CN109149488A - A kind of administrative region of a city railway arrangement structure for pipelines and method - Google Patents

A kind of administrative region of a city railway arrangement structure for pipelines and method Download PDF

Info

Publication number
CN109149488A
CN109149488A CN201811075616.XA CN201811075616A CN109149488A CN 109149488 A CN109149488 A CN 109149488A CN 201811075616 A CN201811075616 A CN 201811075616A CN 109149488 A CN109149488 A CN 109149488A
Authority
CN
China
Prior art keywords
gantry
pipeline
section
buried
direct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811075616.XA
Other languages
Chinese (zh)
Other versions
CN109149488B (en
Inventor
熊盛
周宇冠
李加祺
郑青松
李经伟
杨辉
刘高坤
何武山
黄世明
宋云超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201811075616.XA priority Critical patent/CN109149488B/en
Publication of CN109149488A publication Critical patent/CN109149488A/en
Application granted granted Critical
Publication of CN109149488B publication Critical patent/CN109149488B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/05Suspension arrangements or devices for electric cables or lines
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/02Installations of electric cables or lines in or on the ground or water laid directly in or on the ground, river-bed or sea-bottom; Coverings therefor, e.g. tile

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of administrative region of a city railway arrangement structure for pipelines, direct-buried pipe (6) and aerial laying section including underground laying, the gantry (4) being suspended in outside it is equipped on the supporter (1) along pipeline direction of travel, is equipped at intervals with along pipeline direction of travel several for fixing the fixing piece of the gantry (4);The gantry (4) includes the spaced upper layer gantry and lower layer's gantry for being respectively used to place different type pipeline, if being equipped with dry lattice in the upper layer gantry and lower layer's gantry, Connectivity Section (5) are equipped between the direct-buried pipe (6) and gantry (4), the Connectivity Section (5) includes the aerial linkage section in gantry (4), the buried linkage section in direct-buried pipe (6) and the breeze way for connecting aerial linkage section and buried linkage section.The invention also discloses a kind of administrative region of a city railway pipeline method for arranging.The present invention is able to solve the problem of geology soft location pipe sedimentation, and avoids the interference between different pipelines.

Description

A kind of administrative region of a city railway arrangement structure for pipelines and method
Technical field
The invention belongs to pipeline placement technique fields, more particularly, to a kind of administrative region of a city railway arrangement structure for pipelines and side Method.
Background technique
The laying type of pipeline has very much, is divided into two kinds according to pipelining mode, one is surfaces: conducting wire is directly in pipe In the protectives such as son, wire casing, it is laid in wall, the surface of ceiling and truss, bracket etc..Applied one is dark: conducting wire pipe, In the protectives such as wire casing, it is laid in the inside such as wall, ceiling, terrace and floor, or wiring etc. in concrete plate hole.
Most common of them is buried-pipe laying, and buried-pipe laying is divided into directly buried installation and in-duct installation.Wherein by pipeline Mode on the wall of the independent rack, truss and the building that are laid on ground is exactly aerial laying, is had convenient for applying Work, operation, inspection, maintenance and it is economical the advantages that;Directly buried installation is a kind of system of laying that pipeline is directly buried, its advantage is that Using the space of underground, keep the above space in ground more succinct, and is not required to bearing measure;In-duct installation is by pipeline laying in ground In trench made of concrete or masonry bond under face, the underground space can be made full use of, and provide and more conveniently check Maintenance condition can also lay the pipeline of the high temperature of thermal insulation layer, easy coagulation medium or corrosive media.The disadvantage is that costly, land occupation Area is big, need to set drainage point, easily gathers or seal in oil gas, increases insecurity factor, and dirt clears up difficulty etc..Various system of laying There is the respective scope of application.And in the prior art, the pipelining in a workshop, a factory or even a regional scope A kind of pipelining mode is mostly used to be radiated.
Buried-pipe laying and in-duct installation are most traditional most common pipelining mode, but the location softer in soil property, are passed There are many defects for the in-duct installation mode of system;On the one hand, traditional laying because of shock and vibration and can be built in use It builds the effect of the extraneous stress such as the flexible of object, sedimentation and destroys and lay the line, to cause pipe trench basic in actual use It is deposited in mud;On the other hand, the pipeline of laying is divided into forceful electric power, light current, and two kinds of cross pipe-lines will appear interference, in addition manage Ditch sedimentation can aggravate the interference between strong and weak two kinds of pipelines.In addition to this, traditional single pipelining mode, in landform, sets The different sections for applying the factors such as function, pipeline type are less applicable in, and single system of laying will increase pipelining difficulty, are increased Cost increases repair and maintenance expense.
Summary of the invention
Aiming at the above defects or improvement requirements of the prior art, the present invention provides a kind of administrative region of a city railway arrangement structure for pipelines, Gantry is set up using the existing structure for support in the soft location of soil property, pipeline is placed in gantry, is avoided because of punching It hits, vibrate and the extraneous stress effects such as the flexible of building, sedimentation cause pipe trench foundation settlement into mud;Gantry, which divides two layers, to be set It sets, is respectively used to place forceful electric power pipeline and light current pipeline, prevents two kinds of cross pipe-lines from interfering;Grid is set in gantry, no Same pipeline is placed in different grids, and different pipelines is kept apart, mutual interference, while easy access are avoided And maintenance;It is configured by the way of buried-pipe laying crossing rail location, to adapt to the pipelining of different section.
To achieve the goals above, as one aspect of the present invention, a kind of administrative region of a city railway arrangement structure for pipelines is provided, is wrapped The direct-buried pipe for including underground laying further includes aerial laying section, is equipped with and is suspended in outside it along pipeline direction of travel on the supporter Gantry, be equipped at intervals with along pipeline direction of travel several for fixing the fixing pieces of the gantry;
The gantry includes the spaced upper layer gantry and lower layer's gantry for being respectively used to place different type pipeline, institute Dry lattice is equipped in upper layer gantry and lower layer's gantry if stating, if for being divided into stem portion to place different type pipe respectively Line;
Be equipped with Connectivity Section between the direct-buried pipe and gantry, the Connectivity Section include aerial linkage section in the gantry, The breeze way of buried linkage section and connection aerial linkage section and buried linkage section in direct-buried pipe, to realize aerial laying section It is excessive with the connection of underground laying.
Further, the top of the buried linkage section is equipped with one layer of cover board.
Further, the aerial linkage section includes upper layer branch line and lower layer's branch line.
Further, the bottom of the upper layer branch line is connected to lower layer branch line.
Further, the aerial linkage section, buried linkage section and breeze way are zinc-plated portal structure.
Further, interlayer linkage section, interlayer linkage section end are equipped between the upper layer gantry and lower layer's gantry It is placed in lower layer's gantry.
Further, forceful electric power pipeline is placed in the gantry of upper layer, places light current pipeline in lower layer's gantry.
As another aspect of the present invention, a kind of administrative region of a city railway pipeline method for arranging is provided, is included the following steps:
S1 builds aerial laying section: positioning by design drawing unwrapping wire, by the anchor bolt on design requirement installation wall;Lift bridge Frame, and grid is set in gantry;Pressure experiment and hermeticity experiment are carried out to the gantry set up;It is removed after experiment is qualified Surface rusty stain, brush antirust paint, finishing coat simultaneously do isothermal holding;
S2 lays direct-burried pipeline: first measuring to underground environment, determines the buried depth of pipeline in direct-burried pipeline;It beats Stake, digs pipe trench at unwrapping wire, and bed course is arranged, under bury before pipeline is assembled, and carry out the preservative treatment of pipeline;Pipeline is pressed Power experiment and hermeticity experiment,
The aerial laying section of S3 connection and direct-buried pipe;
S4 carries out preservative treatment to the interface of aerial laying section and direct-buried pipe, returns after the completion of preservative treatment to pipe trench It fills out.
