CN206768822U CN201720584325.8U CN201720584325U CN206768822U CN 206768822 U CN206768822 U CN 206768822U CN 201720584325 U CN201720584325 U CN 201720584325U CN 206768822 U CN206768822 U CN 206768822U
Authority
CN
China
Prior art keywords
steel pipe
pipe column
concrete pile
cast
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720584325.8U
Other languages
Chinese (zh)
Inventor
胡锋
许仕达
周瑞杰
戚兆波
侯本亮
耿东辉
张道龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201720584325.8U priority Critical patent/CN206768822U/en
Application granted granted Critical
Publication of CN206768822U publication Critical patent/CN206768822U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of simple automatic positioning equipment of cast-in-place concrete pile interpolation steel pipe column, including the keeper at the absolute altitude of steel pipe column bottom at the top of bored concrete pile hypomere is fixedly installed on, and is fixedly installed on the spacing steel plate of steel pipe column bottom;The keeper includes base and is arranged on the centralized positioning stake of the base center, and the centralized positioning stake is made up of two pieces of wedge-shaped deckle boards;The center of the spacing steel plate offers the circular hole to match with the centralized positioning stake size.The utility model can automatically and accurately be positioned during erection of steel pipe column, the drawbacks of overcoming conventional method, solve steel pipe column position, absolute altitude, degree control problem, ensure installation accuracy requirement and construction quality, saved with light and handy, materials simple in construction, install and use it is convenient, it is laborsaving time saving the advantages that.

Description

A kind of simple automatic positioning equipment of cast-in-place concrete pile interpolation steel pipe column
Technical field
Architectural engineering and municipal works Underground Construction are the utility model is related to, more particularly to a kind of cast-in-place concrete pile The simple automatic positioning equipment of interpolation steel pipe column.
Background technology
During many architectural engineering and municipal works Underground Constructions, steel pipe column will be inserted in cast-in-place concrete pile, Used as pillar permanently or temporarily.It is general to require that depth is 2m or so in steel column insertion cast-in-place pile concrete.In bored concrete pile The technique of insertion steel pipe column is generally divided into two kinds, first, the complete cast-in-place concrete pile of first casting and constructing, inserts steel pipe column, this side afterwards Steel pipe column be present and be difficult to anchor into inner concrete or anchor into that depth does not meet design requirement and position, perpendicularity are not easy to ensure in method Risk.During other steel pipe column insertion inner concrete, inevitably by mud band people's concrete, concrete quality is influenceed. Second, steel pipe column is welded as a whole with pile cages, in tripping in stake holes to designed elevation correction it is fixed after, then concrete led Cast pile concrete in pipe insertion steel pipe column.This method fixes steel pipe column position by steel reinforcement cage, because in construction at steel reinforcement cage In unstable state, it may occur that displacement deformation, it is related to cause steel pipe column off normal or inclination.Separately in Concrete is poured into a mould because Steel pipe post jamb hinders, and it is outer difficult that concrete arrives at pipe, it is difficult to ensures that the pile concrete on the outside of steel pipe column is closely knit.
Precise positioning (including position, absolute altitude, perpendicularity) is the key of erection of steel pipe column, and it directly influences steel construction peace Packing quality, safety and precision of equipment installation and use, it is necessary to assure it is accurate, construction error control is allowed partially in design, specification Within the scope of difference.Bored concrete pile interpolation steel pipe column carrys out extreme difficulties because of the particularity of its technique to steel pipe column positioning belt.Traditional applies There is steel pipe column position in work method, absolute altitude, perpendicularity are difficult to control, and the disadvantages such as super inclined and influence pile body concrete quality easily occur End, need fundamentally be solved.
Utility model content
The purpose of this utility model is to overcome deficiency of the prior art, there is provided a kind of cast-in-place concrete pile interpolation steel pipe column Simple automatic positioning equipment, can automatically and accurately it be positioned during erection of steel pipe column, the drawbacks of overcoming conventional method, Solve steel pipe column position, absolute altitude, degree control problem, it is ensured that installation accuracy requirement and construction quality, the utility model dress Put saved with light and handy, materials simple in construction, install and use it is convenient, it is laborsaving time saving the advantages that.
Technical scheme is used by the utility model:A kind of cast-in-place concrete pile interpolation steel pipe column is simply automatically positioned dress Put, including be fixedly installed on the keeper at the absolute altitude of steel pipe column bottom at the top of bored concrete pile hypomere, and be fixedly installed on steel pipe column bottom Spacing steel plate;The keeper includes base and is arranged on the centralized positioning stake of the base center, the centralized positioning stake It is made up of two pieces of wedge-shaped deckle boards;The center of the spacing steel plate offers the circle to match with the centralized positioning stake size Hole.
The spacing steel plate is circular configuration, and its diameter is less than steel pipe column internal diameter.
The base is decussate texture.
Every piece of wedge-shaped deckle board is extradited by two pieces of slopes that top is located at vertical symmetrical center line both sides and intersects at top Plate and bottom are located at two blocks of lateral spacing plates that symmetrical center line both sides are parallel to each other and formed.
Two pieces of wedge-shaped deckle board plane perpendicular quadrature composition decussate textures.
The base is by foundation bolt and nut with being fixedly connected at the top of bored concrete pile hypomere and adjusting the base absolute altitude It is and levelling.
The every foundation bolt is furnished with two nuts, and one of them described nut is located at the Its lower side and is used for Adjusting base absolute altitude and levelling, another described nut, which is located on the upside of the base, to be used to fasten.
The beneficial effects of the utility model are:The utility model cast-in-place concrete pile interpolation steel pipe column is simply automatically positioned dress Put, solve steel pipe column position, absolute altitude, degree control problem.Compared with traditional approach, present apparatus accurate positioning, stably may be used Lean on, can ensure that steel column installation accuracy and ensure not being subjected to displacement deformation in work progress, do not influence filling pile construction quality, ensure Construction quality.The present apparatus is easy for installation, quick, takes and is automatically positioned during erection of steel pipe column, without manual synchronizing, significantly Work efficiency is improved, accelerates construction speed, is saved artificial.The present apparatus is simple in construction light and handy, and materials facility, materials save, cost It is low, positioned suitable for the steel pipe column of bored concrete pile interpolation various sizes, it is easy to spread, there is larger economic benefit and society to imitate Benefit.
Brief description of the drawings
Fig. 1:The simple automatic positioning equipment of the utility model cast-in-place concrete pile interpolation steel pipe column installs and uses schematic diagram;
Fig. 2:The utility model keeper schematic view of the mounting position;
Fig. 3:The spacing steel plate schematic view of the mounting position of the utility model;
Fig. 4:The utility model keeper overlooking the structure diagram;
Fig. 5:The utility model keeper side structure schematic view;
Fig. 6:The spacing steel plate structure schematic diagram of the utility model;
Fig. 7:The utility model foundation bolt structure schematic diagram.
Accompanying drawing marks:1st, stake holes;2nd, keeper;3rd, nut;4th, foundation bolt;5th, steel pipe column;6th, spacing steel plate;7th, anchor Face;8th, pea gravel concreten;9th, bored concrete pile;10th, centralized positioning stake;11st, base;12nd, wedge-shaped deckle board;13rd, bolt hole;14th, nut.
Embodiment
The utility model will be further described below in conjunction with the accompanying drawings.
As accompanying drawing 1 to Fig. 7 shows, a kind of simple automatic positioning equipment of cast-in-place concrete pile interpolation steel pipe column, including keeper 2 With spacing steel plate 6.
The keeper 2 is fixedly installed at the absolute altitude of steel pipe column bottom at the top of the hypomere of bored concrete pile 9, is determined for the bottom of steel pipe column 5 Position.The keeper 2 includes base 11 and welding is arranged on the centralized positioning stake 10 at the center of base 11.
The base 11 is decussate texture, and cross is welded into by three pieces of 10mm thickness, the wide steel plate horizontal perpendicular quadratures of 60mm Shape.One of direction is an elongated steel plate, and other direction is two blocks of short steel plates, and long steel plate longitudinal side is leaned on from both sides vertical top Weld at middle part.Long external diameter+the 200mm of steel plate length size=steel pipe column 5;Short steel plate length size=(external diameter of steel pipe column 5+ 200mm—60mm)/2.Two bolts hole 13 are bored at long steel plate both ends, and short steel plate one end is bored a bolt hole 13, set altogether on base 11 Four bolts hole 13.The steel plate end 60mm of 13 centre-to-centre spacing base of bolt hole 11, aperture=installation diameter+3mm of foundation bolt 4.
The centralized positioning stake 10 is made up of two pieces of wedge-shaped deckle boards 12.Every piece of wedge-shaped deckle board 12 is by top positioned at vertical Symmetrical center line both sides simultaneously intersect at two pieces of slopes extradition plate at top and are located at two pieces that symmetrical center line both sides are parallel to each other with bottom Lateral spacing plate is formed, total height 200mm, wherein extradition plate is highly 130mm, lateral spacing plate is highly 70mm.Outside the lateral spacing plate of both sides Away from for 296mm.For wedge-shaped deckle board 12 using the processing of 10mm steel plates, it is 50mm to extradite plate and lateral spacing plate width.Two pieces of wedges The plane perpendicular quadrature group of shape deckle board 12 is welded into decussate texture, and one of wedge-shaped top of deckle board 12 is separated in, from both sides Relative vertical leans the welding of the top-side of other direction wedge shape deckle board 12.
The spacing steel plate 6 is weldingly fixed on the bottom of steel pipe column 5, for coordinating the keeper 2 on bored concrete pile 9 to limit control steel pipe The position of post 5.The spacing steel plate 6 is processed into circular configuration using 10mm steel plates, and its diameter is less than the internal diameter of steel pipe column 5, is steel Internal diameter-the 2mm of tubing string 5.The center of the spacing steel plate 6 offers the circular hole to match with the size of centralized positioning stake 10, The aperture of circular hole is 300mm.
In the utility model, the base 11 is connected by foundation bolt 4 and nut 3,14 with fixed at the top of the hypomere of bored concrete pile 9 Connect and adjust the absolute altitude of base 11 and levelling.The foundation bolt 4 is provided with four, is arranged in the four of the base 11 The individual correspondence position of bolt hole 13;The specification of foundation bolt 4 is not less than ф 16, length 200mm, and wherein screw thread segment length is 100mm, screw thread specification are not less than M14.;Plant and be anchored in the hypomere top concrete of bored concrete pile 9 afterwards, for base 11 to be connected to At the top of 9 hypomeres of bored concrete pile.The every foundation bolt 4 is furnished with two nuts 3 and nut 14, and wherein nut 3 is located at the bottom The downside of seat 11 is used for the absolute altitude of adjusting base 11 and levelling, and another nut 14 is used to fasten positioned at the upside of base 11;It is described Nut 3,14 specifications match with the foundation bolt 4.
The application method of 9 interpolation steel pipe column of the utility model cast-in-place concrete pile, 5 simple automatic positioning equipment is:Bored concrete pile 9 concrete are poured into the bottom absolute altitude above 500mm of steel pipe column 5 or so place;Cut pile crown laitance part and be extremely located at the bottom absolute altitude of steel pipe column 5 Keeper 2 anchors face 7 at following 50mm;According to the installation site of keeper 2 (center of keeper 2 overlaps with pile center) and base 11 Foundation bolt 4 is planted after stake top keeper 2 is anchored in the concrete of face 7 in the position of upper bolt hole 13;A nut 3 is first pressed into keeper The bottom absolute altitude of 2 base 11 is arranged on four foundation bolts 4, then the bolt hole 13 of 2 base of keeper 11 is penetrated into bolt and is seated in spiral shell On mother 3;Finely tune the nut 3 on each bolt and calibrate the absolute altitude of base 11 and horizontal (the top mark height of 2 base of the keeper 11=bottom of steel pipe column 5 Absolute altitude);Another nut 14 is installed in bolt revealed section to tighten, clamped the bottom of keeper 2 with the nut of the downside of base 11 about 3 Seat 11 is fixed on foundation bolt 4;Stake top anchors face 7 to filling pea gravel concreten 8 between the base 11 of keeper 2;Steel pipe column 5 is hung Enter stake holes 1, the centralized positioning stake 10 that the spacing perforate of steel plate 6 in its bottom is worn into keeper 2 is stuck on the outside of guide pile lateral spacing plate, is sat Fall on the base 11 of keeper 2;The top of steel pipe column 5 coordinates to be positioned using steel pipe scaffolding frame;Pour into a mould 9 epimere coagulations of bored concrete pile Soil, the space between the spacing steel plate 6 in the bottom of steel pipe column 5 and stake top first is filled using concrete grouting material, then inside and outside steel pipe column 5 Pour into a mould section concrete on bored concrete pile 9 simultaneously.
The simple automatic positioning equipment embodiment of the utility model cast-in-place concrete pile interpolation steel pipe column is as follows:
1) prepared by positioner
(1) keeper 2 is processed
A, base 11 is processed:3 pieces of wide steel plate strips of 60mm are cut into using 10mm steel plates, one of is long steel plate, processing External diameter+the 200mm of length dimension=steel pipe column 5;Another two pieces are short steel plate, processing length size=(external diameter+200mm of steel pipe column 5- 60mm)/2.Bore two bolts hole 13 in long steel plate both ends;Bore a bolt hole 13 in short steel plate one end.The centre-to-centre spacing steel plate of bolt hole 13 End 60mm, aperture=installation diameter+3mm of foundation bolt 4, setting-out drilling.Drilling precision should meet code requirement.Three blocks of steel Plate horizontal perpendicular quadrature welding across, will two blocks of short steel plates do not set the BE of bolt hole 13, from both sides relatively hang down Directly lean and welded in the middle part of long steel plate longitudinal side, it is desirable to which junction is in same plane.
B, centralized positioning stake 10 is processed:The wedge-shaped quantity of deckle board 12 is two pieces, is cut using 10mm steel plates, processing dimension: Total height is 200mm, wherein extradition plate is highly 130mm, lateral spacing plate is highly 70mm.Both sides lateral spacing plate external distance is 296mm.Will One of wedge-shaped deckle board 12 disconnects block into two from plate top is extradited, and it is 10mm to cut and abandon width.By two half block wedge shape deckle boards 12 Side leans another monoblock wedge shape deckle board 12 from both sides Relative vertical and extradites the welding of plate top-side at the top of extradition plate, it is desirable to welding The relative limiting plate external distance of centralized positioning stake 10 be 296mm and parallel.
C, keeper 2 is assembled:Cross centre line and the position line of centralized positioning stake 10 are marked on the steel plate of base 11, will according to line Centralized positioning stake 10 is assembled with base 11, and the lateral spacing plate in centralized positioning stake 10 and the steel plate of base 11 are welded.
(2) foundation bolt 4 is processed:The quantity of foundation bolt 4 is four, and specification is not less than ф 16, specifically by design requirement.Spiral shell Pole length is 200mm, and wherein screw thread segment length is 100mm, and screw thread specification is not less than M14. and presses design requirement.Screw thread specification should Matched with adapted standard nut, precision should meet code requirement.
(3) nut is purchased:Procurement criteria hex nut, every foundation bolt 4 match somebody with somebody two, and specification matches with foundation bolt 4.
(4) the spacing system of steel plate 6 peace
Spacing steel plate 6 is to cut into circle using 10mm steel plates, and a diameter of internal diameter -2mm of steel pipe column 5, middle part opens up directly Footpath 300mm circular hole.
Spacing steel plate 6 is welded on the bottom of steel pipe column 5, when assembled using cross hairs positioning mode by the axis of steel pipe column 5 with it is spacing The perforate central alignment of steel plate 6.
2) bored concrete pile 9 pushes up the anchoring face 7 of keeper 2 and handled
The concrete of bored concrete pile 9 is poured at the bottom absolute altitude above 500mm of steel pipe column 5, and top laitance portion is manually removed after final set Point, then chisel is picked at 50mm below the bottom of steel pipe column 5 and levelling.
3) heeling-in of foundation bolt 4
Step is:
Positioning:Central cross line is ejected on hypomere stake top anchoring face 7, the point of foundation bolt 4 position is marked on cross hairs;
Drilling:Drilling depth is not less than bolt buried depth, aperture=screw diameter+8-10mm, preferably uses boring of electric hammer;
Borehole cleaning:Check that hole depth, aperture blow out dust in hole with compressed air after qualified, then with hairbrush, cotton by hole Wall outwash, is so repeated 3-5 times, until ashless dust in hole;
Anchor adhesive is prepared:Anchor adhesive by specification is prepared, using mechanical agitation;
Bolt heeling-in:By in anchor adhesive hand-hole, anchorage length is marked on screw rod, is then used rotation or hand hammer Strike mode enters hole;
Solidification, protection:Bolt must not be disturbed in anchor adhesive solidification process.
4) keeper 2 is installed
The base 11 of measurement markers keeper 2 top elevation line and nut 3 push up elevation line on four foundation bolts 4, wherein, it is fixed The top mark height of position 2 base of the part 11=bottom absolute altitude of steel pipe column 5;Bottom absolute altitude -10mm (the bases of keeper 2 of the top mark height of nut 3=steel pipe column 5 11 steel plate thickness);
Nut 3 is installed on bolt according to the top elevation line of nut 3;
The bolt hole 13 of 2 base of keeper 11 is penetrated into bolt to be seated on nut 3, the nut 3 finely tuned on each bolt is calibrated The absolute altitude of base 11 and level;
Another nut 14 is installed in bolt revealed section to tighten, clamped with the nut of the downside of base 11 about 3 by keeper 2 Base 11 is fixed on foundation bolt 4;
Stake top anchoring face 7 to 2 base of keeper, 11 spaces are thin using the ungauged regions of a grade high compared with pile concrete intensity Stone concrete 8 is clogged tightly.
5) steel pipe column 5 is installed
Steel pipe column 5 hangs in stake holes 1, and the spacing perforate of steel plate 6 in the bottom of steel pipe column 5 is aligned to the centralized positioning stake 10 of keeper 2 Wear into being seated on the base 11 of keeper 2, the spacing perforate of steel plate 6 is stuck on the outside of the lateral spacing plate of guide pile.
The top of steel pipe column 5 coordinates to be positioned using steel pipe scaffolding frame.
6) section concrete is poured into a mould on bored concrete pile 9
First filled out using ungauged regions pea gravel concreten 8 grouting material perfusion of the intensity compared with the high grade of the concrete strength of bored concrete pile 9 The space filled between the spacing steel plate 6 in the bottom of steel pipe column 5 and hypomere stake top, it is desirable to which filling is tight, is then poured simultaneously inside and outside steel pipe column 5 Note section concrete on bored concrete pile 9.
The technical characteristic of the simple automatic positioning equipment of the utility model cast-in-place concrete pile interpolation steel pipe column is:
1) mode that is automatically positioned in installation process is taken, one-time-reach-place, the installation rate of steel pipe column 5 is greatly improved, saves simultaneously Work, it is laborsaving.
2) while the position of steel pipe column 5 and absolute altitude are controlled, the wherein centralized positioning stake 10 of keeper 2 is used for the position of steel pipe column 5 Put control;Base 11 is used for the absolute altitude for controlling steel pipe column 5.
3) limiting plate is set to coordinate keeper 2 to position steel pipe column 5 in the bottom of steel pipe column 5, without for various sizes of Steel pipe column 5 specially designs, and realizes positioning equipment standard, generalization, while reduces the volume of positioner.
4) set keeper 2 is aerial using increasing foundation bolt 4, during installation without will anchoring face 7 it is accurately levelling, save It is time, artificial.Double nut is set on foundation bolt 4, precise fine-adjustment can be carried out to the absolute altitude of keeper 2, level, and can be firm by its It is fixed.
5) top of 2 centralized positioning stake of keeper 10 is easy to the limiting plate of steel pipe column 5 to be inserted in installation using wedge shape extradition plate.
6) keeper 2 uses frame configuration formula, and light structure occupies that volume of concrete is small, do not influence the globality of concrete.
7) simple in construction, materials facility, materials save, and cost is low, and fabrication and installation are convenient and swift.

Claims (7)

1. a kind of simple automatic positioning equipment of cast-in-place concrete pile interpolation steel pipe column, it is characterised in that including being fixedly installed on steel Keeper at the absolute altitude of tubing string bottom at the top of bored concrete pile hypomere, and it is fixedly installed on the spacing steel plate of steel pipe column bottom;The positioning Part includes base and is arranged on the centralized positioning stake of the base center, and the centralized positioning stake is made up of two pieces of wedge-shaped deckle boards; The center of the spacing steel plate offers the circular hole to match with the centralized positioning stake size.
2. the simple automatic positioning equipment of cast-in-place concrete pile interpolation steel pipe column according to claim 1, it is characterised in that institute It is circular configuration to state spacing steel plate, and its diameter is less than steel pipe column internal diameter.
3. the simple automatic positioning equipment of cast-in-place concrete pile interpolation steel pipe column according to claim 1, it is characterised in that institute It is decussate texture to state base.
4. the simple automatic positioning equipment of cast-in-place concrete pile interpolation steel pipe column according to claim 1, it is characterised in that every Wedge-shaped deckle board described in block extradites plate and lower portion by two pieces of slopes that top is located at vertical symmetrical center line both sides and intersects at top Formed in two blocks of lateral spacing plates that symmetrical center line both sides are parallel to each other.
5. the simple automatic positioning equipment of cast-in-place concrete pile interpolation steel pipe column according to claim 1 or 4, its feature exist In two pieces of wedge-shaped deckle board plane perpendicular quadrature composition decussate textures.
6. the simple automatic positioning equipment of cast-in-place concrete pile interpolation steel pipe column according to claim 1, it is characterised in that institute Base is stated by foundation bolt and nut with being fixedly connected at the top of bored concrete pile hypomere and adjusting the base absolute altitude and levelling.
7. the simple automatic positioning equipment of cast-in-place concrete pile interpolation steel pipe column according to claim 6, it is characterised in that every Foundation bolt described in root is furnished with two nuts, and one of them described nut is located at the Its lower side and is used for adjusting base mark High and levelling, another described nut, which is located on the upside of the base, to be used to fasten.
CN201720584325.8U 2017-05-24 2017-05-24 A kind of simple automatic positioning equipment of cast-in-place concrete pile interpolation steel pipe column Expired - Fee Related CN206768822U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720584325.8U CN206768822U (en) 2017-05-24 2017-05-24 A kind of simple automatic positioning equipment of cast-in-place concrete pile interpolation steel pipe column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720584325.8U CN206768822U (en) 2017-05-24 2017-05-24 A kind of simple automatic positioning equipment of cast-in-place concrete pile interpolation steel pipe column

Publications (1)

Publication Number Publication Date
CN206768822U true CN206768822U (en) 2017-12-19

Family

ID=60639131

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720584325.8U Expired - Fee Related CN206768822U (en) 2017-05-24 2017-05-24 A kind of simple automatic positioning equipment of cast-in-place concrete pile interpolation steel pipe column

Country Status (1)

Country Link
CN (1) CN206768822U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680736A (en) * 2019-02-15 2019-04-26 中建五局土木工程有限公司 The auxiliary device and inclination checking method of pore-creating filling pile gradient detection
CN109883296A (en) * 2019-01-29 2019-06-14 中建六局建设发展有限公司 It is a kind of for detecting the measuring tool and measurement method of stake diameter and pile position deviation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109883296A (en) * 2019-01-29 2019-06-14 中建六局建设发展有限公司 It is a kind of for detecting the measuring tool and measurement method of stake diameter and pile position deviation
CN109883296B (en) * 2019-01-29 2024-01-02 中建六局建设发展有限公司 Measuring tool and measuring method for detecting deviation of pile diameter and pile position
CN109680736A (en) * 2019-02-15 2019-04-26 中建五局土木工程有限公司 The auxiliary device and inclination checking method of pore-creating filling pile gradient detection
CN109680736B (en) * 2019-02-15 2024-05-10 中建五局土木工程有限公司 Auxiliary device for detecting inclination of hole-forming cast-in-place pile and inclination detection method

Similar Documents

Publication Publication Date Title
CN113445498A (en) Construction process of karst hole pile foundation in complex geology
CN108330902B (en) Construction method for cast-in-situ lower cross beam of high-pile wharf
CN110952456A (en) Pile type bridge construction process
CN114484073B (en) Artificial pipe jacking construction method
CN206768822U (en) A kind of simple automatic positioning equipment of cast-in-place concrete pile interpolation steel pipe column
CN114164823B (en) Pile foundation construction method in high-fill foundation
CN107100164A (en) A kind of long auger guncreting pile construction method
CN112281897A (en) Construction method of bridge pile foundation
CN114411761B (en) Advanced pre-supporting system and method for subway tunnel to be built in new building construction
CN104897143A (en) Cylinder forced centering observation pillar and embedment method thereof
CN114809029A (en) High cutting slope anchor rod frame beam coupling construction method
CN205329709U (en) Mountain region photovoltaic support foundation structure
CN108978713A (en) A kind of prefabrication elevator shaft foundation pit and its installation method
CN117364789A (en) Soft soil deep foundation pit supporting structure for building construction and supporting construction method thereof
CN106403996A (en) Production method of forced centering observation mark stake for precision engineering measurement
CN208251077U (en) A kind of positioning constructing device of networking measurement control stake
CN109024670B (en) Underground comprehensive pipe gallery protection and reinforcement system penetrating through buried high-voltage cable and reinforcement method
CN108661301B (en) Modular assembly platform for vertical frames of well frames and use method
CN106836198A (en) Positioner combined steel formwork bored concrete pile and construction method
CN105951885B (en) A kind of assembled work well standard knot and its installation method in new construction
CN108708369B (en) Positioning construction method and device for construction net measurement control pile
CN112663634A (en) Geotechnical engineering slope reinforcement device and method
CN211340839U (en) Lamp pole base structure
CN210737452U (en) Waterborne assembled berthing pier
CN111271080A (en) Pipe shed construction method for soft surrounding rock section of tunnel portal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171219

CF01 Termination of patent right due to non-payment of annual fee