CN110306410A - A kind of groove construction die device - Google Patents

A kind of groove construction die device Download PDF

Info

Publication number
CN110306410A
CN110306410A CN201910602756.6A CN201910602756A CN110306410A CN 110306410 A CN110306410 A CN 110306410A CN 201910602756 A CN201910602756 A CN 201910602756A CN 110306410 A CN110306410 A CN 110306410A
Authority
CN
China
Prior art keywords
template
side template
die device
groove construction
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910602756.6A
Other languages
Chinese (zh)
Inventor
张贵霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910602756.6A priority Critical patent/CN110306410A/en
Publication of CN110306410A publication Critical patent/CN110306410A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/50Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
    • E01C19/502Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes
    • E01C19/506Removable forms or shutterings, e.g. side forms; Removable supporting or anchoring means therefor, e.g. stakes for kerbs, gutters or similar structures, e.g. raised portions, median barriers

Abstract

The invention discloses a kind of groove construction die devices, it is related to architectural furniture technical field, the present invention includes two parting mechanisms being arranged symmetrically, parting mechanism includes adjusting support frame, top template, side template, side template is arranged vertically, it adjusts and is provided with height adjustment mechanism on support frame, height adjustment mechanism is connected at the top of side template, standing screw is threaded on bracket, standing screw bottom thread is connected with top template, top template is fitted in side template outer wall and orthogonal with side template, end template is removably connected between two side template bottoms, top template, side template, end template and trench wall can surround a type chamber, the present invention has structure simple, it is convenient to disassembly, the advantages of improving construction efficiency.

Description

A kind of groove construction die device
Technical field
The present invention relates to architectural furniture technical fields, more particularly to a kind of groove construction die device.
Background technique
Groove and inspection well construction are the important components of municipal works, and construction quality directly influences entire road The traffic safety and comfort of engineering.Town road groove and inspection shaft position disease take place frequently, and especially well head position settles, is convex Rise, ravelling at incline Dou and well head, crack, fall off etc. it is relatively conventional, it has also become municipal works critical issue urgently to be solved. Carried out when channel excavation using the method that excavator mechanical excavation and artificial clear slot combine, drainage pipeline be layered from top to bottom from Downstream starts successively to carry out, and is made into certain slope, benefit for draining, spoir position cannot influence next process and site operation, Critical facility cannot be buried, and is conducive to the discharge and the transport earthwork of sewage.Channel excavation is completed and after the assay was approved can be into Row sand foundation construction.Before Pipe installing, it is first laid with bottom of trench sand-gravel cushion, backfills sandstone again after Pipe installing to design requirement, The construction quality of sand-gravel cushion is particularly significant for Pipe installing, and sand blinding layer must be uniform to entire pipeline support, prevents Pipeline generates uneven subsidence, makes pipeline discontinuity, then carries out concrete foundation construction, and foundation forms uses steel form, steel Muscle, wood support are reinforced, and the necessary assembly of template tightly must not spillage.
It when carrying out concrete foundation construction in the slot hole dug, generally requires and sets up molding die to pour groove, and show There is groove molding die temporarily assembled using several steel forms, spot welding or bolt are passed through according to groove dimensions size when assembled The mode of connection stitches and fastens each template, and due to being interim splicing structure, installation and removal are all extremely inconvenient, construction efficiency It is low.
Therefore above-mentioned technical problem how is solved, there is very much realistic meaning to those skilled in the art.
Summary of the invention
It is an object of the invention to: pass through spot welding or bolt to solve existing groove molding die using several steel forms Each template is temporarily bolted together by the mode of connection, and installation and removal are all extremely inconvenient, the low technical problem of construction efficiency, this Invention provides a kind of groove construction die device.
The present invention specifically uses following technical scheme to achieve the goals above:
A kind of groove construction die device, the parting mechanism being arranged symmetrically including two, parting mechanism include adjusting support Frame, top template, side template, side template are arranged vertically, are adjusted and are provided with height adjustment mechanism on support frame, and height adjustment mechanism connects It connects at the top of side template, standing screw is threaded on bracket, standing screw bottom thread is connected with top template, top template patch Close side template outer wall and with side template it is orthogonal, end template, top template, side are removably connected between two side template bottoms Template, end template and trench wall can surround a type chamber.
Further, height adjustment mechanism includes being fixed on the swivel nut adjusted on support frame, and swivel nut internal screw thread is connected with silk Bar, screw rod bottom are movably connected at the top of side template by ball bearing.
Further, several pouring holes are offered close to side template on top template, top template upper surface along with side template Vertical direction is evenly equipped with several graduation mark A.
Further, side template one end is provided with several convex blocks, and side template the other end offers several and convex block one One corresponding mounting hole, several pieces of side templates can be stitched and fastened by convex block and mounting hole head and the tail.
Further, side template is evenly equipped with several graduation mark B along its vertical direction close to the one side of top template.
Further, side template bottom is connected at least one fixture block, and end template two side ends offer and corresponding fixture block The card slot of cooperation, side template top are provided with handle.
Further, it adjusts support frame bottom and is connected with base plate, be threaded on base plate and grab Floor screw.
Working principle: after having dug slot hole, carrying out concrete construction according to groove dimensions, and two adjusting support frames are individually placed to slot hole On the ground of two sides, it is located at two side templates in slot hole, top template is then fixed on by adjusting support frame by standing screw Lower section is simultaneously adjacent on the ground, and top template fits together and orthogonal with side template at this time, and observation graduation mark A adjusts side form The spacing of plate and slot crater wall, the spacing are the thickness of preforming trench wall, at this time by will grab Floor screw hammer into underground will be whole A parting mechanism is fixed, and at this moment drives side template to move up and down by twisting screw rod manually, change side template and top template it Between relative position, by observe graduation mark B accurately regulate side form Board position, two side templates are both adjusted to sustained height Afterwards, it then end template is installed is clamped between two side template bottoms, the spacing between end template and slot hole bottom is as preforming at this time The thickness of trench bottom, then repeatedly aforesaid operations stitch and fasten several present apparatus, are then in the milk by pouring hole, to The present apparatus is successively removed after ditch Slot shaping.
Beneficial effects of the present invention are as follows:
1, when the slot dug cheats upper installation mold, first two adjusting support frames are individually placed on the ground of slot hole two sides, It is located at two side templates in slot hole, then top template is fixed on by standing screw and adjusts below support frame and is adjacent on ground On face, top template fits together and orthogonal with side template at this time, moves left and right and adjusts support frame and cheat side template and slot Wall is in suitable spacing, which is the thickness of preforming trench wall, then can drive side by height adjustment mechanism Template moves up and down, to change the relative position between side template and top template, then installs bottom between two side template bottoms Template, the spacing between end template and slot hole bottom is the thickness of preforming trench bottom at this time, at this time two top templates, two sides Template, an end template and trench wall can surround the type chamber of a preforming groove, top template, side template in the present invention and End template quickly can be installed and be adjusted, and also not need spot welding or be bolted in assembling process, while subsequent be applied After work also can fast quick-detach, to improve construction efficiency, while the construction of various sizes specification groove can be applicable in, meet Requirement, practicability are high.
2, by the graduation mark A on observation top template can accurate adjusting side mould plate and slot crater wall spacing, then grabbing ground Screw hammers into underground and fixes entire parting mechanism, and the firm stabilization of fixed structure passes through height adjustment mechanism adjusting side mould plate When position, twisting screw rod manually can drive side template to move up and down, while by the graduation mark B on observation side template, can essence True adjusting side mould Board position, side template both ends are respectively arranged with several convex blocks and corresponding mounting hole, convenient for sending out several It is bright to stitch and fasten, a longer forming recess is formed, is then in the milk by pouring hole, it is easy to operate, it reduces Difficulty of construction.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of groove construction die device of the present invention;
Fig. 2 is the structural schematic diagram of top template and side template at side visual angle;
Fig. 3 is the vertical view figure structure schematic representation of Fig. 2.
Appended drawing reference: 1- parting mechanism, 1.1- adjust support frame, 1.2- top template, 1.3- side template, 2- height adjustment machine Structure, 2.1- swivel nut, 2.2- screw rod, 3- standing screw, 4- ball bearing, 5- pouring hole, 6- graduation mark A, 7- convex block, 8- installation Hole, 9- graduation mark B, 10- end template, 11- fixture block, 12- handle, 13- base plate, 14- grab Floor screw.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not For limiting the present invention, i.e., described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is logical The component for the embodiment of the present invention being often described and illustrated herein in the accompanying drawings can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiment of the present invention, those skilled in the art Member's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
It should be noted that the relational terms of term " first " and " second " or the like be used merely to an entity or Operation is distinguished with another entity or operation, and without necessarily requiring or implying between these entities or operation, there are any This actual relationship or sequence.Moreover, the terms "include", "comprise" or its any other variant be intended to it is non-exclusive Property include so that include a series of elements process, method, article or equipment not only include those elements, but also Further include other elements that are not explicitly listed, or further include for this process, method, article or equipment it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including described There is also other identical elements in the process, method, article or equipment of element.
Feature and performance of the invention are described in further detail with reference to embodiments.
Embodiment 1
As shown in Fig. 1 to 3, the present embodiment provides a kind of groove construction die device, including two be arranged symmetrically divide mould Mechanism 1, parting mechanism 1 include adjusting support frame 1.1, top template 1.2, side template 1.3, and side template 1.3 is arranged vertically, adjusts branch Height adjustment mechanism 2 is provided on support 1.1, height adjustment mechanism 2 is connected to 1.3 top of side template, is threadedly coupled on bracket Have a standing screw 3,3 bottom thread of standing screw is connected with top template 1.2, top template 1.2 be fitted in 1.3 outer wall of side template and with Side template 1.3 is orthogonal, and end template 10, top template 1.2, side template are removably connected between two side templates, 1.3 bottom 1.3, end template 10 and trench wall can surround a type chamber.
In the present embodiment, when the slot dug cheats upper installation mold, two adjusting support frames are first individually placed to slot hole two sides Ground on, make two side templates be located at slot hole in, then by standing screw by top template be fixed on adjust support frame lower section And be adjacent on the ground, top template fits together and orthogonal with side template at this time, moves left and right and adjusts support frame and make side Template and slot crater wall are in suitable spacing, which is the thickness of preforming trench wall, then passes through height adjustment mechanism Side template can be driven to move up and down, to change the relative position between side template and top template, then in two side template bottoms Between end template is installed, at this time end template and slot hole bottom between spacing be preforming trench bottom thickness, at this time two top Template, two side templates, an end template and trench wall can surround the type chamber of a preforming groove, the backform in the present invention Plate, side template and end template quickly can be installed and be adjusted, and also do not needed to carry out spot welding in assembling process or are bolted, Simultaneously after subsequent construction also can fast quick-detach, to improve construction efficiency, while various sizes specification groove can be applicable in Construction, meet requirement, practicability is high.
Embodiment 2
As shown in Fig. 1 to 3, the present embodiment is to be further optimized on the basis of embodiment 1, and specifically, height is adjusted Section mechanism 2 includes being fixed on the swivel nut 2.1 adjusted on support frame 1.1, and 2.1 internal screw thread of swivel nut is connected with screw rod 2.2, screw rod 2.2 Bottom is movably connected in 1.3 top of side template by ball bearing 4, and close side template 1.3 offers several pour on top template 1.2 Hole 5 is built, 1.2 upper surface of top template is evenly equipped with several graduation mark A6, side template 1.3 1 along the direction vertical with side template 1.3 End is provided with several convex blocks 7, and 1.3 the other end of side template offers several and one-to-one mounting hole 8 of convex block 7, several Block side template 1.3 can be stitched and fastened by convex block 7 and 8 head and the tail of mounting hole, and side template 1.3 is close to the one side edge of top template 1.2 Its vertical direction be evenly equipped with several graduation mark B9,1.3 bottom of side template is connected at least one fixture block 11,10 liang of end template Side offers the card slot cooperated with corresponding fixture block 11, and handle 12 is provided at the top of side template 1.3, adjusts 1.1 bottom of support frame Portion is connected with base plate 13, is threaded on base plate 13 and grabs Floor screw 14.
In the present embodiment, by the graduation mark A on observation top template can accurate adjusting side mould plate and slot crater wall spacing, so Entire parting mechanism is fixed grabbing Floor screw and hammer into underground afterwards, the firm stabilization of fixed structure passes through height adjustment mechanism tune When saving side form Board position, twisting screw rod manually can drive side template to move up and down, while pass through the scale on observation side template Line B accurately can be respectively arranged with several convex blocks and corresponding mounting hole in adjusting side mould Board position, side template both ends, and being convenient for will Several present invention stitch and fasten, and form a longer forming recess, are then in the milk by pouring hole, easy to operate fast Victory reduces difficulty of construction.
The above, only presently preferred embodiments of the present invention, are not intended to limit the invention, patent protection model of the invention It encloses and is subject to claims, it is all to change with equivalent structure made by specification and accompanying drawing content of the invention, similarly It should be included within the scope of the present invention.

Claims (7)

1. a kind of groove construction die device, which is characterized in that including two parting mechanisms being arranged symmetrically (1), parting mechanism It (1) include adjusting support frame (1.1), top template (1.2), side template (1.3), side template (1.3) is arranged vertically, adjusts support frame (1.1) it is provided on height adjustment mechanism (2), height adjustment mechanism (2) is connected at the top of side template (1.3), screw thread on bracket It is connected with standing screw (3), standing screw (3) bottom thread is connected with top template (1.2), and top template (1.2) is fitted in side form Plate (1.3) outer wall and orthogonal with side template (1.3), is removably connected with end template between two side templates (1.3) bottom (10), top template (1.2), side template (1.3), end template (10) and trench wall can surround a type chamber.
2. a kind of groove construction die device according to claim 1, which is characterized in that height adjustment mechanism (2) includes It is fixed on the swivel nut (2.1) adjusted on support frame (1.1), swivel nut (2.1) internal screw thread is connected with screw rod (2.2), screw rod (2.2) bottom Portion is movably connected at the top of side template (1.3) by ball bearing (4).
3. a kind of groove construction die device according to claim 1, which is characterized in that lean on nearside on top template (1.2) Template (1.3) offers several pouring holes (5), and top template (1.2) upper surface is uniformly distributed along the direction vertical with side template (1.3) There are several graduation mark A (6).
4. a kind of groove construction die device according to claim 3, which is characterized in that side template (1.3) one end is set It being equipped with several convex blocks (7), side template (1.3) the other end offers several and convex block (7) one-to-one mounting hole (8), if Dry block side template (1.3) can be stitched and fastened from beginning to end by convex block (7) and mounting hole (8).
5. a kind of groove construction die device according to claim 4, which is characterized in that side template (1.3) is close to backform The one side of plate (1.2) is evenly equipped with several graduation mark B (9) along its vertical direction.
6. a kind of groove construction die device according to claim 1, which is characterized in that the connection of side template (1.3) bottom There is at least one fixture block (11), end template (10) two side ends offer and the card slot of corresponding fixture block (11) cooperation, side template (1.3) top is provided with handle (12).
7. according to claim 1 to a kind of groove construction die device described in any claim in 6, which is characterized in that adjust Section support frame (1.1) bottom is connected with base plate (13), is threaded on base plate (13) and is grabbed Floor screw (14).
CN201910602756.6A 2019-07-05 2019-07-05 A kind of groove construction die device Pending CN110306410A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910602756.6A CN110306410A (en) 2019-07-05 2019-07-05 A kind of groove construction die device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910602756.6A CN110306410A (en) 2019-07-05 2019-07-05 A kind of groove construction die device

Publications (1)

Publication Number Publication Date
CN110306410A true CN110306410A (en) 2019-10-08

Family

ID=68079200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910602756.6A Pending CN110306410A (en) 2019-07-05 2019-07-05 A kind of groove construction die device

Country Status (1)

Country Link
CN (1) CN110306410A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201972715U (en) * 2011-02-25 2011-09-14 中铁五局集团第一工程有限责任公司 Integrated ditch cable trough mould frame
CN203531923U (en) * 2013-11-07 2014-04-09 中铁二十局集团第三工程有限公司 Moving framework for tunnel groove construction
CN109162451A (en) * 2018-11-07 2019-01-08 山西建筑工程集团有限公司 A kind of template positioning tool for steel poured and method of cornicing for exterior wall concrete
CN208501732U (en) * 2018-04-18 2019-02-15 张明会 A kind of piping lane cast-in-place construction integral movable type mould bases
DE202018000340U1 (en) * 2018-01-23 2019-04-24 Betomax Systems Gmbh & Co. Kg Formwork and concrete component

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201972715U (en) * 2011-02-25 2011-09-14 中铁五局集团第一工程有限责任公司 Integrated ditch cable trough mould frame
CN203531923U (en) * 2013-11-07 2014-04-09 中铁二十局集团第三工程有限公司 Moving framework for tunnel groove construction
DE202018000340U1 (en) * 2018-01-23 2019-04-24 Betomax Systems Gmbh & Co. Kg Formwork and concrete component
CN208501732U (en) * 2018-04-18 2019-02-15 张明会 A kind of piping lane cast-in-place construction integral movable type mould bases
CN109162451A (en) * 2018-11-07 2019-01-08 山西建筑工程集团有限公司 A kind of template positioning tool for steel poured and method of cornicing for exterior wall concrete

Similar Documents

Publication Publication Date Title
CN104695557A (en) Steel structure building construction method for one-step pre-burying of foundation bolts
CN107724218A (en) A kind of road structure stitches filling device
CN109454746B (en) Concrete pouring device for building construction and construction method thereof
CN209571794U (en) In a kind of shear wall direct-burried distribution box with can turnover type fix device
EP2388377A2 (en) Method and device for manufacturing pipe bedding
CN110306410A (en) A kind of groove construction die device
EP0726361A1 (en) Method of forming pavement on automobile test road pavement member for automobile test road
CN107542081A (en) The installation method of a kind of deep yard drain plate that rockfills and for the hole-forming device in this method
CN215367228U (en) Device for controlling perpendicularity of pile foundation pit steel reinforcement cage
CN206277490U (en) A kind of comprehensive pipe gallery die
CN105952002B (en) A kind of terrace heavy steel plate pre-embedded device and construction method
CN112096096B (en) Positioning device for embedded steel plate and construction method thereof
CN211566302U (en) Structure is pour in construction of building
CN111501762B (en) Steel structure building foundation ground construction treatment method
CN211691489U (en) Spacing adjustable basic unit template device
CN207552823U (en) Non-fragment orbit template weathering receives face device
CN220058016U (en) Roadbed slope arch skeleton protection shaping steel-plastic template
CN206768822U (en) A kind of simple automatic positioning equipment of cast-in-place concrete pile interpolation steel pipe column
CN218373992U (en) A auxiliary device for installation is pour to illumination foundation frame
CN218861555U (en) Groove construction die device
CN110965580A (en) Open-cut tunnel lining symmetrical and synchronous layered cloth pouring system and construction method
CN205839987U (en) A kind of terrace heavy steel plate pre-embedded device
CN219548376U (en) Side form formwork device
CN218540436U (en) Improve mould of bridge pier stud contact net basis buried bolt installation accuracy in advance
CN209780930U (en) Device for reinforcing tunnel bottom of weak laminar surrounding rock and soft laminar surrounding rock tunnel bottom reinforcing structure thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191008

RJ01 Rejection of invention patent application after publication