Further, which is characterized in that in step S3, connect there are two types of the aerial modes for laying section and direct-buried pipe, first is that Linkage section will be set between upper layer gantry and lower layer's gantry, the pipeline of upper layer gantry will be imported into lower layer's gantry, then is passed through Connectivity Section is imported into direct-buried pipe;Another kind be directly by Connectivity Section import direct-buried pipe, Connectivity Section including respectively with upper layer bridge Frame is connected to upper layer branch line and lower layer's branch line with lower layer's gantry, and upper layer branch line is connected to lower layer's branch line.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, can obtain down and show Beneficial effect:
(1) administrative region of a city railway arrangement structure for pipelines of the invention, in the soft location of soil property using existing for support Structure sets up gantry, and pipeline is placed in gantry, avoids because of the extraneous stress such as shock and vibration and the flexible of building, sedimentation Effect causes pipe trench foundation settlement into mud;Two layers of setting of gantry point, is respectively used to place forceful electric power pipeline and light current pipeline, prevent Only two kinds of cross pipe-lines interfere;Grid is set in gantry, and different pipelines is placed in different grids, by different pipes Line is kept apart, and mutual interference, while easy access and maintenance are avoided;Cross rail location by the way of buried-pipe laying into Row setting, to adapt to the pipelining of different section.
(2) administrative region of a city railway arrangement structure for pipelines of the invention, is arranged Connectivity Section between aerial section and buried-pipe laying section, packet Aerial linkage section, buried linkage section and breeze way are included, one section of aerial linkage section is placed in gantry, and buried linkage section is placed in direct-burried In pipe, and by intermediate breeze way connection, realize aerial section between underground pipe it is steady excessively, while the gantry of Connectivity Section For zinc-plated gantry, assembles and corrode or pollutant effects are to the pipe of the inside to avoid the gantry on ground or more is arranged in by grieshoch Line has an impact.And it is equipped with one layer of cover board at the top of buried linkage section, in order to later maintenance.
(3) administrative region of a city railway arrangement structure for pipelines of the invention, the aerial linkage section of two layers of gantry include two branch lines, upper layer Branch line bottom is connected to lower layer's branch line, and the pipeline of upper layer gantry is imported into lower layer's branch line by upper layer branch line, thus by burying Ground linkage section is imported into direct-buried pipe, and overhead two layers of pipeline is transferred in the direct-buried pipe of underground, is realized by linkage section Two layers of gantry and direct-buried pipe it is steady excessively.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that laying section is maked somebody a mere figurehead in a kind of administrative region of a city railway arrangement structure for pipelines of the embodiment of the present invention;
Fig. 2 is to make somebody a mere figurehead between laying and directly buried installation section in a kind of administrative region of a city railway arrangement structure for pipelines of the embodiment of the present invention The structural schematic diagram of Connectivity Section;
Fig. 3 is the structure that the connection structure embodiment one between laying two layers of gantry of section and directly buried installation is maked somebody a mere figurehead in the present invention Schematic diagram;
Fig. 4 is the structure that the connection structure embodiment two between laying two layers of gantry of section and directly buried installation is maked somebody a mere figurehead in the present invention Schematic diagram.
In all attached drawings, identical label indicates same structure or part, in which: 1- supporter, 2- ground elevation, 3- anchor Bolt, 4- gantry, the Connectivity Section 5-, 6- direct-buried pipe.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not For limiting the present invention.As long as in addition, technical characteristic involved in the various embodiments of the present invention described below that Not constituting conflict between this can be combined with each other.
For the good laying of the pipeline in the softer location of guarantee soil property, the present invention is used based on the aerial laying of pipeline, is buried Ground laying supplemented by arrangement structure for pipelines, according to actual landform carry out adaptability setting, with guarantee pipelining arragement construction and Reasonable, the economic and stabilization of method.
Fig. 1 is the structural schematic diagram that laying section is maked somebody a mere figurehead in a kind of administrative region of a city railway arrangement structure for pipelines of the embodiment of the present invention.Such as Shown in Fig. 1, the pipeline configuration of aerial laying includes supporter 1, fixing piece and gantry 4, and supporter 1 provides support for pipeline, Wherein, supporter 1 is existing for support section, such as the structure with certain stability that wall is built on the ground;Branch Direction of travel on support body 1 along pipeline is equipped at intervals with several fixing pieces, and preferably the fixing piece is anchor bolt 3, other are able to achieve bridge Fixed structure between frame 4 and supporter 1 is also within protection scope of the present invention;Gantry 4 along pipeline direction of travel arrange, and It is suspended in outside supporter 1, to form the suspention space that do not take up an area, and solves tradition setting pipe trench foundation settlement into mud The problem of.Gantry 4 is fixed on supporter 1 by spaced several anchor bolts 3, to form firm overhung construction, guarantees pipe The stability of road laying.
Preferably, gantry 4 includes setting up and down two layers, upper layer gantry and the setting of lower layer's gantry interval;Upper layer gantry and Lower layer's gantry is respectively used to place different types of pipeline, preferably, at forceful electric power pipeline and light current cross pipe-line position, by force Electric line and light current pipeline are divided into the gantry 4 of different layers, and if upper layer gantry is for placing forceful electric power pipeline, lower layer's gantry is used for Light current pipeline is placed, to prevent forceful electric power pipeline and light current cross pipe-line from generating interference.As a preferred embodiment, upper layer bridge is erected at At outdoor ground 1200mm, lower layer's gantry is located at away from outdoor ground 1350mm, to be set suitably setting up in range It sets, reducing the interference to other facilities while reducing difficulty of construction reduces danger.
