CN207646753U - Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery - Google Patents

Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery Download PDF

Info

Publication number
CN207646753U
CN207646753U CN201721667853.6U CN201721667853U CN207646753U CN 207646753 U CN207646753 U CN 207646753U CN 201721667853 U CN201721667853 U CN 201721667853U CN 207646753 U CN207646753 U CN 207646753U
Authority
CN
China
Prior art keywords
pipe gallery
piping lane
pier
bottom plate
mere figurehead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721667853.6U
Other languages
Chinese (zh)
Inventor
陈孝湘
郑瑞忠
魏志强
陈允清
吴勤斌
吴登峰
陈雄
林晗
吴培贵
林锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Fujian Electric Power Engineering Co Ltd
Original Assignee
PowerChina Fujian Electric Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Fujian Electric Power Engineering Co Ltd filed Critical PowerChina Fujian Electric Power Engineering Co Ltd
Priority to CN201721667853.6U priority Critical patent/CN207646753U/en
Application granted granted Critical
Publication of CN207646753U publication Critical patent/CN207646753U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model is related to a kind of piping lanes for layment cable, especially a kind of single single cabin formula of pier support makes somebody a mere figurehead pipe gallery, its structural feature is, include single pier supporting member and pipe gallery, the support of single pier supporting member one end is in ground base or supporting surface, pipe gallery includes multiple piping lane sections, each piping lane Duan Jun includes side wall, head cover and bottom plate, side wall includes a left side, right two side, vertically stand on the two sides of bottom plate, between head cover and bottom plate, head cover is in chevron shaped construction, bottom plate is then fixedly connected with the upper surface of single pier supporting member;Multiple cantilever supports that can set up various pipelines are installed, the piping lane section is prefabricated steel member, after basis pours at the scene, carries out in-site installation splicing, the opening face of front and back piping lane section is attached, final to form whole synthesis piping lane on side wall.The advantage is that it is easy for construction, easy to operate, the construction period is short, at low cost, easy access and maintenance.

Description

Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery
Technical field
The utility model is related to a kind of piping lane for layment cable, especially a kind of single single cabin formula of pier support is aerial Pipe gallery is mainly used in industry(Industry)Newly-built region in garden.
Background technology
With the development of society, urban land is more and more nervous, most of circuit includes power cable, communication cable Deng can not lay on the ground, not only it is unfavorable for city appearance, and takes up an area more, is easy to interfere with building, for understanding Certainly this problem, the city development underground space establish underground pipe gallery, and each pipeline is applied to the underground pipe gallery of municipal major trunk roads In.According to the regulation of GB 50838, the definition of pipe gallery is:" be built in Urban Underground for accommodate the above municipal engineering of two classes The structures and affiliated facility of pipeline ".And in urban construction, also turn the underground construction project important as one using aerial.
Traditional underground pipe gallery construction needs to excavate foundation trench first along piping lane axis and after-pouring or use are prefabricated Assembling process builds reinforced concrete pipe gallery structure, Pipe rack pours after the completion of, carries out waterproof homework, finally backfills base Slot, and carry out the construction of ground structure layer or greening restores, and the building for affiliated facilities such as it is aerated, drains, illuminate in inside If so just having the condition for laying all kinds of pipelines.
However, the infant industry in city(Industry)Garden, other than building and the more intensive residential area of road, Industrial park needs to be equipped with a large amount of energy supply pipeline for industrial premises, these pipelines need to lay with road.However industry park Gradually moving into for the workshop in area, across the time may be very long, if it is numerous not only to face maintenance using respective buried laying for pipeline It is trivial, and excavated there may be a large amount of, influence the traffic in garden;According to pipe gallery laying pipeline underground, not only build It is big to surrounding environment influence if the period is long, and investment is also huge, is unfavorable for overhauling.
Utility model content
The purpose of this utility model is that according to prior art shortcoming and a kind of easy for construction, operation letter is provided It is single, the construction period is short, the single cabin formula of single pier support of at low cost, easy access and maintenance makes somebody a mere figurehead pipe gallery.
Purpose described in the utility model is realized by following approach:
Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery, and structural feature is, includes single pier supporting member and integrated pipe Corridor, the support of single pier supporting member one end is in ground base or supporting surface, and pipe gallery includes multiple piping lane sections, often A piping lane Duan Jun includes side wall, head cover and bottom plate, and side wall includes arranged on left and right sides wall, is vertically stood on the two sides of bottom plate, position Between head cover and bottom plate, head cover is in chevron shaped construction, and bottom plate is then fixedly connected with the upper surface of single pier supporting member;On side wall Multiple cantilever supports that can set up various pipelines are installed, the piping lane section is prefabricated steel member, and basis pours at the scene Afterwards, in-site installation splicing is carried out, the opening face of front and back piping lane section is attached, it is final to form whole synthesis piping lane.
The list pier supporting member refers to single pillar support piping lane, and the pipe gallery constructs for closed gallery, by Several piping lane sections are spliced, and design of cover is the chevron structure with conventional roof, and existing aesthetic feeling can also be conducive to simultaneously Top drains.Pipe gallery of the present invention is installed on the ground in a manner of aerial, and the pipeline piping lane that original is embedded in underground changes It is maked somebody a mere figurehead to be mounted on ground, the different energy supply pipe such as medium-pressure power cable, communication cable and feedwater piping can be laid in piping lane Line.Piping lane uses full steel structure precast assembly, and other than basis needs cast in situs, remaining component includes supporting member and piping lane Section is all made of prefabrication, is finished when field basic pours, and all prefabricated components directly arrive scene and carry out assembly, thus subtract significantly The workload at small scene improves construction efficiency, shortens the construction period, reduces construction cost;Pass through industrial park simultaneously Planning, it is only necessary to which single pier is supported in ground, in the greenbelt of be generally laid in road or factory area, does not influence garden land used, can To carry out adaptability design according to the planning of garden, gradually follows up with the construction of garden, do not influence the building construction tune of garden It is whole, it is small to surrounding environment influence.The piping lane design of overhead type facilitates maintenance and maintenance work, and ventilation and drainage, illumination etc. are attached The construction for belonging to facility opposite can be reduced, that is, is reduced construction volume and construction cost and given cable more arrangement spaces again.
The utility model can be specially further:
The multiple cantilever support is unilateral multi-level arrangement, when multiple cantilever supports are installed in multi-level arrangement When on left side wall or right side wall, opposite other side space is set as catwalk.
Either:The multiple cantilever support is arranged for bilateral, is distributed on two side in multi-level arrangement at many levels There is cantilever support, and the space among the cantilever support of both sides is catwalk.
According to the different arrangement of above two, pipe gallery described in the utility model can be divided into single-sided arrangement formula structure It makes and is constructed with bilateral arrangement formula, can be selected according to the practical construction demand of garden.
Two insides of piping lane section are provided with the shutter of pass-through type, and bottom plate is paved into using Turbogrid plates.
Pass-through type shutter refers to that can be closed completely, while can also be in communication with the outside at an angle, in this way, both full The requirement of the sun-proof and rain-proof of foot can also meet ventilation inside piping lane, lighting requirement.
The basis of the list pier supporting member is either independent board-like footing of a pillar or is pile foundation brace foundation.
According to the soil property of garden, the basic different from of single pier supporting member:When foundation soil be cohesive soil or its When he can be used as the stratum of essential bearing stratum, basis uses independent board-like footing of a pillar;When foundation soil is weak soil, then may be used Basis using pile foundation as support pier.This is situation of single pier support member support on soil, when needing to be supported on other It can be designed according to supporting condition when in capital construction, it is ensured that the safety and stability of support.
The list pier supporting member using etc. wall thickness steel tubes, be galvanizing erosion resistant coating, upper end and piping lane section bottom on steel pipe Stiffener plate is arranged in plate junction, and stiffener plate is distributed perpendicular to the lower face of piping lane section bottom plate and along the ring week of steel pipe.
The list pier supporting member upper surface is provided with end face platform, and the piping lane section is seated on the platform of end face, and with End face platform is fixedly connected.
End face platform can be integrated prefabricated with supporting member.
The piping lane section of the pipe gallery uses full steel structure precast assembly, and longitudinal side wall is using frame structure of spreading out.
It is longitudinal as a result, to use truss structure stress, laterally use steelframe system, it is ensured that the stability of structure.
In the multiple single pier supporting members for supporting pipe gallery, moved towards along piping lane between each adjacent two list pier supporting member Direction spacing be 8-12m.
It is longitudinal with pipe gallery trend, is distributed a single pier supporting member every 8-12m, be generally laid in road or work In the greenbelt in plant area domain, garden land used is not influenced, is not take up park building space.
In conclusion the utility model provides a kind of aerial pipe gallery of single single cabin formula of pier support, with the support of single pier Originally the electric integrated piping lane for being embedded in underground is changed to built on stilts installation by mode, and medium-pressure power cable can be laid in piping lane, is led to The different energy supply pipeline such as cable and feedwater piping is interrogated, the related needs of industrial park factory range are met.The utility model has There is following technique effect:
1, piping lane uses full steel structure precast assembly, and other than basis needs cast in situs, remaining component is all made of factory Prefabricated, high precision machining is cheap, and can greatly reduce the workload at scene, improves construction efficiency, shortens construction work Phase.
2, the piping lane of overhead type can be utilized directly without carrying out complicated civil construction, the facilities such as ventilation and drainage, illumination Natural conditions can reduce relevant device compared to underground pipe gallery, simplify operational procedure significantly, reduce construction work amount, drop Low construction cost without concealed work, therefore also reduces simultaneously because overhead type piping lane is not limited by stratum edaphic condition Construction risk.
3, it only needs single pier to be supported in ground, in the greenbelt of be generally laid in road or factory area, does not influence garden use Ground.
4, personnel's repair and maintenance is more simple and convenient, security reliability higher.
Description of the drawings
Fig. 1 is the cross-sectional configuration schematic diagram that single single cabin formula of pier support described in the utility model makes somebody a mere figurehead pipe gallery.
Fig. 2 is the longitudinal plane structure schematic diagram that single single cabin formula of pier support described in the utility model makes somebody a mere figurehead pipe gallery.
The utility model is described further with reference to embodiment.
Specific implementation mode
Most preferred embodiment:
For the present embodiment by taking bilateral arrangement formula construction as an example, single-sided arrangement formula component can refer to understanding.It is single with reference to attached drawing 1-2 The single cabin formula of pier support makes somebody a mere figurehead pipe gallery, includes single pier supporting member 1 and pipe gallery, along the side of trend of pipe gallery To at interval of one single pier supporting member of 8-10m arrangements.Wall thickness steel tubes, the specifications such as 1 use of list pier supporting member can be Φ 325/12, using galvanizing anti-corrosion, overhead height is that 4.0m~6.0m is differed;Single 1 one end of pier supporting member support is mounted on ground On face basis 9 or supporting surface, when foundation soil is cohesive soil or other can be used as the stratum of essential bearing stratum, basis uses Independent board-like footing of a pillar;When foundation soil is weak soil, then basis of the pile foundation as support pier can be used.Single pier supports structure Part 1 is prefabricated components, and after the completion of ground base pours, single pier supporting member 1 can directly joint connection in site installation.
Pipe gallery includes multiple piping lane sections, and each piping lane Duan Jun includes side wall 2, head cover 3 and bottom plate 4, and side wall 2 wraps Arranged on left and right sides wall is included, is vertically stood on the two sides of bottom plate 4, between head cover 3 and bottom plate 4, head cover 3 is on cross section Chevron shaped construction drains convenient for rain-proof, and bottom plate 4 is then fixedly connected with the upper surface of single pier supporting member 1, and it is auxiliary can to increase ribs Help fixation.Multiple cantilever supports 10 that can set up various pipelines are installed, the multiple cantilever support is in more on side wall 2 Level bilateral is arranged, i.e., cantilever support is distributed on two side, and the space among the cantilever support of both sides is that maintenance is walked Road 8;Clear space size is inside piping lane:3.0m wide × 2.4m high, one of access path of centre setting, channel dead size are: 1.0m width × 1.9m high.
The piping lane section is prefabricated steel member, after basis pours at the scene, in-site installation splicing is carried out, by front and back piping lane section Opening face be attached, it is final to form whole synthesis piping lane, it is longitudinal to use 11 stress of truss structure, laterally use steelframe system (With reference to attached drawing 2).3 times 35kV/10kV midium voltage cables 5 can be arranged inside pipe gallery, while can arrange several times logical Interrogate cable 6 and 2 feed pipes 7;Cantilever support bearing length is 1.0m, and interlamellar spacing meets related regulatory requirements, general feelings Under condition, power cable clear spacing is 460mm, communication cable shelf layer clear spacing is 360mm;Under power cable and communication cable Side is respectively arranged the feed pipe or raw water tubes of 1 DN200~DN600.
Compared to traditional underground pipe gallery construction, Civil Cost between 2.5 ten thousand/m~3.0 ten thousand/m, and the duration compared with Long, conventional is more than the engineering of 1.0km, and the construction period is mostly more than 9 months, and civil engineering complex procedures.And the utility model is in addition to base For plinth using outside field cast-in-place, remaining is all made of prefabrication, high precision machining, and cheap, under normal circumstances, piping lane theme The cost of linear meter(lin.m.) is between 0.8 ten thousand/m~1.2 ten thousand/m, and less than the 40% of traditional piping lane, economic benefit is fairly obvious.At the same time, Since main member all uses prefabrication, site operation short time limit to complete, do not examined to Pipe rack since foundation excavation Consider weather conditions, construction is more than to be no more than 2 months the piping lane engineering whole duration of 1.0km, and duration shortening is very notable, and society imitates Benefit is also fairly obvious.
The not described part of the utility model is same as the prior art.

Claims (9)

1. single single cabin formula of pier support makes somebody a mere figurehead pipe gallery, which is characterized in that include single pier supporting member and pipe gallery, single pier For the support of supporting member one end in ground base or supporting surface, pipe gallery includes multiple piping lane sections, each piping lane Duan Jun includes side wall, head cover and bottom plate, and side wall includes arranged on left and right sides wall, is vertically stood on the two sides of bottom plate, is located at head cover Between bottom plate, head cover is in chevron shaped construction, and bottom plate is then fixedly connected with the upper surface of single pier supporting member;It is equipped on side wall Multiple cantilever supports that can set up various pipelines, the piping lane section is prefabricated steel member, after basis pours at the scene, is carried out In-site installation splices, and the opening face of front and back piping lane section is attached, final to form whole synthesis piping lane.
2. the single cabin formula of list pier support according to claim 1 makes somebody a mere figurehead pipe gallery, which is characterized in that the multiple cantilevered Holder is unilateral multi-level arrangement in multi-level arrangement, when multiple cantilever supports are mounted on left side wall or right side wall, Opposite other side space is set as catwalk.
3. the single cabin formula of list pier support according to claim 1 makes somebody a mere figurehead pipe gallery, which is characterized in that the multiple cantilevered Holder is arranged for bilateral in multi-level arrangement, cantilever support, and both sides cantilever support is distributed on two side at many levels Intermediate space is catwalk.
4. the single cabin formula of list pier support according to claim 1 makes somebody a mere figurehead pipe gallery, which is characterized in that two insides of piping lane section It is provided with the shutter of pass-through type, bottom plate is paved into using Turbogrid plates.
5. the single cabin formula of list pier support according to claim 1 makes somebody a mere figurehead pipe gallery, which is characterized in that the list pier supports structure The basis of part is either independent board-like footing of a pillar or is pile foundation brace foundation.
6. the single cabin formula of list pier support according to claim 1 makes somebody a mere figurehead pipe gallery, which is characterized in that the list pier supports structure Part using etc. wall thickness steel tubes, be galvanizing erosion resistant coating on steel pipe, upper end is arranged stiffener plate with piping lane section back plate connections, adds Strengthening tendons plate is distributed perpendicular to the lower face of piping lane section bottom plate and along the ring week of steel pipe.
7. the single cabin formula of list pier support according to claim 1 makes somebody a mere figurehead pipe gallery, which is characterized in that the list pier supports structure Part upper surface is provided with end face platform, and the piping lane section is seated on the platform of end face, and is fixedly connected with end face platform.
8. the single cabin formula of list pier support according to claim 1 makes somebody a mere figurehead pipe gallery, which is characterized in that the pipe gallery Piping lane section uses full steel structure precast assembly, and longitudinal side wall is using frame structure of spreading out.
9. the single cabin formula of list pier support according to claim 1 makes somebody a mere figurehead pipe gallery, which is characterized in that support pipe gallery Along the direction spacing of piping lane trend it is 8-12m between each adjacent two list pier supporting member in multiple list pier supporting members.
CN201721667853.6U 2017-12-05 2017-12-05 Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery Active CN207646753U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721667853.6U CN207646753U (en) 2017-12-05 2017-12-05 Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721667853.6U CN207646753U (en) 2017-12-05 2017-12-05 Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery

Publications (1)

Publication Number Publication Date
CN207646753U true CN207646753U (en) 2018-07-24

Family

ID=62883282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721667853.6U Active CN207646753U (en) 2017-12-05 2017-12-05 Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery

Country Status (1)

Country Link
CN (1) CN207646753U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112962664A (en) * 2021-01-29 2021-06-15 中冶东方工程技术有限公司 Overhead cable corridor with steel pipe truss structure
CN114482126A (en) * 2022-02-08 2022-05-13 中国中建设计研究院有限公司 Open type municipal comprehensive pipe gallery structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112962664A (en) * 2021-01-29 2021-06-15 中冶东方工程技术有限公司 Overhead cable corridor with steel pipe truss structure
CN114482126A (en) * 2022-02-08 2022-05-13 中国中建设计研究院有限公司 Open type municipal comprehensive pipe gallery structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN107769141A (en) Overhead type comprehensive wiring piping lane
CN106759420B (en) A kind of prefabricated assembled transformer substation foundation structure
CN106381885B (en) A kind of Underground Steel pipe gallery with skeleton
CN105735354A (en) Covered-excavation full-top-down construction method of municipal underground engineering
CN207646753U (en) Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery
CN110295624A (en) Crossroad underground pedestrian walk and pipe gallery build structure and its construction method jointly
CN207646757U (en) The aerial pipe gallery of double-cabin type wiring
CN202280073U (en) Precast assembly type equipment foundation
CN206635786U (en) Prefabricated assembled transformer substation foundation structure
CN202324155U (en) Adjustable corrugated prestress anti-pollution drainage culvert
CN205530345U (en) Modular many storehouses utility tunnel structure
CN212001257U (en) But tub ditch is synthesized to wall formula drainage type altogether
CN112900493A (en) From waterproof uncovered piping lane
CN209368878U (en) Assembled underground pipe gallery
CN107401184A (en) A kind of construction method of composite material I well
CN208517950U (en) A kind of novel rotating arm type combination supporting stake
CN106640094B (en) It regulates and stores moldeed depth layer double-hole tunnel and its construction process at interflow with repair track
CN112814026A (en) Hidden vent structure of assembled utility tunnel
CN212983922U (en) Prefabricated construction of wisdom street lamp basis, inspection shaft complex
CN109914473A (en) A kind of high molecule plastic assembled piping lane and its construction method
CN219690584U (en) Comprehensive pipe trench on underground continuous wall crown beam
CN218346255U (en) Deep foundation pit underground comprehensive pipe gallery across subway line
CN210737595U (en) Assembled cross utility tunnel node
CN220725180U (en) Prefabricated comprehensive pipe rack
CN220100103U (en) Buried treatment plant upper cover building pipeline pollution protection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant