Prefabricated assembled pipe gallery assembled up and down
Technical field
The utility model is related to the prefabricated pipe gallery that a kind of underground pipe network is built, and is a kind of prefabrication and assembly construction specifically
Assembled pipe gallery above and below formula.
Background technology
Pipe gallery refers to " municipal pipeline of Urban Underground integrates corridor ", i.e., it is empty to build a kind of tunnel in Urban Underground
Between, by municipal administration, electric power, communication, combustion gas, plumbing, heating power, rubbish conveying etc. a variety of pipelines it is intensive lay tunnel space
In, and provided with systems such as special personnel gateway, pipeline gateway, access hole, hoisting port and disaster-proof monitoring monitoring, form one
New municipal public use pipeline layout facility is planted, implements unified planning, design, build and management.Traditional piping lane is with live colligation
The culvert that reinforcing bar, formwork supporting plate, casting concrete box-shaped tube coupling are built, to accommodate the various pipe networks in underground, traditional construction mode is made
Industry area is big, long construction period, construction quality are difficult to control to, natural environment and climate is big to construction infection.It is comprehensive used at present
Piping lane is mainly cast-in-place concrete pipe gallery, and prefabricated single storehouse pipe gallery, but prefabricated single storehouse pipe gallery is comprehensive
Than relatively low, it is adaptable to electric power tunnel, rain sewage closed conduit etc., but it can not meet large scale pipe gallery size requirements.
Utility model content
The utility model is directed to the deficiency that above-mentioned prior art is present, and proposes a kind of prefabricated assembled integrated pipe assembled up and down
Corridor.
Prefabricated assembled pipe gallery assembled up and down of the present utility model, includes upper storehouse and the lower storehouse of mountain type of inverse hill type,
The upper storehouse includes top plate, is arranged on the epipleural of top plate both sides and the upper spacer being arranged in the middle part of top plate;The lower Cang Bao
Include bottom plate, be arranged on the lower side panel of bottom plate both sides and the lower clapboard being arranged in the middle part of bottom plate.
The epipleural is connected with corresponding lower side panel respectively, and the upper spacer is connected with lower clapboard.
The epipleural, lower side panel, upper spacer and lower clapboard are all vertically arranged with vertical tension hole, the epipleural it is perpendicular
It is connected to tensioning hole with the vertical tension hole of corresponding lower side panel, the vertical tension hole of the upper spacer and the vertical tension of lower clapboard
Hole is connected.
Preferably, between the epipleural and corresponding lower side panel, it is fitted with water-stop glue between upper spacer and lower clapboard
Bar.
Preferably, the upper surface of the lower surface of the epipleural and/or lower side panel is provided with bell and spigot groove, the upper spacer
Lower surface and/or the upper surface of lower clapboard be provided with bell and spigot groove, the sealing adhesive tape is all located in corresponding bell and spigot groove.
Preferably, the angle, lower side panel inner side and angle, the upper spacer both sides of bottom plate on the inside of epipleural with top plate
All being horizontally disposed with the angle and lower clapboard both sides of top plate and the angle of bottom plate has horizontal tensioning hole, the horizontal tensioning
Horizontal tensioning box is both provided with the middle part of hole.
Preferably, the vertical tension hole on lower side panel and the vertical tension hole on lower clapboard are designed with first vertical
The vertical tension hole on vertical tension hole and upper spacer on pulling box, epipleural is designed with the second vertical tension box.
Preferably, the first vertical tension box is located at the middle part in correspondence vertical tension hole, second vertical tension
Box is located at the top in correspondence vertical tension hole.
Preferably, the upper storehouse and the anterior end surface in lower storehouse are designed with splicing the rear side of groove, the upper storehouse and lower storehouse
The splicing that end face is designed with to be connected with splicing groove is raised.
The splicing groove is located on the inside of top plate inner side, epipleural inner side, bottom plate inner side and lower side panel, the upper spacer
Front side with lower clapboard is concordant all with splicing the bottom land of groove.
The splicing is raised on the inside of top plate, on the inside of epipleural, on the inside of bottom plate and on the inside of lower side panel, the upper spacer
The flush raised all with splicing with the rear side of lower clapboard.
Preferably, sealing adhesive tape is installed in the splicing groove.
Preferably, the inner side on the lower side panel top and the both sides on lower clapboard top are both provided with water stopping trough.
The beneficial effects of the utility model are:Prefabricated assembled pipe gallery assembled up and down includes two storehouses, and utilization rate is high,
It is easy to pipe network to be separately laid out, solves job site excavation area greatly, reduce the installation difficulty of job site, convenient height of constructing
Effect, simplifies job site process, reduces difficulty of construction and manufacturing cost.And prefabricated assembled pipe gallery assembled up and down is
It is spliced by upper storehouse and lower storehouse, upper storehouse and lower storehouse can individually be processed, and alleviate the difficulty of processing and manufacturing, while also reducing
Size of components and weight, are convenient for transporting, make, install.Upper storehouse and lower storehouse are entered using prestress wire tension technology
The firm connection of row, bulk strength is higher after splicing is installed, and also increases the overall tensile strength of pipe gallery and anti-cracking resistance.
The connecting portion in upper storehouse and lower storehouse installs the sealing adhesive tape for being capable of water-swellable, enhances sealing property, prevents infiltration
Into inside piping lane, the pipe network in protection piping lane.And sealing adhesive tape is arranged in bell and spigot groove, upper storehouse is further improved with
The tight ness rating of storehouse connection, strengthens water resistance.
It is attached between adjacent piping lane also by prestress wire tension technology, applies prestressing force in advance, each spiral shell
The connection of bolt carries out stretching absorbance, it can be ensured that is not also damaged by earthquake effect bolt, prevents big seam openings
With the difference of high low degree, it is ensured that the function of piping lane common trench is not affected, the culvert bulk strength for constituting piping lane is higher,
With stronger tensile strength and anti-cracking resistance.Vertical tension box is respectively provided at the top of upper storehouse and in the middle part of lower storehouse, is easy to personnel
Operated, reduce the difficulty of installation.
The overall front side of piping lane has the installation bellmouth of splicing groove formation, and the installation that there is rear side splicing to convex to form is inserted
Mouthful, two neighboring piping lane is mutually inserted by bell and spigot, further enhance the culvert bulk strength of piping lane composition.Water-stop glue
Bar is sealed to the connecting portion of adjacent piping lane, improves water resistance, it is to avoid infiltration.Water stopping trough is set on lower storehouse, made in piping lane
Water enter in water stopping trough when being flowed downward along inwall, discharged, it is to avoid the bottom fallen in piping lane, prevented by sealing adhesive tape
Ponding is formed, pipe network inside piping lane is damaged.
Brief description of the drawings
Accompanying drawing 1 is the structural representation one of prefabricated assembled pipe gallery assembled up and down;
Accompanying drawing 2 is the partial enlarged drawing of part A in accompanying drawing 1;
Accompanying drawing 3 is the partial enlarged drawing of part B in accompanying drawing 1;
Accompanying drawing 4 is the structural representation two of prefabricated assembled pipe gallery assembled up and down.
Embodiment
In order to be able to further appreciate that structure of the present utility model, feature and other purposes, in conjunction with appended preferred embodiment
Detailed description is as follows, and illustrated preferred embodiment is merely to illustrate the technical solution of the utility model, and non-limiting practicality
It is new.
Embodiment of the present utility model is as follows:
As shown in Figures 1 to 4, prefabricated assembled pipe gallery assembled up and down includes the upper storehouse 1 of inverse hill type and the lower storehouse of mountain type
2。
Upper storehouse 1 includes top plate 11, be arranged on the epipleural 12 of the both sides of top plate 11 and be arranged on the middle part of top plate 11 on every
Plate 13;The lower clapboard that lower storehouse 2 includes bottom plate 21, is arranged on the lower side panel 22 of the both sides of bottom plate 21 and is arranged on the middle part of bottom plate 21
23。
Epipleural 12 is connected with corresponding lower side panel 22 respectively, and upper spacer 13 is connected with lower clapboard 23, makes upper storehouse 1 and lower storehouse
About 2 are spliced into the piping lane with two storehouses.
Epipleural 12, lower side panel 22, upper spacer 13 and lower clapboard 23 are all vertically arranged with vertical tension hole 3, epipleural 12
Vertical tension hole 3 and the vertical tension hole 3 of corresponding lower side panel 22 be connected, the vertical tension hole 3 of upper spacer 13 and lower clapboard 23
Vertical tension hole 3 be connected.
By the prestress wire in vertical tension hole 3, make epipleural 12 and corresponding lower side panel 22 and upper spacer
13 are firmly connected with lower clapboard 23, upper storehouse 1 and the lower firm combination of storehouse 2, with stronger tensile strength and anti-cracking resistance.
In order to improve sealing water resistance, between epipleural 12 and corresponding lower side panel 22, upper spacer 13 and lower clapboard 23 it
Between be fitted with being capable of the sealing adhesive tape of water-swellable, make the shipwreck outside piping lane with by between epipleural 12 and lower side panel 22
Gap is extend into piping lane, be also in the one of storehouse of piping lane water entered by the gap between upper spacer 13 and lower clapboard 23
In another storehouse.
In order to improve while sealing water resistance, it is ensured that under upper storehouse 1 and the being completely embedded property in lower storehouse 2, epipleural 12
Surface and the upper surface of lower side panel 22, both at least one are provided with bell and spigot groove;The lower surface and lower clapboard 23 of upper spacer 13
Upper surface, both at least one be provided with bell and spigot groove.Sealing adhesive tape between epipleural 12 and lower side panel 22 and on every
Sealing adhesive tape between plate 13 and lower clapboard 23 is all located in the bell and spigot groove of correspondence position.Bell and spigot groove reduce upper storehouse 1 with
The distance between lower storehouse 2, improves the compactness of connection, also installs sealing adhesive tape even closer, it is ensured that water resistance.
In order that front and rear adjacent piping lane is connected firmly, angle, lower side panel 22 inner side of the inner side of epipleural 12 with top plate 11
Angle, the angle of the both sides of upper spacer 13 and top plate 11 and the both sides of lower clapboard 23 and the angle of bottom plate 21 with bottom plate 21
All being horizontally disposed with has horizontal tensioning hole 4, i.e., horizontal tensioning hole 4 is all set on the corner in two storehouses of piping lane.In horizontal tensioning hole 4
Portion is both provided with horizontal tensioning box 41, the joint for accommodating and operating fixed prestress wire.By in horizontal tensioning hole 4
Prestress wire, two neighboring piping lane is firmly connected, with stronger tensile strength and anti-cracking resistance.
In order to carry out vertical on vertical tension hole 3 and lower clapboard 23 on vertical prestressing tensioning, lower side panel 22
Pulling eye 3 is designed with the vertical tension hole 3 on the first vertical tension box 31, epipleural 12 and the vertical tension hole on upper spacer 13
3 are designed with the second vertical tension box 32.
In order that vertical prestressing tension operation is more facilitated, the first vertical tension box 31 is located at correspondence vertical tension hole 3
Middle part, i.e. the middle part positioned at lower side panel 22 and lower clapboard 23.Second vertical tension box 32 is located at the top in correspondence vertical tension hole 3
End, i.e., on top plate 11.
During piping lane installation, first lower storehouse 2 is placed into the irrigation canals and ditches that ground is dug out, then again upper storehouse 1 is lifted into down
On storehouse 2.The position of first vertical tension box 31, which makes operating personnel enter in piping lane, to be operated, and height and position is moderate.
The position of second vertical tension box 32 makes standing to be operated to piping lane top, easy to operate.
In order that adjacent piping lane connection is more prone to and firmly, the front side in upper storehouse 1 and lower storehouse 2 is designed with splicing groove 5, on
The rear side in storehouse 1 and lower storehouse 2 is designed with the splicing projection 6 that can be connected with splicing groove 5.
Splice groove 5 and be located at the inner side of top plate 11, the inner side of epipleural 12, the inner side of bottom plate 21 and the inner side of lower side panel 22, on every
The front side of plate 13 and lower clapboard 23 is concordant all with splicing the bottom land of groove 5.
Splicing projection 6 is located at the inner side of top plate 11, the inner side of epipleural 12, the inner side of bottom plate 21 and the inner side of lower side panel 22, on every
Flush of the rear side of plate 13 and lower clapboard 23 all with splicing projection 6.
During two neighboring piping lane connection, the splicing projection 6 of a piping lane is inserted into the splicing groove 5 of another piping lane,
The connection of two piping lanes can not only directly can be positioned, reduce difficulty of construction, and also add the connection of two piping lanes
Intensity.
In order to ensure to be provided with sealing adhesive tape 7 in the sealing of junction between piping lane, splicing groove 5.
In order to prevent piping lane internal water accumulation, the inner side on the top of lower side panel 22 and the both sides on the top of lower clapboard 23 are both provided with stopping
Tank 8.The infiltration of pipe network water leakage or piping lane material itself flows downward along piping lane inwall in piping lane, and enters water stopping trough
In 8, discharged then along water stopping trough 8, prevent water from flowing downwardly into the bottom in piping lane storehouse, formed the ponding for being difficult to discharge, make pipe
Pipe network in corridor is corroded.