CN110318420A - A kind of prefabricated assembled underground pipe gallery - Google Patents

A kind of prefabricated assembled underground pipe gallery Download PDF

Info

Publication number
CN110318420A
CN110318420A CN201910572811.1A CN201910572811A CN110318420A CN 110318420 A CN110318420 A CN 110318420A CN 201910572811 A CN201910572811 A CN 201910572811A CN 110318420 A CN110318420 A CN 110318420A
Authority
CN
China
Prior art keywords
shaped frame
frame body
underground pipe
pipe gallery
support plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910572811.1A
Other languages
Chinese (zh)
Other versions
CN110318420B (en
Inventor
刘胜豪
高志惠
张壮
邬静芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201910572811.1A priority Critical patent/CN110318420B/en
Publication of CN110318420A publication Critical patent/CN110318420A/en
Application granted granted Critical
Publication of CN110318420B publication Critical patent/CN110318420B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Abstract

The invention discloses a kind of prefabricated assembled underground pipe galleries, belong to building mounting structure technical field, underground pipe gallery is carried out blocking design by it, modularized design, underground pipe gallery is formed by multiple block combiners, it can be realized the prefabricated of the assembled unit of underground pipe gallery, splicing assembling can form a kind of prefabricated assembled underground pipe gallery of underground pipe gallery.This kind of prefabricated assembled underground pipe gallery includes multiple assembled units, and the assembled unit includes combined support plate, side U-shaped frame frame body, partition and top U-shaped frame frame body.Construction period can be shortened using this kind of prefabricated assembled underground pipe gallery, efficiency of construction is improved, reduce the construction cost of entire piping lane.

Description

A kind of prefabricated assembled underground pipe gallery
Technical field
The present invention relates to building mounting structure technical field more particularly to a kind of prefabricated assembled underground pipe galleries.
Background technique
Well-known: underground pipe gallery refers to the comprehensive corridor of underground urban duct.A tunnel is built in Urban Underground Space, by electric power, communication, the various utilities pipelines such as combustion gas, heat supply, plumbing are integrated in one, and are equipped with special access hole, lifting Mouth and monitoring system, implementation unified planning, Uniting, unification is built and management, is to ensure that the important foundation of city operations is set It applies and lifeline.
Existing underground pipe gallery is built, and generally by digging pit, then carries out cast in situs by concrete in hole, from And the framework of underground pipe gallery is formed, arrangement electric power, communication in underground pipe gallery, the various works such as combustion gas, heat supply, plumbing are then arrived again Journey pipeline.
Such as Chinese utility model patent application of existing underground pipe gallery, application number 201721197840.7, disclosed one kind Underground pipe gallery is used to be laid with underground utilities, the exterior wall for being arranged with twice interval and extending parallel, between twice exterior wall It is provided with the top plate and bottom plate of the extending direction extension along exterior wall, top plate and bottom plate are fixedly connected on twice exterior wall;Outside twice The space that wall, top plate and bottom plate are surrounded forms the channel for being laid with underground utilities;The twice exterior wall is by sinking to the steel plate of underground Stake is mutually twisted to be formed, and the top plate is reinforced concrete structure, and bottom plate is reinforced concrete structure.In the present invention, ground The exterior wall of lower piping lane is directly formed by steel sheet pile, steel sheet pile during excavation of earthwork as supporting, in the excavation for completing the earthwork It is used afterwards directly as the exterior wall of underground pipe gallery, supporting and exterior wall is combined into one, the material for reconstructing underground pipe gallery has been saved Material and construction-time, and the expenditure of construction of piping lane can be effectively reduced.
Although above-mentioned underground pipe gallery, the material and construction-time for reconstructing underground pipe gallery are saved, and can be effectively Reduce the expenditure of construction of piping lane.But above-mentioned underground pipe gallery still can only be formed by cast in situs, therefore construction period compared with Long, construction workload is larger, and construction cost is still higher.
Summary of the invention
The technical problems to be solved by the present invention are: provide it is a kind of underground pipe gallery is subjected to blocking design, modularization sets Meter forms underground pipe gallery by multiple block combiners, can be realized the prefabricated of the assembled unit of underground pipe gallery, splicing assembling Form a kind of prefabricated assembled underground pipe gallery of underground pipe gallery.
The technical solution adopted by the present invention to solve the technical problems is: a kind of prefabricated assembled underground pipe gallery, packet Multiple assembled units are included, the assembled unit includes combined support plate, side U-shaped frame frame body, partition and top U-shaped framework Body;
The both ends of the side U-shaped frame frame body opening, which are provided with, extends the first support rim into opening, and described first The first fixture block is provided on support rim;The first bolt hole is provided on first support rim;The side U-shaped frame frame body Connection seam allowance is provided with above the both ends of opening;The upper end of the side U-shaped frame frame body is provided with attachment base;The attachment base On be provided with the matched slot of side wall with top U-shaped frame frame body;
It is provided with the first connection boss on one side of the side U-shaped frame frame body, another on side to being provided with Matched first connected slot of boss is connect with first;
The both ends in combined support board bottom face are provided with the second vertical support rim;On second support rim It is provided with the second fixture block, is provided with the second bolt hole on second support rim;
It is provided with the second connection boss on one side of the combined support plate, another on side to being provided with and the Two connection matched second connected slots of boss;
The both ends of the combined support plate are provided with and connect the matched horizontal connection block of seam allowance;
The combined support plate is mounted between two side U-shaped frame frame bodies, and the opening two of two side U-shaped frame frame bodies Combined support plate is provided between end;The horizontal connection block cooperates with seam allowance is connect, second support rim and first Support rim combines to form support column, and first bolt hole and the second bolt hole are bolted;
It is formed and the matched clip slot of partition between second fixture block and the first fixture block;The partition is mounted on side U In the type frame body opening clip slot that two the second fixture blocks and the first fixture block are formed up and down;
The two side walls of the top U-shaped frame frame body opening are respectively inserted into the side U-shaped framework of combined support plate two sides At the top of body in the slot of attachment base;
On two sides of the top U-shaped frame frame body, third connection boss, another side are provided on a side On be provided with third connected slot;
The assembled unit straight line that hands down connects to form a kind of prefabricated assembled underground pipe gallery, and two neighboring combination is single In member, the second connection boss of a combined support plate is inserted into the second connected slot of another combined support plate;One side First connection boss of face U-shaped frame frame body is inserted into the first connected slot of another side U-shaped frame frame body;One top U Third on type frame body connects boss, is inserted into the third connected slot on another top U-shaped frame frame body.
Further, the junction of the combined support plate and side U-shaped frame frame body, i.e. horizontal connection block with connect seam allowance Between be provided with the first sealing rod.
Further, the second sealing rod is provided between the slot and the side wall of top U-shaped frame frame body opening.
Further, vertical reinforcement support column is provided in the side U-shaped framework body, the reinforcement support column is located at The underface of attachment base.
The beneficial effects of the present invention are: a kind of prefabricated assembled underground pipe gallery of the present invention, due to by piping lane Be set as by multiple assembled unit assembled formations, thus can be realized underground pipe gallery assembled unit it is prefabricated, only need will be prefabricated Finished product assembled unit assemble the construction that underground pipe gallery can be realized at the construction field (site);Therefore it can shorten construction period, improve Efficiency of construction reduces the construction cost of entire piping lane.
Detailed description of the invention
Fig. 1 is a kind of prefabricated assembled underground pipe gallery multiple shot array schematic diagram in the embodiment of the present invention;
Fig. 2 is a kind of prefabricated assembled underground pipe gallery perspective view when assembled in the embodiment of the present invention;
Fig. 3 is a kind of prefabricated assembled underground pipe gallery main view when assembled in the embodiment of the present invention;
Fig. 4 is a kind of prefabricated assembled underground pipe gallery structural schematic diagram when assembled in the embodiment of the present invention;
Fig. 5 is the perspective view of combined support plate in the embodiment of the present invention;
Fig. 6 is the perspective view of U-shaped frame frame body in side in the embodiment of the present invention;
Fig. 7 is the main view of U-shaped frame frame body in side in the embodiment of the present invention;
Fig. 8 is the end view of U-shaped frame frame body in side in the embodiment of the present invention;
[specific symbol description]
1- combined support plate, the second support rim of 11-, 12- horizontal connection block, the second fixture block of 13-, 14- second connect convex Platform, the side 2- U-shaped frame frame body, the first support rim of 21-, the first fixture block of 22-, the first bolt hole of 23-, 24- attachment base, 25- are inserted Slot, 26- connection seam allowance, the connection boss of 27- first, the first connected slot of 28-, 3- partition, the top 4- U-shaped frame frame body, 6- bolt, The first sealing rod of 7-, the second sealing rod of 8-, the first pipeline of 10- arrange storehouse, and the second pipeline of 20- arranges storehouse, 30- third pipeline arrangement Storehouse, the 4th pipeline of 40- arrange storehouse.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples.
As shown in Figures 1 to 8, a kind of prefabricated assembled underground pipe gallery of the present invention, including multiple combinations are single Member, the assembled unit include combined support plate 1, side U-shaped frame frame body 2, partition 3 and top U-shaped frame frame body 4;
The both ends that the side U-shaped frame frame body 2 is open, which are provided with, extends the first support rim 21 into opening, and described the The first fixture block 22 is provided on one support rim 21;The first bolt hole 23 is provided on first support rim 21;The side Connection seam allowance 26 is provided with above the both ends that face U-shaped frame frame body 2 is open;The upper end of the side U-shaped frame frame body 2 is provided with company Joint chair 24;It is provided on the attachment base 24 and the matched slot 25 of the side wall of top U-shaped frame frame body 4;
It is provided with the first connection boss 27 on one side of the side U-shaped frame frame body 2, another on side to being arranged Have and connect matched first connected slot 28 of boss 27 with first;
The both ends of 1 bottom surface of combined support plate are provided with the second vertical support rim 11;Second support is convex It is provided with the second fixture block 13 on platform 11, is provided with the second bolt hole on second support rim 11;
It is provided with the second connection boss 14 on one side of the combined support plate 1, another on side to being provided with Matched second connected slot of boss 14 is connect with second;
The both ends of the combined support plate 1 are provided with and connect the matched horizontal connection block 12 of seam allowance 26;
The combined support plate 1 is mounted between two side U-shaped frame frame bodies 2, and two side U-shaped frame frame bodies 2 are opened Mouth is provided with combined support plate 1 between both ends;The horizontal connection block 12 and the connection seam allowance 26 of two sides cooperate, and described second Support rim 11 combines to form support column with the first support rim 22, and first bolt hole 23 and the second bolt hole pass through bolt 6 is fixed;
It is formed and the matched clip slot of partition 3 between second fixture block 13 and the first fixture block 22;The partition 3 is mounted on In 2 opening of the side U-shaped frame frame body clip slot that two the second fixture blocks 13 and the first fixture block 22 are formed up and down;
The two side walls that the top U-shaped frame frame body 4 is open are respectively inserted into the side U-shaped frame of 1 two sides of combined support plate In the slot 25 of 2 top attachment base 24 of frame body;
On two sides of the top U-shaped frame frame body 4, third connection boss, another side are provided on a side Third connected slot is provided on face;
The assembled unit straight line that hands down connects to form a kind of prefabricated assembled underground pipe gallery, and two neighboring combination is single In member, the second connection boss 14 of a combined support plate 1 is inserted into the second connected slot of another combined support plate 1;One First connection boss 27 of a side U-shaped frame frame body 2 is inserted into the first connected slot 28 of another side U-shaped frame frame body 2; Third on one top U-shaped frame frame body 4 connects boss, the third connected slot being inserted on another top U-shaped frame frame body 4 It is interior.
During application:
1, first to combined support plate 1, side U-shaped frame frame body 2, partition 3 and top U-shaped frame frame body 4 according to design drawing Paper carries out prefabricated.
2, at the installation site, digging good basic installation pit first, installation foundation has been poured, then by prefabricated combined support plate 1, the finished product of side U-shaped frame frame body 2, partition 3 and top U-shaped frame frame body 4 is transported to scene, then to combined support plate 1, side Face U-shaped frame frame body 2, partition 3 and top U-shaped frame frame body 4 carry out splicing assembling according to the content as shown in Fig. 1,2 and 4.
3, the combined support plate 1, side U-shaped frame frame body 2, partition 3 and 4 composite assembly of top U-shaped frame frame body are completed Afterwards, that is, it forms with the first pipeline arrangement storehouse 10, the second pipeline arrangement storehouse 20, third pipeline arrangement storehouse 30 and the 4th pipeline cloth The assembled unit for setting storehouse 40 joins end to end to assembled unit and constitutes piping lane, backfills later to installation pit;To completion pair The construction of underground pipe gallery.
In conclusion a kind of prefabricated assembled underground pipe gallery of the present invention, due to setting piping lane to by more A assembled unit assembled formation, thus can be realized underground pipe gallery assembled unit it is prefabricated, only need to combine prefabricated finished product Unit assembles the construction that underground pipe gallery can be realized at the construction field (site);Each assembled unit is split as fair-sized, is convenient for Transport can shorten construction period, improve efficiency of construction.
In order to avoid underground pipe gallery leak, further, the connection of the combined support plate 1 and side U-shaped frame frame body 2 The first sealing rod 7 is provided between place, i.e. horizontal connection block 12 and connection seam allowance 26.Further, the slot 25 and top U The second sealing rod 8 is provided between the side wall that type frame body 4 is open.
In order to increase the stability of underground pipe gallery structure, further, vertical add is provided in the U-shaped frame frame body 2 Strong support column, the underface reinforced support column and be located at attachment base 24.

Claims (4)

1. a kind of prefabricated assembled underground pipe gallery, it is characterised in that: including multiple assembled units, the assembled unit includes Combined support plate (1), side U-shaped frame frame body (2), partition (3) and top U-shaped frame frame body (4);
The both ends of side U-shaped frame frame body (2) opening are provided with the first support rim (21) extended into opening, described The first fixture block (22) are provided on first support rim (21);The first bolt hole is provided on first support rim (21) (23);Connection seam allowance (26) is provided with above the both ends of side U-shaped frame frame body (2) opening;The U-shaped frame frame body (2) Upper end be provided with attachment base (24);It is provided on the attachment base (24) matched slotting with the side wall of top U-shaped frame frame body (4) Slot (25);
The first connection boss (27) is provided on one side of the side U-shaped frame frame body (2), another on side to being arranged Have and connect matched first connected slot (28) of boss (27) with first;
The both ends of combined support plate (1) bottom surface are provided with vertical the second support rim (11);Second support is convex It is provided on platform (11) the second fixture block (13), is provided with the second bolt hole on second support rim (11);
The second connection boss (14) is provided on one side of the combined support plate (1), another on side to being provided with Matched second connected slot of boss (14) is connect with second;
The both ends of the combined support plate (1) are provided with and connect seam allowance (26) matched horizontal connection block (12);
The combined support plate (1) is mounted between two side U-shaped frame frame bodies (2), and two side U-shaped frame frame bodies (2) Opening is provided with combined support plate (1) between both ends;The connection seam allowance (26) of the horizontal connection block (12) and two sides cooperates, Second support rim (11) combines to form support column with the first support rim (21), first bolt hole (23) and second Bolt hole is fixed by bolt (6);
It is formed and partition (3) matched clip slot between second fixture block (13) and the first fixture block (22);Partition (3) peace In side U-shaped frame frame body (2) opening clip slot that two the second fixture blocks (13) and the first fixture block (22) are formed up and down;
The two side walls of top U-shaped frame frame body (4) opening are respectively inserted into the side U-shaped frame of combined support plate (1) two sides At the top of frame body (2) in the slot (25) of attachment base (24);
On two sides of the top U-shaped frame frame body (4), third connection boss, another side are provided on a side On be provided with third connected slot;
The assembled unit straight line that hands down connects to form a kind of prefabricated assembled underground pipe gallery, two neighboring assembled unit In, the second connection that the second connection boss (14) of a combined support plate (1) is inserted into another combined support plate (1) is inserted Slot;First connection boss (27) of one side U-shaped frame frame body (2) is inserted into the first of another side U-shaped frame frame body (2) and connects It patches in slot (28);Third on one top U-shaped frame frame body (4) connects boss, is inserted into another top U-shaped frame frame body (4) in the third connected slot on.
2. a kind of prefabricated assembled underground pipe gallery according to claim 1, it is characterised in that: the combined support plate (1) with the junction of side U-shaped frame frame body (2), i.e. horizontal connection block (12) is provided with first between seam allowance (26) and stops with connecting Water bar (7).
3. a kind of prefabricated assembled underground pipe gallery according to claim 2, it is characterised in that: the slot (25) with The second sealing rod (8) are provided between the side wall of top U-shaped frame frame body (4) opening.
4. a kind of prefabricated assembled underground pipe gallery according to claim 3, it is characterised in that: the side U-shaped frame Vertical reinforcement support column, the underface reinforced support column and be located at attachment base (24) are provided in frame body (2).
CN201910572811.1A 2019-06-28 2019-06-28 Prefabricated assembled underground utility tunnel Active CN110318420B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910572811.1A CN110318420B (en) 2019-06-28 2019-06-28 Prefabricated assembled underground utility tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910572811.1A CN110318420B (en) 2019-06-28 2019-06-28 Prefabricated assembled underground utility tunnel

Publications (2)

Publication Number Publication Date
CN110318420A true CN110318420A (en) 2019-10-11
CN110318420B CN110318420B (en) 2024-04-09

Family

ID=68120612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910572811.1A Active CN110318420B (en) 2019-06-28 2019-06-28 Prefabricated assembled underground utility tunnel

Country Status (1)

Country Link
CN (1) CN110318420B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114108699A (en) * 2021-10-21 2022-03-01 王树生 Movable construction device

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4439065A (en) * 1980-08-29 1984-03-27 Artur Constapel Continuous gallery construction, in particular for underground mine tunnels
CN105908778A (en) * 2016-06-23 2016-08-31 中交第公路勘察设计研究院有限公司 Comprehensive pipe rack for corrugated spiral pipe structure
CN206052779U (en) * 2016-09-29 2017-03-29 陕西建筑产业投资集团有限公司 A kind of prefabricated pipe gallery splicing structure
WO2017071110A1 (en) * 2015-10-29 2017-05-04 周兆弟 Assembled-type underground pipe gallery
WO2017107372A1 (en) * 2015-12-21 2017-06-29 南京联众建设工程技术有限公司 Urban underground comprehensive steel pipe gallery
US20170254042A1 (en) * 2016-03-02 2017-09-07 Evergreen Walls, Inc. Building Elements For Making Retaining Walls, And Systems And Methods Of Using Same
KR101829149B1 (en) * 2016-11-21 2018-03-30 현대건설주식회사 Water sopt unit for connecting of precast wall
CN207260190U (en) * 2017-09-30 2018-04-20 沈阳建筑大学 A kind of assembled underground pipe gallery splits structure
WO2018076497A1 (en) * 2016-10-31 2018-05-03 浙江鑫宙竹基复合材料科技有限公司 Comprehensive bamboo composite pipe gallery capable of accommodating multiple types of pipes
WO2018076494A1 (en) * 2016-10-31 2018-05-03 浙江鑫宙竹基复合材料科技有限公司 Embedded supporting assembly for pipe gallery
CN207331746U (en) * 2017-09-18 2018-05-08 南京叭叭智能科技有限公司 A kind of underground pipe gallery
CN207348091U (en) * 2017-09-26 2018-05-11 徐运博 A kind of assembled pipe gallery
WO2018196101A1 (en) * 2017-04-28 2018-11-01 东北大学 Integrated formwork for utility tunnel, and method of using same
CN109629602A (en) * 2019-02-15 2019-04-16 沈阳建筑大学 A kind of assembled underground pipe gallery with T-section point of changeable layout
CN109653246A (en) * 2019-01-31 2019-04-19 沈阳建筑大学 A kind of assembly concrete comprehensive pipe gallery structure and construction method
CN210562299U (en) * 2019-06-28 2020-05-19 中国五冶集团有限公司 Prefabricated assembled underground comprehensive pipe gallery

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4439065A (en) * 1980-08-29 1984-03-27 Artur Constapel Continuous gallery construction, in particular for underground mine tunnels
WO2017071110A1 (en) * 2015-10-29 2017-05-04 周兆弟 Assembled-type underground pipe gallery
WO2017107372A1 (en) * 2015-12-21 2017-06-29 南京联众建设工程技术有限公司 Urban underground comprehensive steel pipe gallery
US20170254042A1 (en) * 2016-03-02 2017-09-07 Evergreen Walls, Inc. Building Elements For Making Retaining Walls, And Systems And Methods Of Using Same
CN105908778A (en) * 2016-06-23 2016-08-31 中交第公路勘察设计研究院有限公司 Comprehensive pipe rack for corrugated spiral pipe structure
CN206052779U (en) * 2016-09-29 2017-03-29 陕西建筑产业投资集团有限公司 A kind of prefabricated pipe gallery splicing structure
WO2018076497A1 (en) * 2016-10-31 2018-05-03 浙江鑫宙竹基复合材料科技有限公司 Comprehensive bamboo composite pipe gallery capable of accommodating multiple types of pipes
WO2018076494A1 (en) * 2016-10-31 2018-05-03 浙江鑫宙竹基复合材料科技有限公司 Embedded supporting assembly for pipe gallery
KR101829149B1 (en) * 2016-11-21 2018-03-30 현대건설주식회사 Water sopt unit for connecting of precast wall
WO2018196101A1 (en) * 2017-04-28 2018-11-01 东北大学 Integrated formwork for utility tunnel, and method of using same
CN207331746U (en) * 2017-09-18 2018-05-08 南京叭叭智能科技有限公司 A kind of underground pipe gallery
CN207348091U (en) * 2017-09-26 2018-05-11 徐运博 A kind of assembled pipe gallery
CN207260190U (en) * 2017-09-30 2018-04-20 沈阳建筑大学 A kind of assembled underground pipe gallery splits structure
CN109653246A (en) * 2019-01-31 2019-04-19 沈阳建筑大学 A kind of assembly concrete comprehensive pipe gallery structure and construction method
CN109629602A (en) * 2019-02-15 2019-04-16 沈阳建筑大学 A kind of assembled underground pipe gallery with T-section point of changeable layout
CN210562299U (en) * 2019-06-28 2020-05-19 中国五冶集团有限公司 Prefabricated assembled underground comprehensive pipe gallery

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
姜亚丽;: "装配式预应力城市综合管廊应用研究", 居舍, no. 12, 25 April 2019 (2019-04-25) *
杨世泽;陈涛;王千华;: "核电站大直径内圆外方钢筋混凝土廊道施工", 武汉大学学报(工学版), no. 1, 20 October 2011 (2011-10-20) *
王述红;贺宇;索善泽;韩光全;: "预制装配式与现浇整体式综合管廊受力对比分析", 混凝土与水泥制品, no. 09, 20 September 2018 (2018-09-20) *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114108699A (en) * 2021-10-21 2022-03-01 王树生 Movable construction device

Also Published As

Publication number Publication date
CN110318420B (en) 2024-04-09

Similar Documents

Publication Publication Date Title
CN106555408A (en) The structure and construction method of underground pipe gallery
CN107859065A (en) A kind of ultra-high performance concrete precast assembly pipe gallery and construction method
CN107938701A (en) Subway station covered back-digging overlapping wall construction technology based on prefabricated ground-connecting-wall
CN105401593A (en) Assembly type square underground pipe gallery
CN208415305U (en) A kind of precast assembly monoblock type pipe gallery and component and unit
CN110318420A (en) A kind of prefabricated assembled underground pipe gallery
CN206376277U (en) The structure of underground pipe gallery
CN210562299U (en) Prefabricated assembled underground comprehensive pipe gallery
CN109629602A (en) A kind of assembled underground pipe gallery with T-section point of changeable layout
CN218060410U (en) Prefabricated piping lane of straight bolt transverse connection
CN207392241U (en) A kind of ultra-high performance concrete precast assembly pipe gallery
CN206800484U (en) Ruggedized construction for underpass
CN210341982U (en) Can change assembled utility tunnel that has T shape node of overall arrangement
CN205917728U (en) Arched cross -section steel buckled plate city utility tunnel
CN213233403U (en) Steel connecting piece of underground continuous wall and underground continuous wall
CN211948028U (en) Pipeline river-crossing structure utilizing existing box culvert
CN206359996U (en) Prefabricated assembled pipe gallery assembled up and down
CN211922702U (en) Prefabricated cable utility tunnel
CN211285692U (en) Corrugated steel pipe gallery based on prestressed tendons
CN111980065A (en) Assembled underground pipe gallery and connecting method thereof
CN204098066U (en) The square underground pipe gallery of assembling
CN209989839U (en) Assembled utility tunnel's channel steel and assembled utility tunnel
CN208088343U (en) A kind of assembled piping lane component and piping lane
CN111305267A (en) UHPC prefabricated assembled comprehensive pipe gallery flat curve connecting segment structure and construction method
CN220377306U (en) Prefabricated pile wall superposed assembled underground structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant