CN212983922U - Prefabricated construction of wisdom street lamp basis, inspection shaft complex - Google Patents

Prefabricated construction of wisdom street lamp basis, inspection shaft complex Download PDF

Info

Publication number
CN212983922U
CN212983922U CN202020990386.6U CN202020990386U CN212983922U CN 212983922 U CN212983922 U CN 212983922U CN 202020990386 U CN202020990386 U CN 202020990386U CN 212983922 U CN212983922 U CN 212983922U
Authority
CN
China
Prior art keywords
concrete prefabricated
concrete
prefabricated section
mounting groove
street lamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020990386.6U
Other languages
Chinese (zh)
Inventor
李海涛
李莉
黎仕国
唐云华
章沛蓉
杨志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Municipal Engineering Design and Research Institute Co.,Ltd.
Original Assignee
Chengdu Municipal Engineering And Research Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Municipal Engineering And Research Design Institute filed Critical Chengdu Municipal Engineering And Research Design Institute
Priority to CN202020990386.6U priority Critical patent/CN212983922U/en
Application granted granted Critical
Publication of CN212983922U publication Critical patent/CN212983922U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Non-Portable Lighting Devices Or Systems Thereof (AREA)

Abstract

The utility model relates to a prefabricated construction of wisdom street lamp basis, inspection shaft complex belongs to municipal facilities technical field, including the first concrete prefabricated section that is used for fixed street lamp, one side of first concrete prefabricated section is provided with the second concrete prefabricated section, all be provided with the inspection shaft in the second concrete prefabricated section, adopt the setting of first concrete prefabricated section and second concrete prefabricated section, need not the scene and pour, when actually installing, only need on the scene dig groove, with first concrete prefabricated section and second concrete prefabricated section arrange the inslot in can, adopt the first concrete prefabricated section and the second concrete prefabricated section of factory prefabrication, improved constructor's site operation efficiency to the shape and the surface smoothness of the first concrete prefabricated section after pouring and second concrete prefabricated section are better, and the pleasing to the eye degree is better; the first concrete prefabricated block and the second concrete prefabricated block which are prefabricated can be repeatedly utilized, and the using effect of the prefabricated structure is improved.

