CN109629602A - A kind of assembled underground pipe gallery with T-section point of changeable layout - Google Patents
A kind of assembled underground pipe gallery with T-section point of changeable layout Download PDFInfo
- Publication number
- CN109629602A CN109629602A CN201910118088.XA CN201910118088A CN109629602A CN 109629602 A CN109629602 A CN 109629602A CN 201910118088 A CN201910118088 A CN 201910118088A CN 109629602 A CN109629602 A CN 109629602A
- Authority
- CN
- China
- Prior art keywords
- piping lane
- bolt hole
- bolt
- ladder
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Supports For Pipes And Cables (AREA)
Abstract
The present invention relates to a kind of assembled underground pipe galleries with T-section point of changeable layout, belong to technical field of buildings.Including left of piping lane, right of piping lane, middle partition, support frame, U-tube piece.The piping lane left is connected by way of ladder tongue and groove and bolt with piping lane right, middle partition is connected by way of bolt with main body, support frame is connect by way of bolt with section of jurisdiction main body and middle partition, is connected by way of bolt between section of jurisdiction and section of jurisdiction, between section of jurisdiction and U-tube piece.Bearing capacity of the present invention is high, can according to need and changes interior, constructs quick and convenient, economic effect is preferable, is hardly damaged in transit, is conducive to shorten the construction period.
Description
Technical field
The invention belongs to technical field of buildings, more particularly to a kind of assembled with T-section point of changeable layout
Underground pipe gallery.
Background technique
Since traditional direct-burried pipeline occupancy road underground space is more, while the laying of pipeline tends not to and road construction
It is synchronous, cause road frequently to excavate, not only seriously affect the normal pass of road, while also bringing serious noise and fugitive dust etc.
Problem of environmental pollution, the traffic and life agency to people are greatly inconvenient.Since traditional direct-burried pipeline occupies road underground space
It is more, while the laying of pipeline tends not to synchronous with road construction, causes road frequently to excavate, not only seriously affects road
Normal pass, while the problem of environmental pollutions such as serious noise and fugitive dust are also brought, the traffic and life agency to people are very big
Inconvenience, and the appearance very good solution of underground pipe gallery this problem.
Underground pipe gallery is also known as common trench, it is to implement unified planning, design, construction and maintenance, is built in Urban Underground and is used for
Lay the public utility of municipal public use pipeline.Refer to Urban Underground for concentrate laying electric power, communication, radio and television,
The public tunnel of the municipal pipelines such as water supply, draining, heating power, combustion gas.
In underground pipe gallery construction tide, since the tradition cast-in-place excavation activity duration is long, communications and transportation is caused to be obstructed,
Ground surface environment is destroyed simultaneously, and construction efficiency is low, forming quality of products is poor etc., standardisation requirements are not achieved.If by traditional
Cast-in-place underground pipe gallery is changed to assembled construction, forms pipe storehouse by the way that prefabricated components are mutually assembled.
And often volume and weight is larger for integrated precast piping lane, transport and on-site hoisting from factory to construction site
It is extremely inconvenient.And existing fabricated construction piping lane is mostly since assembled structural member is too many, assembling structure stability is poor, power transmission
The problems such as effect is bad, and transport is more difficult, is easy to appear junction structural failure.
Summary of the invention
To solve the above problems, the present invention provides a kind of assembled with T-section point of changeable layout
Underground pipe gallery, it is high mainly for developing a kind of bearing capacity, it can according to need and change interior, construct quick and convenient,
Economic effect is preferable, is hardly damaged in transit, is conducive to the underground pipe gallery shortened the construction period.
The technical solution adopted by the invention is as follows:
A kind of assembled underground pipe gallery with T-section point of changeable layout, including left of piping lane, right of piping lane, in
Partition, support frame, U-tube piece, the piping lane left and piping lane right passes through ladder tongue and groove and is bolted, and middle partition passes through spiral shell
Bolt is connected with left of piping lane and piping lane right, and support frame is connect by bolt with left of piping lane, right of piping lane, middle partition, section of jurisdiction
It is bolted between section of jurisdiction, between section of jurisdiction and U-tube piece;Right top plate of left top plate of piping lane and bottom plate, piping lane and bottom
The top plate and bottom plate of plate and U-tube piece, on the inside of piping lane left left ladder, the inside of piping lane right right ladder and in
On partition, left of piping lane and piping lane left junction, right of piping lane and piping lane right junction, outside the main body of middle partition
Side, the outside of middle plate ladder, U-tube piece and left of piping lane and piping lane right junction, are respectively disposed with attended operation hole,
Attended operation hole is a cuboid gap, and the specific location of arrangement is close to Member Lip concrete side where it, often
A attended operation hole is all disposed with a bolt hole, and bolt hole runs through from attended operation hole to the concrete of place Member Lip
Body;The pre-embedded bolt is embedded in respectively on the two sides interior wall of left inside wall of piping lane, right inside wall of piping lane and middle partition;Pipe
Left of corridor is by left first bolt hole, and left second bolt hole, left convex block, left ladder, left second ladder forms, described
Left convex block is arranged in the most external of left top plate bottom plate of piping lane, and thickness is about the half of top plate underplate concrete thickness, institute
Stating left ladder is the ladder-like concrete outstanding on the basis of piping lane left top plate and base plate thickness, described left first
Bolt hole and left second bolt hole are the bolt hole through left ladder;Right of piping lane by right bolt hole, right ladder with
And right groove composition, for the right groove arrangement in the outermost of right top plate bottom plate of piping lane, thickness is about that top plate bottom plate is mixed
The half of solidifying soil thickness, the right ladder is the ladder-like coagulation outstanding on the basis of right top plate base plate thickness of piping lane
Soil, right bolt hole run through right ladder;Ladder tongue and groove is that left convex block and right groove are constituted, and the bolt of connection is worn respectively
Cross left first bolt hole and right bolt hole;The middle plate ladder of middle partition rides on right ladder, and the main body of middle partition rides over
On left second ladder, middle partition is fixed by bolt and left second ladder, bolt be each passed through left second bolt hole and
Middle crab bolt hole, middle partition is vertical by being vertically bolted with piping lane left, and middle partition and right of piping lane vertically pass through middle plate
Bolt hole connection, cross bolts and longitudinal bolt are alternately arranged;The middle plate ladder is prominent on the basis of the thickness of middle partition
Concrete block, middle crab bolt hole run through middle plate ladder;Every piece of support frame is provided with the support to match with pre-embedded bolt
Frame bolt hole and support frame support plate for planning inner space;U-tube piece is placed at T-section point, by bolt with it is other
Section of jurisdiction is connected.
Further, the pre-embedded bolt quantity of left of the piping lane, right of piping lane and middle partition is identical, arranges height one
It causes, quantity is 4 rows, and the pre-embedded bolt columns of every section section of jurisdiction is 6-10 column.
Further, left first bolt hole, left second bolt hole, right bolt hole, middle crab bolt hole is every
The arrangement of section section of jurisdiction is about 4-6, and left first bolt hole is passed through by a bolt with right bolt hole and fixed, middle crab bolt hole
It is fixed with left second bolt hole by a bolt hole.
Further, the support frame height is that a kind of assembled underground with T-section point of changeable layout is comprehensive
The half of piping lane internal height is closed, every two support frame is paved with a side wall.
Further, left of the piping lane and the right on piece of piping lane are for the bolt hole of lateral connection and for longitudinally connected
Bolt hole be alternately arranged.
Further, the U-tube piece is placed at T-section point, and three faces are good with three assembly respectively by bolt
Tube coupling is connected.
Beneficial effects of the present invention:
Advantages and advantages of the invention are bearing capacity height, can according to need and change interior, speed of application is fast, favorably
In shortening the construction period, economic effect is preferable, be hardly damaged in transit, and it is convenient to construct, and scene is without welding, effective solution pipe
Various problems in piece transport and construction.
Detailed description of the invention
Fig. 1 is a kind of section of jurisdiction splicing of assembled underground pipe gallery with T-section point of changeable layout of the present invention
Schematic diagram.
Fig. 2 is a kind of main view of the assembled underground pipe gallery with T-section point of changeable layout of the present invention.
Fig. 3 is left schematic diagram of piping lane of the present invention.
Fig. 4 is right schematic diagram of piping lane.
Fig. 5 is middle partition schematic diagram.
Fig. 6 is a kind of schematic diagram of support frame.
Fig. 7 is another schematic diagram of support frame.
Fig. 8 is U-tube piece schematic diagram.
Fig. 9 is node schematic diagram.
Figure 10 is U-tube piece and other section of jurisdiction connection schematic diagrams.
In figure, 1 is piping lane left;2 be piping lane right;3 be middle partition;4 be support frame;5 be U-tube piece;6 be connection behaviour
Make hole;7 be connecting hole;8 be pre-embedded bolt;1-1 is left first bolt hole;1-2 is left second bolt hole;1-3 is left
Convex block;1-4 is left ladder;1-5 is left second ladder;2-1 is right bolt hole;2-2 is right ladder;2-3 is right
Groove;3-1 is middle crab bolt hole;3-2 is middle plate ladder;4-1 is support frame bolt hole;4-2 is support frame support plate.
Specific embodiment
In order to further illustrate the present invention, the present invention is described in detail with reference to the accompanying drawings and embodiments, but not
They can be interpreted as limiting the scope of the present invention.
Embodiment: as shown in Figures 1 to 8, a kind of assembled underground with T-section point of changeable layout of the present invention is comprehensive
Piping lane, including piping lane left 1, piping lane right 2, middle partition 3, support frame 4, U-tube piece 5 are closed, the piping lane left 1 and piping lane are right
Piece 2 is by ladder tongue and groove and is bolted, and middle partition 3 is connected by bolt with piping lane left 1 and piping lane right 2, and support frame 4 is logical
It crosses bolt to connect with piping lane left 1, piping lane right 2, middle partition 3, pass through between section of jurisdiction and section of jurisdiction, between section of jurisdiction and U-tube piece 5
It is bolted;The top plate and bottom plate of left 1 top plate of piping lane and bottom plate, piping lane right 2 top plates and bottom plate and U-tube piece 5, piping lane are left
On the inside of left ladder 1-4 of piece 1, on the inside of piping lane right 2 right ladder 2-2 and middle partition 3, piping lane left 1 and pipe
The junction that corridor is left 1, the junction that piping lane is right 2 and piping lane right 2, the main body outside of middle partition 3, middle plate ladder 3-2's
Outside, U-tube piece 5 and piping lane left 1 and piping lane right 2 junction, are respectively disposed with attended operation hole 6, attended operation
Hole 6 is a cuboid gap, and the specific location of arrangement is close to Member Lip concrete side where it, each connection behaviour
Make hole 6 and be all disposed with a bolt hole 7, bolt hole 7 runs through from attended operation hole 6 to the concrete bodies of place Member Lip;Institute
Pre-embedded bolt 8 is stated to be embedded in respectively on the two sides interior wall of left 1 inside wall of piping lane, right 2 inside walls of piping lane and middle partition 3;Pipe
Corridor left 1 is by left first bolt hole 1-1, left second bolt hole 1-2, left convex block 1-3, left ladder 1-4, and left second
Ladder 1-5 composition, the left convex block 1-3 are arranged in the most external of left 1 top plate bottom plate of piping lane, and thickness is about top plate bottom plate
The half of concrete thickness, the left ladder 1-4 are the ranks outstanding on the basis of piping lane left 1 top plate and base plate thickness
Scalariform concrete, the left first bolt hole 1-1 and left second bolt hole 1-2 are the bolt hole through left ladder 1-4;
Piping lane right 2 is arranged in by right bolt hole 2-1, right ladder 2-2 and right groove 2-3 composition, the right groove 2-3
The outermost of right 2 top plate bottom plates of piping lane, thickness are about the half of top plate underplate concrete thickness, and the right ladder 2-2 is
The ladder-like concrete outstanding on the basis of right 2 top plate base plate thickness of piping lane, right bolt hole 2-1 run through right ladder 2-
2;Ladder tongue and groove is left convex block 1-3 and right groove 2-3 is constituted, and the bolt of connection is each passed through left first bolt hole 1-
1 and right bolt hole 2-1;The middle plate ladder of middle partition 3 rides on right ladder 2-2, and the main body of middle partition 3 rides over left second
On ladder 1-5, middle partition 3 is fixed by bolt and left second ladder 1-5, and bolt is each passed through left second bolt hole 1-2
With middle crab bolt hole 3-1, middle partition 3 and piping lane left 1 is vertical by being vertically bolted, middle partition 3 and piping lane right 2 it is vertical
By middle crab bolt hole 3-1 connection, cross bolts and longitudinal bolt are alternately arranged;The middle plate ladder 3-2 is in middle partition 3
Concrete block outstanding on the basis of thickness, middle crab bolt hole 3-1 run through middle plate ladder 3-2;Every piece of support frame 4 be provided with
The support frame bolt hole 4-1 that pre-embedded bolt 8 the matches and support frame support plate 4-2 for planning inner space;U-tube piece 5
It is placed at T-section point, is connected by bolt with other sections of jurisdiction.
8 quantity of pre-embedded bolt of the piping lane left 1, piping lane right 2 and middle partition 3 is identical, arrangement height is consistent,
Quantity is 4 rows, and 8 columns of pre-embedded bolt of every section section of jurisdiction is 6-10 column.
The left first bolt hole 1-1, left second bolt hole 2-2, right bolt hole 2-1, middle crab bolt hole 3-1 exist
The arrangement of every section section of jurisdiction is about 4-6, and left first bolt hole 1-1 is passed through by a bolt with right bolt hole 2-1 and fixed, in
Crab bolt hole 3-1 and left second bolt hole 1-2 is fixed by a bolt hole.
4 height of support frame as described above is inside a kind of assembled underground pipe gallery with T-section point of changeable layout
The half of height, every two support frame 4 are paved with a side wall.
For the bolt hole 7 of lateral connection and for longitudinally connected bolt hole on the piping lane left 1 and piping lane right 2
7 be to be alternately arranged.
As shown in Figure 6 and Figure 7, support frame is to realize the critical component for changing layout, and each support frame is piping lane height
Half, is conveniently replaceable transport when layout, and the position of support frame bolt hole and quantity and the position of pre-embedded bolt are consistent with quantity.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered
It is considered as protection scope of the present invention.
Claims (6)
1. a kind of assembled underground pipe gallery with T-section point of changeable layout, it is characterised in that: including piping lane left
(1), piping lane right (2), middle partition (3), support frame (4), U-tube piece (5), the piping lane left (1) and piping lane right (2) are logical
It crosses ladder tongue and groove and is bolted, middle partition (3) is connected by bolt with piping lane left (1) and piping lane right (2), support frame
(4) it is connect with piping lane left (1), piping lane right (2), middle partition (3) by bolt, between section of jurisdiction and section of jurisdiction, section of jurisdiction and U-tube
Piece is bolted between (5);Right (2) top plate of left (1) top plate of piping lane and bottom plate, piping lane and bottom plate and U-tube piece (5)
Top plate and bottom plate, on the inside of piping lane left (1) left ladder (1-4), the inside of piping lane right (2) right ladder (2-2)
And on middle partition (3), piping lane left (1) with the junction of piping lane left (1), piping lane right (2) with the company of piping lane right (2)
Place is met, the main body outside of middle partition (3), the outside of middle plate ladder (3-2), U-tube piece (5) and piping lane left (1) and piping lane are right
The junction of piece (2) is respectively disposed with attended operation hole (6), and attended operation hole (6) are a cuboid gap, arrangement
Specific location be that Member Lip concrete side, each attended operation hole (6) are disposed with a bolt hole where it
(7), bolt hole (7) is through the concrete bodies from attended operation hole (6) to place Member Lip;The pre-embedded bolt (8) is respectively
It is embedded on the two sides interior wall of piping lane left (1) inside wall, right (2) inside wall of piping lane and middle partition (3);Piping lane left (1)
By left first bolt hole (1-1), left second bolt hole (1-2), left convex block (1-3), left ladder (1-4), left
Two ladders (1-5) composition, the left convex block (1-3) are arranged in the most external of piping lane left (1) top plate bottom plate, and thickness is about
The half of top plate or underplate concrete thickness, the left ladder (1-4) are the top plate and base plate thickness at piping lane left (1)
On the basis of ladder-like concrete outstanding, left first bolt hole (1-1) and left second bolt hole (1-2) are through a left side
The bolt hole of piece ladder (1-4);Piping lane right (2) by right bolt hole (2-1), right ladder (2-2) and right groove (2-
3) it forms, the right groove (2-3) is arranged in the outermost of piping lane right (2) top plate bottom plate, and thickness is about top plate or bottom plate
The half of concrete thickness, the right ladder (2-2) are the ranks outstanding on the basis of piping lane right (2) top plate base plate thickness
Scalariform concrete, right bolt hole (2-1) run through right ladder (2-2);Ladder tongue and groove is left convex block (1-3) and right groove
(2-3) is constituted, and the bolt of connection is each passed through left first bolt hole (1-1) and right bolt hole (2-1);Middle partition (3)
Middle plate ladder ride on right ladder (2-2), the main body of middle partition (3) rides on left second ladder (1-5), middle partition
(3) fixed with left second ladder (1-5) by bolt, bolt is each passed through left second bolt hole (1-2) and middle crab bolt
Hole (3-1), middle partition (3) is vertical by being vertically bolted with piping lane left (1), and middle partition (3) is vertical with piping lane right (2)
It is connected by middle crab bolt hole (3-1), cross bolts and longitudinal bolt are alternately arranged;The middle plate ladder (3-2) is in interval
Concrete block outstanding on the basis of the thickness of plate (3), middle crab bolt hole (3-1) run through middle plate ladder (3-2);Every piece of support
Frame (4) is provided with the support frame bolt hole (4-1) to match with pre-embedded bolt (8) and the support frame branch for planning inner space
Fagging (4-2);U-tube piece (5) is placed at T-section point, is connected by bolt with other sections of jurisdiction.
2. a kind of assembled underground pipe gallery with T-section point of changeable layout according to claim 1, special
Sign is: left of the piping lane (1), and pre-embedded bolt (8) quantity of piping lane right (2) and middle partition (3) is identical, arrangement height
Unanimously, quantity is 4 rows, and pre-embedded bolt (8) columns of every section section of jurisdiction is 6-10 column.
3. a kind of assembled underground pipe gallery with T-section point of changeable layout according to claim 1, special
Sign is: left first bolt hole (1-1), left second bolt hole (2-2), right bolt hole (2-1), middle crab bolt hole
The arrangement of (3-1) in every section section of jurisdiction is about 4-6, and left first bolt hole (1-1) and right bolt hole (2-1) are by a bolt
Across fixation, middle crab bolt hole (3-1) is fixed with left second bolt hole (1-2) by a bolt hole.
4. according to a kind of assembled underground pipe gallery with T-section point of changeable layout described in claim 1, feature
Be: support frame (4) is highly a kind of assembled underground pipe gallery internal height with T-section point of changeable layout
Half, every two support frame (4) are paved with a side wall.
5. a kind of assembled underground pipe gallery with T-section point of changeable layout according to claim 1, special
Sign is: for the bolt hole (7) of lateral connection and for longitudinally connected on the piping lane left (1) and piping lane right (2)
Bolt hole (7) is to be alternately arranged.
6. a kind of assembled underground pipe gallery with T-section point of changeable layout according to claim 1, special
Sign is: U-tube piece (5) is placed at T-section point, and three faces are connected with three good tube couplings of assembly respectively by bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910118088.XA CN109629602A (en) | 2019-02-15 | 2019-02-15 | A kind of assembled underground pipe gallery with T-section point of changeable layout |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910118088.XA CN109629602A (en) | 2019-02-15 | 2019-02-15 | A kind of assembled underground pipe gallery with T-section point of changeable layout |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109629602A true CN109629602A (en) | 2019-04-16 |
Family
ID=66065327
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910118088.XA Withdrawn CN109629602A (en) | 2019-02-15 | 2019-02-15 | A kind of assembled underground pipe gallery with T-section point of changeable layout |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109629602A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110318420A (en) * | 2019-06-28 | 2019-10-11 | 中国五冶集团有限公司 | A kind of prefabricated assembled underground pipe gallery |
CN110984222A (en) * | 2019-12-17 | 2020-04-10 | 江苏安荣电气设备有限公司 | Urban rail transit pipeline integrated system |
CN118128091A (en) * | 2024-05-07 | 2024-06-04 | 福州市规划设计研究院集团有限公司 | T-shaped pipe gallery prefabricated member and production method thereof |
-
2019
- 2019-02-15 CN CN201910118088.XA patent/CN109629602A/en not_active Withdrawn
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110318420A (en) * | 2019-06-28 | 2019-10-11 | 中国五冶集团有限公司 | A kind of prefabricated assembled underground pipe gallery |
CN110318420B (en) * | 2019-06-28 | 2024-04-09 | 中国五冶集团有限公司 | Prefabricated assembled underground utility tunnel |
CN110984222A (en) * | 2019-12-17 | 2020-04-10 | 江苏安荣电气设备有限公司 | Urban rail transit pipeline integrated system |
CN118128091A (en) * | 2024-05-07 | 2024-06-04 | 福州市规划设计研究院集团有限公司 | T-shaped pipe gallery prefabricated member and production method thereof |
CN118128091B (en) * | 2024-05-07 | 2024-07-09 | 福州市规划设计研究院集团有限公司 | Production method of prefabricated part of T-shaped pipe gallery |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202969415U (en) | Multifunctional assembled comprehensive pipe gallery | |
WO2017071110A1 (en) | Assembled-type underground pipe gallery | |
CN203702166U (en) | Segment lining ring structure applicable to rectangular tunnel | |
CN109629602A (en) | A kind of assembled underground pipe gallery with T-section point of changeable layout | |
CN106381885B (en) | A kind of Underground Steel pipe gallery with skeleton | |
CN107542106A (en) | The pipe gallery built using the pavement underground space | |
CN207567813U (en) | The underground pipe gallery of three cabin structures | |
CN210315654U (en) | Urban tunnel, rail transit interval tunnel and utility tunnel co-construction structure | |
CN207160068U (en) | A kind of disjunctor corrugated steel piping lane | |
WO2017071111A1 (en) | Underground pipe gallery protection structure | |
CN110541433A (en) | Assembled underground pipe gallery | |
CN202324155U (en) | Adjustable corrugated prestress anti-pollution drainage culvert | |
CN210341982U (en) | Can change assembled utility tunnel that has T shape node of overall arrangement | |
CN111519658A (en) | Novel assembled underground pipe gallery | |
CN209816915U (en) | Double-circular shield construction comprehensive pipe gallery | |
CN212427206U (en) | Assembled underground pipe gallery | |
CN211948551U (en) | Underground parking garage and urban tunnel co-construction structure | |
CN109457733A (en) | A kind of assembly concrete underground pipe gallery | |
CN111980065B (en) | Assembled underground pipe gallery and connecting method thereof | |
CN211057848U (en) | Circular utility tunnel extensible structure of individual layer | |
CN210238570U (en) | Assembled underground pipe gallery structure | |
CN210684774U (en) | Assembled concrete utility tunnel is connected to slot type | |
CN210509196U (en) | Large-section tunnel structure of hard rock stratum underground excavation single-layer lining subway parking line | |
CN110318420A (en) | A kind of prefabricated assembled underground pipe gallery | |
CN208088343U (en) | A kind of assembled piping lane component and piping lane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190416 |
|
WW01 | Invention patent application withdrawn after publication |