CN206359996U - Prefabricated assembled pipe gallery assembled up and down - Google Patents

Prefabricated assembled pipe gallery assembled up and down Download PDF

Info

Publication number
CN206359996U
CN206359996U CN201621281673.XU CN201621281673U CN206359996U CN 206359996 U CN206359996 U CN 206359996U CN 201621281673 U CN201621281673 U CN 201621281673U CN 206359996 U CN206359996 U CN 206359996U
Authority
CN
China
Prior art keywords
vertical tension
epipleural
side panel
storehouse
pipe gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621281673.XU
Other languages
Chinese (zh)
Inventor
孙学明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Emu Town Chang Ming Assembly Building Technology Co Ltd
Original Assignee
Qingdao New Century Prefabricated Components Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao New Century Prefabricated Components Co Ltd filed Critical Qingdao New Century Prefabricated Components Co Ltd
Priority to CN201621281673.XU priority Critical patent/CN206359996U/en
Application granted granted Critical
Publication of CN206359996U publication Critical patent/CN206359996U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

A kind of prefabricated assembled pipe gallery assembled up and down, includes upper storehouse and the lower storehouse of mountain type of inverse hill type, the upper storehouse includes top plate, is arranged on the epipleural of top plate both sides and the upper spacer being arranged in the middle part of top plate;The lower storehouse includes bottom plate, is arranged on the lower side panel of bottom plate both sides and the lower clapboard being arranged in the middle part of bottom plate.The epipleural is connected with corresponding lower side panel respectively, and the upper spacer is connected with lower clapboard.The epipleural, lower side panel, upper spacer and lower clapboard are all vertically arranged with vertical tension hole, and the vertical tension hole of the epipleural is connected with the vertical tension hole of corresponding lower side panel, and the vertical tension hole of the upper spacer is connected with the vertical tension hole of lower clapboard.Prefabricated assembled pipe gallery assembled up and down includes two storehouses, and utilization rate is high, is easy to pipe network to be separately laid out, solve job site excavation area big, reduce the installation difficulty of job site, convenient and efficient of constructing, simplify job site process, reduce difficulty of construction and manufacturing cost.

Description

Prefabricated assembled pipe gallery assembled up and down
Technical field
The utility model is related to the prefabricated pipe gallery that a kind of underground pipe network is built, and is a kind of prefabrication and assembly construction specifically Assembled pipe gallery above and below formula.
Background technology
Pipe gallery refers to " municipal pipeline of Urban Underground integrates corridor ", i.e., it is empty to build a kind of tunnel in Urban Underground Between, by municipal administration, electric power, communication, combustion gas, plumbing, heating power, rubbish conveying etc. a variety of pipelines it is intensive lay tunnel space In, and provided with systems such as special personnel gateway, pipeline gateway, access hole, hoisting port and disaster-proof monitoring monitoring, form one New municipal public use pipeline layout facility is planted, implements unified planning, design, build and management.Traditional piping lane is with live colligation The culvert that reinforcing bar, formwork supporting plate, casting concrete box-shaped tube coupling are built, to accommodate the various pipe networks in underground, traditional construction mode is made Industry area is big, long construction period, construction quality are difficult to control to, natural environment and climate is big to construction infection.It is comprehensive used at present Piping lane is mainly cast-in-place concrete pipe gallery, and prefabricated single storehouse pipe gallery, but prefabricated single storehouse pipe gallery is comprehensive Than relatively low, it is adaptable to electric power tunnel, rain sewage closed conduit etc., but it can not meet large scale pipe gallery size requirements.
Utility model content
The utility model is directed to the deficiency that above-mentioned prior art is present, and proposes a kind of prefabricated assembled integrated pipe assembled up and down Corridor.
Prefabricated assembled pipe gallery assembled up and down of the present utility model, includes upper storehouse and the lower storehouse of mountain type of inverse hill type, The upper storehouse includes top plate, is arranged on the epipleural of top plate both sides and the upper spacer being arranged in the middle part of top plate;The lower Cang Bao Include bottom plate, be arranged on the lower side panel of bottom plate both sides and the lower clapboard being arranged in the middle part of bottom plate.
The epipleural is connected with corresponding lower side panel respectively, and the upper spacer is connected with lower clapboard.
The epipleural, lower side panel, upper spacer and lower clapboard are all vertically arranged with vertical tension hole, the epipleural it is perpendicular It is connected to tensioning hole with the vertical tension hole of corresponding lower side panel, the vertical tension hole of the upper spacer and the vertical tension of lower clapboard Hole is connected.
Preferably, between the epipleural and corresponding lower side panel, it is fitted with water-stop glue between upper spacer and lower clapboard Bar.
Preferably, the upper surface of the lower surface of the epipleural and/or lower side panel is provided with bell and spigot groove, the upper spacer Lower surface and/or the upper surface of lower clapboard be provided with bell and spigot groove, the sealing adhesive tape is all located in corresponding bell and spigot groove.
Preferably, the angle, lower side panel inner side and angle, the upper spacer both sides of bottom plate on the inside of epipleural with top plate All being horizontally disposed with the angle and lower clapboard both sides of top plate and the angle of bottom plate has horizontal tensioning hole, the horizontal tensioning Horizontal tensioning box is both provided with the middle part of hole.
Preferably, the vertical tension hole on lower side panel and the vertical tension hole on lower clapboard are designed with first vertical The vertical tension hole on vertical tension hole and upper spacer on pulling box, epipleural is designed with the second vertical tension box.
Preferably, the first vertical tension box is located at the middle part in correspondence vertical tension hole, second vertical tension Box is located at the top in correspondence vertical tension hole.
Preferably, the upper storehouse and the anterior end surface in lower storehouse are designed with splicing the rear side of groove, the upper storehouse and lower storehouse The splicing that end face is designed with to be connected with splicing groove is raised.
The splicing groove is located on the inside of top plate inner side, epipleural inner side, bottom plate inner side and lower side panel, the upper spacer Front side with lower clapboard is concordant all with splicing the bottom land of groove.
The splicing is raised on the inside of top plate, on the inside of epipleural, on the inside of bottom plate and on the inside of lower side panel, the upper spacer The flush raised all with splicing with the rear side of lower clapboard.
Preferably, sealing adhesive tape is installed in the splicing groove.
Preferably, the inner side on the lower side panel top and the both sides on lower clapboard top are both provided with water stopping trough.
The beneficial effects of the utility model are:Prefabricated assembled pipe gallery assembled up and down includes two storehouses, and utilization rate is high, It is easy to pipe network to be separately laid out, solves job site excavation area greatly, reduce the installation difficulty of job site, convenient height of constructing Effect, simplifies job site process, reduces difficulty of construction and manufacturing cost.And prefabricated assembled pipe gallery assembled up and down is It is spliced by upper storehouse and lower storehouse, upper storehouse and lower storehouse can individually be processed, and alleviate the difficulty of processing and manufacturing, while also reducing Size of components and weight, are convenient for transporting, make, install.Upper storehouse and lower storehouse are entered using prestress wire tension technology The firm connection of row, bulk strength is higher after splicing is installed, and also increases the overall tensile strength of pipe gallery and anti-cracking resistance.
The connecting portion in upper storehouse and lower storehouse installs the sealing adhesive tape for being capable of water-swellable, enhances sealing property, prevents infiltration Into inside piping lane, the pipe network in protection piping lane.And sealing adhesive tape is arranged in bell and spigot groove, upper storehouse is further improved with The tight ness rating of storehouse connection, strengthens water resistance.
It is attached between adjacent piping lane also by prestress wire tension technology, applies prestressing force in advance, each spiral shell The connection of bolt carries out stretching absorbance, it can be ensured that is not also damaged by earthquake effect bolt, prevents big seam openings With the difference of high low degree, it is ensured that the function of piping lane common trench is not affected, the culvert bulk strength for constituting piping lane is higher, With stronger tensile strength and anti-cracking resistance.Vertical tension box is respectively provided at the top of upper storehouse and in the middle part of lower storehouse, is easy to personnel Operated, reduce the difficulty of installation.
The overall front side of piping lane has the installation bellmouth of splicing groove formation, and the installation that there is rear side splicing to convex to form is inserted Mouthful, two neighboring piping lane is mutually inserted by bell and spigot, further enhance the culvert bulk strength of piping lane composition.Water-stop glue Bar is sealed to the connecting portion of adjacent piping lane, improves water resistance, it is to avoid infiltration.Water stopping trough is set on lower storehouse, made in piping lane Water enter in water stopping trough when being flowed downward along inwall, discharged, it is to avoid the bottom fallen in piping lane, prevented by sealing adhesive tape Ponding is formed, pipe network inside piping lane is damaged.
Brief description of the drawings
Accompanying drawing 1 is the structural representation one of prefabricated assembled pipe gallery assembled up and down;
Accompanying drawing 2 is the partial enlarged drawing of part A in accompanying drawing 1;
Accompanying drawing 3 is the partial enlarged drawing of part B in accompanying drawing 1;
Accompanying drawing 4 is the structural representation two of prefabricated assembled pipe gallery assembled up and down.
Embodiment
In order to be able to further appreciate that structure of the present utility model, feature and other purposes, in conjunction with appended preferred embodiment Detailed description is as follows, and illustrated preferred embodiment is merely to illustrate the technical solution of the utility model, and non-limiting practicality It is new.
Embodiment of the present utility model is as follows:
As shown in Figures 1 to 4, prefabricated assembled pipe gallery assembled up and down includes the upper storehouse 1 of inverse hill type and the lower storehouse of mountain type 2。
Upper storehouse 1 includes top plate 11, be arranged on the epipleural 12 of the both sides of top plate 11 and be arranged on the middle part of top plate 11 on every Plate 13;The lower clapboard that lower storehouse 2 includes bottom plate 21, is arranged on the lower side panel 22 of the both sides of bottom plate 21 and is arranged on the middle part of bottom plate 21 23。
Epipleural 12 is connected with corresponding lower side panel 22 respectively, and upper spacer 13 is connected with lower clapboard 23, makes upper storehouse 1 and lower storehouse About 2 are spliced into the piping lane with two storehouses.
Epipleural 12, lower side panel 22, upper spacer 13 and lower clapboard 23 are all vertically arranged with vertical tension hole 3, epipleural 12 Vertical tension hole 3 and the vertical tension hole 3 of corresponding lower side panel 22 be connected, the vertical tension hole 3 of upper spacer 13 and lower clapboard 23 Vertical tension hole 3 be connected.
By the prestress wire in vertical tension hole 3, make epipleural 12 and corresponding lower side panel 22 and upper spacer 13 are firmly connected with lower clapboard 23, upper storehouse 1 and the lower firm combination of storehouse 2, with stronger tensile strength and anti-cracking resistance.
In order to improve sealing water resistance, between epipleural 12 and corresponding lower side panel 22, upper spacer 13 and lower clapboard 23 it Between be fitted with being capable of the sealing adhesive tape of water-swellable, make the shipwreck outside piping lane with by between epipleural 12 and lower side panel 22 Gap is extend into piping lane, be also in the one of storehouse of piping lane water entered by the gap between upper spacer 13 and lower clapboard 23 In another storehouse.
In order to improve while sealing water resistance, it is ensured that under upper storehouse 1 and the being completely embedded property in lower storehouse 2, epipleural 12 Surface and the upper surface of lower side panel 22, both at least one are provided with bell and spigot groove;The lower surface and lower clapboard 23 of upper spacer 13 Upper surface, both at least one be provided with bell and spigot groove.Sealing adhesive tape between epipleural 12 and lower side panel 22 and on every Sealing adhesive tape between plate 13 and lower clapboard 23 is all located in the bell and spigot groove of correspondence position.Bell and spigot groove reduce upper storehouse 1 with The distance between lower storehouse 2, improves the compactness of connection, also installs sealing adhesive tape even closer, it is ensured that water resistance.
In order that front and rear adjacent piping lane is connected firmly, angle, lower side panel 22 inner side of the inner side of epipleural 12 with top plate 11 Angle, the angle of the both sides of upper spacer 13 and top plate 11 and the both sides of lower clapboard 23 and the angle of bottom plate 21 with bottom plate 21 All being horizontally disposed with has horizontal tensioning hole 4, i.e., horizontal tensioning hole 4 is all set on the corner in two storehouses of piping lane.In horizontal tensioning hole 4 Portion is both provided with horizontal tensioning box 41, the joint for accommodating and operating fixed prestress wire.By in horizontal tensioning hole 4 Prestress wire, two neighboring piping lane is firmly connected, with stronger tensile strength and anti-cracking resistance.
In order to carry out vertical on vertical tension hole 3 and lower clapboard 23 on vertical prestressing tensioning, lower side panel 22 Pulling eye 3 is designed with the vertical tension hole 3 on the first vertical tension box 31, epipleural 12 and the vertical tension hole on upper spacer 13 3 are designed with the second vertical tension box 32.
In order that vertical prestressing tension operation is more facilitated, the first vertical tension box 31 is located at correspondence vertical tension hole 3 Middle part, i.e. the middle part positioned at lower side panel 22 and lower clapboard 23.Second vertical tension box 32 is located at the top in correspondence vertical tension hole 3 End, i.e., on top plate 11.
During piping lane installation, first lower storehouse 2 is placed into the irrigation canals and ditches that ground is dug out, then again upper storehouse 1 is lifted into down On storehouse 2.The position of first vertical tension box 31, which makes operating personnel enter in piping lane, to be operated, and height and position is moderate. The position of second vertical tension box 32 makes standing to be operated to piping lane top, easy to operate.
In order that adjacent piping lane connection is more prone to and firmly, the front side in upper storehouse 1 and lower storehouse 2 is designed with splicing groove 5, on The rear side in storehouse 1 and lower storehouse 2 is designed with the splicing projection 6 that can be connected with splicing groove 5.
Splice groove 5 and be located at the inner side of top plate 11, the inner side of epipleural 12, the inner side of bottom plate 21 and the inner side of lower side panel 22, on every The front side of plate 13 and lower clapboard 23 is concordant all with splicing the bottom land of groove 5.
Splicing projection 6 is located at the inner side of top plate 11, the inner side of epipleural 12, the inner side of bottom plate 21 and the inner side of lower side panel 22, on every Flush of the rear side of plate 13 and lower clapboard 23 all with splicing projection 6.
During two neighboring piping lane connection, the splicing projection 6 of a piping lane is inserted into the splicing groove 5 of another piping lane, The connection of two piping lanes can not only directly can be positioned, reduce difficulty of construction, and also add the connection of two piping lanes Intensity.
In order to ensure to be provided with sealing adhesive tape 7 in the sealing of junction between piping lane, splicing groove 5.
In order to prevent piping lane internal water accumulation, the inner side on the top of lower side panel 22 and the both sides on the top of lower clapboard 23 are both provided with stopping Tank 8.The infiltration of pipe network water leakage or piping lane material itself flows downward along piping lane inwall in piping lane, and enters water stopping trough In 8, discharged then along water stopping trough 8, prevent water from flowing downwardly into the bottom in piping lane storehouse, formed the ponding for being difficult to discharge, make pipe Pipe network in corridor is corroded.

Claims (9)

1. a kind of prefabricated assembled pipe gallery assembled up and down, it is characterised in that under upper storehouse (1) and mountain type including inverse hill type Storehouse (2), the upper storehouse (1) includes top plate (11), is arranged on the epipleural (12) of top plate (11) both sides and is arranged on top plate (11) upper spacer (13) in the middle part of;The lower storehouse (2) include bottom plate (21), be arranged on the lower side panel (22) of bottom plate (21) both sides with And it is arranged on the lower clapboard (23) in the middle part of bottom plate (21);
The epipleural (12) is connected with corresponding lower side panel (22) respectively, and the upper spacer (13) is connected with lower clapboard (23);
The epipleural (12), lower side panel (22), upper spacer (13) and lower clapboard (23) are all vertically arranged with vertical tension hole (3), the vertical tension hole (3) of the vertical tension hole (3) of the epipleural (12) and corresponding lower side panel (22) is connected, it is described on every The vertical tension hole (3) of plate (13) is connected with the vertical tension hole (3) of lower clapboard (23).
2. prefabricated assembled pipe gallery assembled up and down according to claim 1, it is characterised in that the epipleural (12) Sealing adhesive tape is fitted between corresponding lower side panel (22), between upper spacer (13) and lower clapboard (23).
3. prefabricated assembled pipe gallery assembled up and down according to claim 2, it is characterised in that the epipleural (12) Lower surface and/or lower side panel (22) upper surface be provided with bell and spigot groove, the lower surface and/or lower clapboard of the upper spacer (13) (23) upper surface is provided with bell and spigot groove, and the sealing adhesive tape is all located in corresponding bell and spigot groove.
4. prefabricated assembled pipe gallery assembled up and down according to claim 1, it is characterised in that on the inside of epipleural (12) Angle, upper spacer (13) both sides and top plate (11) on the inside of angle, lower side panel (22) with top plate (11) with bottom plate (21) Angle and the angle of lower clapboard (23) both sides and bottom plate (21) be all horizontally disposed with and have horizontal tensioning hole (4), the water Horizontal tensioning box (41) is both provided with the middle part of sheet pulling eye (4).
5. prefabricated assembled pipe gallery assembled up and down according to claim 1 or 2, it is characterised in that lower side panel (22) On vertical tension hole (3) and the vertical tension hole (3) on lower clapboard (23) be designed with the first vertical tension box (31), upside The vertical tension hole (3) on vertical tension hole (3) and upper spacer (13) on plate (12) is designed with the second vertical tension box (32)。
6. prefabricated assembled pipe gallery assembled up and down according to claim 5, it is characterised in that described first vertical Pulling box (31) is located at the middle part of correspondence vertical tension hole (3), and the second vertical tension box (32) is located at correspondence vertical tension hole (3) top.
7. prefabricated assembled pipe gallery assembled up and down according to claim 1, it is characterised in that the upper storehouse (1) and The anterior end surface of lower storehouse (2) is designed with splicing groove (5), and the back end surface of upper storehouse (1) He Xiacang (2) is designed with can be with Splice the splicing projection (6) that groove (5) is connected;
The splicing groove (5) is located at top plate (11) inner side, epipleural (12) inner side, bottom plate (21) inner side and lower side panel (22) Bottom land of the front side of inner side, the upper spacer (13) and lower clapboard (23) all with splicing groove (5) is concordant;
It is described to splice raised (6) positioned at top plate (11) inner side, epipleural (12) inner side, bottom plate (21) inner side and lower side panel (22) Flush of the rear side of inner side, the upper spacer (13) and lower clapboard (23) all with splicing raised (6).
8. prefabricated assembled pipe gallery assembled up and down according to claim 7, it is characterised in that the splicing groove (5) sealing adhesive tape (7) is installed in.
9. prefabricated assembled pipe gallery assembled up and down according to claim 1, it is characterised in that the lower side panel (22) The both sides on the inner side on top and lower clapboard (23) top are both provided with water stopping trough (8).
CN201621281673.XU 2016-11-22 2016-11-22 Prefabricated assembled pipe gallery assembled up and down Active CN206359996U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621281673.XU CN206359996U (en) 2016-11-22 2016-11-22 Prefabricated assembled pipe gallery assembled up and down

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621281673.XU CN206359996U (en) 2016-11-22 2016-11-22 Prefabricated assembled pipe gallery assembled up and down

Publications (1)

Publication Number Publication Date
CN206359996U true CN206359996U (en) 2017-07-28

Family

ID=59372327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621281673.XU Active CN206359996U (en) 2016-11-22 2016-11-22 Prefabricated assembled pipe gallery assembled up and down

Country Status (1)

Country Link
CN (1) CN206359996U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268680A (en) * 2017-08-09 2017-10-20 中冶京诚工程技术有限公司 Prefabricated double-bin underground comprehensive pipe gallery

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268680A (en) * 2017-08-09 2017-10-20 中冶京诚工程技术有限公司 Prefabricated double-bin underground comprehensive pipe gallery

Similar Documents

Publication Publication Date Title
CN206052779U (en) A kind of prefabricated pipe gallery splicing structure
CN207597428U (en) Prefabricated piping lane is connected waterproof construction with cast-in-place piping lane
CN108832563A (en) A kind of pre-fabricated electric cables comb and its construction method
CN208280170U (en) Assembled steel structure piping lane
CN205297593U (en) Prefabricated cable tunnel module of combined type
CN206359996U (en) Prefabricated assembled pipe gallery assembled up and down
CN107542153A (en) A kind of method and pipe gallery for solving urban waterlogging
CN205894103U (en) Prefabricated parabola type utility tunnel
CN103726514B (en) The anti-leakage structure of diaphragm wall and anti-seepage construction method
CN206052769U (en) A kind of prefabricated pipe gallery with drainage function
CN209619870U (en) Box culvert is used in a kind of transformation of underground piping
CN212427204U (en) Assembled utility tunnel
CN208690872U (en) A kind of pre-fabricated electric cables comb
CN210917454U (en) Assembly type comprehensive pipe rack assembly capable of being turned on construction site
CN114263219A (en) Advanced water stop structure of bottom plate post-cast strip for underground engineering and construction method
CN204098066U (en) The square underground pipe gallery of assembling
CN114263193A (en) Box culvert type cable trench and construction method
CN106836287A (en) A kind of construction method of pipe gallery
CN110318420A (en) A kind of prefabricated assembled underground pipe gallery
CN208782449U (en) A kind of cable duct bank
CN221298042U (en) Fire control intake structure
CN210684632U (en) Reinforced cement fast-assembling escape canal
RU136457U1 (en) REINFORCED CONCRETE COLLECTOR FOR OPERATION OF UNDERGROUND COMMUNICATIONS
CN219327154U (en) Large-scale earthing basement roof drainage system
CN216839944U (en) Anti-waterlogging backward-flowing structure of medium and small-section cable trench

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180426

Address after: 266000 No. 1, he Ling Road, Chengyang District, Qingdao, Shandong.

Patentee after: Qingdao EMU Town Chang Ming Assembly Building Technology Co., Ltd.

Address before: 266000 No. 1, he Ling Road, Chengyang District, Qingdao, Shandong.

Patentee before: QINGDAO NEW CENTURY PREFABRICATED COMPONENTS CO., LTD.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Prefabricated upper and lower assembly integrated pipe gallery

Effective date of registration: 20220530

Granted publication date: 20170728

Pledgee: Agricultural Bank of China Limited Qingdao Sifang sub branch

Pledgor: QINGDAO MOTORSPORT TOWN CHANGMING ASSEMBLY CONSTRUCTION TECHNOLOGY CO.,LTD.

Registration number: Y2022370010080