Description

Prefabricated construction of wisdom street lamp basis, inspection shaft complex
Technical Field
The utility model belongs to the technical field of municipal facilities technique and specifically relates to a prefabricated construction of wisdom street lamp basis, inspection shaft complex is related to.
Background
Along with the new development concept of park cities, cities are continuously promoted, and city construction measures are also continuously promoted. Street lamps refer to lamps providing a road with an illumination function, and generally to lamps in a road illumination range in traffic illumination. Street lamps are widely used in various places requiring illumination.
Chinese patent with publication number CN203517505U discloses a dual-purpose street lamp, which comprises a group or groups of street lamps connected in parallel by cables, each street lamp comprises a lamp post and a lighting lamp on the lamp post, the lamp post is vertically arranged on the road surface, and the dual-purpose street lamp is characterized in that: the solar energy charging and discharging device further comprises a solar cell panel, a wind power generation system, a charging and discharging controller, a storage battery and a warning light, wherein the solar cell panel is arranged at the top of the lamp post; the wind power generation system is arranged at the lower part of the solar cell panel and the upper part of the lamp post, and meanwhile, the cable is laid in a cable trench under a road; the charging and discharging controller and the storage battery are arranged in a concrete well at the lower part of a road surface, electric energy obtained by the solar cell panel and the wind power generation system is transmitted to the storage battery comprising the charging and discharging controller, and the storage battery supplies power to the illuminating lamp and the safety warning lamp through the cable.
The above prior art solutions have the following drawbacks: the existing lamp post foundation is usually cast by on-site concrete, and concrete wells and the like are laid by bricks, so that the problem of low construction efficiency exists in both the on-site concrete casting and the brick laying modes.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing an improve efficiency of construction's wisdom street lamp basis, inspection shaft complex's prefabricated construction.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
the utility model provides a prefabricated construction of wisdom street lamp basis, inspection shaft complex, is including the first concrete prefabricated section that is used for fixed street lamp, one side of first concrete prefabricated section is provided with second concrete prefabricated section, all be provided with the inspection shaft in the second concrete prefabricated section.
By adopting the technical scheme, the first concrete prefabricated block and the second concrete prefabricated block are arranged, the on-site pouring is not needed, only the on-site groove is needed to be dug when the concrete prefabricated block is actually installed, the first concrete prefabricated block and the second concrete prefabricated block are placed in the groove, the on-site construction efficiency of constructors is improved by adopting the first concrete prefabricated block and the second concrete prefabricated block which are prefabricated in factories, and the shapes and the surface smoothness of the first concrete prefabricated block and the second concrete prefabricated block after pouring are better, so that the attractiveness is better; the first concrete prefabricated block and the second concrete prefabricated block which are prefabricated can be repeatedly utilized, and the using effect of the prefabricated structure is improved.
The present invention may be further configured in a preferred embodiment as: the second concrete prefabricated section is provided with two and is located the both sides of first concrete prefabricated section respectively, both sides all be provided with the inspection shaft in the second concrete prefabricated section.
Through adopting above-mentioned technical scheme, when only an inspection shaft, the cable can first penetrate the inspection shaft, switch-on to the street lamp in, this moment wear back the inspection shaft again and lay towards next street lamp, the condition of acute angle can appear when wearing back the inspection shaft in the cable this moment, lead to the cable wearing and tearing to appear buckling, and adopt the setting of two inspection shafts, after the cable of switch-on to the street lamp can pass one of them inspection shaft, the other inspection shaft of rethread passes through, the effect of laying to the cable has been improved, prevent that the cable from appearing damaging.
The present invention may be further configured in a preferred embodiment as: both sides first mounting groove has all been seted up on the face of second concrete prefabricated section towards first concrete prefabricated section, the direction of height setting along second concrete prefabricated section of first mounting groove, the both sides of first concrete prefabricated section are provided with the first mounting bar of sliding connection in first mounting groove, second concrete prefabricated section can dismantle through first mounting groove and first mounting bar and be connected to on the first concrete prefabricated section.
Through adopting above-mentioned technical scheme, first mounting groove and first mounting bar can realize dismantling between second concrete prefabricated section and the first concrete prefabricated section and connect, can select the second concrete prefabricated section of appointed quantity under the environment of difference, and be connected together first concrete prefabricated section and second concrete prefabricated section, make first concrete prefabricated section and second concrete prefabricated section become a whole, indirectly improved the bearing effect to the street lamp, and it is fixed to conveniently install after first concrete prefabricated section and the prefabrication of second concrete prefabricated section.
The present invention may be further configured in a preferred embodiment as: first precast concrete piece all is provided with first balancing weight on adjacent two faces of second precast concrete piece, first balancing weight can dismantle simultaneously and be connected to on the first precast concrete piece.
Through adopting above-mentioned technical scheme, the weight of multiplicable whole prefabricated construction of setting up of first balancing weight, when the highly higher weight of street lamp is heavier, through the weight that increases whole prefabricated construction, further improvement is to the bearing effect of street lamp.
The present invention may be further configured in a preferred embodiment as: the second mounting groove has been seted up on the face of first concrete prefabricated section towards first balancing weight, the direction of height setting along first concrete prefabricated section is followed to the second mounting groove, be provided with the second mounting bar that is used for sliding connection in the second mounting groove on the first balancing weight, first balancing weight can be dismantled through second mounting groove and second mounting bar and be connected to on the first concrete prefabricated section.
Through adopting above-mentioned technical scheme, the setting of second mounting groove and second mounting bar can make on first balancing weight can dismantle and be connected to first concrete prefabricated section, conveniently installs first balancing weight when needs use first balancing weight to can make first balancing weight and first concrete prefabricated section become a whole, thereby further improve the bearing effect of prefabricated construction to the street lamp.
The present invention may be further configured in a preferred embodiment as: first concrete prefabricated section and second concrete prefabricated section are provided with the second balancing weight on deviating from the inspection shaft open-ended face, the second balancing weight can be dismantled and be connected to on first concrete prefabricated section and the second concrete prefabricated section.
Through adopting above-mentioned technical scheme, the setting of second balancing weight can further increase whole prefabricated construction's weight to further make prefabricated construction can be applicable to the street lamp of different weight, improved the bearing effect of whole prefabricated construction to the street lamp.
The present invention may be further configured in a preferred embodiment as: third mounting grooves are formed in the faces, facing the second balancing weight, of the first concrete precast block and the second concrete precast block, third mounting strips used for being connected in the third mounting grooves in a sliding mode are arranged on the second balancing weight, and the second balancing weight is detachably connected with the first concrete precast block and the second concrete precast block through the third mounting grooves and the third mounting strips.
Through adopting above-mentioned technical scheme, the setting up of third mounting groove and third mounting bar is conveniently installed the second balancing weight when needs to can make second balancing weight and first concrete prefabricated section and second concrete prefabricated section become a whole, thereby improve the bearing effect of whole prefabricated construction to the street lamp.
The present invention may be further configured in a preferred embodiment as: the second balancing weight comprises a plurality of splicing blocks, a fourth mounting groove and a fourth mounting bar which are matched with each other are respectively arranged on the opposite surfaces of the adjacent splicing blocks, and the adjacent second balancing weight is detachably connected with the fourth mounting groove and the fourth mounting bar together.
Through adopting above-mentioned technical scheme, the setting of a plurality of splice pieces can further increase whole prefabricated construction's weight to further improve whole prefabricated construction's application scope, the setting of fourth mounting groove and fourth mounting bar can make a plurality of splice pieces form a whole, thereby improves whole prefabricated construction to the bearing effect of different weight street lamps.
The present invention may be further configured in a preferred embodiment as: the inspection well includes the well body and articulates the well lid that sets up on well body opening, the well lid passes through the electromagnetic lock to be fixed to on the opening of the well body, set up the first hole of permeating water on the diapire of the well body, set up on the second balancing weight and be used for permeating water the hole with the first second that permeates water the hole intercommunication and set up.
By adopting the technical scheme, accumulated water entering the well body permeates into the ground bottom through = the first water permeable hole and the second water permeable hole, so that damage to a cable in the well body is prevented; the arrangement of the electromagnetic lock can prevent other illegal personnel from opening the well cover to damage the optical cable and the electric cable in the inspection well.
The present invention may be further configured in a preferred embodiment as: and the surfaces of the first concrete precast blocks, which deviate from the first concrete precast blocks, and the surfaces of the second concrete precast blocks, which are adjacent to the first balancing weights, are provided with balancing weight interfaces.
Through adopting above-mentioned technical scheme, more counter weight concatenations can be accomplished in the setting of counter weight interface to further make whole prefabricated construction be applicable to heavier street lamp, prevent that whole prefabricated construction from being located the inslot and topple over, improved whole prefabricated construction's stability.
To sum up, the utility model discloses a following at least one useful technological effect:
1. the arrangement of the first concrete precast block and the second concrete precast block which are prefabricated in a factory improves the field construction efficiency of constructors, and the shapes and the surface smoothness of the first concrete precast block and the second concrete precast block after pouring are good, and the attractiveness is good;
2. the first concrete prefabricated block and the second concrete prefabricated block can form a whole by adopting the arrangement of the first mounting groove and the first mounting strip, so that the bearing effect of the whole prefabricated structure on the street lamp is improved;
3. the weight of the whole prefabricated structure can be increased by adopting the arrangement of the first balancing weight and the second balancing weight, the whole prefabricated structure can be suitable for street lamps with different weights, and the bearing effect of the whole prefabricated structure on the street lamps with different weights is further improved;
4. the setting of second mounting groove and second mounting bar, third mounting groove and third mounting bar, fourth mounting groove and fourth mounting bar can make first balancing weight and second balancing weight and first concrete prefabricated section and second concrete prefabricated section become a whole to further improve the bearing effect of whole prefabricated construction to the street lamp.
Drawings
FIG. 1 is a schematic view of a half-section structure for showing a first installation groove and a second installation groove;
FIG. 2 is an enlarged view of portion A of FIG. 1;
FIG. 3 is a schematic view of a half-section structure for showing a third mounting groove and a fourth mounting groove;
FIG. 4 is an enlarged view of portion B of FIG. 3;
fig. 5 is an exploded view for showing the positioning pin.
In the figure, 11, a first concrete precast block; 12. a second concrete precast block; 13. an inspection well; 131. a well body; 132. a well cover; 133. a first water permeable hole; 14. a first mounting groove; 141. a first mounting bar; 16. A first weight block; 161. a second mounting groove; 162. a second mounting bar; 17. A second counterweight block; 171. a third mounting groove; 172. a third mounting bar; 173. splicing blocks; 174. a fourth mounting groove; 175. a fourth mounting bar; 176. a second water permeable hole; 18. a counterweight interface; 19. and (6) positioning the bolt.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses a prefabricated construction of wisdom street lamp basis, inspection shaft complex, including the first concrete prefabricated section 11 that is used for fixed street lamp, one side of first concrete prefabricated section 11 is provided with second concrete prefabricated section 12.
The first concrete precast block 11 and the second concrete precast block 12 are arranged, the on-site pouring is not needed, when the concrete precast block is actually installed, only the on-site groove digging is needed, the first concrete precast block 11 and the second concrete precast block 12 are arranged in the groove, the first concrete precast block 11 and the second concrete precast block 12 which are prefabricated in a factory are adopted, the construction site efficiency of constructors is improved, the shapes and the surface smoothness of the first concrete precast block 11 and the second concrete precast block 12 after the pouring are better, and the attractiveness is better.
In order to improve the laying effect of the cable, two second concrete precast blocks 12 are arranged and are respectively positioned at two sides of the first concrete precast block 11, and inspection wells 13 are arranged in the second concrete precast blocks 12 at two sides; when only one inspection shaft 13, the cable can first penetrate inspection shaft 13, switch-on to the street lamp in, pass back inspection shaft 13 again this moment and lay towards next street lamp, the crooked condition of acute angle can appear when passing back inspection shaft 13 in the cable this moment, lead to the cable wearing and tearing of buckling to appear, and adopt the setting of two inspection shafts 13, the cable of switch-on to the street lamp can pass behind one of them inspection shaft 13, the other inspection shaft 13 of rethread passes through, the sharp-angled condition of buckling can not appear in the cable, the laying effect to the cable has been improved, prevent that the cable from damaging. With reference to fig. 1 and fig. 2, in order to detachably connect the first concrete precast block 11 and the second concrete precast block 12 together, so as to conveniently fix the first concrete precast block 11 and the second concrete precast block 12, a first mounting groove 14 is formed on the surface of the second concrete precast block 12 facing the first concrete precast block 11, the first mounting groove 14 is formed along the height direction of the second concrete precast block 12, two sides of the first concrete precast block 11 are provided with first mounting bars 141 slidably connected in the first mounting groove 14, and the second concrete precast block 12 is detachably connected to the first concrete precast block 11 through the first mounting groove 14 and the first mounting bars 141.
With reference to fig. 1 and 2, in this embodiment, the cross section of the first mounting groove is set to be "Ω" shaped, and the first mounting bar is disposed in cooperation with the first mounting groove of "Ω", so that the first mounting bar can be prevented from being separated from the first mounting groove along the length direction perpendicular to the first mounting groove.
With reference to fig. 1 and fig. 2, in this embodiment, in order to improve the fixing effect between the first concrete prefabricated section 11 and the second concrete prefabricated section 12, two first mounting grooves 14 are provided on each surface of the second concrete prefabricated section 12 facing the first concrete prefabricated section 11, and two first mounting strips 141 are also provided on each surface of the first concrete prefabricated section 11 facing the second concrete prefabricated section 12. With reference to fig. 1 and 2, in order to make the whole prefabricated structure suitable for a heavy street lamp, first balancing weights 16 are disposed on two faces of the first concrete prefabricated section 11 adjacent to the second concrete prefabricated section 12.
With reference to fig. 1 and fig. 2, in order to detachably connect first counterweight 16 to first concrete prefabricated section 11 at the same time, so that first counterweight 16 is installed when needed, second installation groove 161 is opened on the surface of first concrete prefabricated section 11 facing first counterweight 16, second installation groove 161 is disposed along the height direction of first concrete prefabricated section 11, second installation strip 162 for sliding connection in second installation groove 161 is disposed on first counterweight 16, and first counterweight 16 is detachably connected to first concrete prefabricated section 11 through second installation groove 161 and second installation strip 162.
In the pole engineering that closes, the street lamp cardinal number is greater than facilities such as friendship ann, intelligent transportation far away, removes the pole setting of many poles unifications, and the independent pole setting of some illumination in addition, this part pole setting adopt first concrete prefabricated section 11 can, if the lamp pole height has the promotion, can dispose first balancing weight 16 as appropriate, increase whole prefabricated construction's equilibrium.
With reference to fig. 1 and fig. 2, in this embodiment, in order to facilitate installation and fixation between the first counterweight block 16 and the first concrete prefabricated block 11, only one second installation groove 161 is provided on two surfaces of the first concrete prefabricated block 11, and only one second installation strip 162 is provided on each first counterweight block 16.
In the pole closing engineering, after multiple systems share a pole, when other pipeline inspection well obstacles exist in the longitudinal direction of the facility belt for arranging the second concrete precast block 12, the second concrete precast block 12 can be replaced, and the two second concrete precast blocks 12 are respectively arranged on two sides of the right-angle direction of the first concrete precast block 11, so that longitudinal obstacles are effectively avoided.
As shown in fig. 3, in order to further adapt the whole prefabricated structure to street lamps with different weights, a second balancing weight 17 is arranged on the surface of the first concrete prefabricated block 11 and the second concrete prefabricated block 12, which is away from the opening of the inspection well 13.
With reference to fig. 3 and 4, in order to detachably connect the second counterweight block 17 to the first concrete precast block 11 and the second concrete precast block 12, a third mounting groove 171 is formed on the surface of the first concrete precast block 11 and the surface of the second concrete precast block 12 facing the second counterweight block 17, a third mounting bar 172 for slidably connecting the second counterweight block 17 to the third mounting groove 171 is disposed on the second counterweight block 17, and the second counterweight block 17 is detachably connected to the first concrete precast block 11 and the second concrete precast block 12 through the third mounting groove 171 and the third mounting bar 172.
In the pole combining engineering, after multiple systems share a pole, the transverse width for setting the inspection well 13 and the first concrete precast block 11 in the facility belt is limited, and the lamp pole cannot be effectively balanced by adopting the combination form of one concrete precast block 11 and two inspection wells 13, and then the second balancing weight 17 is arranged until the vertical pole is balanced.
With reference to fig. 3 and 4, in this embodiment, in order to improve the installation effect of the second balancing weight 17 on the first concrete precast block 11 and the second concrete precast block 12, a third installation groove 171 is respectively provided on the first concrete precast block 11 and the two second concrete precast blocks 12, and three third installation bars 172 for respectively moving into each third installation groove 171 are provided on the second balancing weight 17.
In connection with fig. 3 and 4, in order to further adjust the weight of the second weight 17 so that the whole prefabricated structure can be adapted to street lamps of different weights, the second weight 17 comprises a plurality of splice blocks 173.
Referring to fig. 3 and 4, in order to detachably connect the adjacent splicing blocks 173 together, a fourth mounting groove 174 and a fourth mounting bar 175, which are engaged with each other, are respectively provided on opposite surfaces of the adjacent splicing blocks 173, and the adjacent second weight blocks 17 are detachably connected together through the fourth mounting groove 174 and the fourth mounting bar 175.
With reference to fig. 3 and 4, in the present embodiment, in order to improve the installation and fixation effect between the adjacent splicing blocks 173, three fourth installation grooves 174 are uniformly distributed on each splicing block 173, and three fourth installation bars 175 for moving into each fourth installation groove 174 are arranged on the adjacent splicing blocks 173.
With reference to fig. 2 and 4, in the present embodiment, in order to improve the mounting and fixing effects between the second mounting bar 162 and the second mounting groove 161, the third mounting bar 172 and the third mounting groove 171, and the fourth mounting bar 175 and the fourth mounting groove 174, the cross sections of the second mounting groove 161, the third mounting groove 171, and the fourth mounting groove 174 are all set to be dovetail-shaped, and the second mounting bar 162, the third mounting bar 172, and the fourth mounting bar 175 are set to be dovetail blocks that are fitted to the dovetail-shaped second mounting groove 161, the third mounting groove 171, and the fourth mounting groove 174. In order to further make the whole prefabricated structure applicable to heavier street lamps, a counterweight interface 18 is arranged on the surface of the first counterweight block 16, which is far away from the first concrete prefabricated block 11, and on the surface of the second concrete prefabricated block 12, which is adjacent to the first counterweight block 16; in the present embodiment, in order to improve the mounting effect between the counterweight and the counterweight interface 18, the cross section of the counterweight interface 18 is provided in a dovetail shape.
More counter weights can be connected in the setting of counter weight interface 18 to be applicable to heavier street lamp, when need not connect other counter weights, can pour a layer of concrete in the inslot that ground was dug, set up on the concrete of pouring with counter weight interface matched with connecting block, thereby make first concrete prefabricated section 11 and second concrete prefabricated section 12 become a whole with the concrete of pouring, thereby further improve the bearing effect of whole prefabricated construction to the street lamp.
As shown in fig. 3, the inspection well 13 includes a well body 131 and a well cover 132 hinged on the opening of the well body 131, the well cover 132 is fixed on the opening of the well body 131 through an electromagnetic lock; in order to prevent the influence of water entering the well body 131 on the cable, a first water permeable hole 133 is formed in the bottom wall of the well body 131, and a second water permeable hole 176 communicated with the first water permeable hole 133 is formed in the second balancing weight 17.
In this embodiment, the manhole cover 132 is a ball-milling cast iron anti-theft manhole cover, and in order to further prevent the illegal person from damaging the cable in the inspection well 13, an optical fiber sensor (not shown in the figure) is disposed in the inspection well 13, the cable in the inspection well 13 is monitored by the optical fiber sensor, and when the illegal person enters the inspection well 13, a signal is transmitted to the monitoring person.
With reference to fig. 1 and 5, in this application, after first concrete prefabricated section 11 and second concrete prefabricated section 12 are spliced with first mounting groove 14 and first mounting bar 141 each other and form, adopt location bolt 19 to fix between first concrete prefabricated section 11 and the second concrete prefabricated section 12, the direction of wearing to establish of location bolt 19 is perpendicular with the length direction of first mounting groove 14 and first mounting bar 141, location bolt 19 can prevent that first mounting bar 141 from being located in first mounting groove 14 and breaking away from along the grafting direction of first mounting bar 141, the fixed effect of concatenation between the whole prefabricated construction has been improved.
With reference to fig. 1 and 5, in this application, after first balancing weight 16 is installed to first concrete prefabricated section 11 through second mounting groove 161 and second mounting bar 162, it is fixed with adopting location bolt 19 equally between first balancing weight 16 and the first concrete prefabricated section 11, the direction of wearing to establish of location bolt 19 is perpendicular with the length direction of second mounting groove 161 and second mounting bar 162, location bolt 19 can prevent that second mounting bar 162 is located the grafting direction of second mounting bar 162 and breaks away from in second mounting groove 161, the fixed effect of concatenation between the whole prefabricated construction has been improved.
As shown in fig. 3, in the present application, the positioning pins 19 are also inserted into the bottom wall of the inspection well 13 and located at two sides of the first and second water- permeable holes 133 and 176, the second balancing weight 17 can be fixed to the first and second concrete prefabricated blocks 11 and 12 by the positioning pins 19, and the plurality of second balancing weights 17 can be fixed together, so that the third mounting bar 172 is prevented from being separated from the third mounting groove 171 along the length direction of the third mounting groove 171, and the fourth mounting bar 175 is also prevented from being separated from the fourth mounting groove 174 along the length direction of the fourth mounting groove 171.
The implementation principle of the embodiment is as follows: when the prefabricated structure needs to be laid, firstly, a groove is dug at a position needing to be laid, the first concrete prefabricated block 11 drives the first mounting strip 141 to be matched with the first mounting groove 14 on the second concrete prefabricated block 12, the mounting and fixing between the first concrete prefabricated block 11 and the second concrete prefabricated block 12 are completed, at this time, whether the first balancing weight 16 and the second balancing weight 17 need to be used is selected according to the specification of a street lamp, when the first balancing weight 16 needs to be used, the first balancing weight 16 drives the second mounting strip 162 to move into the second mounting groove 161 on the first concrete prefabricated block 11, the mounting and fixing of the first balancing weight 16 are completed, when the second balancing weight 17 needs to be fixed, the splicing blocks 173 with different numbers are mounted together through the fourth mounting groove 174 and the fourth mounting strip 175, then the second balancing weight 17 drives the third mounting strip 172 to move into the third mounting groove 171 of the first concrete prefabricated block 11 and the second concrete prefabricated block 12, the installation of the second distribution block is completed, so that the installation of the whole prefabricated structure is completed, the whole prefabricated structure can be suitable for street lamps with different specifications, the field construction efficiency of constructors is improved by adopting a factory prefabrication method, each prefabricated part can be repeatedly utilized, the using effect of the prefabricated structure is improved, the shapes and the surface smoothness of the first concrete prefabricated block 11 and the second concrete prefabricated block 12 which are poured in a factory are better, and the attractiveness is better; the road engineering continues to the reconstruction period, if the patent is adopted in the matched rod combining engineering, the road engineering can be decomposed again and return to a module structure, the module combination is repeated according to the actual situation after the project reconstruction, the old construction is facilitated, the module can be used continuously, the construction cost of the engineering with the reconstruction property is more economic and reasonable, and the new development requirement is implemented efficiently; the construction method has the advantages that modular prefabrication is adopted, so that the synchronous coefficient of construction site excavation and module manufacturing is improved, bad weather is immunized, and the construction period is effectively shortened; the construction method of the prefabricated structure and the inspection well 13 combination ensures that the prefabricated structure and the inspection well 13 are jointly balanced to form the upright rod on the premise of ensuring the use function, thereby effectively reducing the space requirement of a balance structure; the existing road construction adopts a design of combining multiple poles into one, the design of combining multiple poles into one brings new design wave, the lamp is loaded on an illuminating lamp pole, the intelligent urban system facilities such as traffic, intelligent traffic, skynet and 5G are built by combining poles, the matched power supply and communication pipelines are evolved from independent galvanized steel pipes into intelligent comprehensive calandria with multiple systems sharing routes, the simple prefabricated hollow pipe intelligent street lamp foundation or cast-in-place steel bar upright post foundation can not meet the current demand, and the application provides a larger and more stable foundation to balance the lamp pole; after the integrated design of the street, on one hand, the problem that the intelligent comprehensive calandria is criss-cross and communicated is solved, cables and optical cables laid between the intelligent comprehensive calandria are orderly connected in series in a straight line and are led up in a bent way so as to connect a pole internal connection base in a T-shaped manner, on the other hand, the urban planning pipeline and an inspection well thereof which are buried in the street are avoided, the space limitation that facilities are provided with transverse wide width and vertical soil is relieved, when the traditional method that the calandria routing is required to be provided with more inspection wells and the inspection well is separated from the intelligent street lamp foundation is only provided with a foundation balancing upright rod, the inspection well has no balancing function, so that the foundation is huge, the conflict probability of the comprehensive calandria and the urban planning pipeline is directly improved, although various special foundations such as a horse riding pier type, a plank stool type, a plank upright rod type and the like are, the problem of space limitation can not effectively be solved to the homoenergetic, and the mode of precast concrete piece concatenation is adopted in this application, splices as required selectivity when in-service use, when having solved the problem of idle limitation, the effectual equilibrium that improves the basis when supporting to the lamp pole.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (10)

1. The utility model provides a prefabricated construction of wisdom street lamp basis, inspection shaft complex which characterized in that: including first concrete prefabricated section (11) that is used for fixed street lamp, one side of first concrete prefabricated section (11) is provided with second concrete prefabricated section (12), all be provided with inspection shaft (13) in second concrete prefabricated section (12).
2. The prefabricated structure of the intelligent street lamp foundation and inspection well complex as claimed in claim 1, wherein: the second concrete prefabricated section (12) is provided with two and is located the both sides of first concrete prefabricated section (11) respectively, both sides all be provided with inspection shaft (13) in the second concrete prefabricated section (12).
3. The prefabricated structure of the intelligent street lamp foundation and inspection well complex as claimed in claim 1, wherein: both sides first mounting groove (14) have all been seted up on second concrete prefabricated section (12) towards the face of first concrete prefabricated section (11), the direction of height setting of second concrete prefabricated section (12) is followed in first mounting groove (14), the both sides of first concrete prefabricated section (11) are provided with first mounting bar (141) of sliding connection in first mounting groove (14), second concrete prefabricated section (12) can be dismantled through first mounting groove (14) and first mounting bar (141) and be connected to on first concrete prefabricated section (11).
4. The prefabricated structure of the intelligent street lamp foundation and inspection well complex as claimed in claim 1, wherein: first precast concrete piece (11) all are provided with first balancing weight (16) on adjacent two faces of second precast concrete piece (12), first balancing weight (16) can dismantle simultaneously and be connected to on first precast concrete piece (11).
5. The prefabricated structure of the intelligent street lamp foundation and inspection well complex as claimed in claim 4, wherein: second mounting groove (161) have been seted up on first concrete prefabricated section (11) towards the face of first balancing weight (16), the direction of height setting of first concrete prefabricated section (11) is followed in second mounting groove (161), be provided with on first balancing weight (16) and be used for sliding connection second mounting bar (162) in second mounting groove (161), first balancing weight (16) can be dismantled through second mounting groove (161) and second mounting bar (162) and be connected to on first concrete prefabricated section (11).
6. The prefabricated structure of the intelligent street lamp foundation and inspection well complex as claimed in claim 1, wherein: first concrete prefabricated section (11) and second concrete prefabricated section (12) deviate from on inspection shaft (13) open-ended face and are provided with second balancing weight (17), second balancing weight (17) can be dismantled and be connected to on first concrete prefabricated section (11) and second concrete prefabricated section (12).
7. The prefabricated structure of the intelligent street lamp foundation and inspection well complex as claimed in claim 6, wherein: third mounting groove (171) have all been seted up on first concrete precast block (11) and second concrete precast block (12) towards the face of second balancing weight (17), be provided with third mounting bar (172) that are used for sliding connection in third mounting groove (171) on second balancing weight (17), second balancing weight (17) can be dismantled through third mounting groove (171) and third mounting bar (172) and connect on first concrete precast block (11) and second concrete precast block (12).
8. The prefabricated structure of the intelligent street lamp foundation and inspection well complex as claimed in claim 7, wherein: the second balancing weight (17) comprises a plurality of splicing blocks (173), a fourth mounting groove (174) and a fourth mounting bar (175) which are matched with each other are respectively arranged on the opposite surfaces of the adjacent splicing blocks (173), and the adjacent second balancing weight (17) is detachably connected with the fourth mounting bar (175) through the fourth mounting groove (174).
9. The prefabricated structure of the intelligent street lamp foundation and inspection well complex as claimed in claim 8, wherein: inspection shaft (13) include the well body (131) and articulated well lid (132) of setting on well body (131) opening, well lid (132) are fixed to the opening of well body (131) through the electromagnetic lock on, first hole (133) of permeating water has been seted up on the diapire of well body (131), offer on second balancing weight (17) be used for with first hole (133) of permeating water intercommunication set up second hole (176) of permeating water.
10. The prefabricated structure of the intelligent street lamp foundation and inspection well complex as claimed in claim 4, wherein: and counterweight interfaces (18) are arranged on the surface of the first counterweight block (16) deviating from the first concrete prefabricated block (11) and the surface of the second concrete prefabricated block (12) adjacent to the first counterweight block (16).
CN202020990386.6U 2020-06-01 2020-06-01 Prefabricated construction of wisdom street lamp basis, inspection shaft complex Active CN212983922U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020990386.6U CN212983922U (en) 2020-06-01 2020-06-01 Prefabricated construction of wisdom street lamp basis, inspection shaft complex

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020990386.6U CN212983922U (en) 2020-06-01 2020-06-01 Prefabricated construction of wisdom street lamp basis, inspection shaft complex

Publications (1)

Publication Number Publication Date
CN212983922U true CN212983922U (en) 2021-04-16

Family

ID=75421938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020990386.6U Active CN212983922U (en) 2020-06-01 2020-06-01 Prefabricated construction of wisdom street lamp basis, inspection shaft complex

Country Status (1)

Country Link
CN (1) CN212983922U (en)

Similar Documents

Publication Publication Date Title
CN105113543B (en) 0815 type underground pipe gallery assembling combination cabin concrete structure of shallow embedding
CN205062838U (en) Combination cabin concrete structure is assembled to shallow utility tunnel of burying
CN207348091U (en) A kind of assembled pipe gallery
CN1142363C (en) underground comprehesive pipe gallery and system for comprehensive developing and utilizing underground space
CN106381885B (en) A kind of Underground Steel pipe gallery with skeleton
CN106351254A (en) Multilayer urban underground comprehensive pipe gallery
CN107769141A (en) Overhead type comprehensive wiring piping lane
CN210529750U (en) Cable type utility tunnel system
CN106906843A (en) Underground pipe gallery and its construction method
CN212983922U (en) Prefabricated construction of wisdom street lamp basis, inspection shaft complex
CN207538079U (en) A kind of pipe network stent for underground utilities
CN205776345U (en) City integrated piping lane
CN207646753U (en) Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery
CN208039269U (en) A kind of three-layer pipe corridor section foundation pit supporting construction
CN209741909U (en) pipeline erects guided transport system on foundation ditch
CN110863512A (en) Prefabricated cable utility tunnel
CN109469099A (en) Assembled underground pipe gallery
CN109629602A (en) A kind of assembled underground pipe gallery with T-section point of changeable layout
CN215329996U (en) Wind-solar complementary intelligent street lamp enlarged foundation drainage structure
CN211922702U (en) Prefabricated cable utility tunnel
CN108844014A (en) One kind fast installing anticreep road lamp device
CN209368878U (en) Assembled underground pipe gallery
CN109457733A (en) A kind of assembly concrete underground pipe gallery
CN106677207A (en) Staggered type underground traffic pipe gallery car entrance and exit structure
CN109914473A (en) A kind of high molecule plastic assembled piping lane and its construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No.21, Wufu Street, Chengdu, Sichuan 610015

Patentee after: Chengdu Municipal Engineering Design and Research Institute Co.,Ltd.

Address before: No.21, Wufu Street, Chengdu, Sichuan 610015

Patentee before: CHENGDU MUNICIPAL ENGINEERING AND RESEARCH DESIGN INSTITUTE