If being equipped with dry lattice in gantry 4 to be respectively used to place different pipelines if gantry 4 is divided into stem portion by grid, with Different pipelines is kept apart, mutual interference, while easy access and maintenance are avoided.Preferably, gantry 4 is zinc-plated bridge Frame is generated shadow to the pipeline of the inside by grieshoch aggregation and corrosion or pollutant effects to avoid the gantry that ground or more is arranged in It rings.
Preferably, contact net pipeline is set to vehicle and hands over ride position, in order to which vehicle is driven out to;Municipal water pipe is avoided rail and is set It sets, the indispensable life industrial water pipe such as life water pipe and well water pipe, outdoor fire hydrant water pipe, rain pipe, municipal water pipe is according to reality Border demand and plant layout structure.
Buried system of laying is used according to corresponding design specification.Illumination is all necessary, institute for entire workshop It is arranged with illuminating pipeline around entire workshop.Weak current comprehensive pipeline is mainly communication line, because of debugging demand, communication line master It is arranged in northeast and the southwest both direction of workshop.
Fig. 2 is to make somebody a mere figurehead between laying and directly buried installation section in a kind of administrative region of a city railway arrangement structure for pipelines of the embodiment of the present invention The structural schematic diagram of linkage section.As shown in Fig. 2, the softer location of soil property carries out the laying of pipeline by the way of aerial laying, The mode that the suitable location of soil property can choose buried-pipe laying is laid the line, cross the preferred buried-pipe laying in rail location mode, Connectivity Section 5 is equipped between aerial laying location and buried-pipe laying location, Connectivity Section 5 is zigzag structure, and Connectivity Section includes aerial One section of linkage section, buried linkage section and breeze way, aerial linkage section is placed in gantry 1, and buried linkage section is placed in direct-buried pipe 6 It is interior, it is equipped with breeze way between aerial linkage section and buried linkage section and draws pipeline more than ground for reducing the height of pipeline Enter into the direct-buried pipe 6 of below ground.Preferably, making somebody a mere figurehead linkage section, buried linkage section and breeze way is portal structure, pipeline It is placed in portal structure, to play a certain protective role.Further, the gantry of Connectivity Section is zinc-plated gantry, to avoid setting The gantry more than ground is set to have an impact the pipeline of the inside by grieshoch aggregation and corrosion or pollutant effects.And buried The top of linkage section is equipped with one layer of cover board, in order to later maintenance.
Fig. 3 is the structure that the connection structure embodiment one between laying two layers of gantry of section and directly buried installation is maked somebody a mere figurehead in the present invention Schematic diagram.As shown in figure 3, Connectivity Section 5 includes aerial linkage section, buried linkage section and breeze way, wherein aerial linkage section includes Two branch lines, upper layer branch line bottom is connected to lower layer's branch line, and upper layer branch line is placed in the gantry of upper layer, and lower layer's branch line is placed in lower layer In gantry, the pipeline of upper layer gantry is imported into lower layer's branch line by upper layer branch line, to be imported into directly by buried linkage section In pipe laying 6, overhead two layers of pipeline is transferred in the direct-buried pipe 6 of underground.Preferably, Connectivity Section 5 is zinc-plated gantry, is used for Pipeline, which provides protection against, to be damaged.
Fig. 4 is the structure that the connection structure embodiment two between laying two layers of gantry of section and directly buried installation is maked somebody a mere figurehead in the present invention Schematic diagram.As shown in figure 4, being equipped with interlayer linkage section, the end of interlayer linkage section between the end and lower layer's gantry of upper layer gantry It is placed in lower layer's gantry, is placed at the top of interlayer linkage section in the gantry of upper layer, for the pipeline in the gantry of upper layer to be passed through interlayer Linkage section is imported into lower layer's gantry, and the transfer between upper and lower level provides protection;The pipeline being imported into lower layer's gantry is logical It crosses Connectivity Section 5 to be transferred in direct-buried pipe 6, the pipeline in two layers of gantry is transferred to underground to realize, and ensure transfer process Middle pollutant can not erode to internal pipeline, increase pipeline service life.
As another aspect of the present invention, a kind of administrative region of a city railway pipeline method for arranging is provided, steps are as follows:
S1 builds aerial laying section;
S11 is positioned by design drawing unwrapping wire, by the anchor bolt on design requirement installation wall, it is preferable that be arranged one every 3 meters A anchor bolt, for fixing gantry;
S12 lifts gantry 4, and grid is arranged in gantry 4;Preferably, away from setting upper layer at outdoor ground 1200mm Lower layer's gantry is arranged at 1350mm for gantry, then that light current pipeline and forceful electric power pipeline is arranged apart;
S13 carries out pressure experiment and hermeticity experiment to the gantry 4 set up, to guarantee the pipeline in it not by ash Strata collection and corrosion or pollutant effects;
Surface rusty stain, brush antirust paint, finishing coat are removed after S14 experiment is qualified and do isothermal holding;
S2 lays direct-burried pipeline;
S21 first measures underground environment, determines the buried depth of pipeline in direct-burried pipeline;
S22 piling, digs pipe trench at unwrapping wire, and bed course is arranged, under bury before pipeline is assembled, and carry out the preservative treatment of pipeline;
S23 carries out pressure experiment and hermeticity experiment to pipeline,
The aerial laying section of S3 connection and direct-buried pipe 6, there are two types of the modes for connecting aerial laying section and direct-buried pipe, first is that will be Linkage section is set between upper layer gantry and lower layer's gantry, the pipeline of upper layer gantry is imported into lower layer's gantry, then passes through connection Section is imported into direct-buried pipe;Another kind be directly by Connectivity Section import direct-buried pipe, Connectivity Section including respectively with upper layer gantry and Lower layer's gantry connection upper layer branch line and lower layer's branch line, upper layer branch line are connected to lower layer's branch line.
S4 carries out preservative treatment to the interface of aerial laying section and direct-buried pipe, returns after the completion of preservative treatment to pipe trench It fills out.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, it is not used to The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should all include Within protection scope of the present invention.

Claims (9)

1. a kind of administrative region of a city railway arrangement structure for pipelines, the direct-buried pipe (6) including underground laying, which is characterized in that further include making somebody a mere figurehead Section is laid, the gantry (4) being suspended in outside it is equipped on the supporter (1) along pipeline direction of travel, along pipeline direction of travel It is equipped at intervals with several for fixing the fixing piece of the gantry (4);
The gantry (4) includes the spaced upper layer gantry and lower layer's gantry for being respectively used to place different type pipeline, institute Dry lattice is equipped in upper layer gantry and lower layer's gantry if stating, if for being divided into stem portion to place different type pipe respectively Line;
Connectivity Section (5) are equipped between the direct-buried pipe (6) and gantry (4), the Connectivity Section (5) includes being set in gantry (4) Aerial linkage section, the buried linkage section being set in direct-buried pipe (6) and the breeze way for connecting aerial linkage section and buried linkage section, with Realize that the connection of aerial laying section and underground laying is excessive.
2. a kind of administrative region of a city railway arrangement structure for pipelines according to claim 2, which is characterized in that the buried linkage section Top is equipped with one layer of cover board.
3. a kind of administrative region of a city railway arrangement structure for pipelines according to claim 1, which is characterized in that the aerial linkage section packet Include upper layer branch line and lower layer's branch line.
4. a kind of administrative region of a city railway arrangement structure for pipelines according to claim 3, which is characterized in that the bottom of the upper layer branch line Portion is connected to lower layer's branch line.
5. a kind of administrative region of a city railway arrangement structure for pipelines according to claim 1, which is characterized in that the aerial linkage section, Buried linkage section and breeze way are zinc-plated portal structure.
6. a kind of administrative region of a city railway arrangement structure for pipelines according to claim 1, which is characterized in that the upper layer gantry is under It is equipped with interlayer linkage section between layer gantry, interlayer linkage section end is placed in lower layer's gantry.
7. a kind of administrative region of a city railway arrangement structure for pipelines according to claim 1, which is characterized in that placed in the gantry of upper layer strong Electric line places light current pipeline in lower layer's gantry.
8. a kind of administrative region of a city railway pipeline method for arranging as described in any one of claim 1~7, which is characterized in that including Following steps:
S1 builds aerial laying section: positioning by design drawing unwrapping wire, by the anchor bolt on design requirement installation wall;Gantry is lifted, And grid is set in gantry;Pressure experiment and hermeticity experiment are carried out to the gantry set up;Table is removed after experiment is qualified Face rusty stain, brush antirust paint, finishing coat simultaneously do isothermal holding;
S2 lays direct-burried pipeline: first measuring to underground environment, determines the buried depth of pipeline in direct-burried pipeline;Piling, Unwrapping wire digs pipe trench, and bed course is arranged, under bury before pipeline is assembled, and carry out the preservative treatment of pipeline;It is real that pressure is carried out to pipeline It tests and hermeticity experiment,
The aerial laying section of S3 connection and direct-buried pipe;
S4 carries out preservative treatment to the interface of aerial laying section and direct-buried pipe, backfills after the completion of preservative treatment to pipe trench.
9. a kind of administrative region of a city railway pipeline method for arranging according to claim 8, which is characterized in that it is characterized in that, step In S3, connect there are two types of the aerial modes for laying section and direct-buried pipe, first is that company will be arranged between upper layer gantry and lower layer's gantry Section is connect, the pipeline of upper layer gantry is imported into lower layer's gantry, then is imported into direct-buried pipe by Connectivity Section;Another kind is direct Direct-buried pipe is imported by Connectivity Section, Connectivity Section includes being connected to upper layer branch line and lower layer's branch with upper layer gantry and lower layer's gantry respectively Line, upper layer branch line are connected to lower layer's branch line.
CN201811075616.XA 2018-09-14 2018-09-14 Urban railway pipeline arrangement structure and method Active CN109149488B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811075616.XA CN109149488B (en) 2018-09-14 2018-09-14 Urban railway pipeline arrangement structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811075616.XA CN109149488B (en) 2018-09-14 2018-09-14 Urban railway pipeline arrangement structure and method

Publications (2)

Publication Number Publication Date
CN109149488A true CN109149488A (en) 2019-01-04
CN109149488B CN109149488B (en) 2024-05-24

Family

ID=64825468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811075616.XA Active CN109149488B (en) 2018-09-14 2018-09-14 Urban railway pipeline arrangement structure and method

Country Status (1)

Country Link
CN (1) CN109149488B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115130755A (en) * 2022-05-20 2022-09-30 国家石油天然气管网集团有限公司 Method, processor, device and storage medium for determining long-distance pipeline route

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101651309A (en) * 2008-08-12 2010-02-17 上海宝冶建设有限公司 Method for embedding direct-embedded power cable protecting pipe for field compaction test mechanical strength
US7994426B1 (en) * 2004-06-10 2011-08-09 Rizzuto Jr Salvatore A Slack cable arrangement for underground electric service conduit connected to service boxes on the sides of buildings
CN105098679A (en) * 2015-07-02 2015-11-25 中国电建集团贵阳勘测设计研究院有限公司 Combined vertical post for cable bridge
CN204852787U (en) * 2015-08-18 2015-12-09 无锡市政设计研究院有限公司 Direct -burried heating power pipeline protection architecture
CN106058779A (en) * 2016-07-19 2016-10-26 中铁第四勘察设计院集团有限公司 Tram project ground interval strong and weak electricity pipe line layout structure
CN106451271A (en) * 2016-12-28 2017-02-22 国网冀北电力有限公司迁西县供电分公司 Cable aisle bridge structure and installment method thereof
CN206250693U (en) * 2016-11-23 2017-06-13 中冶南方工程技术有限公司 Integrated form multiple types cable laying route device
CN107492851A (en) * 2017-09-27 2017-12-19 中建七局建筑装饰工程有限公司 A kind of cable tray connector of adjustable angle
CN209029874U (en) * 2018-09-14 2019-06-25 中铁第四勘察设计院集团有限公司 A kind of administrative region of a city railway arrangement structure for pipelines

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7994426B1 (en) * 2004-06-10 2011-08-09 Rizzuto Jr Salvatore A Slack cable arrangement for underground electric service conduit connected to service boxes on the sides of buildings
CN101651309A (en) * 2008-08-12 2010-02-17 上海宝冶建设有限公司 Method for embedding direct-embedded power cable protecting pipe for field compaction test mechanical strength
CN105098679A (en) * 2015-07-02 2015-11-25 中国电建集团贵阳勘测设计研究院有限公司 Combined vertical post for cable bridge
CN204852787U (en) * 2015-08-18 2015-12-09 无锡市政设计研究院有限公司 Direct -burried heating power pipeline protection architecture
CN106058779A (en) * 2016-07-19 2016-10-26 中铁第四勘察设计院集团有限公司 Tram project ground interval strong and weak electricity pipe line layout structure
CN206250693U (en) * 2016-11-23 2017-06-13 中冶南方工程技术有限公司 Integrated form multiple types cable laying route device
CN106451271A (en) * 2016-12-28 2017-02-22 国网冀北电力有限公司迁西县供电分公司 Cable aisle bridge structure and installment method thereof
CN107492851A (en) * 2017-09-27 2017-12-19 中建七局建筑装饰工程有限公司 A kind of cable tray connector of adjustable angle
CN209029874U (en) * 2018-09-14 2019-06-25 中铁第四勘察设计院集团有限公司 A kind of administrative region of a city railway arrangement structure for pipelines

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115130755A (en) * 2022-05-20 2022-09-30 国家石油天然气管网集团有限公司 Method, processor, device and storage medium for determining long-distance pipeline route

Also Published As

Publication number Publication date
CN109149488B (en) 2024-05-24

Similar Documents

Publication Publication Date Title
CN105064400A (en) Urban comprehensive pipe rack of steel corrugated plate structure
CN107761911A (en) A kind of construction method for the blowdown pipe network for improving installation quality
CN104482343B (en) A kind of shock-insulation building flexibly connects the construction method of installation of pipeline
CN103123016A (en) Construction method for laying gas pipelines along bridge
CN206090610U (en) Utility tunnel system
CN207143708U (en) A kind of across foundation ditch synthesis steel trestle of lift-on/lift-off type
CN209029874U (en) A kind of administrative region of a city railway arrangement structure for pipelines
CN105672351A (en) Construction method of buckling connection type prefabricated ribbed bar concrete comprehensive pipe rack structure
CN109149488A (en) A kind of administrative region of a city railway arrangement structure for pipelines and method
CN102877538A (en) Construction method for fixing HDPE (high-density polypropylene) pipe by embedding iron wires
CN109137965A (en) A kind of pipe gallery
CN202194159U (en) Square pipe gallery bracket and square pipe gallery
CN111456085A (en) Cast-in-place concrete construction method for pipe gallery segment
CN204113295U (en) A kind of municipal shield tunnel
CN208280171U (en) A kind of city integrated piping lane
CN207646753U (en) Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery
CN214695953U (en) Domestic sewage drainage pipe that municipal works were used
CN206635786U (en) Prefabricated assembled transformer substation foundation structure
CN212612636U (en) Prefabricated inspection well
CN211948676U (en) Major diameter municipal administration steel pipe underground installation structure
CN209781885U (en) novel waterproof well chamber
CN204113300U (en) Municipal tunnel
CN210507520U (en) City utility tunnel structure
CN110635436A (en) Compound cable pit
CN111980065A (en) Assembled underground pipe gallery and connecting method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant