CN204852787U - Direct -burried heating power pipeline protection architecture - Google Patents

Direct -burried heating power pipeline protection architecture Download PDF

Info

Publication number
CN204852787U
CN204852787U CN201520620417.8U CN201520620417U CN204852787U CN 204852787 U CN204852787 U CN 204852787U CN 201520620417 U CN201520620417 U CN 201520620417U CN 204852787 U CN204852787 U CN 204852787U
Authority
CN
China
Prior art keywords
heat distribution
distribution pipeline
tongue
heating power
protective cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520620417.8U
Other languages
Chinese (zh)
Inventor
戴惠
沈晓铃
徐相梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Municipal Design Institute Co Ltd
Original Assignee
Wuxi Municipal Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Municipal Design Institute Co Ltd filed Critical Wuxi Municipal Design Institute Co Ltd
Priority to CN201520620417.8U priority Critical patent/CN204852787U/en
Application granted granted Critical
Publication of CN204852787U publication Critical patent/CN204852787U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a direct -burried heating power pipeline protection architecture belongs to municipal technical field. It is equipped with the slot on the road surface, heating power pipeline is laid to the ditch inslot, is equipped with the backfill material all around at heating power pipeline, backfills the material upper end and lays the visor. The visor front end is equipped with the semi -circular lip of the tongue, and the rear end is equipped with the semi -circular root of the tongue, still be equipped with pipeline identification on the visor. The shape interlock mutually of the semi -circular lip of the tongue and the semi -circular root of the tongue. The utility model discloses simple structure, warning are understood, use and maintain the convenience. Set up heating power pipeline protection apron in step directly over laying under the road heating power pipeline, it is simple and convenient.

Description

A kind of directly buried heat distribution pipeline pipe protection structure
Technical field
The utility model relates to a kind of directly buried heat distribution pipeline pipe protection structure, belongs to municipal technical field.
Background technique
Heat distribution pipeline is the pipeline of the heat energy such as delivering vapor or superheated water medium, and safety class is higher, belongs to lifeline engineering.At present, domestic heating pipeline is generally along town road direct buried-pipe laying under walk or green belt.In view of current municipal pipeline management comparatively loose and under road pipe laying more, through after a period of time, often occur in transformation or road excavation time, heat distribution pipeline is dug brokenly, cause steam, superheated water to leak, jeopardize municipal traffic and pedestrian's security of the lives and property, cause serious accident.Further, the more difficult discovery of the leakage of under ground piping.Current monitoring and warning means are limited: most adopt the artificial investigation of audition method piecemeal, but heat distribution pipeline is embedded in subsurface, and not only labor intensity is large, investigation efficiency is low and easily occur that leakage point omits situation, and the manpower and materials cost thus dropped into is higher; Or arrange pressure or temperature instrument along the line at pipeline, the change fluctuating range according to system pressure or temperature determines whether to leak, but the high and maintenance management difficulty of these precision instrument costs is large, therefore generally only arranges at key conduit.Under these means or take a lot of work effort, efficiency, or it is high to increase electronic device equipment cost.Above-mentioned deficiency still has the place being worth improving.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned deficiency; thering is provided a kind of structure simply and intuitively for municipal directly buried heat distribution pipeline pipe protection structure, is the structure of a kind of directly buried heat distribution pipeline pipe protection cover plate and the heat distribution pipeline applying this cover plate warning and leakage monitoring specifically.
According to the technological scheme that the utility model provides, a kind of directly buried heat distribution pipeline pipe protection structure, road surface is provided with groove, lays heat distribution pipeline, be provided with backfilling material in heat distribution pipeline surrounding in groove, and protective cover is laid in backfilling material upper end.Described protective cover front end is provided with the semicircle the tip of the tongue, and rear end is provided with the semicircle root of the tongue; Protective cover is also provided with pipeline marker.The shape of the described semicircle the tip of the tongue and the semicircle root of the tongue can be engaged.
Described protective cover is positioned at 0.2-0.5m place directly over heat distribution pipeline.
Described backfilling material is poromeric material, is specially coarse sand and/or rubble.Described protective cover is formed by hollow concrete and the material compacting that can vary with temperature color.Described hollow concrete is sand, one or more configurations of rubble, cement, epoxy resin form.
The beneficial effects of the utility model: the utility model structure is simple, warning understands, working service is convenient.Directly over heating pipeline, heat distribution pipeline cover sheet is synchronously set being laid with under road, simple and convenient.Not only can warn thermal pipe to lay position and avoid construction to dig by mistake and damage; and when heat distribution pipeline produces minor leakage; cover sheet directly over the steam leaked is conducted to by the sandstone gap of backfill; cover sheet color can variation with temperature and changing; according to cover sheet change in color, management maintenance personnel just judge whether heating pipeline exists minute leakage intuitively; for the on-call maintenance of pipeline, maintenance provide foundation, occur to prevent large leakage.
Accompanying drawing explanation
Fig. 1 is the utility model structural section figure.
Fig. 2 is protective cover structural representation.
Description of reference numerals: 1, protective cover; 1-1, the semicircle the tip of the tongue; 1-2, the semicircle root of the tongue; 2, heat distribution pipeline; 3, backfilling material; 4, groove.
Embodiment
As shown in Figure 1-2: a kind of directly buried heat distribution pipeline pipe protection structure, road surface is provided with groove 4, lay heat distribution pipeline 2, be provided with backfilling material 3 in heat distribution pipeline 2 surrounding in groove 4, protective cover 1 is laid in backfilling material 3 upper end.Described protective cover 1 front end is provided with semicircle the tip of the tongue 1-1, and rear end is provided with semicircle root of the tongue 1-2; Protective cover 1 is also provided with pipeline marker 5, for warning construction or maintainer.
Protective cover 1 starting point is that semicircle the tip of the tongue 1-1 protrudes, and end is that semicircle root of the tongue 1-2 is recessed, and described the tip of the tongue 1-1 and root of the tongue 1-2 is engaged mutually, and more protection cover plate intensity can prevent from cover sheet from being constructed digging further by mistake.Described protective cover 1 is positioned at 0.2-0.5m place directly over heat distribution pipeline 2.
Described backfilling material 3 is poromeric material, is specially coarse sand and/or rubble.Described protective cover 1 is formed by hollow concrete and the material compacting that can vary with temperature color.Described hollow concrete is sand, one or more configurations of rubble, cement, epoxy resin form.
During the utility model embody rule, first on road, excavate groove 4, then heat distribution pipeline 2 is positioned over the precalculated position in groove 4 and backfill the ventilative backfilling material 3 such as medium coarse sand, graded broken stone and as requested compacting backfill put in place;
Described protective cover 1 is placed in 0.2 ~ 0.5 meter of directly over heat distribution pipeline 2; The semicircle the tip of the tongue 1-1 of last block protection lid 1 and the semicircle root of the tongue 1-2 engaged strengthening cover plate intensity of a rear block protection lid 1;
Finally be backfilling and compacted according to road structure requirement backfilling material 3.
When the intact dirt of heat distribution pipeline is leaked, pipeline configuration layer is complete can realize heat insulation effect, and now tube circumference soil temperature is basically identical, and ambient temperature residing for cover sheet 1 is consistent, and its color is also consistent; Now cover sheet 1 is as heat distribution pipeline 2 witness marker, prevents construction and excavation from destroying heat distribution pipeline 2.When minor leakage occurs heat distribution pipeline in running 2; superheated water in pipeline or steam leakage; the steam leaked conducts to cover sheet 3 by the gap of backfilling material 3 rises; cause leakage point peripheral temperature higher than all the other pipeline section peripheral temperature; thus temperature variant cover sheet 1 color above breakthrough is changed; can embody warning breakthrough intuitively, thus the timely pipe-repairing of prompting maintainer avoids breakthrough expansion to cause security incident.

Claims (7)

1. a directly buried heat distribution pipeline pipe protection structure, road surface is provided with groove (4), lays heat distribution pipeline (2), it is characterized in that: be provided with backfilling material (3) in heat distribution pipeline (2) surrounding in groove (4), and protective cover (1) is laid in backfilling material (3) upper end.
2. directly buried heat distribution pipeline pipe protection structure as claimed in claim 1, it is characterized in that: described protective cover (1) front end is provided with the semicircle the tip of the tongue (1-1), rear end is provided with the semicircle root of the tongue (1-2); Protective cover (1) is also provided with pipeline marker (5).
3. directly buried heat distribution pipeline pipe protection structure as claimed in claim 2, is characterized in that: the shape of the described semicircle the tip of the tongue (1-1) and the semicircle root of the tongue (1-2) can be engaged.
4. directly buried heat distribution pipeline pipe protection structure as claimed in claim 1, is characterized in that: described protective cover (1) is positioned at 0.2-0.5m place directly over heat distribution pipeline (2).
5. directly buried heat distribution pipeline pipe protection structure as claimed in claim 1, is characterized in that: described backfilling material (3) is poromeric material, is specially coarse sand and/or rubble.
6. directly buried heat distribution pipeline pipe protection structure as claimed in claim 1, is characterized in that: described protective cover (1) is suppressed by hollow concrete and the material that can vary with temperature color and formed.
7. directly buried heat distribution pipeline pipe protection structure as claimed in claim 6, is characterized in that: described hollow concrete is sand, one or more configurations of rubble, cement, epoxy resin form.
CN201520620417.8U 2015-08-18 2015-08-18 Direct -burried heating power pipeline protection architecture Active CN204852787U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520620417.8U CN204852787U (en) 2015-08-18 2015-08-18 Direct -burried heating power pipeline protection architecture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520620417.8U CN204852787U (en) 2015-08-18 2015-08-18 Direct -burried heating power pipeline protection architecture

Publications (1)

Publication Number Publication Date
CN204852787U true CN204852787U (en) 2015-12-09

Family

ID=54743332

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520620417.8U Active CN204852787U (en) 2015-08-18 2015-08-18 Direct -burried heating power pipeline protection architecture

Country Status (1)

Country Link
CN (1) CN204852787U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109149488A (en) * 2018-09-14 2019-01-04 中铁第四勘察设计院集团有限公司 A kind of administrative region of a city railway arrangement structure for pipelines and method
CN111173991A (en) * 2020-02-14 2020-05-19 广东君兆建设集团有限公司 Municipal road pipeline construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109149488A (en) * 2018-09-14 2019-01-04 中铁第四勘察设计院集团有限公司 A kind of administrative region of a city railway arrangement structure for pipelines and method
CN111173991A (en) * 2020-02-14 2020-05-19 广东君兆建设集团有限公司 Municipal road pipeline construction method

Similar Documents

Publication Publication Date Title
CN102587352B (en) Hot-water draining consolidation processing device and hot-water draining consolidating processing method for soft soil foundation
CN107587557A (en) Outdoor water engineering construction method
CN103015400B (en) Efficient quick method for treating separated directly-connected vacuum preloaded foundation
CN104179194A (en) Integrated pipe trench in soft soil stratum and construction method of integrated pipe trench
CN104762937B (en) A kind of pumped-storage power station being applied to ecological reservoir and sewage water treatment method thereof
CN106122589A (en) A kind of earth pressure balance method
CN204852787U (en) Direct -burried heating power pipeline protection architecture
CN204387699U (en) Self-adhesive heat discoloration thermal pipe leaks warning tape
CN107034900B (en) Structure is administered to frozen soil side slope disease of slumping of hot melt
CN208651807U (en) One kind being suitable for mountain area complicated landform slurry delivery pipe line paving system
CN202139571U (en) Plant protective river foundation structure
CN110273424A (en) A kind of construction method of yard piping
CN103487130B (en) The structure of buried column amplifying fiber vibration induction signal, construction technology and method
CN206608621U (en) A kind of directly buried heat distribution pipeline pipe protection structure
CN205206847U (en) Shield constructs business turn over hole portal annular and freezes sealed sealing device
CN106836278A (en) The construction method of corrugated steel pipe gallery
CN208293588U (en) A kind of Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages
CN204551318U (en) A kind of heat distribution pipeline warning pile
CN206220108U (en) Cut Slopes of Expansive Soil reinforced earth back-pressure antiseepage supporting construction
CN109339062A (en) The guard method and its protection structure that fuel gas conduit is intersected above when thermal pipe is laid with
CN208687110U (en) A kind of directly buried heat distribution pipeline pipe protection structure
CN205839693U (en) A kind of man-made lake backing layer
CN102392460B (en) A kind of basement external waterproof structure and construction method thereof
CN206173974U (en) Push pipe construction is with dark underground structure of small -size
CN108487310B (en) Geomembrane isolation process for reducing horizontal clear distance between pipeline and building and pipeline

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant