CN207646753U - Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery - Google Patents
Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery Download PDFInfo
- Publication number
- CN207646753U CN207646753U CN201721667853.6U CN201721667853U CN207646753U CN 207646753 U CN207646753 U CN 207646753U CN 201721667853 U CN201721667853 U CN 201721667853U CN 207646753 U CN207646753 U CN 207646753U
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- piping lane
- pier
- bottom plate
- mere figurehead
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model is related to a kind of piping lanes for layment cable, especially a kind of single single cabin formula of pier support makes somebody a mere figurehead pipe gallery, its structural feature is, include single pier supporting member and pipe gallery, the support of single pier supporting member one end is in ground base or supporting surface, pipe gallery includes multiple piping lane sections, each piping lane Duan Jun includes side wall, head cover and bottom plate, side wall includes a left side, right two side, vertically stand on the two sides of bottom plate, between head cover and bottom plate, head cover is in chevron shaped construction, bottom plate is then fixedly connected with the upper surface of single pier supporting member;Multiple cantilever supports that can set up various pipelines are installed, the piping lane section is prefabricated steel member, after basis pours at the scene, carries out in-site installation splicing, the opening face of front and back piping lane section is attached, final to form whole synthesis piping lane on side wall.The advantage is that it is easy for construction, easy to operate, the construction period is short, at low cost, easy access and maintenance.
Description
Technical field
The utility model is related to a kind of piping lane for layment cable, especially a kind of single single cabin formula of pier support is aerial
Pipe gallery is mainly used in industry(Industry)Newly-built region in garden.
Background technology
With the development of society, urban land is more and more nervous, most of circuit includes power cable, communication cable
Deng can not lay on the ground, not only it is unfavorable for city appearance, and takes up an area more, is easy to interfere with building, for understanding
Certainly this problem, the city development underground space establish underground pipe gallery, and each pipeline is applied to the underground pipe gallery of municipal major trunk roads
In.According to the regulation of GB 50838, the definition of pipe gallery is:" be built in Urban Underground for accommodate the above municipal engineering of two classes
The structures and affiliated facility of pipeline ".And in urban construction, also turn the underground construction project important as one using aerial.
Traditional underground pipe gallery construction needs to excavate foundation trench first along piping lane axis and after-pouring or use are prefabricated
Assembling process builds reinforced concrete pipe gallery structure, Pipe rack pours after the completion of, carries out waterproof homework, finally backfills base
Slot, and carry out the construction of ground structure layer or greening restores, and the building for affiliated facilities such as it is aerated, drains, illuminate in inside
If so just having the condition for laying all kinds of pipelines.
However, the infant industry in city(Industry)Garden, other than building and the more intensive residential area of road,
Industrial park needs to be equipped with a large amount of energy supply pipeline for industrial premises, these pipelines need to lay with road.However industry park
Gradually moving into for the workshop in area, across the time may be very long, if it is numerous not only to face maintenance using respective buried laying for pipeline
It is trivial, and excavated there may be a large amount of, influence the traffic in garden;According to pipe gallery laying pipeline underground, not only build
It is big to surrounding environment influence if the period is long, and investment is also huge, is unfavorable for overhauling.
Utility model content
The purpose of this utility model is that according to prior art shortcoming and a kind of easy for construction, operation letter is provided
It is single, the construction period is short, the single cabin formula of single pier support of at low cost, easy access and maintenance makes somebody a mere figurehead pipe gallery.
Purpose described in the utility model is realized by following approach:
Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery, and structural feature is, includes single pier supporting member and integrated pipe
Corridor, the support of single pier supporting member one end is in ground base or supporting surface, and pipe gallery includes multiple piping lane sections, often
A piping lane Duan Jun includes side wall, head cover and bottom plate, and side wall includes arranged on left and right sides wall, is vertically stood on the two sides of bottom plate, position
Between head cover and bottom plate, head cover is in chevron shaped construction, and bottom plate is then fixedly connected with the upper surface of single pier supporting member;On side wall
Multiple cantilever supports that can set up various pipelines are installed, the piping lane section is prefabricated steel member, and basis pours at the scene
Afterwards, in-site installation splicing is carried out, the opening face of front and back piping lane section is attached, it is final to form whole synthesis piping lane.
The list pier supporting member refers to single pillar support piping lane, and the pipe gallery constructs for closed gallery, by
Several piping lane sections are spliced, and design of cover is the chevron structure with conventional roof, and existing aesthetic feeling can also be conducive to simultaneously
Top drains.Pipe gallery of the present invention is installed on the ground in a manner of aerial, and the pipeline piping lane that original is embedded in underground changes
It is maked somebody a mere figurehead to be mounted on ground, the different energy supply pipe such as medium-pressure power cable, communication cable and feedwater piping can be laid in piping lane
Line.Piping lane uses full steel structure precast assembly, and other than basis needs cast in situs, remaining component includes supporting member and piping lane
Section is all made of prefabrication, is finished when field basic pours, and all prefabricated components directly arrive scene and carry out assembly, thus subtract significantly
The workload at small scene improves construction efficiency, shortens the construction period, reduces construction cost;Pass through industrial park simultaneously
Planning, it is only necessary to which single pier is supported in ground, in the greenbelt of be generally laid in road or factory area, does not influence garden land used, can
To carry out adaptability design according to the planning of garden, gradually follows up with the construction of garden, do not influence the building construction tune of garden
It is whole, it is small to surrounding environment influence.The piping lane design of overhead type facilitates maintenance and maintenance work, and ventilation and drainage, illumination etc. are attached
The construction for belonging to facility opposite can be reduced, that is, is reduced construction volume and construction cost and given cable more arrangement spaces again.
The utility model can be specially further:
The multiple cantilever support is unilateral multi-level arrangement, when multiple cantilever supports are installed in multi-level arrangement
When on left side wall or right side wall, opposite other side space is set as catwalk.
Either:The multiple cantilever support is arranged for bilateral, is distributed on two side in multi-level arrangement at many levels
There is cantilever support, and the space among the cantilever support of both sides is catwalk.
According to the different arrangement of above two, pipe gallery described in the utility model can be divided into single-sided arrangement formula structure
It makes and is constructed with bilateral arrangement formula, can be selected according to the practical construction demand of garden.
Two insides of piping lane section are provided with the shutter of pass-through type, and bottom plate is paved into using Turbogrid plates.
Pass-through type shutter refers to that can be closed completely, while can also be in communication with the outside at an angle, in this way, both full
The requirement of the sun-proof and rain-proof of foot can also meet ventilation inside piping lane, lighting requirement.
The basis of the list pier supporting member is either independent board-like footing of a pillar or is pile foundation brace foundation.
According to the soil property of garden, the basic different from of single pier supporting member:When foundation soil be cohesive soil or its
When he can be used as the stratum of essential bearing stratum, basis uses independent board-like footing of a pillar;When foundation soil is weak soil, then may be used
Basis using pile foundation as support pier.This is situation of single pier support member support on soil, when needing to be supported on other
It can be designed according to supporting condition when in capital construction, it is ensured that the safety and stability of support.
The list pier supporting member using etc. wall thickness steel tubes, be galvanizing erosion resistant coating, upper end and piping lane section bottom on steel pipe
Stiffener plate is arranged in plate junction, and stiffener plate is distributed perpendicular to the lower face of piping lane section bottom plate and along the ring week of steel pipe.
The list pier supporting member upper surface is provided with end face platform, and the piping lane section is seated on the platform of end face, and with
End face platform is fixedly connected.
End face platform can be integrated prefabricated with supporting member.
The piping lane section of the pipe gallery uses full steel structure precast assembly, and longitudinal side wall is using frame structure of spreading out.
It is longitudinal as a result, to use truss structure stress, laterally use steelframe system, it is ensured that the stability of structure.
In the multiple single pier supporting members for supporting pipe gallery, moved towards along piping lane between each adjacent two list pier supporting member
Direction spacing be 8-12m.
It is longitudinal with pipe gallery trend, is distributed a single pier supporting member every 8-12m, be generally laid in road or work
In the greenbelt in plant area domain, garden land used is not influenced, is not take up park building space.
In conclusion the utility model provides a kind of aerial pipe gallery of single single cabin formula of pier support, with the support of single pier
Originally the electric integrated piping lane for being embedded in underground is changed to built on stilts installation by mode, and medium-pressure power cable can be laid in piping lane, is led to
The different energy supply pipeline such as cable and feedwater piping is interrogated, the related needs of industrial park factory range are met.The utility model has
There is following technique effect:
1, piping lane uses full steel structure precast assembly, and other than basis needs cast in situs, remaining component is all made of factory
Prefabricated, high precision machining is cheap, and can greatly reduce the workload at scene, improves construction efficiency, shortens construction work
Phase.
2, the piping lane of overhead type can be utilized directly without carrying out complicated civil construction, the facilities such as ventilation and drainage, illumination
Natural conditions can reduce relevant device compared to underground pipe gallery, simplify operational procedure significantly, reduce construction work amount, drop
Low construction cost without concealed work, therefore also reduces simultaneously because overhead type piping lane is not limited by stratum edaphic condition
Construction risk.
3, it only needs single pier to be supported in ground, in the greenbelt of be generally laid in road or factory area, does not influence garden use
Ground.
4, personnel's repair and maintenance is more simple and convenient, security reliability higher.
Description of the drawings
Fig. 1 is the cross-sectional configuration schematic diagram that single single cabin formula of pier support described in the utility model makes somebody a mere figurehead pipe gallery.
Fig. 2 is the longitudinal plane structure schematic diagram that single single cabin formula of pier support described in the utility model makes somebody a mere figurehead pipe gallery.
The utility model is described further with reference to embodiment.
Specific implementation mode
Most preferred embodiment:
For the present embodiment by taking bilateral arrangement formula construction as an example, single-sided arrangement formula component can refer to understanding.It is single with reference to attached drawing 1-2
The single cabin formula of pier support makes somebody a mere figurehead pipe gallery, includes single pier supporting member 1 and pipe gallery, along the side of trend of pipe gallery
To at interval of one single pier supporting member of 8-10m arrangements.Wall thickness steel tubes, the specifications such as 1 use of list pier supporting member can be Φ
325/12, using galvanizing anti-corrosion, overhead height is that 4.0m~6.0m is differed;Single 1 one end of pier supporting member support is mounted on ground
On face basis 9 or supporting surface, when foundation soil is cohesive soil or other can be used as the stratum of essential bearing stratum, basis uses
Independent board-like footing of a pillar;When foundation soil is weak soil, then basis of the pile foundation as support pier can be used.Single pier supports structure
Part 1 is prefabricated components, and after the completion of ground base pours, single pier supporting member 1 can directly joint connection in site installation.
Pipe gallery includes multiple piping lane sections, and each piping lane Duan Jun includes side wall 2, head cover 3 and bottom plate 4, and side wall 2 wraps
Arranged on left and right sides wall is included, is vertically stood on the two sides of bottom plate 4, between head cover 3 and bottom plate 4, head cover 3 is on cross section
Chevron shaped construction drains convenient for rain-proof, and bottom plate 4 is then fixedly connected with the upper surface of single pier supporting member 1, and it is auxiliary can to increase ribs
Help fixation.Multiple cantilever supports 10 that can set up various pipelines are installed, the multiple cantilever support is in more on side wall 2
Level bilateral is arranged, i.e., cantilever support is distributed on two side, and the space among the cantilever support of both sides is that maintenance is walked
Road 8;Clear space size is inside piping lane:3.0m wide × 2.4m high, one of access path of centre setting, channel dead size are:
1.0m width × 1.9m high.
The piping lane section is prefabricated steel member, after basis pours at the scene, in-site installation splicing is carried out, by front and back piping lane section
Opening face be attached, it is final to form whole synthesis piping lane, it is longitudinal to use 11 stress of truss structure, laterally use steelframe system
(With reference to attached drawing 2).3 times 35kV/10kV midium voltage cables 5 can be arranged inside pipe gallery, while can arrange several times logical
Interrogate cable 6 and 2 feed pipes 7;Cantilever support bearing length is 1.0m, and interlamellar spacing meets related regulatory requirements, general feelings
Under condition, power cable clear spacing is 460mm, communication cable shelf layer clear spacing is 360mm;Under power cable and communication cable
Side is respectively arranged the feed pipe or raw water tubes of 1 DN200~DN600.
Compared to traditional underground pipe gallery construction, Civil Cost between 2.5 ten thousand/m~3.0 ten thousand/m, and the duration compared with
Long, conventional is more than the engineering of 1.0km, and the construction period is mostly more than 9 months, and civil engineering complex procedures.And the utility model is in addition to base
For plinth using outside field cast-in-place, remaining is all made of prefabrication, high precision machining, and cheap, under normal circumstances, piping lane theme
The cost of linear meter(lin.m.) is between 0.8 ten thousand/m~1.2 ten thousand/m, and less than the 40% of traditional piping lane, economic benefit is fairly obvious.At the same time,
Since main member all uses prefabrication, site operation short time limit to complete, do not examined to Pipe rack since foundation excavation
Consider weather conditions, construction is more than to be no more than 2 months the piping lane engineering whole duration of 1.0km, and duration shortening is very notable, and society imitates
Benefit is also fairly obvious.
The not described part of the utility model is same as the prior art.
Claims (9)
1. single single cabin formula of pier support makes somebody a mere figurehead pipe gallery, which is characterized in that include single pier supporting member and pipe gallery, single pier
For the support of supporting member one end in ground base or supporting surface, pipe gallery includes multiple piping lane sections, each piping lane
Duan Jun includes side wall, head cover and bottom plate, and side wall includes arranged on left and right sides wall, is vertically stood on the two sides of bottom plate, is located at head cover
Between bottom plate, head cover is in chevron shaped construction, and bottom plate is then fixedly connected with the upper surface of single pier supporting member;It is equipped on side wall
Multiple cantilever supports that can set up various pipelines, the piping lane section is prefabricated steel member, after basis pours at the scene, is carried out
In-site installation splices, and the opening face of front and back piping lane section is attached, final to form whole synthesis piping lane.
2. the single cabin formula of list pier support according to claim 1 makes somebody a mere figurehead pipe gallery, which is characterized in that the multiple cantilevered
Holder is unilateral multi-level arrangement in multi-level arrangement, when multiple cantilever supports are mounted on left side wall or right side wall,
Opposite other side space is set as catwalk.
3. the single cabin formula of list pier support according to claim 1 makes somebody a mere figurehead pipe gallery, which is characterized in that the multiple cantilevered
Holder is arranged for bilateral in multi-level arrangement, cantilever support, and both sides cantilever support is distributed on two side at many levels
Intermediate space is catwalk.
4. the single cabin formula of list pier support according to claim 1 makes somebody a mere figurehead pipe gallery, which is characterized in that two insides of piping lane section
It is provided with the shutter of pass-through type, bottom plate is paved into using Turbogrid plates.
5. the single cabin formula of list pier support according to claim 1 makes somebody a mere figurehead pipe gallery, which is characterized in that the list pier supports structure
The basis of part is either independent board-like footing of a pillar or is pile foundation brace foundation.
6. the single cabin formula of list pier support according to claim 1 makes somebody a mere figurehead pipe gallery, which is characterized in that the list pier supports structure
Part using etc. wall thickness steel tubes, be galvanizing erosion resistant coating on steel pipe, upper end is arranged stiffener plate with piping lane section back plate connections, adds
Strengthening tendons plate is distributed perpendicular to the lower face of piping lane section bottom plate and along the ring week of steel pipe.
7. the single cabin formula of list pier support according to claim 1 makes somebody a mere figurehead pipe gallery, which is characterized in that the list pier supports structure
Part upper surface is provided with end face platform, and the piping lane section is seated on the platform of end face, and is fixedly connected with end face platform.
8. the single cabin formula of list pier support according to claim 1 makes somebody a mere figurehead pipe gallery, which is characterized in that the pipe gallery
Piping lane section uses full steel structure precast assembly, and longitudinal side wall is using frame structure of spreading out.
9. the single cabin formula of list pier support according to claim 1 makes somebody a mere figurehead pipe gallery, which is characterized in that support pipe gallery
Along the direction spacing of piping lane trend it is 8-12m between each adjacent two list pier supporting member in multiple list pier supporting members.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721667853.6U CN207646753U (en) | 2017-12-05 | 2017-12-05 | Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721667853.6U CN207646753U (en) | 2017-12-05 | 2017-12-05 | Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207646753U true CN207646753U (en) | 2018-07-24 |
Family
ID=62883282
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721667853.6U Active CN207646753U (en) | 2017-12-05 | 2017-12-05 | Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207646753U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112962664A (en) * | 2021-01-29 | 2021-06-15 | 中冶东方工程技术有限公司 | Overhead cable corridor with steel pipe truss structure |
CN114482126A (en) * | 2022-02-08 | 2022-05-13 | 中国中建设计研究院有限公司 | Open type municipal comprehensive pipe gallery structure and construction method thereof |
-
2017
- 2017-12-05 CN CN201721667853.6U patent/CN207646753U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112962664A (en) * | 2021-01-29 | 2021-06-15 | 中冶东方工程技术有限公司 | Overhead cable corridor with steel pipe truss structure |
CN114482126A (en) * | 2022-02-08 | 2022-05-13 | 中国中建设计研究院有限公司 | Open type municipal comprehensive pipe gallery structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107769141A (en) | Overhead type comprehensive wiring piping lane | |
CN106759420B (en) | A kind of prefabricated assembled transformer substation foundation structure | |
CN106381885B (en) | A kind of Underground Steel pipe gallery with skeleton | |
CN105735354A (en) | Covered-excavation full-top-down construction method of municipal underground engineering | |
CN207646753U (en) | Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery | |
CN110295624A (en) | Crossroad underground pedestrian walk and pipe gallery build structure and its construction method jointly | |
CN207646757U (en) | The aerial pipe gallery of double-cabin type wiring | |
CN202280073U (en) | Precast assembly type equipment foundation | |
CN206635786U (en) | Prefabricated assembled transformer substation foundation structure | |
CN202324155U (en) | Adjustable corrugated prestress anti-pollution drainage culvert | |
CN205530345U (en) | Modular many storehouses utility tunnel structure | |
CN212001257U (en) | But tub ditch is synthesized to wall formula drainage type altogether | |
CN112900493A (en) | From waterproof uncovered piping lane | |
CN209368878U (en) | Assembled underground pipe gallery | |
CN107401184A (en) | A kind of construction method of composite material I well | |
CN208517950U (en) | A kind of novel rotating arm type combination supporting stake | |
CN106640094B (en) | It regulates and stores moldeed depth layer double-hole tunnel and its construction process at interflow with repair track | |
CN112814026A (en) | Hidden vent structure of assembled utility tunnel | |
CN212983922U (en) | Prefabricated construction of wisdom street lamp basis, inspection shaft complex | |
CN109914473A (en) | A kind of high molecule plastic assembled piping lane and its construction method | |
CN219690584U (en) | Comprehensive pipe trench on underground continuous wall crown beam | |
CN218346255U (en) | Deep foundation pit underground comprehensive pipe gallery across subway line | |
CN210737595U (en) | Assembled cross utility tunnel node | |
CN220725180U (en) | Prefabricated comprehensive pipe rack | |
CN220100103U (en) | Buried treatment plant upper cover building pipeline pollution protection structure |