most basic difficulty of high precipitous rock slope restoration of the ecosystem Topic;On the other hand, the electricity production situation of solar panels and weather conditions are positively correlated, and are also positively correlated with the water requirement of vegetation, therefrom The solar energy intelligent irrigation system of foundation, in addition the cycling and reutilization for the side slope rainwater that water storage type gutter is collected, simple and convenient Ground solves the maintenance problem at revegetation initial stage, not only ecological but also energy saving without carrying out additional power supply for irrigation system.Separately Outside, the present invention establishes vegetational type using the combination of pure indigenous plant, with group's collocation mould of sowing collocation, resistance to shade and the raw collocation of sun Formula, that takes into account flowering plant intersperses effect, is capable of forming the group of natural deduction, achievees the purpose that restoration of the ecosystem.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is schematic diagram of the invention;Fig. 2 is edge slope structure partial enlarged view of the invention
In figure: 1, riding track gutter;2, storage chamber;3, solar energy automatic control system;4, water pump;5, water pipe;6, micro- profit Pipe;7, flexible ecological stick;8, J-type anchor pole;9, soil moved in improve the original matrix;10, high-tensile steel wires protective net;11, plant species sublayer;12, rain Water filtering grid;13, riding track cover board;
Specific embodiment
With reference to the accompanying drawings and examples, the present invention is further explained.
Embodiment 1
As depicted in figs. 1 and 2, the present invention provides a kind of high precipitous rock slope Ecosystem restoration system, which includes water storage Type gutter, solar energy automatic irrigation system, protection against erosion soil moved in improve the original reconstructing system.Water storage type gutter is located at side slope riding track platform, It is formed including side slope riding track gutter 1 and storage chamber 2, storage chamber 2 is also the water source of solar energy automatic irrigation system, riding track row Dmp filter grid 12 is additionally provided between ditch 1 and storage chamber 2.Solar energy automatic irrigation system includes that solar energy automatically controls system System 3, water pipe 5, water pump 4 and micro- profit pipe 6.Water pipe 5 is connect with storage chamber 2, water pump 4 and micro- profit pipe 6, and solar energy automatically controls System 3 is connect with water pump 4, and solar energy automatic control system 3 will start water when sun-drenched weather electric energy supplements sufficient Pump 4, to run pouring program, when power consumption will switch off the pump 4 operation, certainly, the unlatching of water pump 4 to a certain extent Whether the preceding water level that can also detect storage chamber 2 is suitable for that less in rainy weather solar panels electric energy supplement, water pump 4 will be always In halted state.Micro- profit pipe 6 is installed in the center cavity of flexible ecological stick 7, and micro- profit pipe 6 is under the conditions of certain pressure, water Divide the nanometer level microporous carry out water-seepage type pouring by being distributed in tube wall.Protection against erosion soil moved in improve the original reconstructing system include flexible ecological stick 7, J-type anchor pole 8, high-tensile steel wires protective net 10, soil moved in improve the original matrix 9 and plant species sublayer 11.Flexible ecological stick 7 is hollow circle Cylinder, cylindrical body are made of water penetration host material, and the diameter of flexible ecological stick 7 is 8-10cm, single length about 1.5-2m.It is soft Property ecological rod comply with palisades tendency, be close to palisades installation, and be fixed by J-type anchor pole 8, vertical direction two rows flexible ecological The spacing of stick 7 is 10-15cm.It is filled by soil moved in improve the original matrix 9 in the gap of two rows of flexible ecological sticks 7.High-tensile steel wires protective net is located at 7 outside of flexible ecological stick, for compressing flexible ecological stick 7 and protection soil moved in improve the original matrix 9, and logical J-type anchor pole 8 is fixed.Plant Seed layer 11 is located at most surface layer, is made of indigenous plant seed, nutrient matrix, binder etc..
Embodiment 2
The implementation method of the high precipitous rock slope Ecosystem restoration system, its step are as follows: (1) building water storage type draining Ditch: first clearing up riding track platform, and molding simultaneously pours riding track gutter 1, storage chamber 2 and riding track barricade, and reserved water pipe 5 is logical Then road carries out water-proofing treatment to storage chamber 2, finally install riding track cover board 13;(2) solar energy automatic irrigation system is installed: first Water pipe 5 is accessed into storage chamber 2, fixed solar energy automatic control system 3 is connected in riding track edge, and with water pump 4, and water pipe 5 goes out Water end (W.E.) is connect with micro- profit pipe 6;(3) protection against erosion soil moved in improve the original reconstructing system: side slope is cleared up first, danger stone is removed, then with filling Pneumatic drill drills, and then carries out flexible ecological stick 7 and installs, using the fixed flexible ecological of the J-type anchor pole 8 of φ 8mm reinforcement fabrication Stick, anchor pole enter rock depth about 10cm, and micro- profit pipe 6 is passed through out of flexible ecological stick 7 cavity, then carry out high-tensile steel wires protective net 10 are laid with, and are fixed using the J-type anchor pole of φ 16mm reinforcement fabrication, and anchor pole enters rock depth about 40cm, finally carry out soil moved in improve the original matrix 9 and spray It broadcasts;(4) plant species sublayer is sowed grass seeds by duster, and plant species sublayer 11 is made of indigenous plant seed, nutrient matrix, binder, and thickness is about 0.5-1cm.Soil moved in improve the original matrix by loam, high polymer binder, foaming agent, plant fiber, bentonite, nitrogenous fertilizer, calcium magnesium phosphate and The material mixings such as water form, the mass percent meter of dosage be respectively loam 45%, water 45%, high polymer binder 0.2%, Foaming agent 0.1%, plant fiber 6%, bentonite 1%, calcium magnesium phosphate 0.5%, nitrogenous fertilizer 0.2%.Indigenous plant seed includes dragon Pawl thatch, Paspalum distichum, Raphiolepis indica, the fruit of a cubeb litsea tree, hill gooseberry etc. and precipice ginger spore, are formed using sowing combined hybrid, and seed is used Amount is Egyptian grass 0.5g/m2, Paspalum distichum 1g/m2, Raphiolepis indica 5g/m2, fruit of a cubeb litsea tree 5g/m2, hill gooseberry 5g/m2, precipice ginger spore 0.1g/m2
Certainly, the present invention can also have other various embodiments, without deviating from the spirit and substance of the present invention, ripe It knows those skilled in the art and makes various corresponding changes and modifications, but these corresponding changes and change in accordance with the present invention Shape all should fall within the scope of protection of the appended claims of the present invention.

Claims (12)

1. a kind of high precipitous rock slope Ecosystem restoration system, which is characterized in that the system include water storage type gutter, solar energy from Dynamic irrigation system, protection against erosion soil moved in improve the original reconstructing system;Water storage type gutter includes gutter, storage chamber and dmp filter grid;Too Positive energy automatic irrigation system includes solar energy automatic control system, water pipe, water pump and micro- profit pipe;Protection against erosion soil moved in improve the original rebuilds system System includes flexible ecological stick, J-type anchor pole, high-tensile steel wires protective net, soil moved in improve the original matrix and plant species sublayer.
2. high precipitous rock slope Ecosystem restoration system according to claim 1, which is characterized in that the water storage type gutter Positioned at side slope riding track platform, the storage chamber is the water source of solar energy automatic irrigation system.
3. high precipitous rock slope Ecosystem restoration system according to claim 1, which is characterized in that the water pipe and water storage Chamber, water pump and the connection of micro- profit pipe, the solar energy automatic control system are connect with water pump, and according to weather and the water level of storage chamber Situation control water pump opens or closes.
4. high precipitous rock slope Ecosystem restoration system according to claim 1, which is characterized in that micro- profit pipe is installed on In the center cavity of flexible ecological stick, nanoscale infiltration micropore is distributed in micro- profit tube wall.
5. high precipitous rock slope Ecosystem restoration system according to claim 1, which is characterized in that the flexible ecological stick is Hollow cylindrical body, cylindrical body are made of water penetration host material, and the diameter of flexible ecological stick is 8-10cm.
6. high precipitous rock slope Ecosystem restoration system according to claim 1, which is characterized in that the flexible ecological stick is suitable Palisades tendency is answered, is close to palisades installation, and be fixed by J-type anchor pole, the spacing of vertical direction two rows ecological rod is 10- 15cm。
7. high precipitous rock slope Ecosystem restoration system according to claim 1, which is characterized in that two rows of flexible ecological sticks Gap is filled by soil moved in improve the original matrix, and soil moved in improve the original stromal thickness is identical as the diameter of flexible ecological stick.
8. high precipitous rock slope Ecosystem restoration system according to claim 1, which is characterized in that the high-tensile steel wires are anti- Protective net is located on the outside of flexible ecological stick, for compressing flexible ecological stick and protection soil moved in improve the original matrix, and is consolidated by J-type anchor pole It is fixed.
9. high precipitous rock slope Ecosystem restoration system according to claim 1, which is characterized in that plant species sublayer position In most surface layer, thickness about 0.5-1cm is made of indigenous plant seed, nutrient matrix, binder etc..
10. the implementation method of high precipitous rock slope Ecosystem restoration system as described in claim 1, its step are as follows: (1) building Water storage type gutter: first clearing up riding track platform, and molding simultaneously pours riding track gutter, storage chamber and riding track barricade, and pre- Water pipe channel is stayed, water-proofing treatment then is carried out to storage chamber, riding track cover board is finally installed;(2) solar energy automatic irrigation system is pacified Dress: first accessing storage chamber for water pipe, and fixed solar energy automatic control system is connected in riding track edge, and with water pump, and water pipe goes out Water end (W.E.) is connect with micro- profit pipe;(3) protection against erosion soil moved in improve the original reconstructing system: side slope is cleared up first, removes danger stone, then with inflation Drilling row drilling, then carries out the installation of flexible ecological stick, using the fixed flexible ecological stick of the J-type anchor pole of φ 8mm reinforcement fabrication, anchor Bar enters rock length 10cm, and micro- profit pipe is passed through out of flexible ecological stick cavity, then carries out the laying of high-tensile steel wires protective net, uses The J-type anchor pole of φ 16mm reinforcement fabrication is fixed, and anchor pole enters rock length 40cm, is finally carried out soil moved in improve the original matrix and is sowed grass seeds by duster;(4) vegetable seeds Layer is sowed grass seeds by duster, and plant species sublayer is made of indigenous plant seed, nutrient matrix, binder, thickness about 0.5-1cm.
11. the implementation method of high precipitous rock slope Ecosystem restoration system according to claim 10, which is characterized in that described Soil moved in improve the original matrix is by substances such as loam, high polymer binder, foaming agent, plant fiber, bentonite, nitrogenous fertilizer, calcium magnesium phosphate and water It mixes.
12. the implementation method of high precipitous rock slope Ecosystem restoration system according to claim 10, which is characterized in that described Indigenous plant seed includes Egyptian grass, Paspalum distichum, Raphiolepis indica, the fruit of a cubeb litsea tree, hill gooseberry etc. and precipice ginger spore, using sowing Combined hybrid forms.
CN201810874391.8A 2018-08-03 2018-08-03 A kind of high precipitous rock slope Ecosystem restoration system and implementation method Pending CN109168385A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810874391.8A CN109168385A (en) 2018-08-03 2018-08-03 A kind of high precipitous rock slope Ecosystem restoration system and implementation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810874391.8A CN109168385A (en) 2018-08-03 2018-08-03 A kind of high precipitous rock slope Ecosystem restoration system and implementation method

Publications (1)

Publication Number Publication Date
CN109168385A true CN109168385A (en) 2019-01-11

Family

ID=64919958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810874391.8A Pending CN109168385A (en) 2018-08-03 2018-08-03 A kind of high precipitous rock slope Ecosystem restoration system and implementation method

Country Status (1)

Country Link
CN (1) CN109168385A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952576A (en) * 2019-12-20 2020-04-03 大连交通大学 Ecological blanket structure for ecological slope protection and construction method thereof
CN110952575A (en) * 2019-12-20 2020-04-03 大连交通大学 Combined supporting system for ecological slope protection and construction method thereof
CN111972225A (en) * 2020-09-03 2020-11-24 兰州交通大学 Novel soil layer structure slope greening system and construction method thereof
CN113089695A (en) * 2021-05-08 2021-07-09 中国科学院西北生态环境资源研究院 Landslide body side slope ecological restoration structure and method
CN113186945A (en) * 2021-04-25 2021-07-30 三峡大学 Intelligent maintenance system and method for ecological slope protection
CN114531992A (en) * 2022-02-21 2022-05-27 内蒙古太伟生态科技有限公司 Reclamation method for preventing and controlling water and soil loss of side slope of waste dump

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818499A (en) * 2010-03-05 2010-09-01 深圳市如茵生态环境建设有限公司 Revegetation system on steep rocky slopes and implementing method thereof
CN101974911A (en) * 2010-09-17 2011-02-16 北京矿冶研究总院 Ecological restoration method for side slope of acid waste rock yard
CN202153909U (en) * 2011-07-13 2012-03-07 田昕 Solar photovoltaic water-lift self-pressure micro-irrigation system
JP2014095281A (en) * 2012-10-10 2014-05-22 Sanyo Road Industries Frame for solar panel and installation method therefor
CN204860408U (en) * 2015-07-30 2015-12-16 新疆农业科学院土壤肥料与农业节水研究所 Utilize micro - irrigation equipment of solar drive
CN208965501U (en) * 2018-08-03 2019-06-11 深圳文科园林股份有限公司 One kind being used for high precipitous rock slope Ecosystem restoration system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818499A (en) * 2010-03-05 2010-09-01 深圳市如茵生态环境建设有限公司 Revegetation system on steep rocky slopes and implementing method thereof
CN101974911A (en) * 2010-09-17 2011-02-16 北京矿冶研究总院 Ecological restoration method for side slope of acid waste rock yard
CN202153909U (en) * 2011-07-13 2012-03-07 田昕 Solar photovoltaic water-lift self-pressure micro-irrigation system
JP2014095281A (en) * 2012-10-10 2014-05-22 Sanyo Road Industries Frame for solar panel and installation method therefor
CN204860408U (en) * 2015-07-30 2015-12-16 新疆农业科学院土壤肥料与农业节水研究所 Utilize micro - irrigation equipment of solar drive
CN208965501U (en) * 2018-08-03 2019-06-11 深圳文科园林股份有限公司 One kind being used for high precipitous rock slope Ecosystem restoration system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952576A (en) * 2019-12-20 2020-04-03 大连交通大学 Ecological blanket structure for ecological slope protection and construction method thereof
CN110952575A (en) * 2019-12-20 2020-04-03 大连交通大学 Combined supporting system for ecological slope protection and construction method thereof
CN111972225A (en) * 2020-09-03 2020-11-24 兰州交通大学 Novel soil layer structure slope greening system and construction method thereof
CN113186945A (en) * 2021-04-25 2021-07-30 三峡大学 Intelligent maintenance system and method for ecological slope protection
CN113089695A (en) * 2021-05-08 2021-07-09 中国科学院西北生态环境资源研究院 Landslide body side slope ecological restoration structure and method
CN113089695B (en) * 2021-05-08 2022-04-15 中国科学院西北生态环境资源研究院 Landslide body side slope ecological restoration structure and method
CN114531992A (en) * 2022-02-21 2022-05-27 内蒙古太伟生态科技有限公司 Reclamation method for preventing and controlling water and soil loss of side slope of waste dump

Similar Documents

Publication Publication Date Title
CN109168385A (en) A kind of high precipitous rock slope Ecosystem restoration system and implementation method
CN104314087B (en) A kind of side-slope greening and protection structure and construction method thereof
CN106900342B (en) Integrated semi-lithologic high slope vegetation reconstruction protection method
CN105961120B (en) One kind being suitable for arid biogeographic zone ecological restoration of mine side slope vegetation quick recovery method
CN105230323B (en) A kind of growth-promoting binary stereoscopic configurations pattern against corrosion suitable for feldspathic sandstone small watershed
CN103583172B (en) A kind of arid arid area pattern of farming and implantation methods thereof
CN100562630C (en) Structural water resource recovery method
CN107989050B (en) A kind of device and construction method feeding moisture nutriment for rock side slope greening vegetation and circulation
CN106900322A (en) The engineering wound-surface Ecological recovery technology of moss crust
CN101748719A (en) Method of vegetation restoration and reconstruction of bare rock slope in East China
CN101818499A (en) Revegetation system on steep rocky slopes and implementing method thereof
CN110249813B (en) Method for greening high and steep rocky slope in mining pit
CN103141176A (en) Method for improving saline soil in excavated grooves of border trees in coastal region
CN108093729A (en) Side-slope greening and protection method
CN107711461A (en) Arid area arbor integration irrigation system
CN109594567A (en) A kind of shotcrete protection rock slope ecological safeguard structure arrangement and its method
CN206547425U (en) A kind of side slope plants raw slot structure from seeping water
CN111919629A (en) A plant living system for side slope ecological remediation
CN205669185U (en) A kind of hydraulic engineering ecological protection slope
CN207461064U (en) Arid area arbor integration irrigation system
CN111887067B (en) Method for ecological restoration of artificial vegetation on high and steep rock slope
CN207392215U (en) A kind of rock side slope ecological afforestation slope protection device
CN208965501U (en) One kind being used for high precipitous rock slope Ecosystem restoration system
CN106192873A (en) Island Wetland ecological water-retaining method
CN207944417U (en) A kind of ecological bank protection structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190111

WD01 Invention patent application deemed withdrawn after publication