CN208039269U - A kind of three-layer pipe corridor section foundation pit supporting construction - Google Patents

A kind of three-layer pipe corridor section foundation pit supporting construction Download PDF

Info

Publication number
CN208039269U
CN208039269U CN201820507381.6U CN201820507381U CN208039269U CN 208039269 U CN208039269 U CN 208039269U CN 201820507381 U CN201820507381 U CN 201820507381U CN 208039269 U CN208039269 U CN 208039269U
Authority
CN
China
Prior art keywords
foundation pit
pile
layer pipe
anchor
bored concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820507381.6U
Other languages
Chinese (zh)
Inventor
王文正
姚建国
贾学斌
姚毅
石国伶
黄金
史永杰
吴洋
王永丰
张艳秋
郑雪梅
韩雪刚
付晓健
王富强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN201820507381.6U priority Critical patent/CN208039269U/en
Application granted granted Critical
Publication of CN208039269U publication Critical patent/CN208039269U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of three-layer pipe corridor section foundation pit supporting constructions, including foundation pit, the bored concrete pile in foundation pit both sides, the steel waist rail that is connected on bored concrete pile and the pile-anchor retaining being connected with steel waist rail are set, three-layer pipe corridor section is provided in the middle part of foundation pit, bored concrete pile upper inner is equidistantly connected with five steel waist rails from top to bottom, steel waist rail bottom is equipped with steel bracket, steel waist rail connects pile-anchor retaining, and pile-anchor retaining is made of first of anchor pole, second anchor pole, third road anchor pole, the 4th anchor pole and the 5th anchor pole set gradually from top to bottom;Steel waist rail is connected by pile-anchor retaining, by five anchor pole oblique pulls in bored concrete pile both sides, as pipe gallery engineering construction pit supporting, supporting construction service life is 1 year, and base hole sides safety grade is level-one.The design of important leverage of the supporting construction as construction safety, such structure improves speed of application, while meeting the needs of pattern foundation pit supporting structure safety, accelerates the anchorage cable stretching time.

Description

A kind of three-layer pipe corridor section foundation pit supporting construction
Technical field
The utility model is related to piping lane technical field of construction, more specifically, it relates to a kind of three-layer pipe corridor section foundation pit branch Protection structure.
Background technology
As population is continuously increased, society continues to develop, the number of the pipelines such as required all kinds of cables, optical cable, water supply, draining Amount is also more and more, and the planning of municipal pipeline and Layout Problem are especially prominent.Urban Underground pipe gallery carries a city Numerous pipelines such as electric power, communication, combustion gas, plumbing, broadcasting and TV, be qualified urban lifeline.According to national related rule Model requirement, city integrated piping lane need to build numerous systems such as fire-fighting, environmental monitoring, personnel positioning tracking, Electric control, illumination, And each system data should be able to be uploaded to ground monitoring center, realize the real time monitoring to each system.But city integrated piping lane is ground Lower tunnel has signal of communication unlike ground, and new signal transmission platform can only be built in piping lane could be by each system Data are uploaded to ground monitoring center.At present for subterranean tunnel generally using the wire communications platform such as optical fiber, bus, one A system need to be laid with a communications cable, and system Construction is more, and the cable that need to be laid with is more, system Construction, construction, maintenance work Work amount is bigger.
Existing cast in situs underground pipe gallery need to carry out at the construction field (site) steel bar meter binding, formwork, concrete cast, The processes such as maintenance, form removal, not only working procedure is complicated, long construction period, at the same need also exist for larger raw material storage and The problems such as processing factory site, the deuce to pay is brought to the construction environment of narrow field.Especially in the work of pipe gallery construction, The design of foundation pit temporary support structures is particularly important, and due to foundation pit relatively depth and structure construction is complicated, and supporting construction is pacified as construction How full important leverage improves speed of application, while meeting pattern foundation pit supporting structure safely as a problem.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of three-layer pipe corridor section pattern foundation pit supporting structures Structure has solved the problems mentioned above in the background art.
To achieve the above object, the utility model provides the following technical solutions:
A kind of three-layer pipe corridor section foundation pit supporting construction, including foundation pit, be arranged foundation pit both sides bored concrete pile, be connected to perfusion Steel waist rail in stake and the pile-anchor retaining being connected with steel waist rail, are provided with three-layer pipe corridor section in the middle part of foundation pit, on bored concrete pile Five steel waist rails are equidistantly connected on the inside of portion from top to bottom, steel waist rail bottom is equipped with steel bracket, and steel waist rail connects pile-anchor retaining, Pile-anchor retaining is by first of the anchor pole, second anchor pole, third road anchor pole, the 4th anchor pole and the 5th that set gradually from top to bottom Road anchor pole composition.
Further, the fluting total length of the foundation pit is 1.6km, foundation depth 18000mm, overall width 19000mm.
Further, the width of three-layer pipe corridor section is 12000mm and is centrally located, the foundation pit side of two lateral extent foundation pits Wall distance is 3500mm.
Further, the pile diameter is 800mm, and bored concrete pile depth is 18000mm+8000mm, i.e. bored concrete pile bottom section Go deep into 8000mm below foundation pit.
Further, the rectangular tripod structure of the steel bracket is fixed on bored concrete pile and upper end supporting steel waist rail.
Further, along foundation pit to down either side oblique pull, the inclination angle between pile-anchor retaining and horizontal plane is the pile-anchor retaining 15°。
Further, dewatering well, a diameter of 600mm of dewatering well are provided on the outside of the bored concrete pile of foundation pit both sides.
In conclusion the utility model has the advantages that compared with prior art:
Steel waist rail is connected by pile-anchor retaining by five anchor pole oblique pulls in bored concrete pile both sides to face as pipe gallery engineering When pattern foundation pit supporting structure, supporting construction service life be 1 year, base hole sides safety grade is level-one.Supporting construction is as construction safety Important leverage, the design of such structure improves speed of application, while meeting the needs of pattern foundation pit supporting structure safety, accelerates anchorage cable stretching Time.
More clearly to illustrate the structure feature and effect of the utility model, come below in conjunction with the accompanying drawings with specific embodiment pair The utility model is described in detail.
Description of the drawings
Fig. 1 is the three-layer pipe corridor section pattern foundation pit supporting structure cross-section diagram of the utility model.
Fig. 2 is the structural schematic diagram of steel bracket in the utility model.
Reference numeral:1- steel waist rail, 2- steel brackets, 3- pile-anchor retainings, 4- dewatering wells, 5- bored concrete piles, 6- three-layer pipes corridor section, 7- foundation pits, first of anchor pole of 31-, 32- seconds anchor pole, 33- thirds road anchor pole, the 4th anchor poles of 34-, the 5th anchor poles of 35-.
Specific implementation mode
The technical solution of the utility model is described further in the following with reference to the drawings and specific embodiments.
Referring to Fig. 1-2, a kind of three-layer pipe corridor section foundation pit supporting construction, including foundation pit 7, perfusion in 7 both sides of foundation pit is set Stake 5, the steel waist rail 1 being connected on bored concrete pile 5 and the pile-anchor retaining 3 being connected with steel waist rail 1, the fluting of the foundation pit 7 are total Length is 1.6km, and 7 depth of foundation pit is 18000mm, overall width 19000mm, and 7 middle part of foundation pit is provided with three-layer pipe corridor section 6, The width of three-layer pipe corridor section 6 is 12000mm and is centrally located that the foundation pit side-wall distance of two lateral extent foundation pits 7 is 3500mm; 5 a diameter of 800mm of bored concrete pile, 5 depth of bored concrete pile are 18000mm+8000mm, i.e., 5 bottom of bored concrete pile section gos deep into 7 lower section of foundation pit 8000mm, upper part inside are equidistantly connected with five steel waist rails 1 from top to bottom, and 1 bottom of steel waist rail is equipped with steel bracket 2, steel branch 2 rectangular tripod structure of frame is fixed on bored concrete pile 5 and upper end supporting steel waist rail 1, and steel waist rail 1 connects pile-anchor retaining 3, piled anchor Supporting 3 is by first of the anchor pole 31, second anchor pole 32, third road anchor pole 33, the 4th anchor pole 34 that set gradually from top to bottom With the 5th anchor pole 35 form, pile-anchor retaining 3 along foundation pit 7 to down either side oblique pull, the inclination angle between pile-anchor retaining 3 and horizontal plane It is 15 °, 5 outside of bored concrete pile of 7 both sides of foundation pit is provided with dewatering well 4,4 a diameter of 600mm of dewatering well.
First of anchor pole 31 of the pile-anchor retaining 3, second anchor pole 32, third road anchor pole 33, the 4th anchor pole 34, 5th anchor pole, 35 design parameter such as following table:
Steel waist rail 1 is connected by above-mentioned pile-anchor retaining 3, by five anchor pole oblique pulls in 5 both sides of bored concrete pile, as pipe gallery Engineering construction pit supporting, supporting construction service life are 1 year, and base hole sides safety grade is level-one.Supporting construction is used as and applies The design of the important leverage of work safety, such structure improves speed of application, while meeting the needs of pattern foundation pit supporting structure safety, accelerates anchor The cable stretching time.
The technical principle of the utility model is described above in association with specific embodiment, is only the preferred implementation of the utility model Mode.The scope of protection of the utility model is not limited merely to above-described embodiment, technology belonging to the idea of the present invention Scheme belongs to the scope of protection of the utility model.Those skilled in the art, which would not require any inventive effort, to be associated To other specific implementation modes of the utility model, these modes are fallen within the scope of protection of the utility model.

Claims (7)

1. a kind of three-layer pipe corridor section foundation pit supporting construction, which is characterized in that including foundation pit (7), setting foundation pit (7) both sides filling Stake (5), the steel waist rail (1) being connected on bored concrete pile (5) and the pile-anchor retaining (3) being connected with steel waist rail (1) are noted, in foundation pit (7) middle part is provided with three-layer pipe corridor section (6), and bored concrete pile (5) upper inner is equidistantly connected with five steel waist rails from top to bottom (1), steel waist rail (1) bottom is equipped with steel bracket (2), and steel waist rail (1) connects pile-anchor retaining (3), and pile-anchor retaining (3) is by from top to bottom First of anchor pole (31), second anchor pole (32), third road anchor pole (33), the 4th anchor pole (34) and the 5th set gradually Anchor pole (35) forms.
2. a kind of three-layer pipe corridor section foundation pit supporting construction according to claim 1, which is characterized in that the foundation pit (7) Fluting total length is 1.6km, and foundation pit (7) depth is 18000mm, overall width 19000mm.
3. a kind of three-layer pipe corridor section foundation pit supporting construction according to claim 2, which is characterized in that three-layer pipe corridor section (6) width is 12000mm and is centrally located that the foundation pit side-wall distance of two lateral extent foundation pits (7) is 3500mm.
4. a kind of three-layer pipe corridor section foundation pit supporting construction according to claim 3, which is characterized in that the bored concrete pile (5) A diameter of 800mm, bored concrete pile (5) depth are 18000mm+8000mm, i.e. bored concrete pile (5) bottom section is goed deep into below foundation pit (7) 8000mm。
5. a kind of three-layer pipe corridor section foundation pit supporting construction according to claim 1, which is characterized in that the steel bracket (2) Rectangular tripod structure is fixed on bored concrete pile (5) and upper end supporting steel waist rail (1).
6. a kind of three-layer pipe corridor section foundation pit supporting construction according to claim 1, which is characterized in that the pile-anchor retaining (3) along foundation pit (7) to down either side oblique pull, inclination angle of the pile-anchor retaining (3) between horizontal plane is 15 °.
7. a kind of three-layer pipe corridor section foundation pit supporting construction according to claim 1, which is characterized in that in foundation pit (7) both sides Bored concrete pile (5) on the outside of be provided with dewatering well (4), dewatering well (4) a diameter of 600mm.
CN201820507381.6U 2018-04-11 2018-04-11 A kind of three-layer pipe corridor section foundation pit supporting construction Active CN208039269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820507381.6U CN208039269U (en) 2018-04-11 2018-04-11 A kind of three-layer pipe corridor section foundation pit supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820507381.6U CN208039269U (en) 2018-04-11 2018-04-11 A kind of three-layer pipe corridor section foundation pit supporting construction

Publications (1)

Publication Number Publication Date
CN208039269U true CN208039269U (en) 2018-11-02

Family

ID=63943503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820507381.6U Active CN208039269U (en) 2018-04-11 2018-04-11 A kind of three-layer pipe corridor section foundation pit supporting construction

Country Status (1)

Country Link
CN (1) CN208039269U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111139869A (en) * 2020-01-22 2020-05-12 江苏科技大学 Excavation type high-waterproof comprehensive pipe gallery structure and construction method thereof
CN114164726A (en) * 2021-12-28 2022-03-11 同济大学 Local deep excavation backfill structural roadbed and rapid construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111139869A (en) * 2020-01-22 2020-05-12 江苏科技大学 Excavation type high-waterproof comprehensive pipe gallery structure and construction method thereof
CN114164726A (en) * 2021-12-28 2022-03-11 同济大学 Local deep excavation backfill structural roadbed and rapid construction method
US11781280B2 (en) 2021-12-28 2023-10-10 Tongji University Local deep excavation and backfilling structural subgrade and its rapid construction method

Similar Documents

Publication Publication Date Title
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
CN101509263A (en) Digging method foundation pit structure of steel cover and plate cover, and construction method
CN101560770B (en) Novel deep building foundation pit supporting system
CN101701461B (en) Method for constructing energy-saving underground tube structure
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN113202173B (en) Construction method for temporarily replacing cross-foundation-pit concrete pipe with steel pipe in deep foundation pit construction
CN113482044B (en) Power pipeline relocation method for invading subway station structure
CN115182737A (en) Vertical orthogonal ejection type air duct structure of deep-buried subway station and construction method
CN208039269U (en) A kind of three-layer pipe corridor section foundation pit supporting construction
CN108487297A (en) The construction method that bracing members are set up in a kind of half lid excavation construction of subway station
CN103174132A (en) Construction method of minor diameter pile inside city underground construction underground excavation pilot tunnel
CN203654196U (en) Guide apparatus for large and multifunctional over-water construction platform
CN108708290B (en) Box bridge frame hollow structure of small-radius railway curve unit and cast-in-place construction method
CN108951642B (en) Reinforced structure capable of preventing foundation pit from rising and crossing existing tunnel and construction method
CN110295624A (en) Crossroad underground pedestrian walk and pipe gallery build structure and its construction method jointly
CN210263929U (en) A preformed hole template for building civil engineering
CN109024670B (en) Underground comprehensive pipe gallery protection and reinforcement system penetrating through buried high-voltage cable and reinforcement method
CN203821399U (en) Deep foundation pit supporting structure
CN114855822A (en) Construction method for deep foundation pit of rain sewage pipeline on highway
CN212642195U (en) Foundation ditch canopy that prevents dust
CN205206824U (en) Structure is segmented secretly to intercept water by square vertical
CN210105867U (en) Shield tunnel end frozen soil wall and ground are wall jointly reinforced structure
CN114701949A (en) Method for installing main girder of bridge crane of main power house of pump station
CN203922510U (en) A kind of simple and easy cable machine that is arranged in slope
CN210033432U (en) Reinforcing structure for shield tunnel to penetrate existing building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant