CN109162451A - A kind of template positioning tool for steel poured and method of cornicing for exterior wall concrete - Google Patents
A kind of template positioning tool for steel poured and method of cornicing for exterior wall concrete Download PDFInfo
- Publication number
- CN109162451A CN109162451A CN201811320481.9A CN201811320481A CN109162451A CN 109162451 A CN109162451 A CN 109162451A CN 201811320481 A CN201811320481 A CN 201811320481A CN 109162451 A CN109162451 A CN 109162451A
- Authority
- CN
- China
- Prior art keywords
- template
- support frame
- cornice
- exterior wall
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 41
- 238000000034 method Methods 0.000 title claims abstract description 15
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 8
- 239000010959 steel Substances 0.000 title claims abstract description 8
- 238000010276 construction Methods 0.000 claims abstract description 15
- 238000009434 installation Methods 0.000 claims abstract description 7
- 230000002787 reinforcement Effects 0.000 claims abstract description 7
- 238000005266 casting Methods 0.000 claims abstract description 5
- 238000004519 manufacturing process Methods 0.000 claims abstract description 5
- 239000000463 material Substances 0.000 claims description 5
- 239000004575 stone Substances 0.000 claims description 4
- 239000011248 coating agent Substances 0.000 claims description 3
- 238000000576 coating method Methods 0.000 claims description 3
- 239000011440 grout Substances 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 claims description 3
- 239000002985 plastic film Substances 0.000 claims description 3
- 229920006255 plastic film Polymers 0.000 claims description 3
- 239000013464 silicone adhesive Substances 0.000 claims description 3
- 239000002002 slurry Substances 0.000 claims description 3
- 239000002689 soil Substances 0.000 claims description 3
- 238000005507 spraying Methods 0.000 claims description 3
- 239000004568 cement Substances 0.000 claims description 2
- 230000015271 coagulation Effects 0.000 claims description 2
- 238000005345 coagulation Methods 0.000 claims description 2
- 239000000203 mixture Substances 0.000 claims description 2
- 238000000465 moulding Methods 0.000 abstract description 5
- 230000003014 reinforcing effect Effects 0.000 abstract description 5
- 238000009415 formwork Methods 0.000 abstract description 3
- 238000011065 in-situ storage Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000005034 decoration Methods 0.000 description 2
- 230000008447 perception Effects 0.000 description 2
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 239000011324 bead Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 238000009510 drug design Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 230000009545 invasion Effects 0.000 description 1
- 238000010297 mechanical methods and process Methods 0.000 description 1
- 230000005226 mechanical processes and functions Effects 0.000 description 1
- 230000000116 mitigating effect Effects 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/06—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a kind of cornice for the exterior wall concrete template positioning tool for steel poured and methods, pass through the production, installation and reinforcing of shaper, it is ensured that the component for pouring forming is no longer plastered, and the duration is saved, and reduces cost, guarantees construction quality.The tool includes the support frame for casting concrete molding cornice template and cornice template lower part;The cornice template is the long template that cross section is L-type, is divided into plate and vertical plate, and the cornice template and support frame are installed together by the dovetail screw;Every piece of cornice template corresponds to multiple support frames;Support frame as described above is installed on exterior wall by expansion bolt;The riser height of the cornice template is consistent with the upper vertical section height of support frame;The sheet width of the cornice template is greater than the horizontal section length of support frame as described above.The use of this tool simplifies cast-in-situ concrete member formwork reinforcement process, is simple and efficient, and has good application value.
Description
Technical field
The present invention a kind of cornice for the exterior wall concrete template positioning tool for steel poured and method, belong to architectural engineering technology
Field.
Background technique
Exterior wall concrete, which cornices, to be referred to the molding band-like cast-in-place moulding of concreting, is built to separate with decoration
Object is built, is corniced as nonload bearing element, it is desirable that the straight beautiful, height of lines unanimously, plays the effect of decoration.Normal practice is
Outer-wall building is constructed simultaneously, is limited by outer wall operation space and technical requirements, often because levelness of cornicing is poor, surface perception matter
Amount cannot meet the requirements need to carry out it is secondary pick chisel repairing and plastering.
When doing clear-water concrete and cornicing, straightness, levelness, surface perception and pollution are all important the standard of considering,
However there are following problems in practice of construction: 1, different finishing way handover position ways are different, and there are process handover difficulties;2,
It acquires a certain degree of difficulty in actual mechanical process to the levelness control of concrete eaves;3, concrete eaves is located on the outside of exterior wall, away from ground
Height 3m-6m is differed, and there are certain difficulties for the formwork that cornices reinforcing;4, it exterior wall Splitting Tile and stone material construction period, is easily destroyed mixed
The corner angle of solidifying soil eaves, it is unfavorable to the finished product protection of eaves out.
Summary of the invention
To solve the shortcomings of the prior art, the invention discloses a kind of templates corniced and poured for exterior wall concrete
Positioning tool and method pass through the production, installation and reinforcing of shaper, it is ensured that and the component for pouring forming is no longer plastered,
The duration is saved, cost is reduced, guarantees construction quality.
The invention is realized by the following technical scheme:
A kind of positioning tool poured that cornices for exterior wall concrete, including for the molding cornice template of casting concrete and set
It is placed in the support frame of the cornice template lower part;
The cornice template is the long template that cross section is L-type, is divided into plate and vertical plate, is arranged on the plate and vertical plate edge
There are multiple first mounting holes;
Support frame as described above includes upper vertical section, lower vertical section, horizontal segment and angle brace between upper vertical section and lower vertical section,
Angle brace is set between the horizontal segment and lower vertical section, fixation hole, the upper vertical section and water are provided in the lower vertical section
The second mounting hole is provided in flat section, second mounting hole matches with the first mounting hole size and location, first peace
It fills and dovetail screw is set in hole and the second mounting hole;The cornice template and support frame are mounted on one by the dovetail screw
It rises;Every piece of cornice template corresponds to multiple support frames;
Support frame as described above is installed on exterior wall by the expansion bolt being arranged in fixation hole;
The riser height of the cornice template and the upper vertical section height of support frame are consistent;
The width of the plate of the cornice template is greater than the length of the horizontal segment of support frame as described above.
Further, the angle phase between the angle between the plate and vertical plate and the upper vertical section and horizontal segment
Together.
Further, the plate and vertical plate are orthogonal.
Further, the cornice template is arranged fluted on one side, and another side is provided with convex block, the convex block and groove type
The matching of shape size.
Further, the cornice template is glued board.
Further, the cornice template is divided into upper layer and lower layer, and upper layer is flexible board, lower layer spliced by muti-piece rigid plate and
At fixation is bonded between lower layer's rigid plate and upper layer flexible board, and the length of the rigid plate is greater than two neighboring support frame
Spacing.
It is corniced the method that the positioning tool poured positioned, including following step using described for exterior wall concrete
It is rapid:
Step 1, production exterior wall cornice positioning tool;
Step 2, the first construction of progress exterior wall Splitting Tile or stone material, when construction, reserve position of cornicing, to reserving before construction
Cornice position carry out dabbing processing, after the completion of picking chisel, clear up chisel face is picked, guarantee the clean non-loosening coagulation of joint part
Soil;
Step 3 after the completion of outer wall surface, first carries out bar planting operation, is implanted into longitudinal reinforcement and transverse steel;
Step 4, after the completion of bar planting with reserve the position installation support frame that cornices, support frame is by installing expanding screw in fixation hole
Bolt is fixed on metope, and the lower plane for reserving position of cornicing is concordant with the horizontal segment of support frame as described above;
Step 5, installs cornice template on the support frame, described to choose template and fixed using dovetail screw with template, chooses template and is placed in
On the inside of bracket and top, is fixed from outside and lower section, and vertical section height is consistent on the vertical plate and support frame of cornice template, is chosen
The wide support frame horizontal segment out of the plate of eaves template, is protruded within the walls;
Step 6 prevents from pouring first with plastic film to covering protection is carried out within the scope of 1m above and below position of cornicing before concreting
Concrete grout pollutes metope during building, and is then cleared up joint part and is brushed and mix glairin cement slurry, using small hand-held
Vibration board vibrates, it is ensured that concreting is closely knit and upper surface is substantially smooth, concrete eaves upper surface placing and troweling light;
Step 7, concreting are completed, and after maintenance reaches design concrete strength, are removed, torn open to positioning tool
Except when first remove the dovetail screw of fixed cornice template, then remove the expansion bolt of fixing support rack, finally remove and cornice
Template;
Step 8 after form removable, carries out jointing to gap up and down of cornicing with silicone adhesive, the coating that cornices is carried out after the completion of jointing
Spraying to get.
Compared with the prior art, the invention has the following beneficial effects:
The present invention has rational design, and the use of the tool simplifies cast-in-situ concrete member formwork reinforcement process, is simple and efficient, has
Good application value.
The tool 1) it makes simply, it is at low cost.Use light, the appropriate labor intensity for mitigating worker;
2) effectively solve the problems, such as that exterior wall alien invasion reinforces difficulty;
3) the outer levelness corniced and straightness are effectively controlled using shaping tool;
4) disassembly is simple, and labor efficiency is high.
5) rubbish waste product is few, energy conservation and environmental protection.
Detailed description of the invention
Following further describes the present invention with reference to the drawings.
Fig. 1 is schematic structural view of the invention;
Fig. 2 is support frame structure diagram;
Fig. 3 is 2 cornice template schematic diagram of embodiment;
Fig. 4 is cornice the schematic diagram poured using structure of the invention;
Fig. 5 is 1 cornice template schematic diagram of embodiment.
In figure, 1 it is cornice template, 2 is support frame, 3 is plate, 4 is vertical plate, 6 is upper vertical section, 7 is lower vertical section, 8
It is angle brace for horizontal segment, 9,10 be fixation hole, 11 be the second mounting hole, 12 be dovetail screw, 13 be expansion bolt, 14 is flexible
Material plate, 15 be rigid plate, 16 to cornice, 17 be metope, 18 be gap, 19 be reinforcing bar, 20 for position of cornicing, 21 be groove,
22 be convex block.
Specific embodiment
The present invention is described in further detail combined with specific embodiments below, but protection scope of the present invention is not
Be limited to these embodiments, it is all without departing substantially from the change of present inventive concept or equivalent substitute be included in protection scope of the present invention it
It is interior.
As shown in Figs. 1-5,
Embodiment 1
A kind of positioning tool poured that cornices for exterior wall concrete, including it is used for molding 1 He of cornice template of casting concrete
It is set to the support frame 2 of the cornice template lower part;
The cornice template 1 is the long template that cross section is L-type, is divided into plate 3 and vertical plate 4,4 edge of the plate 3 and vertical plate
On be provided with multiple first mounting holes;
Support frame as described above includes upper vertical section 6, lower vertical section 7, the horizontal segment 8 between upper vertical section and lower vertical section and angle
Angle brace 9 is arranged in support 9 between the horizontal segment and lower vertical section, fixation hole 10 is provided in the lower vertical section, described vertical
It is provided with the second mounting hole 11 on section and horizontal segment, second mounting hole 11 matches with the first mounting hole size and location,
Dovetail screw 12 is set in first mounting hole and the second mounting hole;The cornice template and support frame pass through the dovetail spiral shell
Silk is installed together;The corresponding multiple support frames 2 of every piece of cornice template 1;
Support frame as described above 2 is installed on exterior wall by the expansion bolt 13 being arranged in fixation hole;
3 height of vertical plate of the cornice template 1 is consistent with 6 height of upper vertical section of support frame;
The width of the plate of the cornice template 1 is greater than the length of the horizontal segment of support frame as described above.
Further, the angle phase between the angle between the plate and vertical plate and the upper vertical section and horizontal segment
Together.
Further, the plate and vertical plate are orthogonal.
Further, as shown in figure 5, the cornice template is arranged fluted 21 on one side, another side is provided with convex block 22, institute
Convex block and the matching of groove shapes size are stated, the convex block of one piece of cornice template is embedded in the recessed of another piece of cornice template in actual use
In slot, muti-piece cornice template is assembled using this method, is dismantled after being finished, all very convenient, institute is transported and save
It states convex block and groove shapes size matches so that muti-piece cornice template overlap joint closely, will not generate overlapping the slot, guarantee that finished product cornices
Quality.
Further, the cornice template is glued board.
During practice of construction, it is welded into support frame using 30mm × 30mm angle bar, lower end vertical portion is by expansion bolt
It is fixed on metope, inside installs the vertical plate and plate of cornice template, guarantees construction precision and easy to operate.Concreting finishes
Cornice template and branch stake tool are removed afterwards.
Embodiment 2
As shown in figure 3,
Cornice template does not use the structure of convex block and groove plug-in type in positioning tool described in embodiment 1, and uses one
Formula structure, the integral type cornice template structure are divided into upper layer and lower layer, and upper layer is flexible board 14, and lower layer is spelled by muti-piece rigid plate 15
It connects, fixation is bonded between lower layer's rigid plate and upper layer flexible board, and the length of the rigid plate is greater than two neighboring branch
The spacing of support, cornice template is unfolded in actual use, is set up on support frame, and peace in the first mounting hole for passing through edge
Dress dovetail screw fixes the two;Upper layer flexible board is integral type plate, when not used can fold cornice template, flexible when use
Plate can make finished product surface of cornicing smooth consistent again, will not generate overlapping the slot, guarantee pouring quality.
Embodiment of the method
It is corniced the method that the positioning tool poured positioned using described for exterior wall concrete, comprising the following steps:
Step 1, production exterior wall cornice positioning tool, are welded into support frame, weld bead height using 30mm × 30mm galvanized angle iron
6mm, when welding, each connecting portion angle was 90 degree;The cornice template selects 12mm thickness glued board
Step 2, the first construction of progress 17 Splitting Tile of exterior wall or stone material, when construction, reserves position 20 of cornicing, to pre- before construction
The position 20 of cornicing reserved carries out dabbing processing, after the completion of picking chisel, clears up chisel face is picked, guarantees the clean non-loosening of joint part
Concrete.
Step 3 after the completion of outer wall surface, first carries out bar planting operation, is implanted into longitudinal reinforcement and transverse steel;Longitudinal reinforcement
Former concrete is implanted into using 8@300mm of Φ and is no less than 80mm;Reinforcing bar is upper layer and lower layer, thickness of protection tier 20mm, lateral steel
Muscle is bound using 6@100mm of Φ and longitudinal reinforcement overlap joint.
Step 4 is reserving the installation of position 16 support frame that cornices after the completion of bar planting, and support frame passes through installation in fixation hole
8 expansion bolt 13 of Φ is fixed on metope 17, and the expansion bolt length is not less than 140mm;Each support frame clipping room away from for
600mm;
When support frame is installed, it is ensured that the expansion bolt of each bracket is mounted in same level seam, convenient for controlling the levelness of bracket,
The expansion bolt spacing of same support frame takes 120mm, and punches and choose Splitting Tile brickwork joint position when installing, and rives in order to avoid destroying
Brick;The lower plane for reserving position of cornicing is concordant with the horizontal segment of support frame as described above;
Step 5, installs cornice template on the support frame, described to choose template and fixed using dovetail screw with template, chooses template and is placed in
On the inside of bracket and top, is fixed from outside and lower section, in order to demoulding;
The riser height of cornice template is 92 ㎜, is consistent with vertical section height on support frame, for controlling the concrete that cornices
The levelness and straightness of outer corners;The wide support frame horizontal segment 60mm out of the plate of cornice template, protrudes within the walls, can effectively keep away
Exempt from spillage in concreting process and pollutes lower part metope.
Step 6, concrete use C20 pea gravel concreten, before concreting first with plastic film to position of cornicing above and below
Covering protection is carried out within the scope of 1m, prevents concrete grout in casting process from polluting metope, then joint part is cleared up and applied
Brush mixes the plain-water slurries of 108 glue, carries out concreting and cornices 16, concrete looks for 20 slopes ㎜ from root of cornicing outward, and use is small
Type hold vibration board vibrate, it is ensured that concreting is closely knit and upper surface is substantially smooth, concrete eaves upper surface with beat with
Troweling;The gap 12mm 18 is reserved between concrete top of cornicing and the position roof that cornices reserved.
Step 7, concreting are completed, and after maintenance reaches design concrete strength, are torn open to positioning tool
It removes, the dovetail screw of fixed cornice template is first removed when dismounting, then remove the expansion bolt of fixing support rack, finally remove
Cornice template;
Step 8 after form removable, carries out jointing to gap up and down of cornicing with silicone adhesive, it is ensured that rainwater will not seep from gap
Enter, the spraying of the coating that carries out after the completion of jointing cornicing to get.
The present invention is not limited by embodiment illustrated herein, and is to fit to and principles disclosed herein and novelty
The consistent widest range of feature.
Claims (7)
1. a kind of positioning tool poured that cornices for exterior wall concrete, which is characterized in that including being formed for casting concrete
Cornice template (1) and be set to the support frame (2) of the cornice template (1) lower part;
The cornice template (1) is the long template that cross section is L-type, is divided into plate (3) and vertical plate (4), the plate (3) and vertical
Multiple first mounting holes are provided on edges of boards edge;
Support frame as described above (2) includes upper vertical section (6), lower vertical section (7), the level between upper vertical section and lower vertical section
Section (8) and angle brace (9), are arranged angle brace, are provided with fixation hole in the lower vertical section between the horizontal segment and lower vertical section
(10), it is provided with the second mounting hole (11) on the upper vertical section and horizontal segment, second mounting hole (11) and the first installation
Hole size and location matches, and dovetail screw (12) are arranged in first mounting hole and the second mounting hole (11);It is described to cornice
Template (1) and support frame (2) are installed together by the dovetail screw (12);Every piece of cornice template (1) correspondence is multiple
Support frame (2);
Support frame as described above (2) is installed on exterior wall by the expansion bolt (13) being arranged in fixation hole (10);
The riser height of the cornice template (1) and the upper vertical section height of support frame (2) are consistent;
The width of the plate (3) of the cornice template (1) is greater than the length of the horizontal segment of support frame as described above (2).
2. a kind of positioning tool poured that cornices for exterior wall concrete according to claim 1, which is characterized in that described
Angle between plate (3) and vertical plate (4) is identical as the angle between the upper vertical section (6) and horizontal segment (8).
3. a kind of positioning tool poured that cornices for exterior wall concrete according to claim 1 or 2, which is characterized in that
The plate (3) and vertical plate (4) are orthogonal.
4. a kind of positioning tool poured that cornices for exterior wall concrete according to claim 1, which is characterized in that described
Cornice template (1) is arranged fluted (21) on one side, and another side is provided with convex block (22), the convex block and groove shapes size
Match.
5. a kind of positioning tool poured that cornices for exterior wall concrete according to claim 1 or 5, which is characterized in that
The cornice template (1) is glued board.
6. a kind of positioning tool poured that cornices for exterior wall concrete according to claim 1, which is characterized in that described
Cornice template (1) is divided into upper layer and lower layer, and upper layer is flexible board (14), and lower layer is spliced by muti-piece rigid plate (15), under described
Fixation is bonded between layer rigid plate and upper layer flexible board, and the length of the rigid plate is greater than the spacing of two neighboring support frame.
7. it is corniced the method that the positioning tool poured positioned using exterior wall concrete is used for described in claim 1-6,
It is characterized in that, comprising the following steps:
Step 1, production exterior wall cornice positioning tool;
Step 2, the first construction of progress exterior wall Splitting Tile or stone material, when construction, reserve position of cornicing, to reserving before construction
Cornice position carry out dabbing processing, after the completion of picking chisel, clear up chisel face is picked, guarantee the clean non-loosening coagulation of joint part
Soil;
Step 3 after the completion of outer wall surface, first carries out bar planting operation, is implanted into longitudinal reinforcement and transverse steel;
Step 4 is reserving the position installation support frame that cornices after the completion of bar planting, and support frame is by installing expanding screw in fixation hole
Bolt is fixed on metope, and the lower plane for reserving position of cornicing is concordant with the horizontal segment of support frame as described above;
Step 5, installs cornice template on the support frame, described to choose template and fixed using dovetail screw with template, chooses template and is placed in
On the inside of bracket and top, is fixed from outside and lower section, and vertical section height is consistent on the vertical plate and support frame of cornice template, is chosen
The wide support frame horizontal segment out of the plate of eaves template, is protruded within the walls;
Step 6 prevents from pouring first with plastic film to covering protection is carried out within the scope of 1m above and below position of cornicing before concreting
Concrete grout pollutes metope during building, and is then cleared up joint part and is brushed and mix glairin cement slurry, using small hand-held
Vibration board vibrates, it is ensured that concreting is closely knit and upper surface is substantially smooth, concrete eaves upper surface placing and troweling light;
Step 7, concreting are completed, and after maintenance reaches design concrete strength, are removed, torn open to positioning tool
Except when first remove the dovetail screw of fixed cornice template, then remove the expansion bolt of fixing support rack, finally remove and cornice
Template;
Step 8 after form removable, carries out jointing to gap up and down of cornicing with silicone adhesive, the coating that cornices is carried out after the completion of jointing
Spraying to get.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811320481.9A CN109162451B (en) | 2018-11-07 | 2018-11-07 | Template positioning tool and method for exterior wall concrete cornice pouring |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811320481.9A CN109162451B (en) | 2018-11-07 | 2018-11-07 | Template positioning tool and method for exterior wall concrete cornice pouring |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109162451A true CN109162451A (en) | 2019-01-08 |
CN109162451B CN109162451B (en) | 2024-01-30 |
Family
ID=64876751
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811320481.9A Active CN109162451B (en) | 2018-11-07 | 2018-11-07 | Template positioning tool and method for exterior wall concrete cornice pouring |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109162451B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110306410A (en) * | 2019-07-05 | 2019-10-08 | 张贵霖 | A kind of groove construction die device |
CN110512778A (en) * | 2019-09-05 | 2019-11-29 | 上海市房地产科学研究院(上海市住宅修缮工程质量检测中心) | A kind of bridging piece and its construction technology for clay brick facade |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3815338A1 (en) * | 1988-05-05 | 1989-11-16 | Wolfgang Baumann | Equipment which can be used in the building industry, in particular cornice-shuttering retaining means or clamp |
CN206397145U (en) * | 2016-12-19 | 2017-08-11 | 中冶天工集团有限公司 | The outer eaves mould fixing device of concrete of encorbelmenting |
CN206737411U (en) * | 2017-05-25 | 2017-12-12 | 沭阳县平安树木业有限公司 | A kind of collapsible building template |
CN207794610U (en) * | 2018-02-02 | 2018-08-31 | 青岛一建集团有限公司 | The support device corniced for installing exterior wall |
CN209211890U (en) * | 2018-11-07 | 2019-08-06 | 山西建筑工程集团有限公司 | A kind of template positioning tool for steel poured that cornices for exterior wall concrete |
-
2018
- 2018-11-07 CN CN201811320481.9A patent/CN109162451B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3815338A1 (en) * | 1988-05-05 | 1989-11-16 | Wolfgang Baumann | Equipment which can be used in the building industry, in particular cornice-shuttering retaining means or clamp |
CN206397145U (en) * | 2016-12-19 | 2017-08-11 | 中冶天工集团有限公司 | The outer eaves mould fixing device of concrete of encorbelmenting |
CN206737411U (en) * | 2017-05-25 | 2017-12-12 | 沭阳县平安树木业有限公司 | A kind of collapsible building template |
CN207794610U (en) * | 2018-02-02 | 2018-08-31 | 青岛一建集团有限公司 | The support device corniced for installing exterior wall |
CN209211890U (en) * | 2018-11-07 | 2019-08-06 | 山西建筑工程集团有限公司 | A kind of template positioning tool for steel poured that cornices for exterior wall concrete |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110306410A (en) * | 2019-07-05 | 2019-10-08 | 张贵霖 | A kind of groove construction die device |
CN110512778A (en) * | 2019-09-05 | 2019-11-29 | 上海市房地产科学研究院(上海市住宅修缮工程质量检测中心) | A kind of bridging piece and its construction technology for clay brick facade |
Also Published As
Publication number | Publication date |
---|---|
CN109162451B (en) | 2024-01-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102644362B (en) | Architectural decoration plastering construction method | |
CN103821366B (en) | Clear water concrete metope grooved stereo wood pattern decoration construction method | |
CN104746772B (en) | Ash concrete hollow partition board anti-cracking construction method | |
CN104675124B (en) | A kind of prefabricated Niche type construction technology of Separate Home electronic box hole to be provided | |
CN111364754A (en) | Construction method of art wood grain veneer fair-faced concrete | |
CN106065702A (en) | A kind of splice floor tile and the preparation technology of this splicing floor tile and paving technique | |
CN1461372A (en) | Concrete building construction form unit and manufacturing device therefor, and concrete building constructed by using concrete building construction form | |
CN109162451A (en) | A kind of template positioning tool for steel poured and method of cornicing for exterior wall concrete | |
CN105064579A (en) | Construction method guaranteeing pouring formation of toilet water-stop ridge platform | |
CN107447893A (en) | A kind of lightgage steel joist concrete anticracking filling wall and its construction method | |
CN110644318A (en) | Concrete construction method for field road pavement | |
CN110039635A (en) | PC component production technology | |
CN109676748A (en) | A kind of production method of the concrete prefabricated frame of distribution box | |
CN209211890U (en) | A kind of template positioning tool for steel poured that cornices for exterior wall concrete | |
CN108118807A (en) | A kind of steel framework concrete partition and its construction method | |
CN110409600A (en) | Unit-combination type cesspool construction method | |
CN207194239U (en) | Lightgage steel joist concrete anticracking fills wall | |
CN111663770B (en) | Quick and easy combination and shaping mold for post-cast strip of cast-in-place slab and construction method of quick and easy combination and shaping mold | |
CN110468697A (en) | A kind of dustless construction technology of bridge expanssion joint | |
CN102767284B (en) | Semi-prefabricating construction process for concrete thin-wall lower return eave | |
CN106320662B (en) | Decorating outer wall of building ultra-wide concrete wire construction method | |
CN215291458U (en) | Large-area concrete dividing joint forming tool | |
CN113006382B (en) | Roof waterproof structure and paving process | |
KR101646527B1 (en) | The construction and civil engineering and construction methods that integrally formed stone | |
CN110725532B (en) | Supporting system for small formwork of bare concrete decorative wall and construction process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |